This is a set of construction plan documents and specifications for the SD FLAP SDGFP Parking(1) North Point Parking Lot project in Charles Mix County, South Dakota. The project involves reconstruction of approximately 98,000 square feet of deteriorated pavement at the North Point Recreation Area boat ramp facility on the Missouri River (Lake Francis Case) near Pickstown. The work includes removal and replacement of existing asphalt and base materials to a depth of 9.5 inches, with placement of 3.5 inches of new asphalt concrete pavement over 6 inches of aggregate base. Primary work items encompass roadway excavation (5,700 cubic yards), subexcavation of poor subgrade soils (3,000 cubic yards), roadway aggregate placement using Method 2 (3,800 tons), and asphalt concrete pavement placement Type 1 (2,300 tons). The project also includes subexcavation benching, stabilization geotextile installation as an optional item (Option X), slope adjustments to match existing conditions, placement of an 8-foot by 8-foot concrete dumpster pad, creation of an ADA-compliant accessible parking space with appropriate pavement markings and symbols, removal and reset of existing fencing, and installation of temporary traffic control signage.
The construction plans specify typical sections showing existing ground conditions with varying asphalt depths (9.5 inches), aggregate base depths (0.5 to 3 inches), and lime-cement depths (3 to 4 inches), along with proposed new pavement sections. Survey control points and staking requirements are established with coordinates provided (N= 278509.1658, E= 2439775.8301 at elevation 1368.62 for project begin; N= 279147.8608, E= 2439237.8576 at elevation 1366.03 for project end). The project station limits extend from 900+00.00 to 908+40.90, covering approximately 0.16 miles. Additional elements include fog seal application to asphalt lifts, tack coat and prime coat placement, pavement edge safety details, clearing and grubbing (1.45 acres), topsoil placement and hydraulic seeding (0.2 acres), permanent pavement markings including solid white striping and accessibility symbols, sign installation with removal and reset of existing delineators, and temporary traffic control measures during construction.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
03/11/2026
DI
girdergdr.
galvanizedgalv.
gage (gauge)ga.G footingftg.
finishfin.
flared end sectionFES federalFed.
fill facef.f.F exteriorext.
expansion jointexp. jt.
excavationexc.
edge of waterEW and wifeet ux and otherset al edge of roadER equationEQ or eq.
edge of pavementEOP
Engineer(s)engr(s).
embankmentemb.
elevationelev.
elevation with numberEl. 94.066 superelevation ratee eastEE drawing(s)dwg(s).
donation land claimDLC districtDist.
distancedist.
diaphragmdiaph.
diagonaldiag.
diameterdia. or D drop inletDI design hour volumeDHV decrementdecr.D culvertculv.
contingent sumCTSM centersctrs.
point of curve to spiralCS creekcr.
corrugatedcorr.
continuouscont.
construction jointconstr. jt.
constructionconstr.
concreteconc.
columncol.
countyCo.
corrugated metal pipeCMP clearclr.
center to centerc-c concrete box culvertCBCC bearingbrg.
bridgebr.
balance pointBP bench markBM backBK beginning, beginbeg.
both facesb.f.B asphaltasph.
approachappr.
alternatealt.
aheadAH aggregateaggr.
average daily trafficADT abutmentabut.A diameterØ curve deltaΔ centerline�
ABBREVIATIONS
routerte.
rightRt. or RT reference hubRH retaining wallret. wall ReservationRes.
reservoirres.
requiredreqd.
reinforcementreinf.
reconstructionreconst.
roadwayrdwy.
roadrd.
right-of-wayR/W rangeR.
radiusRR quantitiesquant., QtyQ pavementpvmt.
point of tangentPT pounds per square inchpsi projectproj.
point on tangentPOT point on spiralPOS point on curvePOC platepl.
point of intersectionPI perforateperf.
point of compound curvePCC point of curvePCP outside diameterOD other faceo.f.
on centerso.c.O numberno. or # negativeneg.
normal crownNC northNN mountain(s)mtn(s).
monumentmon.
minimummin.
Midwest Guardrail SystemMGS maximummax.
materialmatl.
maintenancemaint.
magneticmag.M low waterLW leftLt. or LT lump sumLPSM longitudelong.
latitudelat.
laminationlam.
length of curveLL jointjt.J interiorint.
inclusive, includingincl.
inside diameterIDI highwayhwy.
high waterHW horizontalhoriz.
hexagonhex.
homestead entry surveyHES headwallhdwl.H
WestWW vertical point of intersectionVPI vehicles per hourvph verticalvert.
design speedVV typicaltyp.
point of tangent to spiralTS transversetransv.
temporary construction easementTCE temporary bench markTBM tangenttan.
townshipT.
tangent lengthTT symmetricalsym.
structuralstruc.
straightstr.
stiffenerstiff.
standardstd.
stationsta.
