BUREAU OF LAND MANAGEMENT
LAKE COUNTY, OREGON
SPECIFICATIONS
for the construction of the
COUGAR PEAK WILDFIRE POKER FENCE REPAIR
DIVISION 1 SECTION 01 10 00
GENERAL REQUIREMENTS SUMMARY
Fence Reconstruct/Repair 01 10 00 - 2
PART 1: GENERAL
1.01 SUMMARY:
A. Description of Work: Furnishing labor, equipment, supplies, and materials, except for specified. No government furnished property (see Table 1 and Table 2)
Table 1. Description of fence construction and removal with associated GIS miles of by each.
Fence construction type GIS Miles Remove and replace gap fence 3 wire 0.4 New 4 wire construction 0.5 Removal only of fence 0.3 Remove and replace wire 5.8 Remove and replace with clearing needed 1.1 Grand Total 8.1
Table 2. Number of each structure to be left, maintained, reconstructed, or newly constructed.
Structures Sum 3 post corner construct 7 4 post corner new construct 5 Creek crossing 1 Fix Cut fence 1 Gate plus stress panels* 23 Hbrace/stress panel in line 15 Line Tree 1 Rebuild Rock jack 2 Reuse rock jack in fence 9 Tie into rocks at fence end 6 Rock tie down 4 Stream tie down 2 Tie down other 1 Grand Total 75 *There are 23 gate locations where in most cases there may be up to one stress panels/ Hbraces and one end panel on either side of each gate. So for estimates there would be a potential another 23 Hbraces/stress panel and another 23 end panels associated with these gates.
Fence Reconstruct/Repair 01 10 00 - 3
As described herein and shown on the accompanying drawings.
B. Location: Work under this Contract is located in Lake County, Oregon. The work locations are shown on Map 1-6. The fence is located approximately 20 miles northwest of Lakeview, Oregon.
C. Access routes to individual fence lines will be as designated by the Contracting Officer
Representative. The Contractor shall adhere to the designated routes. Routes will not necessarily be the shortest possible route to the fence lines. Travel with a wheeled or track vehicle is permitted on the designated routes and to remote gap fences and along fence lines. General access to fence lines is over rough desert terrain. No blading is allowed. Use of UTV’s or ATV’s is allowed.
D. Environmental Considerations: The Contractor shall keep the work site free of all construction debris. Items such as fence wire reels, fence post bundle ties, scraps of fence wire, staple and nail containers and other debris resulting from construction shall be removed from public land. Clearing along the fence of vegetation debris can be scattered in the immediate vicinity of the fence line outside of the clearing area.
E. A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract. Contractor shall furnish weed free UTV.
1.02 REFERENCES:
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:
ASTM American Society for Testing and Materials 1916 Race Street Philadelphia, PA 19103
1.03 QUALITY ASSURANCE:
A. Measurements: Where approved manufacturer's diagrams and shop drawings give specific measurements or rough-in dimensions for equipment, these dimensions shall take precedence over dimensions indicated on the drawings.
B. American Society for Testing and Materials (latest edition of each standard recommended by the American Society of Testing and Materials, ASTM):
Fence Reconstruct/Repair 01 10 00 - 4
ASTM A 53 Pipe, Steel, Black, and Hot-Dipped Zinc-Coated Welded and Seamless ASTM A 116 Zinc-Coated (Galvanized) Steel Woven Wire Fence Fabric ASTM A 121 Zinc-Coated (Galvanized) Steel Barbed Wire ASTM A 390 Zinc-Coated (Galvanized) Steel Poultry Fence Fabric
(Hexagonal and Straight Line) ASTM A 702 Steel Fenceposts and Assemblies, Hot-Wrought ASTM A 85-/854M Zinc-Coated (Galvanized) Steel Smooth High-Tensile
Fence and Trellis Wire ASTM F 1083-91 Pipe, Steel, Hot-Dipped Zinc-Coated (Galvanized) Welded,
1.09 SEQUENCING AND SCHEDULING:
A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days.
PART 2: PRODUCTS
CONTRACTOR-FURNISHED MATERIALS:
Item name Unit Description T-Posts ea 5 ½’, 1.33 lbs/ft Fence Clips ea Barbed Wire roll 12½ ga. x 1320’ class 1, 2 point, ASTM cert.
Smooth Wire 12½ ga. x 1320’ class 1, twisted, ASTM cert.
Wire Stays ea 36”, 100/bundle Steel pipe
Steel drill stem like pipe ea 2” (2.375 outside diameter) non-galvanized, previously used, drill stem pipe or new pipe. Lengths are indicated on drawings
Clamp materials ea 2 3/8” galvanized Brace Band. Install with galvanized 5/16” and 1 ¼” carriage bolt and nut. Welding can be substituted for clamp materials
Wood stays ea 2” X 4” X 4”
Staples: Shall be 12-ga, bright-finish or galvanized with slash-cut points 1-1/2 inches long.
Nails: Shall be 40d.
PART 3: EXECUTION
Fence Reconstruct/Repair 01 10 00 - 5
3.01 PROJECT MEETINGS:
A. Pre-Work Conference:
1. A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.
3. Within 1 week of the notice to proceed a construction schedule shall be submitted that described the activities, equipment, and work force, \with dates and duration of activities, and that shows completion of the work within the period of performance.
4. The Contractor shall be prepared to summarize and explain procedures planned for the project and present the submittals requested in the specifications.
B. Final Inspection:
1. The Contractor shall notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule final inspection.
2. Submittals: Submit all product information to show compliance with the specifications 14 days prior to construction acceptance of the work will be based on visual inspection.
