This is an Invitation for Bid (IFB) for pavement reconstruction at the North Point Recreation Area parking lot in Pickstown, South Dakota, issued by the Federal Highway Administration Central Federal Lands Highway Division. The project (Solicitation Number 6982AF26B000005) involves complete reconstruction of a 98,000 square-foot parking lot serving a boat ramp facility, including excavation of existing asphalt and base materials to 9.5 inches depth, placement of 6 inches of aggregate base, and installation of 3.5 inches of new asphalt pavement. Principal work items include 5,700 cubic yards of roadway excavation, 3,300 cubic yards of subexcavation, 3,800 tons of roadway aggregate, 2,300 tons of asphalt concrete pavement, signing, striping, a concrete dumpster pad, and minor ADA-compliant adjustments. Sealed bids are due by 2:00 p.m. local time on May 19, 2026, at the FHWA Central Federal Lands Division office in Lakewood, Colorado. The estimated project price range is $2,000,000 to $5,000,000.

This is a full and open competition with HUBZone price evaluation preference, requiring a 10 percent price evaluation factor applied to all offers except those from HUBZone small business concerns not waiving the preference. Bidders must submit original bid bonds (20 percent of bid price or $3,000,000, whichever is less), complete SF-1442 forms, bid schedules for both Schedule A (base work) and Schedule X (stabilization geotextile option), contractor qualifications, and certifications. The contract type is firm fixed price with a mandatory 10 calendar day start and completion required within a specified timeframe subject to extensions. Performance and payment bonds are required within 10 days of award. The project is governed by FAR, Revolutionary FAR Overhaul (RFO), Department of Transportation Acquisition Regulation, and Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24). Large business prime contractors winning contracts exceeding $2.0 million must submit small business subcontracting plans with goals including 43.02 percent for small businesses, 5.0 percent for small disadvantaged businesses, 3.0 percent for HUBZone businesses, 5.0 percent for women-owned small businesses, and 5.0 percent for service-disabled veteran-owned small businesses. Technical questions must be submitted by 4:00 p.m. on May 12, 2026.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SOLICITATION NUMBER:

SOLICITATION TYPE:

PROJECT NUMBER:

PROJECT NAME:

6982AF26B000005

Full and Open Competition with HUBZone Price Evaluation Preference

SD FLAP SDGFP PARKING (1)

NORTH POINT PARKING LOT

BID OPENING DATE:

See Page A-1, Item 13A

This solicitation cites Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-24 US Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL

HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov https://highways.dot.gov/federal-lands mailto:CFLContracts@dot.gov

PROJECT SD FLAP SDGFP PARKING (1)

LOCATION NORTH POINT RECREATION AREA

COUNTY CHARLES MIX

STATE

LENGTH

TYPE OF IMPROVEMENT

SOUTH DAKOTA

SCHEDULE A: .16 MILES

OPTION X: .16 MILES

ROADWAY EXCAVATION,

AGGREGATE BASE AND PAVING,

PERMANENT SIGNING, AND

PERMANENT PAVEMENT MARKINGS

TABLE OF CONTENTS

Notice to Bidders ............................................................................................................. A-i

Solicitation, Offer, and Award ........................................................................................ A-1

Basis for Award and Bid Schedule ................................................................................ A-6

Solicitation Provisions .....................................................................................................B-9

Contract Clauses ..............................................................................................................C-1

Construction Wage Rate Requirement............................................................................ D-1

Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-16 Division 200 ................................................................................................................... E-27 Division 300 ................................................................................................................... E-29 Division 400 ................................................................................................................... E-30 Division 500 ......................................................................................................... SEE FP-24 Division 600 ................................................................................................................... E-31 Division 700 ................................................................................................................... E-36

APPENDIX

Appendix A ....................................................................Small Business Subcontracting Plan

PROJECT OVERVIEW

The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River.