point of spiral to tangentST streetst.
specificationspec.
spacing, spaces or spacedspa.
shouldershldr.
sectionsec.
point of spiral to curveSC seasonal average daily trafficSADT southSS
DRAINAGE SYMBOLS
Riprap apron (proposed)
Underdrain (existing, proposed)
With drop inlet (existing, proposed)
With headwalls (existing, proposed)
With end sections (existing, proposed)
Pipe culvert (existing, proposed)
Box culvert (existing, proposed)
Bridge (existing, proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (existing, proposed)
S y m b o ls c p w w o rk in g \c e n tr a l0
\d
\S
Y M
(9 )S
D G
F P
.d g n
:4
P
M
N o v e m b e r
Sheet 1 of 2
AND ABBREVIATIONS
CONVENTIONAL PLAN SYMBOLS
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
SD FLAP SDGFP PARKING(1)
A2
20068
MICHAEL
FLICK
BH
0.00EL.
TP
TP
FENCE & CATTLE GUARD SYMBOLS
Cattle guard (existing, proposed)
Fence with gate (existing, proposed)
Fence (existing, proposed)
GEOLOGIC SYMBOLS
Material source
Boring location
LANDSCAPING & VEGETATION SYMBOLS
Tree line
Tree
MAPPING SYMBOLS
Survey control point
Trail
Spot elevation
Double Track
Single Track
Railroad
North arrow
Coordinate Grid Tick
Building (existing, proposed)
RIGHT-OF-WAY SYMBOLS
Section corner (found, projected)16
Section corner (found, projected)4
Section corner (found, projected)
Right-of-way line (proposed)
Right-of-way line (existing)
Property line
Parcel number
Monument (as described)
Temporary (proposed)
Permanent (proposed)
Permanent (existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section16
Section4
Section
Township or Range line
City
County
State
National
Boundaries
GUARDRAIL, BARRIER & WALL SYMBOLS
Retaining Wall (existing, proposed)
Median & Side Barrier (existing, proposed)
Guardwall (proposed)
Guardrail (existing, proposed)
SIGN SYMBOLS
Post mounted (existing, proposed)
Portable (proposed)
Delineator (existing, proposed)
Commercial (existing, proposed)
Signs
ROADWAY SYMBOLS
Roadway obliteration
Roadway centerline (with station ticks)
Edge of roadway (existing, proposed)
Toe of fill
Transition
Top of Cut
Slope stake limits
Clearing/construction limits
UTILITY SYMBOLS
Telephone (existing, proposed)
Power (existing, proposed)
Fiber optic (existing, proposed)
CATV (existing, proposed)
Overhead utility
Water (existing, proposed)
Telephone (existing, proposed)
Sanitary sewer (existing, proposed)
Power (existing, proposed)
Oil (existing, proposed)
Gas (existing, proposed)
Fiber optic (existing, proposed)
CATV (existing, proposed)
Underground utility
Telephone pedestal (existing, proposed)
Street light (existing, proposed)
Support pole anchor (existing, proposed)
Support pole (existing, proposed)
Surface (existing, proposed)
Underground (existing, proposed)
Irrigation ditch
PROJECT SPECIFIC SYMBOLS
Telephone (existing, proposed)CATV (existing, proposed)Existing grass island
S y m b o ls p w w o r k in g \c e n tr a l0
\d
\S
Y M
S
D G
F P
.d g n
:4 o v e m b e r
Sheet 2 of 2
AND ABBREVIATIONS
CONVENTIONAL PLAN SYMBOLS
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
A3
S u r v e y
C o n tr o l p w w o r k in g \c e n tr a l0
\d
\C
T L
S
D G
F P
.d g n
:4
A u g u s t
5 SURVEY CONTROL
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
A4
DATE: 3/17/2026
MISSOURI RIVER
(LAKE FRANCIS CASE)
CHARLES MIX COUNTY
s t A v e
297th St
Day-use area access road
Day-use area
Limits of construction
150 300075150
Scale in feet
N
NOTE:
906+
907+
908+00
909+00
910+00
Schedule A and Option X
SD FLAP SDGFP PARKING(1)
900+00.00
BEGIN PROJECT
Schedule A and Option X
SD FLAP SDGFP PARKING(1)
908+40.90
END PROJECT
To Pickstown
3 miles
T o L a k e A n d e s m ile s concrete portion of the boat ramp.
