B08_RFQ_140L4323Q0008_Cougar_Peak_Wildfire_Fence_Repair_Sections_B-C_(for_AMD1)_0001.pdf

PDF 157 KB Posted

Attached to
BLM Cougar Peak Wildfire Poker Fence Repair
Solicitation number
140L4323Q0008
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT NO. 0001 – 02/01/2023 – SEE STRIKETHROUGH CHANGES AND RED FONT

COUGAR PEAK WILDFIRE POKER FENCE REPAIR SOLICITATION NO. 140L4323Q0008

BLM LAKEVIEW DISTRICT, LAKE COUNTY, OR Page 5 of 44

SECTION B – BID SCHEDULE

This requirement is for one (1) Firm Fixed Price Construction purchase order for the Cougar Peak Wildfire Poker

Fence Repair in Lake County, Oregon for the BLM Lakeview District Office.

Item

no. Item Description*

Estimated

Quantity

Unit of

Measure

Unit

Price Total

0001 5 1/2' Steel 1.33 T Posts w/clips 2,640 EA $ $

0002 Smooth Wire gauge 12.5 – 1320’ roll 40 EA $ $

Barbed Wire 12.5 51/2 spacing 2 pt. –

1320’ roll

100 EA $ $

0004 Woven Wire 28 LF $ $

0005 Wire Stays 2,640 EA $ $

0006 Wood Stays (for gates) 69 EA $ $

2 3/8" x 7’ 1ft Steel Drill Stem Pipe

Post 28-32 length

1,721 EA LF $ $

0008 Stress Panel (steel) 40 EA $ $

0009 End Panel (steel) 23 EA $ $

0010 3 Post Corner (steel) 8 EA $ $

0011 4 Post Corner (steel) 5 EA $ $

0012 Rock Basket Stress Panel 2 EA $ $

0013 Rock Tie down 6 4 EA $ $

0014 Rock Tie In 6 EA $ $

0015 Wire Gate 24 EA $ $

0016 New Fence - 3 -wire PACK IN labor 2,270 LF $ $

0017 New Fence - standard 4-wire labor 26,400

2,640

LF $ $

0018 Fence Removal wire only labor 42,240 40,128

LF $ $

0019 Fence Replacement wire only labor 40,128 LF $ $

BLM LAKEVIEW DISTRICT, LAKE COUNTY, OR Page 6 of 44

Fence Repair A (minor) labor 100 LF $ $

Clearing labor and tools 5,280 LF $ $

Mobilization 1 EA $ $

Disposal fees of materials 2,000 LB $ $

GRAND TOTAL:

*A detailed description of what is to be included in each of these items is discussed in the Specifications.

EA= each

LF= linear feet

LB = pound

PERFORMANCE PERIOD: See Section F.

(End of Section B)

BLM LAKEVIEW DISTRICT, LAKE COUNTY, OR Page 7 of 44

SECTION C – SPECIFICATIONS/DRAWINGS

Attachments to Section C

ATTACHMENT PAGES

1. Specifications

2. Drawings

3. Maps

4. Answers to Site Visit Questions and Requests for Information

(End of Section C)

File details come from the government source that posted it. Updated .