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

NOTICE TO BIDDERS

A-i

I. PRE-BID INFORMATION

ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8).

Bids and shall be submitted in sealed envelopes or packages:

(1) addressed to the office specified in the solicitation, and

(2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed above when delivered to the office specified in the solicitation.

Submit the following documents with your Bid Package–

• SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2

• Indication of interest in formal Partnering, Page A-5

• Bid Schedule Pages A-6 through A-10

• Completed an applicable Authority to Bind certificate, pages A-11 through A-15

• Buy American Act & Hazardous Materials, Pages A-16 through A-17

• Bid Guarantee (RFO Clause 52.228-1), Pages B-1 through B-4. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive.

o Digital copies may be downloaded at https://www.gsa.gov/forms-library/bid-bond

• Completed the VETS-4212 declaration, Page A-ii; Bidders’ Information, Pages B-5 through B-8.

• HUBZone small business concerns electing to waive the evaluation preference, complete RFO Clause 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C of the IFB.

https://www.gsa.gov/forms-library/bid-bond

A-ii

Bidders should retain all other pages for their information. Bids should be submitted in a sealed envelope and include the Contractor’s Name, Solicitation Number and the Project Number/Name.

It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at https://sam.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.

This solicitation and subsequent contract are governed by the 48 CFR, Chapter 1, Federal Acquisition Regulation (FAR), Revolutionary FAR Overhaul (RFO), Department of Transportation Acquisition Regulation (TAR), and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24.

The FP-24 was utilized for the design of this project. Paper copies of the FP-24 will not be provided to bidders or the awarded Prime Contractor. The FP-24 is available electronically at https://flh.fhwa.dot.gov/resources/specs/ and a copy is uploaded with this solicitation.

Applicable FAR, RFO and TAR provisions and clauses in this IFB are incorporated by reference or full text. FAR, RFO and TAR provisions and clauses incorporated by reference can be accessed on the Internet at https://www.acquisition.gov/content/regulations, https://www.acquisition.gov/far-overhaul/far-part-deviation-guide and https://www.acquisition.gov/tar.

Notice of SAM Registration – Offerors or quoters are required to have an active Federal Government contracts registration in the System for Award Management (SAM) when they submit an offer or quotation, and at the time of award. Failure to be fully registered prior to submission of a bid may require award to the next successful registered offeror. See RFO Subpart 4.203-1(b).

Register online at www.sam.gov.

“System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in DOT solicitations.

Examples include:

• 52.222-25, Affirmative Action Compliance, and

• 52.212-3(d), Offeror Representations and Certifications—Commercial Products and Commercial Services.

• 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals— Representation.

• 52.212-3(t), Offeror Representations and Certifications—Commercial Products and Commercial Services.

https://sam.gov/ https://flh.fhwa.dot.gov/resources/specs/ https://www.acquisition.gov/content/regulations https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://www.acquisition.gov/far-overhaul/far-part-deviation-guide https://www.acquisition.gov/tar http://www.sam.gov/

A-iii

Contracting officers will not need to consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.”

Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $45 million. If your average annual gross receipts for the past 5 years are above $45 million, you are a large business for this solicitation. If they are below $45 million you are a small business. Before submitting bids, you must ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov. Include NAICS 237310 in your SAM profile.

Vets-4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: https://www.dol.gov/agencies/vets/programs/vets4212

• My firm had a qualifying Federal Contract in 2025 and has complied with the reporting requirements.

• My firm did not have a qualifying Federal Contract in 2025 and is therefore exempt from the reporting requirements.

This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to the price of all offers except HUBZone small business concerns that have not waived the evaluation preference and otherwise successful offers from small business concerns. See RFO Clause 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns.

In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, RFO Clause 52.219-14, Limitations on Subcontracting will apply.

Bid Guarantee – Follow the requirements of RFO Clause 52.228-1 Bid Guarantee and Subpart

102.03 of the FP-24. Bid bonds must be originals and have original signatures and corporate seals.

Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.

Accuracy and Completeness of Bid- The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.

Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).

http://www.sam.gov/ https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.dol.gov%2Fagencies%2Fvets%2Fprograms%2Fvets4212&data=05%7C01%7Cryan.d.phillips%40dot.gov%7C09d955a274d74e8474dc08dbc51eeb3d%7Cc4cd245b44f04395a1aa3848d258f78b%7C0%7C0%7C638320508951679944%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=gIALto4XEaeYAJrJxNNxKww0nAj0lFMpA2G36Z3hVxc%3D&reserved=0

A-iv

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON MAY 12, 2026

Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions.

Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov

Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email), if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email).

For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See RFO Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.

Email Address to submit modifications to bids for this project is cflcontracts@dot.gov

II. POST AWARD INFORMATION

CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.

Subcontracting – RFO Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.

RFO Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $2.0 million, is required to submit a subcontracting plan prior to contract award.

The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of request of the CO, that bidder may be ineligible for award of the contract. (Prime and subcontracting | U.S. Small Business Administration) mailto:CFLContracts@dot.gov https://sam.gov/ https://www.sba.gov/federal-contracting/contracting-guide/prime-subcontracting#subcontracting https://www.sba.gov/federal-contracting/contracting-guide/prime-subcontracting#subcontracting

A-v

Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) https://subnet.sba.gov/client/dsp_Landing.cfm so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Revolutionary Federal Acquisition Regulation Overhaul (RFO) 5.303, Announcement of contract awards, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.

A list of currently known business concerns owned and controlled by socially and economically disadvantaged individual and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at DOT Subcontracting Directory | US Department of Transportation.

See Appendix A for Sample Small Business Subcontracting Plan.

NOTE:

• Consider the following FHWA small business goals in development of Subcontracting plans and efforts:

FHWA Small Business Subcontracting Goals (As of FY 2026) Business Size Goal (%)

SB 43.02%

SDB 5.0%

HUBZone 3.0%

WOSB 5.0%

SDVOSB 5.0%

Insurance requirements - See Subsection 107.05 of the FP-24.

Masterworks - Contractors shall use the Government’s web-based system Masterworks to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes).

The Contractor shall be required to attend a training session on the use of Masterworks. The virtual training sessions will be either a video presentation or live training as determined by the CO. The Contractor shall be responsible for training additional staff.

The Contractor shall be required to submit a user account form to gain access to the Masterworks.

See Subsection 104.04.

https://subnet.sba.gov/client/dsp_Landing.cfm https://www.transportation.gov/osdbu/procurement-assistance/dot-subcontracting-directory https://www.transportation.gov/osdbu/procurement-assistance/dot-subcontracting-directory

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

1. SOLICITATION NO.

6982AF26B000005

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

04/17/2026

PAGE OF

PAGES

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

HFLCEO260107PR

6. PROJECT NO.

SD FLAP SDGFP Parking (1)

7. ISSUED BY:

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS DIVISION

12300 WEST DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CODE: 69050001 8. ADDRESS OFFER TO:

Stephanie Navarro Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228

9. FOR INFORMATION CALL

SEE PAGE A-3

A. NAME:

SEE PAGE A-3

B. TELEPHONE NO. (Include area code)

SEE PAGE A-3

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:

ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:

1. 48 CFR, CHAPTER 1, FEDERAL ACQUISTION REGULATION (FAR), REVOLUTIONARY FAR OVERHAUL (RFO)

AND THE DEPARTMENT OF TRANSPORATION REGULATION (TAR)

2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES.

3. SPECIAL CONTRACT REQUIREMENTS.

4. PLANS.

5. BID SCHEDULE.

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS, FP-24, U.S. CUSTOMARY UNITS.

7. SUBCONTRACTING PLAN.

See Subsection 104.04 of the FP-24 for governing order of precedence

11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *See Page A-3

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m.