limits of construction. Do not stage on the be used for staging within the proposed
The North Point Boat Ramp parking lot may
S it e M a p
S h e e t] p w w o r k in g \c e n tr a l0
\d
\S
T E
S
D G
F P
.d g n
:0
F e b r u a r y
SITE MAP
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
A5
LC
16'-19' (match existing width)31'14'14'36'16'-19' (match existing width)5' 5' top asphalt lift)
Fog seal (applied to
(placed in two lifts)
3.5" Asphalt concrete pavement
6" Roadway aggregate, method 2 asphalt lifts)
Tack coat (between to first asphalt lift)
Prime coat (applied prior
Limit
Stake
Slope
Existing Ground
Limit
Stake
Slope
LC
varies from 3" to 4"
Existing aggregate base depth varies from 0.5" to 3"
Existing asphalt pavement depth
9.5" Roadway excavation
(placed in two lifts)
3.5" Asphalt concrete pavement
6" Roadway aggregate, method 2 for structural section details
See mainline typical section
(safety edge)
Construct 30° pavement edge
See Detail A
9.5" Roadway Excavation
Stabilization Geotextile (Option X)
Shoulder up with aggregate base
Stabilization Geotextile (Option X)
Stabilization Geotextile (Option X) top asphalt lift)
Fog seal (applied to
(placed in two lifts)
3.5" Asphalt concrete pavement
6" Roadway aggregate, method 2 asphalt lifts)
Tack coat (between to first asphalt lift)
Prime coat (applied prior
Construction Limits
Drive Lane Parking Spaces Drive Lane Drive Lane Parking Spaces Drive Lane
Match existing Match existing Match existing
Match existing Match existing
Match existing
900+00.00 to 908+40.90
RTE 900 NORTH POINT PARKING
TYPICAL SECTION
127'
Average existing width
900+00.00 to 908+40.90
RTE 900 NORTH POINT PARKING
EXISTING TYPICAL SECTION
906+46.09 to 907+22.33, Rt.
ABA PARKING PAD
RTE 900 NORTH POINT PARKING
TYPICAL SECTION
1.75% (MAX)
existing paved areas.
5. Clearing and grubbing limits include areas outside of existing pavement and grass islands within
4. See D sheets for proposed cross section points.
slopes during final grading. Paid as placing conserved topsoil.
concrete pavement surfacing, grade the windrowed topsoil material onto the final roadway fill edge. Incidental to clearing and grubbing, not paid separately. After completion of final asphalt
3. During clearing and grubbing, windrow existing topsoil material outside of the existing roadway
1:3, to match existing slopes.
Construct a 1:4 or flatter foreslope. Steepen the foreslopes as necessary, but not steeper than 2.
Dimensions shown are approximate and may be varied by the CO.1.
Note:
DETAIL A
1:3 MAX
:1
1' limits and Topsoil
Seeding limits and Topsoil
Seeding
4.
Clearing and grubbing limit
4.
4.4.
4.
4.
5.
0.16TOTALS (mi)
840.9TOTALS (ft)
840.9900+00.00 to 908+40.90
(ft)
Roadway Station to Station
LENGTH OF PROJECT
R e m o v e a n d
R e p la c e P a v e m e n t p w w o r k in g
\c e n tr a l0
\d
\T
Y P
S
D G
F P
.d g n
:0
J a n u a r y
TYPICAL SECTION
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
A6 left
Sheet and Description
B3 B3 B3 B4 B4 B5 B5
SURVEY
AND
STAKING
SUMMARY
CLEARING AND
REVEGETATION
SUMMARY
GRADING
SUMMARY
MISCELLANEOUS
SUMMARY
SURFACING
SUMMARY
PERMANENT
PAVEMENT
MARKING
SUMMARY
PERMANENT
SIGNING
SUMMARY
BID
SCHEDULE
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 1 1
A0030 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0040 15401-0000 CONTRACTOR TESTING LPSM ALL
A0050 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0060 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0070 15720-0000 STORMWATER POLLUTION PREVENTION PLAN LPSM ALL
A0080 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0090 20101-0000 CLEARING AND GRUBBING ACRE 1.39 0.06 1.45
A0100 20301-2400 REMOVAL OF SIGN EACH 2 2
A0110 20401-0000 ROADWAY EXCAVATION CUYD 5173 527 5700
A0120 20402-0000 SUBEXCAVATION CUYD 3300 As directed by the CO.
A0150 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 3594 206 3800
A0160 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 2143 157 2300
A0170 40601-0000 FOG SEAL TON 4 0.5 4.5
A0180 40605-0000 BLOTTER TON 15 5 20
A0190 41102-1000 PRIME COAT, METHOD 1 SQYD 10814 586 11400
A0200 41201-0000 TACK COAT TON 4 0.5 4.5
A0210 61002-1000 PAD, CONCRETE SQYD 7 3 10
A0220 61921-1000 REMOVE AND RESET FENCE LNFT 11 4 15
A0230 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0240 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 20
A0250 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20
A0260 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER HOUR 20
A0270 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20
A0280 62201-3150 HYDRAULIC EXCAVATOR, 1.0 CUBIC YARD MINIMUM CAPACITY
WITH THUMB ATTACHMENT HOUR 20
A0290 62301-0000 GENERAL LABOR HOUR 40
A0310 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
A0320 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 0.19 0.01 0.2
A0330 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.19 0.01 0.2
A0340 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.19 0.01 0.2
A0350 63301-0000 SIGN SYSTEM EACH 2 2
A0360 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 9966 334 10300
A0370 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 2 2
A0380 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 2 2
A0390 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0410 63701-0000 FIELD OFFICE EACH 1
PAY ITEM
NUMBER
LINE
ITEM
NO.
c p w w o rk in g \c e n tr a l0
\d
S D
G F P S O
Q .x ls m
]S h e e t
-M a r-
:3 P
M
A
M
E
N
D
SUMMARY OF QUANTITIES - Schedule A
Milestone: 100% Submittal
Date Completed: 02/19/26
Report Date: 02/19/2026
Remarks and/or
Determination of
Estimated Quantity
Estimated
Quantities
ALLOW-
ANCE
UNITPAY ITEM DESCRIPTION
PROJECT
B1
SD FLAP SDGFP PARKING(1)
NORTH POINT PARKING LOT
SHEET
NUMBER
03/11/2026
20068 left
B6
SURFACING
SUMMARY
BID
SCHEDULE
X0010 20702-0000 STABILIZATION GEOTEXTILE SQYD 10814 586 11400
PAY ITEM
NUMBER
LINE
ITEM
NO.
c p w w o rk in g \c e n tr a l0
\d
S D
G F P S O
Q O p ti o n X
.x ls m ]S h e e t
-M a r-
:0 P
M
A
M
E
N
D
SUMMARY OF QUANTITIES - Option X
Milestone: 100% Submittal
Date Completed: 1/22/26
Report Date: 1/22/26
Remarks and/or Determination of Estimated Quantity
Estimated
Quantities
ALLOW-
ANCE
UNITPAY ITEM DESCRIPTION
PROJECT
B2
SD FLAP SDGFP PARKING(1)
NORTH POINT PARKING LOT
SHEET
NUMBER
03/11/2026
20068
:2
F e b r u a r y
S u r v e y a n d S ta k in g a n d C le a r in g a n d
G r u b b in g a n d G r a d in g
S u m m a r ie s p w w o r k in g
\c e n tr a l0
\d
\T
A B
S
D G
F P
.d g n
GRADING SUMMARIES
AND REVEGETATION AND
SURVEY AND STAKING, CLEARING
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
B3
:4
J a n u a r y
S u r f a c in g S u m m a r y p w w o r k in g
\c e n tr a l0
\d
\T
A B
S
D G
F P
.d g n
SUMMARIES
SURFACING AND MISCELLANEOUS
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
B4
NOTE:
condition for use on this project to verify that stencils are available and in good available for use from SDGFP. Coordinate with the CO
2. Plug In and Plug Out pavement marking stencils are
1. Estimate accounts for 2 coats of paint.
:3
J a n u a r y
P e r m a n e n t P a v e m e n t M a r k in g s a n d
P e r m a n e n t S ig n in g
S u m m a r p w w o r k in g
\c e n tr a l0
\d
\T
A B
S
D G
F P
.d g n
SUMMARIES
PERMANENT PAVEMENT MARKINGS
PERMANENT SIGNING AND
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
B5 subexcavation geotextile filter.
1. Option X stabilization geotextile does not include
O p ti o n
X p w w o r k in g
\c e n tr a l0
\d
\T
A B
S
D G
F P
.d g n
:4
J a n u a r y
OPTION X
SURFACING SUMMARY
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
B6
ROADWAY EXCAVATION
Roadway Excavation Topsoil Stripping in Cuts
Topsoil Stripping in Cuts
2.5"- 6" Subgrade
3"- 4" Aggregate base
0.5"- 3" Asphalt Concrete Pavement
Roadway Excavation
:2 a r c h
D e s ig n I n tl
F p w w o r k in g \c e n tr a l0
\d
\E
W K
S
D G
F P
.d g n
DRAWINGS
EARTHWORK REPRESENTATION
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
B7
C P -3
C P -3
JB
S W -0
T P
JB
E M
S W -0
S W -0
JB
T
T
Edge of pavement
Edge of pavement
Protect in place
Existing light pole and junction box box, Protect in place
Existing light pole and junction and pave
Remove grass island and pave
Remove grass island
Missouri River
Curve BL_900-02
Protect in place
Existing trail
Curve BL_900-01
Limits of construction
Remove tree root ball prior to construction
Tree to be removed by others and pave
Remove grass island
Limits of construction
(t yp
' (ty p
V a r ie s
V a r ty p
V a r ie s and pave
Remove grass island
Verify prior to beginning work
Estimated location of underground power
Protect in place
Underground power, Existing culvert, do not disturb
4" solid white stripe (typ.)