3.02 INSTALLATION:
B. General: Steel posts shall be used for end-panel, corner-panel, brace panel, or gate-panel.
Drive steel posts.
C. Driving Posts:
Steel T-Posts: Drive into the ground to the depth shown on the drawings or until the anchor plate is slightly below the ground surface. Posts shall be driven plumb. When rock formations prevent driving remove anchor plate and excavate or drill holes a minimum of 18 inches deep for t-posts and 2 feet 6 inches for drill stem pipe posts. Drill holes can be slightly narrower than the diameter of the post and drive post into the ground.
D. Corner Post, Gate Post, Corner Panel, Brace, and End Panel (Stress Panel) Assemblies:
Fence Reconstruct/Repair 01 10 00 - 6
Construct as shown on the drawings or as staked in the field. Rock jacks can be minimally substituted for these items. Construct stress panels/ HBraces on crests of hills, and a maximum of 1,320 feet center-to-center for barbed wire sections. In addition, stress panels are required at points between which wire is to be stretched. Construct end panels at the end of fence and at gate locations unless shown otherwise on the drawings, or existing fence structures are in place.
E. Figure Fours and Rock Jacks: Are currently existing in the fence and may be re-utilized in many instances as designated on the maps. Figure fours can be used in lieu of steel posts as needed in rocky areas. Figure fours and rock jacks shall be constructed as shown on the drawings.
F. Wire: Stretch tightly and staple to wood posts or securely attach to steel posts with standard wire clips. Wire is properly stretched when it is springy to the touch. Drive staples into wood until the staple comes in contact with the wire against the post, but not so tight as to crimp the wire or prevent movement of the wire. Do not drive staples parallel to the grain of the wood. There is almost no wood in this fence. Some trees are located along the line and can be used as in line posts only. Terminate wire at each end post, gate post, corner post, or stress panel. Wrap wire around the post two times and tie off by wrapping around the incoming wire a minimum of four times. One stay will be placed between all t-posts and attached to the barbed wires only and the bottom smooth wire will not have the stay attached.
G. Brace Wire: Shall be double-looped and twisted tight.
H. Gates: Shall be installed according to the Work Data Sheet, the drawings, and as recommended by the manufacturer when applicable.
I. Mechanical Gate Closers: Line up the latch with the gate. Adjust latch assembly after installation so that the latch does not bind, and the gate hangs properly.
J. Clearing: Maximum clearing width is 4 feet on each side of the fenceline. Provide minimum disturbance to existing grass and sod. Most all fences do not need clearing due to burned area. There is 1.1 miles of fence that will need some clearing along the fence line.
3.03 DISPOSAL OF DEBRIS:
A. Requirements: Any items or materials found to be functional, and reusable may be reused in the repair or reconstruction. Items or debris not designated as salvage for the Government shall become the property of the Contractor. The Contractor shall be responsible for disposal of materials in a legal manner and for payment of any fees required. Burning of removed materials is not permitted on the work site.
PART 4: MEASUREMENT AND PAYMENT
Fence Reconstruct/Repair 01 10 00 - 7
4.01 METHOD OF MEASUREMENT:
A. Units: The work described in this section will not be measured for payment.
4.02 BASIS OF PAYMENT:
A. Units: Each 1 unit.
END OF SECTION
Fence Reconstruct/Repair
WORK SUMMARY CHART
for
SECTION 02834 - WIRE FENCES AND GATES
Fence type: 3 and 4-WIRE FENCE, ALL STEEL POST
Type of top wire: BARBED
Type of intermediate wires: BARBED
Type of bottom wire: BARBLESS
Standard 4 wire spacing-dimensions in inches (Spacing see Typical 3 and 4 wire fence specifications):
E: varies.
D: 12"
C: 8”
B: 6”
A: 16"
Line post spacing (L): 16 ft 6 inches
Stay spacing: 8 ft 0 inches stays not connected to bottom wire
Length of steel T-posts: 5 ft 6 inches
Depth of steel posts in ground: 18 inches
Type of stress panels: Drill stem pipe
Type of corner panels: metal drill stem pipe
Type of gates: 4-wire, Type of mechanical gate closers: PIPE AND CHAIN or mechanical gate closures Standard 3 wire spacing dimensions in inches (Spacing see maps and drawings):
D: 6"
C: 12”
B: 10”
A: 20"
Line post spacing (L): 16 ft 6 inches
Stay spacing: 8 ft 0 inches stays not connected to bottom wire
Length of steel T-posts: 5 ft 6 inches
Depth of steel posts in ground: 18 inches
Type of stress panels: Drill stem pipe
Type of corner panels: metal drill stem pipe
Type of gates: 4-wire, Type of mechanical gate closers: PIPE AND CHAIN or mechanical gate closures
END OF SECTION
PART 5: Hazardous material containment.
A. During contractor operations on lands managed by the BLM, in event of a release as defined in Oregon Administrative Rules (OAR), Chapter 340, Division 142, Oil and Hazardous Materials Emergency Response Requirements, the Contractor shall immediately implement an appropriate cleanup of the spill utilizing appropriate equipment and safety precautions.
PART 6: PLANS/DRAWINGS
A. DRAWINGS
1. Typical 3 or 4 Wire Fence
2. Steel end panels and Clamp Details
3. Rock Tie
4. Line Tree
5. Wire Gate
6. Rock Basket stress panel
7. Steel Corner panels
B. MAPS
1. Map 1 Vicinity Map – location of fences from Lakeview, OR
2. Map 2 – legend to maps
3. Map 3 – YaYa_fences
4. Map 4 Heckman Seeding Fences
5. Map 5 Moss Creek Fences
6. Map 6a 6b - Pine Creek Fences
7. Map 7- Coyote fences