(hour) local time on 5/19/26 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is is not required.

C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA

X

X

X

X

X

A-1

STANDARD FORM 1442 (REV. 12/2022) BACK

OFFEROR (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

UEI.

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with 60 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE INDIVIDUAL BID SCHEDULE(S)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED

TO SIGN OFFER (Type or print)

20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27

(4 copies unless otherwise specified)

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

□ 10 U.S.C. 2304(c)( ) □ 41 U.S.C. 3304(a)( )

26. ADMINISTERED BY CODE: 27. PAYMENT WILL BE MADE BY

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 167

LAKEWOOD, COLORADO 80228

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by

(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON

AUTHORIZED TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA

BY

31C. AWARD

DATE

A-2

Item 8:

Item 9:

Item 11:

LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.

FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov.

FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov .

COMPLETION DATE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than See SCR Section 108.01, subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.

Item 12A: PERFORMANCE AND PAYMENT BONDS: See RFO Clause 52.228-15

Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-24.

Item 13B: BID BOND AMOUNT: See RFO Provision 52.228-1 Bid Guarantee

(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-

24. All bid guarantees must have original signatures with original corporate seals.

Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO

ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE

DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY

RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to https://sam.gov.

Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the

FP-24.

ESTIMATED

PRICE: The price range of the project work is between $2,000,000 and $5,000,000.

A-3 mailto:CFLContracts@dot.gov mailto:CFLContracts@dot.gov https://sam.gov/

Bid Schedule Instructions

BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one (1) schedule and one (1) option.

Before preparing the bid, carefully read the Solicitation Provisions and the following:

• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government

• Multiply the unit price by the quantity for each pay item and show the amount bid.

When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.

• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.

• Also show the Construction Cost Total for each schedule/option as well as the combined Total of each Schedule and the Option in the spaces provided on the Bid Summary page.

NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.

Basis for Award

To be eligible for award of contract, the offeror shall submit prices for each item necessary to complete all contract work in Schedule A and Option X.

Per RFO provision 52.217-5, Evaluation of Options (JULY 1990)(DEVIATION OCT 2025), the Government will evaluate offers for award purposes by adding the total price for all options to the total price for Schedule A. Evaluation of options will not obligate the Government to exercise the option(s). If the determination is made to exercise any of the Options, the Contracting Officer will provide the contractor with written notice no later than 60 days after contract award, per RFP clause 52.217-7, Option for Increased Quantity- Separately Priced Line Item (MAR 1989).

Accordingly, award of contract, if made, will be made to the lowest responsive, responsible bidder, if funds are available.

A-4

Partnering

A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.

CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.

A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.

Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-14. Costs of partnering would be in addition to the contract award amount.

Please indicate your desire to participate in a formal partnering meeting on this project.

(___) We would like to participate in a formal partnering meeting.

(___) We do not want to participate in a formal partnering meeting.