Day use area access ty p
(t yp
Edge of pavement
Edge of pavement
Protect in place
Existing light pole and junction box box, Protect in place
Existing light pole and junction and pave
Remove grass island and pave
Remove grass island
Missouri River
Curve BL_900-02
Protect in place
Existing trail
Curve BL_900-01
Limits of construction
Remove tree root ball prior to construction
Tree to be removed by others and pave
Remove grass island
Limits of construction
(t yp
' (ty p
V a r ie s
V a r ty p
V a r ie s and pave
Remove grass island
Verify prior to beginning work
Estimated location of underground power
Protect in place
Underground power, Existing culvert, do not disturb
4" solid white stripe (typ.)
Day use area access ty p
(t yp
2. See sheets D3-D6 for points and point tables.
1. Verify horizontal and vertical alignment prior to the start of construction.
NOTES:
N
25 50012.525
Scale in feet
Curve Data:
Curve BL_900-01 Curve BL_900-02
PI 902+68.42
Δ = 05°16'17" (RT)
R = 1,000.00' T = 46.03' L = 92.00'
PI 905+12.15
Δ = 03°30'01" (RT)
R = 1,000.00' T = 30.56' L = 61.09'
P C
.3
P T
.3
P C
.6
P T
.6
N46°50'37"W N46°50'37"W N41°34'19"W
BEGIN PROJECT
BEGIN ROADWAY CONSTRUCTION
SD FLAP SDGFP PARKING(1)
900+00.00 "BL_900"
N= 278509.1658 E= 2439775.8301 El.= 1368.62
BEGIN PROJECT
BEGIN ROADWAY CONSTRUCTION
SD FLAP SDGFP PARKING(1)
900+00.00 "BL_900"
N= 278509.1658 E= 2439775.8301 El.= 1368.62
B
L
P la n
-5 s c a le
S h e p w w o rk in g \c e n tr a l0
\d
\P
L N
(9 )S
D G
F P
.d g n
:0
F e b ru a ry
900+00 to 905+20
LOT PLAN SHEET
RTE 900 NORTH POINT PARKING
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
D1
C
JB
JB
C P -3
JB
P K
S W -0
P L U
G
IN
P L U
G O
U T existing handrail
Remove and reset
Protect in place
Existing concrete boat ramp
Edge of pavement
Missouri River
Limits of construction
Curve BL_900-02
Curve BL_900-03
Protect in place
Existing gravel apron
Protect in place
Existing light pole and junction box
Protect in place
Existing junction box
Protect in place
Existing delineator
Remove and Install R7-1L
907+42
Remove and Install R7-1R
906+76
See Special 634-A
"Plug Out" Pavement Marking
907+50
See Special 634-A
"Plug In" Pavement Marking
907+50
V a r ie s
' (ty p ty p
(t yp
(t yp construction
Limits of
V a r ie s pavement
Edge of
See Special 634-A
Accessible Pavement marking (typ.)
spaces (2) for boat ramp
Existing accessible parking concrete pad, Protect in place
Existing vault toilet and
See Special 610-A
Install 8'x8' concrete dumpster pad
Verify prior to beginning work
Estimated location of underground power sidewalk existing
Tie in to
4" solid white stripe (typ.)
Exisiting sidewalk, protect in place
'4
(t yp existing handrail
Remove and reset
Protect in place
Existing concrete boat ramp
Edge of pavement
Missouri River
Limits of construction
Curve BL_900-02
Curve BL_900-03
Protect in place
Existing gravel apron
Protect in place
Existing light pole and junction box
Protect in place
Existing junction box
Protect in place
Existing delineator
Remove and Install R7-1L
907+42
Remove and Install R7-1R
906+76
See Special 634-A
"Plug Out" Pavement Marking
907+50
See Special 634-A
"Plug In" Pavement Marking
907+50
V a r ie s
' (ty p ty p
(t yp
(t yp construction
Limits of
V a r ie s pavement
Edge of
See Special 634-A
Accessible Pavement marking (typ.)
spaces (2) for boat ramp
Existing accessible parking concrete pad, Protect in place
Existing vault toilet and
See Special 610-A
Install 8'x8' concrete dumpster pad
Verify prior to beginning work
Estimated location of underground power sidewalk existing
Tie in to
4" solid white stripe (typ.)
Exisiting sidewalk, protect in place
'4
(t yp
N
25 50012.525
Scale in feet
2. See sheets D3-D6 for points and point tables.
1. Verify horizontal and vertical alignment prior to the start of construction.
NOTES:
NO
PARKING
ANY
TIME
NO
PARKING
ANY
TIME
Curve Data:
Curve BL_900-03
PI 905+12.15
Δ = 03°30'01" (RT)
R = 1,000.00' T = 30.56' L = 61.09'
Curve BL_900-02
PI 907+70.49
Δ = 20°51'30" (RT)
R = 500.00' T = 92.03' L = 182.02'
P T
.6
P C
.4
P T
.4
P O
E
.7
N38°04'18"W
N17°12'48"W
NO
PARKING
ANY
TIME
NO
PARKING
ANY
TIME
END PROJECT
END ROADWAY CONSTRUCTION
SD FLAP SDGP PARKING (1)
908+40.90 "BL_900"
N= 279147.8608 E= 2439237.8576 El.= 1366.03
END PROJECT
END ROADWAY CONSTRUCTION
SD FLAP SDGP PARKING (1)
908+40.90 "BL_900"
N= 279147.8608 E= 2439237.8576 El.= 1366.03
B
L
P la n
-5 s c a le
S h e p w w o rk in g \c e n tr a l0
\d
\P
L N
(9 )S
D G
F P
.d g n
:3 a rc h
905+20 to 908+40.90
LOT PLAN SHEET
RTE 900 NORTH POINT PARKING
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
D2
C P -3
C P -3
JB
S W -0
T P
JB
E M
S W -0
S W -0
JB
T
T
Missouri River
A01
A02
A03
A04
A05
A06
A28
A27
A26
A25
A24
X03
X06
X01
X02
X04
X05
X07
X08
X09 X12
X11
X10 X13
X14
X15
X16
X17
X18
X19
X20
X21
X22
X28
X25
X23
X24
X26
X27
X30
X29
R
.6 R
N
25 50012.525
Scale in feet
1. See D5-D6 for point tables.
NOTES:
P
T S
B L
P la n s c a le
S h e p w w o r k in g \c e n tr a l0
\d
\P
L N
S
D G
F P
.d g n
:5
N o v e m b e r
900+00 to 905+20
LOT POINTS
RTE 900 NORTH POINT PARKING
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
D3
JB
JB
C P -3
JB
P K
S W -0
P L U
G
IN
P L U
G O
U T
Missouri River
A23
A22
A21
A20
A19
A18
A16
A15
A14
A17
A13
A12
A11
A10
A09
A08
A07
A29
A30
A32
A31 X31
X32
X33
X34
X35
X36
X37
X38
X39
X43
X40
X41
X42
X45
X44
X46
X47
X48
B06
B05
B01
B02
B04
B03
N
25 50012.525
Scale in feet
1. See D5-D6 for point tables.
NOTES:
P
T S
B L
P la n s c a le
S h e p w w o r k in g \c e n tr a l0
\d
\P
L N
S
D G
F P
.d g n
:4
N o v e m b e r
905+20 to 908+40.90
LOT POINTS
RTE 900 NORTH POINT PARKING
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
D4
1. Proposed elevations match existing ground to accommodate no-rise condition.
R
T E
P o in t T a b le p w w o r k in g \c e n tr a l0
\d
\P
L N
S
D G
F P
.d g n
:5 a r c h
Sheet 1 of 2
RTE 900 POINT TABLES
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
D5
1. Proposed elevations match existing ground to accommodate no-rise condition.
R
T E
P o in t T a b le
S h e e p w w o r k in g
\c e n tr a l0
\d
\P
L N
S
D G
F P
.d g n
:0 a r c h
Sheet 2 of 2
RTE 900 POINT TABLES
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
D6
NO SCALE
for structural section
See typical sections
Finished grade
Backfill according to Section 204
Geotextile filter for structural section
See typical sections
Finished grade according to Section 204
Backfill with material
NOTE:
See bench detail than Bench if greater Varies min.
Width of need
See note 3 not construct slopes steeper than 1V:2H unless approved.
slope adjustments to match the subgrade hinge point. Do
At daylight locations, match the existing fill slope or make 5.
roadway cross slope when steeper than 2%.
toward the daylight for drainage, or match the existing subgrade hinge point. Slope the excavation bottom 2%
Daylight to drain when the excavation is within of the 4.
every of subexcavation depth.
bottom layers. Provide a minimum bench width for
Widen top of subexcavation area to allow for bench width in 3.
Do not place backfill material within the structural section.2.
Minimum subexcavation dimensions are1.
TYPICAL SECTION
SUBEXCAVATION
BENCH DETAIL
(2 ft typ.)
2 ft
1'
2' max.
6 feet wide x 6 feet long.
1-foot
2 feet
4 feet
SUBEXCAVATION
C204-51
FP-24
05/2025
CFLHD DETAIL
:3
S e p te m b e r
C
S h e p w w o r k in g \c e n tr a l0
\d
\C
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
F1
Existing asphalt pavement
Existing base course
New asphalt pavement
New base course
NEW PAVEMENT AT PARKING AREA ENTRANCE
(Full depth of proposed pavement section) Saw cut
Existing concrete boat ramp
New asphalt pavement
New base course
(Full depth of proposed pavement section) Saw cut
Existing subgrade
NEW PAVEMENT AT BOAT RAMP
401-A
A
S h e p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:4 o v e m b e r
SPECIAL
PAVEMENT TRANSITIONS
NO SCALE
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
K1
CONCRETE PAD
3.5" Asphalt concrete pavement
6" Roadway aggregate method 2
4" Bedding material
4" Concrete
Match Existing
610-A
C o n c r e te
P a d p w w o r k in g
\c e n tr a l0
\d
\6
A
.d g n :0
J a n u a r y
SPECIAL
CONCRETE PAD DETAIL
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
T1
H m in
Edge of pavement
POST TYPE
POST
SINGLE
POST SIZE TABLE
AREA (SQFT)
MAXIMUM SIGN
4" x 4"
SIZE
POST
4" x 6"
6" x 6"
H /5 o r m a x
SINGLE POST
(min.)
2'
OR RESIDENTIAL DISTRICT
ROADSIDE SIGN IN BUSINESS
Wood m a x
W
W
W
NOTES:
additional information.
Refer to Section 2A.18 of the MUTCD, latest edition, for for wood posts.
Refer to Special 633-B for breakaway support details
Uniform Traffic Control Devices" (MUTCD), latest edition.
Locate and set sign height according to the "Manual on
3.
2.
1.
SPEED
LIMIT
633-A
S p
A
S h e p w w o r k in g \c e n tr a l0
\d
\E
.d g n
:1
N o v e m b e r
SPECIAL
SIGN STRUCTURES
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
T2
Sign panel
4''
WOOD POST
POST SIZE HOLE DIAMETER
6'' x 6''
1.5''
2''
3'
4'
4'
D
Existing ground
(MIN.)
(D)
(See Table)
Holes (See Table)
Wood sign post
6.
5.
4.
3.
2.
1.
latest edition, for additional information.
Refer to Section 2A.18 of the MUTCD, details.
Refer to Special 633-A for sign mounting latest edition of the MUTCD.
Signs and Markings" as specified in the standards in the "Standard Highway
For sign punching details, see the blank position.
Maintain the post assembly in a plumb apart.
cannot be spaced a minimum of 7 feet if multiple posts are required and posts posts are considered to be non-breakaway
Signs requiring 6- by 6-inch wood signs placed behind protective barriers.
Breakaway sign support is not required for m a x
STATE PROJECT
NUMBER
SHEET
WOOD POST DATA TABLE
4'' x 6''
4'' x 4'' Not Required
NOTES:
633-B
S p
C
S h e p w w o r k in g \c e n tr a l0
\d
\E
.d g n
:2
D e c e m b e r
SPECIAL
WOOD POSTS
BREAKAWAY SIGN SUPPORT
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
T3 m in
24" min.
TYPE
PAVEMENT MARKING AREAS
8.7
8.6
SQFT
3'-9" (typ.)
Plug Out Symbol
Plug In Symbol w/ Symbol, blue background, and white border w/ Symbol only
Accessibility Symbol:
NOTES:
4.
3.
2.
1.
and white border
(b) w/ Symbol, blue background,
(a) w/ Symbol only; or following configurations:
otherwise by the CO in one of the as indicated in the plans or directed
Provide Accessibility Symbol marking edition.
"Standard Highway Signs", latest symbols in accordance with the
Place all letters, numerals, and kind as approved by the CO.
"Plug Out" symbols and replace in
Document existing "Plug In" and
Devices'' (MUTCD), latest edition.
''Manual on Uniform Traffic Control markings in accordance with the
Place pavement word and symbol
3" min.
(typ.)
"21
See Note 3
Blue background
See Note 3
White border
See Note 3
Accessibility symbol 9" R
6" R
" R
3" R (typ.)
3" R (typ.)
ACCESSIBILITY SYMBOL
PLUG IN AND PLUG OUT SYMBOLS 2.
64" (Match Existing)
M a tc h E x is ti n g
M a tc h E x is ti n g
72" (Match Existing)
2.
2.
634-A
S p
A
S h e p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:2
D e c e m b e r
SPECIAL
SYMBOLS AND WORDS
PAVEMENT MARKINGS
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
T4
ANGULAR PARKING
NOTES:
2.
1.
parking space symbol details.
Refer to Special 634-A for accessibility
(MUTCD), latest edition.
on Uniform Traffic Control Devices" markings in accordance with the "Manual
Install pavement striping and symbol striping (typ.)
4" solid white striping (typ.)