A-5

BID SCHEDULE

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

Bid Schedule Project: SD FLAP SDGFP PARKING(1), NORTH POINT PARKING LOT

A-6

Schedule : A

Sch edule Base

Line Item Number

Pay Item Number Description Supplemental Description

Quantity Unit Unit Price Amount

A0010 15101-0000

MOBILIZATION

ALL LPSM

A0020 15215-7000

SURVEY AND STAKING,

PARKING AREA 1.000 EACH

A0030 15301-0000

CONTRACTOR QUALITY

CONTROL ALL LPSM

A0040 15401-0000

CONTRACTOR TESTING

ALL LPSM

A0050 15501-0000

CONSTRUCTION SCHEDULE

ALL LPSM

A0060 15701-0000

SOIL EROSION CONTROL

ALL LPSM

A0070 15720-0000

STORMWATER POLLUTION

PREVENTION PLAN

ALL LPSM

A0080 15802-0000

WATERING FOR DUST

CONTROL ALL LPSM

A0090 20101-0000

CLEARING AND GRUBBING

1.450 ACRE

A0100 20301-2400

REMOVAL OF SIGN

2.000 EACH

A0110 20401-0000

ROADWAY EXCAVATION

5,700.000 CUYD

A0120 20402-0000

SUBEXCAVATION

3,300.000 CUYD

A0150 30202-2000

ROADWAY AGGREGATE,

METHOD 2 3,800.000 TON

A0160 40301-0100

ASPHALT CONCRETE

PAVEMENT, TYPE 1 2,300.000 TON

A0170 40601-0000

FOG SEAL

4.500 TON

A0180 40605-0000

BLOTTER

20.000 TON

A0190 41102-1000

PRIME COAT, METHOD 1

11,400.000 SQYD

A0200 41201-0000

TACK COAT

4.500 TON

Project No: SD FLAP SDGFP PARKING(1)

Project Name: NORTH POINT PARKING LOT

BID SCHEDULE

Bid Schedule

A-7

A0210 61002-1000

PAD, CONCRETE

10.000 SQYD

A0220 61921-1000

REMOVE AND RESET FENCE

15.000 LNFT

A0230 62201-0200

DUMP TRUCK, 8 CUBIC

YARD MINIMUM CAPACITY 20.000 HOUR

A0240 62201-0550

BACKHOE LOADER, 6 CUBIC

FOOT MINIMUM RATED

CAPACITY BUCKET, 24-INCH

WIDTH

20.000 HOUR

A0250 62201-0950

WHEEL LOADER, 3 CUBIC

YARD MINIMUM RATED

CAPACITY 20.000 HOUR

A0260 62201-1300

BULLDOZER, 160HP

MINIMUM FLYWHEEL

POWER 20.000 HOUR

A0270 62201-2850

MOTOR GRADER, 12 FOOT

MINIMUM BLADE 20.000 HOUR

A0280 62201-3150

HYDRAULIC EXCAVATOR,

1.0 CUBIC YARD MINIMUM

CAPACITY WITH THUMB

ATTACHMENT

20.000 HOUR

A0290 62301-0000

GENERAL LABOR

40.000 HOUR

A0310 62302-1100

SPECIAL LABOR, HIRED

SURVEY SERVICES 20.000 HOUR

A0320 62406-0300

PLACING CONSERVED

TOPSOIL, 4-INCH DEPTH 0.200 ACRE

A0330 62510-2000

SEEDING, HYDRAULIC

METHOD 0.200 ACRE

A0340 62515-2000

MULCHING, HYDRAULIC

METHOD 0.200 ACRE

A0350 63301-0000

SIGN SYSTEM

2.000 EACH

A0360 63401-0300

PAVEMENT MARKINGS,

TYPE B, SOLID 10,300.000 LNFT

A0370 63405-0050

PAVEMENT MARKINGS,

SYMBOLS 2.000 EACH

A0380 63405-0850

PAVEMENT MARKINGS,

TYPE B, ACCESSIBILITY

SYMBOL

2.000 EACH

A0390 63501-0000

TEMPORARY TRAFFIC

CONTROL ALL LPSM

A0410 63701-0000

FIELD OFFICE

1.000 EACH

Submitted By: Schedule Total:

Bid Schedule

A-8

X Schedule :

Schedule Type : Option

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

X0010 20702-0000

STABILIZATION

GEOTEXTILE 11,400.000 SQYD

Submitted By: Schedule Total:

BID SCHEDULE

Project No :

Project Name :

SD FLAP SDGFP PARKING(1)

NORTH POINT PARKING LOT

Bid Schedule

A-9

Schedule Bid Total

Schedule A - Base

Schedule Bid Total

Schedule X - Option

Bid Total

BID SCHEDULE SUMMARY

Total-Schedule(s) and Option(s)

Schedule A, Option X

Bid Schedule

A-10

INSTRUCTIONS: When the offeror/principal is a corporation, include this certification with your offer/bid.