4" solid white
ANGULAR PARKING WITH VAN ACCESSIBLE AISLE
18" ty p ty p
634-B
S p C
S h e p w w o r k in g
\c e n tr a l0
\d
\E
.d g n
:4
J a n u a r y
SPECIAL
IN PARKING AREAS
PAVEMENT MARKINGS
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
T5
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD NAME
WORK
ROAD
AHEAD
ROAD WORK
END
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
WORK
ROAD
AHEAD
xx
MPH
ROAD NAME
ROAD WORK
END
WORK
ROAD
xxxxxxx
ROAD WORK
END
xx
MPH
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
ROAD TYPE
DISTANCE BETWEEN
A B C
NOTE:
M in o r R o a d
M a jo r R o a d
B as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
A
B
C
A
A
A
A
Pr oje ct Lim its
See Note 8 W16-8P W20-1 over
W20-1
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1
G20-2
See Note 8 W16-8P W20-1 over
G20-2
G20-2
See Note 9 W20-1
See Note 9 W20-1
(optional) W13-1P
See Note 10 G20-1 specify the distance to the work area in feet or in miles. Install an The message on the W20-1 signs may be ROAD WORK AHEAD or may roads only).
name of the road on which the construction does occur (applies to major construction work occurs, include a supplementary plaque indicating the If W20-1 is placed on a roadway other than that on which the actual
Cover post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use.
Maintain two-way traffic during all non-work hours except as approved.
Ensure all sign supports exposed to traffic are crashworthy.
construction area.
needed to indicate a maximum recommended speed through the Install advisory speed plaques under the W20 series warning signs as messages as required.
signs, locate the warning signs to fit field conditions as approved. Vary Where advance warning signs, placed as shown, interfere with permanent operations.
and details in this traffic control plan as necessary to accommodate actual applicable to this project. The Contractor may add or delete information Not all details shown on the temporary traffic control sheets may be
Erect all project advance warning signs before starting construction work.
State standards may be used as an alternative if approved.
verify that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, nearest whole mile.
at each end of the project. Show the distance on the G20-1 sign to the
Ro ad N ame
SIGN SPACING TABLE
For work zones that are 2 miles or more in length, install G20-1 signs
Sign Spacing Table.
When used, place the two W20-1 signs "B" feet apart according to the additional W20-1 sign when approach speeds exceed 50 mph.
Expressway / Freeway
NO SCALE
SIGNS IN FEET
Rural greater than 50 mph
Urban and Rural 35 mph to 50 mph
Urban and Rural 30 mph and less
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
635-1
FP-24, FP-14
2/2024
FLH STANDARD
:1
J a n u a ry
S td
-1
S h e p w w o rk in g \c e n tr a l0
\d
\S td -1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
T6
NO SCALE
See post detail (typ.)
Breakaway holes
See table for hole size parallel to sign face.
Field drill holes through post
Bottom of sign panel
Post�
Local tangent
< 10
" diameter4 1Attach sign panels with a minimum of two a minimum lateral distance of 1 ft behind the face of lateral offset of 2 ft may be used. In areas with curbs, 6" x 6" or larger.
Use 7 ft minimum spacing between posts for sign posts and 6 ft minimum mounting height for secondary sign.
use 7 ft minimum mounting height for main sign
NOTE:
90°
93°
WOOD POST SELECTION TABLE
X X
0.75X
H
H
X
0.2X0.6X 0.2X
Y
H
D
H
D
H
D
Long side of post
D
7.
6.
5.
4.
3.
2.
1.
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
bolts per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
State standards may be used as an alternative if approved.
S e e N o te m in
S e e N o te m in
See Note 4
6' - 12'
On tangent alignment
200'
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
(INCH) (INCH) (INCH)
Diamond ≤ 48"
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
> 30'
> 17'
12' - 16'
> 13'
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
1.5
1.5
1.5
1.5
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
635-14
FP-24, FP-14
2/2024
FLH STANDARD
:4
J a n u a ry
S td
-1
S h e p w w o rk in g \c e n tr a l0
\d
\S td
-1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
NORTH POINT PARKING LOT
T7
| A |
| TTL(900)SDGFP_01 |
| SYM(900)SDGFP_01 |
| SYM(900)SDGFP_01 |
| CTL(900)SDGFP |
| STE(900)SDGFP |
| TYP(900)SDGFP_01 |
| B |
| TAB(900)SDGFP |
| TAB(900)SDGFP |
| TAB(900)SDGFP |
| TAB(900)SDGFP |
| EWK(900)SDGFP |
| D |
| PLN(900)SDGFP_01 |
| PLN(900)SDGFP_01 |
| PLN(900)SDGFP_02 |
| PLN(900)SDGFP_02 |
| PLN(900)SDGFP_02 |
| PLN(900)SDGFP_02 |
| F |
| Subexcavation |
| K |
| Pavement Transitions |
| T |
| 610-A |
| Sign Bracing (Signs 1 of 3) |
| Wood and Steel Posts (Signs 2 of 3) |
| Pavement Markings Symbols and Words |
| Pavement Markings and Signing in Parking Areas |
| Advance Signing |
| Sign Installation, Wood Posts |
File details come from the government source that posted it. Updated .