Corporate Certificate

I, (name), certify that I am the

(title), of the corporation named as the

Offeror/Principal herein;

that (name), who signed this offer and/or bid bond on behalf of (company name) is

(title) of this corporation;

that the offer was duly signed for and on behalf of said corporation by authority and scope of its governing body, and within the scope of its corporate powers.

(signature) Affix Corporate Seal

(title)

A-11

INSTRUCTIONS: When the offeror/principal is a limited liability corporation, include this certification with your offer/bid.

Limited Liability Certificate

I, (name), certify that I am the

(title), of the limited liability company named as the Offeror/Principal herein;

that (name), who signed this offer and/or bid bond on behalf of (company name) is

(title) of this company;

that the offer was duly signed for and on behalf of said company by authority and scope of its governing body, and within the scope of its powers.

(signature) Affix Company Seal (as applicable)

(title)

A-12

INSTRUCTIONS: When the offeror/principal is a partnership, include this certification with your offer/bid.

Authority to Bind Partnership

This certifies that the names and signatures of all partners are listed below, and that the person signing the proposal has the authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting

Officer.

(Include names and signatures of all partners)

A-13

INSTRUCTIONS: When the offeror/principal is a joint venture, include this certification with your offer/bid.

Authority to Bind Joint Venture

This certifies that the person signing the proposal has the authority to actually bind the joint venture pursuant to its joint venture agreement, and that each of the named persons listed below individually has full authority to enter into and execute contractual instruments on behalf of said joint venture, except as follows:

(State “None” or describe limitations, if any)

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to and acknowledge by the Contracting

Officer.

(Include names and signatures of all applicable individuals)

A-14

INSTRUCTIONS: When the offeror/principal is a sole proprietorship, include this certification with your offer/bid.

Sole Proprietorship Requirement

An Offeror/Principal that is a sole proprietorship must submit an offer/bid and a bond signed by the sole proprietor, or by one duly authorized to sign for the sole proprietor. If the signature is by someone other than the sole proprietor, a copy of the power of attorney authorizing the individual to sign must be provided with the offer/bid.

A-15

It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the RFO are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.

NOTE TO CONTRACTOR:

The following information and any applicable supporting data is required for evaluation of requests under RFO Clause 52.225-9 Paragraph (c) & (d) and RFO Provision 52.225-10 Paragraph (b).

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

HAZARDOUS MATERIALS

As required by RFO Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the RFO clause and defined under the latest version of Federal Standard No. 313.

Hazardous Material

Identification Number

A-16

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

BIOBASED PRODUCTS AND SUSTAINABLE PRODUCTS AND SERVICES

See RFO Provision 52.223-1 Biobased Product Certification and RFO 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts for usage, certification, and reporting requirements.

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:

• It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

• The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

• Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.

A-17

Bid Bond (See Instructions on Page 3)

Date Bond Executed (Must Not Be Later Than Bid Opening Date)

OMB Control Number: 9000-0001 Expiration Date: 1/31/2027

Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture Corporation Other (Specify)

State Of Incorporation

Surety(ies) (Name And Business Address)

Penal Sum Of Bond Bid Identification Percent Of Bid Price

Amount Not To Exceed Bid Date Invitation Number 6982AF26B000005 Million(s)

Thousand(s)

Hundred(s)

Cents

For (Construction , Supplies Or Services) Construction

Obligation:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

Conditions:

The Principal has submitted the bid identified above.

Therefore:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

Authorized For Local Reproduction STANDARD FORM 24 (REV. 10/2023) Previous Edition Is Not Usable Prescribed by GSA – FAR (48 CFR) 53.228(a)

B-1

Witness:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

Principal

Signature(s) 1.

(Seal)

2.

(Seal)

3.

(Seal) Corporate Seal Name(s)

And Title(s) (Typed)

1. 2. 3.

Individual Surety(ies)

Signature(s) 1. (Seal) 2. (Seal) Name(s) (Typed)

1. 2.

Corporate Surety(ies)

Su re ty A

Name And Address

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

B

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

C

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

D

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

STANDARD FORM 24 (REV. 10/2023) PAGE 2

B-2

Su re

E

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

F

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

G

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability

Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

STANDARD FORM 24 (REV. 10/2023) PAGE 3

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated

"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form

28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New

Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include

"proposal" and "offeror."

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (MVCB), 1800 F

Street, NW, Washington, DC 20405.

STANDARD FORM 24 (REV. 10/2023) PAGE 4

B-4

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

BIDDER’S INFORMATION

INSTRUCTIONS: Answer all questions on this form inserting "none" or "not applicable" where appropriate. If more space is required attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.

If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.

1. Name and address of business:

Name Unique Entity ID (See FAR Provision 52.204-6) *

Street Employer ID Number (EIN)*

City State Zip Code

* Necessary for Government reporting purposes only.

County

Telephone Number (Include Area Code)

Fax Number (Include Area Code) E-mail address

2. a. Type of organization (check appropriate box):

If a Foreign entity:

Individual Non-profit organization Corporation

Partnership Joint Venture Registered in:

b. Size and type of Business Concern (check appropriate boxes):

Large Business Concern Small Disadvantaged Business Concern Emerging Small Business

Small Business Concern Women-Owned Small Business SBA 8(a) Certified

HUB Zone Business Concern Veteran Owned Business Concern Service-Disabled Veteran-Owned Business Concern

Individual Non-profit organization Corporation

Partnership Joint Venture Incorporated in:

B-5

3. If a joint venture or general partnership:

a. Provide the name under which the project will be bid, the home office address, and name of the principal who will represent the company with regard to this project if different from "1." above.

Principal

Business Name

Street

City State Zip Code

b. Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner. Attach a separate sheet for additional partners.

Sponsoring Partner Other Partner

Street Street

City State Zip Code City State Zip Code

4. Date organization established: _______________________

5. Name of succeeded business, if any: _________________________________________________________

6. How many years have you been in business as:

a. General contractor years.

b. Subcontractor years.

7. a. Furnish the following information concerning the owner, partners, officers and directors:

Percent of Business Owned

Years of Business Experience

Name Title Contracting Other

b. Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following:

- Present position, responsibility, and length of employment.

- Amount and type of construction experience.

- Amount and type of highway construction experience, including position, responsibility, and a brief project description of each period of employment.

- Formal education and training, professional or technical registrations or licenses.

B-6

8. a. Contracts in force. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, and Contact Name, Email and

Telephone # Scope of Work Performed Contract Amount Estimated

Completion Date Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.

B-7

9. a. List up to five of the largest jobs you have completed in the last five years which are similar in project work scope to this project. (Attach additional sheets if necessary)

Project Name and Contract Numbers

Owner's Name, Address, Contact Name, Email and

Telephone # Scope of Work

Performed Original and Final Contract Amounts

Original and Final Completion Dates

Names of On-site Project Manager and Superintendent

Name of Surety

b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet

B-8

B-9

Solicitation Provisions

52.203-2 Certificate of Independent Price Determination (APR 1985)

(a) The offeror certifies that-

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to-

(i) Those prices;

(ii) The intention to submit an offer; or

(iii) The methods or factors used to calculate the prices offered.

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory-

(1) Is the person in the offeror’s organization responsible for determining the prices being offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to paragraphs (a)(1) through (a)(3) of this provision; or

(2)(i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to paragraphs (a)(1) through (a)(3) of this provision ____________ [insert full name of person(s) in the offeror’s organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror’s organization];

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) of this provision have not participated, and will not participate, in any action contrary to paragraphs (a)(1) through (a)(3) of this provision; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to paragraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph…