SD FLAP CS23A(1) AD Plans.pdf
PDF 15 MB Posted
- Attached to
- SD FLAP CS23A(1) - DELTA-01 ACCESS ROAD Federal contract opportunity
- Solicitation number
- 6982AF23B000020
About this file
This solicitation is for a highway construction project to improve access to a missile site launch control facility located in Jackson County, South Dakota. The proposed improvements include paving 0.51 miles of county road CS-23A, widening the travel way from 17 to 24 feet wide with two 11-foot travel lanes and one-foot shoulders. Additional work involves installing MUTCD signage and striping, constructing embankment to address shoulder erosion, replacing three culverts to improve drainage after failures, and decreasing future maintenance needs. The estimated price range for the project work is between $700,000 to $2,000,000. The soliciting agency is the Federal Highway Administration within the Department of Transportation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary SD FLAP CS23A(1) DELTA 01 ACCESS ROAD.pdf | ||
| Interested Bidders List 6982AF23B000020.pdf | ||
| 6982AF23B000020 AMD A001 SF30.pdf | ||
| QUESTIONS AND ANSWERS SD FLAP CS23A(1) Delta 01 Access Road_05 25 2023.pdf | ||
| QUESTIONS AND ANSWERS SD FLAP CS23A(1) Delta 01 Access Road 05 23 2023.pdf | ||
| SD FLAP CS23A(1) Final Pavments Report.pdf | ||
| SD_FLAP CR23A(1)_FinalHydraulicsMemo.pdf | ||
| IFB 6982AF23B000020 SD FLAP CS23A(1) DELTA 01 ACCESS ROAD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
S h e e t c p w w o rk in g \c e n tr a l0
\d
\S Y
M (S
D F
L A
P )C
S
A
(1 d g n :1
P
M
S e p te m b e r
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
SD
SD FLAP CS23A(1)
A2
DELTA-01 ACCESS ROAD
04/18/2023
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS
1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS
National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick
ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
N
CP
36 31
36 31
0.00EL.
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS 1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
INF' = Infinite Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
Sheet 2 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
S h e e p w w o rk in g \c e n tr a l0
\d
\S Y
M (S
D F
L A
P )C
S
A
(1 d g n :1
S e p te m b e r
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
A3
GEODETIC AZIMUTH = GRID AZIMUTH + MAPPING ANGLE
TO COMPUTE GEODETIC AZIMUTHS USE THE FOLLOWING FORMULA:
A MEAN COMBINED FACTOR OF TWO POINTS.
INVERSE THE STATE PLANE COORDINATES AND DIVIDE THE COMPUTED DISTANCE BY
NOTE: TO PRECISELY CHECK DISTANCES BETWEEN POINTS AS MEASURED ON THE GROUND:
SURVEY CONTROL
S u r v e y
C o n tr o l p w w o rk in g \c e n tr a l0
\d
\C
T L
(S D
F L
A P
)C S
A (1 d g n
:2
A u g u s t
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
A4
End Project
127+45.00
DELTA-01 ACCESS ROAD
SD FLAP CS23A(1)
Begin Project
101+18.00
23 miles
To Kadoka
20 miles
To Wall
Scale in Feet
500' 1000'
I-90
100+00
105+00
110+00
115+00
120+00
125+00
S it e M a p p w w o r k in g \c e n tr a l0
\d
\S
T E
S
D F
L A
P C
S A
.d g n
:2
S e p te m b e r
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SITE MAP
STATE PROJECT
A5
Average 21 ft
Station to Station
LENGTH OF PROJECT
101+18 to 127+45
TOTAL (mi)
TOTALS (ft)
(ft)
Roadway
0.50
See plans for locations of superelevations
METHOD OF SUPERELEVATION
NO SCALE
NOTE:
Min. superelevation 2% 6% Max. superele vation
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for
1:4
DETAIL A
5.
101+18 to 127+30
TYPICAL SECTION
101+18 to 127+45
EXISTING TYPICAL SECTION
TYPICAL SECTIONS
See the cross sections for cut and fill slope ratios.
no additional clearing to limit wetland impacts.
Clear 5' beyond slope stake limit except when adjacent to wetlands where there is roadway edge. Incidental to clearing and grubbing, not paid separately.
During clearing and grubbing, windrow existing topsoil material outside of existing
Round all earth slopes slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
5.
4.
3.
2.
1.
4-inch existing gravel (approximate depth)
Asphalt concrete pavement sides of roadway)
(Detail applies to both right and left
Shoulder up with roadway aggregate, method 2
Construct 30° pavement edge (safety edge)
1:4 (typ) 1:4 (ty p)
LC
2% Existing ground placed in 2 lifts
4.5" Asphalt concrete pavement
2%
Slope stake limit
See Detail A
Fog seal
(applied between lifts)
Tack coat
7" Roadway aggregate, method 2 method 2
Roadway aggregate, E X
R /W
E X
R /W
Slope stake limit pavement)
(top of
Profile grade
5.
first lift of asphalt)
(applied prior to
Prime coat
4.
4.
to existing using Roadway Aggregate 127+30 to 127+45 transition from 4.5" ACP from 18 ft to 24 ft Existing width varies
30°
0.6"
Clearing and construction limits
Traveled Way
11'
Traveled Way
11'
Shldr
1'
Shldr
1'
0'-5' seeding limits
Topsoil and seeding limits
Topsoil and
0'-5'
T y p ic a l
S e c ti o n
S h e e p w w o rk in g \c e n tr a l0
\d
\T
Y P
(S D
F L
A P
)C S
A (1
.d g n
:2
A p r il
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
A6
Subgrade edge base edge
Aggregate pavement edge
Asphalt concrete M a in li n e
R
Shoulder edge
Subgrade edge base edge
Aggregate
B
B
A
A
Typical culvert location
Approach Road
End Section A-A
R b y t h e C o n tr a c ti n g
O f f ic e r
R ig h t-o f w a y o r a s s ta k e d
Subgrade edge base edge
Aggregate pavement edge
Asphalt concrete
M a in li n e
Approach Road
A B
BA
b y t h e C o n tr a c ti n g
O f f ic e r
R ig h t-o f w a y o r a s s ta k e d base edge
Aggregate
End Section A-A x = 15' min. for type 2 approach x = 0' for type 1 approach
Flatten slope
V a ria b le
(1:6 des irabl e)1:4 o r flat ter
(1:6 desirable)
1:4 or flatter
Mainline edge subgrade
Normal
VPC
VPI Typical maximum grade ±10% ±2%
V a ria b le s Variable
4" Aggregate base s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach
A
Type
Class
(optional) design grade
Typical maximum Mainline stationing road centerline.
existing radii or widths. R1 is on the left side of the approach
Vary radii to fit unusual field conditions. Do not reduce 8.
grade. Under special conditions, use 6% maximum.
within ±2%. In snowy regions restrict this to a 0% to -2%
Construct approach roads with landing areas having grades 7.
thicknesses and foreslopes.
Refer to mainline typical sections for structural section 6.
with widths greater than 15 feet.
Apply the normal mainline crown section to approach roads 5.
Drawing 602-9).
the mainline roadway, use safety end sections (see Standard area. When a culvert must be placed within the clear zone of provide a flatter foreslope and increased mainline recovery
Place culverts at the end of the approach road radius to 4.
be varied ±20°.
Under special conditions, the approach road angle shown may 3.
mainline roadway construction.
Construct cut and fill slopes for approach roads to match with 2.
be field verified.
Stations shown are approximate locations. Actual locations to 1.
NOTE:
road connection on plan and profile sheet
Example of symbol showing standard approach
NO SCALE
90° 90°
6 6 5 5
TYPICAL SECTION
TYPES 1 & 2
APPROACH ROAD
SECTION A-A
SECTION B-B
TYPICAL SYMBOL
TYPICAL SECTION
TYPE 3
APPROACH ROAD
Match existing radii35102812122A127+05 Rt.
Match existing radii60601854542A124+91 Lt.
N/AN/A54443A110+81 Lt.
N/AN/A48443A101+45 Rt.
REMARKS
(ft)
R
(ft)
R
(ft)
W
LENGTH (ft)
TOTAL
LENGTH (ft)
PAVED
CLASS
TYPE
STATION
APPROACH ROAD SUMMARY
*Match Existing
Paved apronn/a*A3
200�ADT 5028E2
ADT < 199�100 4024D2
ADT < 100�25 4022C2
ADT < 252520B2
Minimum 2-way Use2518A2
Logging Truck Use4016D1
Farm Equipment2516C1
Minimum 1-way use2514B1
Field Access1512A1
SAMPLE APPLICATION
(ft) R
RADIUS
MIN.
(ft) W
WIDTH
MIN.
CLASSTYPE
TYPICAL PROFILE
APPROACH ROADS
TYPICAL SECTION
Paved length
Total length
W W
Total length
4' (typ.)
Paved length
4' (typ.)
4' (typ.)
W
VariableWVariable3' min.
20' desired 15' min.
1.3'W1.3'd
16'x
D D e s ig n S u rv
F p w w o rk in g \c e n tr a l0
\d
\T
Y P
(S D
F L A
P )C
S A
.d g n
:5
S e p te m b e r
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
A7
Sheet and Description
B3 B3 B3 B4 B4 B5 B5
Survey Summary
Miscellaneous Summary
Grading Summary
Drainage Summary
Surfacing Summary
Pavement Marking
Summary
Signing Summary Allowance Bid
Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 10 10
A0030 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING
CONTROL MILE 0.5 0.5
A0040 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 1.0 1.0
A0050 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL
A0070 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0080 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0090 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
A0100 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0110 20101-0000 CLEARING AND GRUBBING ACRE 1.7 0.1 1.8
A0120 20301-2400 REMOVAL OF SIGN EACH 4 4
A0130 20302-2100 REMOVAL OF PIPE CULVERT LNFT 166 9 175
A0140 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 446 14 460
A0150 20303-3200 REMOVAL OF SIDEWALK, CONCRETE SQYD 4.2 0.8 5.0
A0160 20402-0000 SUBEXCAVATION CUYD 200 As directed by CO
A0170 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1,373 127 1,500
A0180 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 18 2 20
A0190 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 58 7 65
A0200 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,918 232 3,150
A0210 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1,832 168 2,000
A0220 40601-0000 FOG SEAL TON 3.1 0.9 4.0
A0230 41102-1000 PRIME COAT, METHOD 1 SQYD 7,298 102 7,400
A0240 41105-0000 BLOTTER TON 10.8 0.2 11.0
A0250 41201-0000 TACK COAT TON 3.1 0.9 4.0
A0260 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT EACH 4 4
A0270 60201-0800 24-INCH PIPE CULVERT LNFT 29 6 35
A0280 60201-1000 36-INCH PIPE CULVERT LNFT 140 10 150
A0290 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT LNFT 132 8 140
A0300 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 2 2
A0310 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 4 4
A0320 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE CULVERT EACH 10 10
A0330 61509-0000 DETECTABLE WARNING PANELS SQYD 2.6 0.4 3.0
A0340 61902-2100 GATE, METAL, 30 FEET WIDTH (MODIFY EXISTING
GATE) EACH 1 1
A0350 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 20
MileStone: AD Checkin Date Completed: 04/10/23 Report Date: 04/10/23
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-A pr
-2
9:
A
M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\p w w or ki ng \c en tr al
\d
8\ [S
D F
LA
P
C S
A (1
0% S
O Q
.x ls m ]S he et
STATE PROJECT
B1SD FLAP CS23A
DELTA-01 ACCESS ROADSD
SHEET
Sheet and Description
B3 B3 B3 B4 B4 B5 B5
Survey Summary
Miscellaneous Summary
Grading Summary
Drainage Summary
Surfacing Summary
Pavement Marking
Summary
Signing Summary Allowance Bid
Schedule
A0360 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED
CAPACITY BUCKET, 24-INCH WIDTH HOUR 20
A0370 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED
CAPACITY HOUR 20
A0380 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER HOUR 20
A0390 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20
A0400 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM
CAPACITY HOUR 20
A0410 62301-0000 GENERAL LABOR HOUR 240
A0420 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
(BIOLOGIST) HOUR 10
A0430 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 10
A0440 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
A0450 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH SQYD 6,889 211 7,100
A0460 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.5 0.1 1.6
A0470 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.5 0.1 1.6
A0480 63301-0000 SIGN SYSTEM EACH 4 4
A0490 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A0500 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 3.9 0.1 4.0
A0510 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
-A pr -2
9:
A M
MileStone: AD Checkin Date Completed: 04/10/23 Report Date: 04/10/23 c:
\p w w or ki ng \c en tr al
\d
8\ [S
D F
LA
P
C S
A (1
0% S
O Q
.x ls m ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B2SD FLAP CS23A
DELTA-01 ACCESS ROADSD
SHEET
:4
N o v e m b e r
S u rv e y M is c G ra d in g p w w o rk in g \c e n tr a l0
\d
\T
A B
(S D
F L
A P
)C S
A (1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
MISCELLANEOUS SUMMARY
SURVEY, GRADING, AND
STATE PROJECT
NUMBER
SHEET
SD
B3
:5
A e b r u a r y
D r a in a g e a n d
S u r f a c in p w w o rk in g \c e n tr a l0
\d
\T
A B
(S D
F L
A P
)C S
A (1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARY
DRAINAGE AND SURFACING
STATE PROJECT
NUMBER
SHEET
SD
B4
:0
N o v e m b e r
S ig n in g S tr ip in g T
T C p w w o rk in g \c e n tr a l0
\d
\T
A B
(S D
F L
A P
)C S
A (1 d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES
AND TRAFFIC CONTROL
SIGNING, PAVEMENT MARKING,
STATE PROJECT
NUMBER
SHEET
SD
B5
B H
N
Begin 6" solid white stripe, LT/RT
Begin 4" double yellow stripe, CL
101+18
Existing edge of gravel
Remove and replace
M1-6
102+74, RT
to match existing
Sawcut existing asphalt
Proposed edge of pavement
100'50'0
Scale in Feet
Protect in place
Existing pipe culvert
E: 564840.60
N: 1539667.14
SD FLAP CS23A(1)
Begin Project
101+18.00
APN #688
John Paul Nuemann
Property Owner:
Buffalo Gap National Grassland
United States Forest Service
Property Owner:
A
CS-23A
Limits of construction
Protect in place
Existing fence
Limits of construction
Protect in place
Existing fence is approximate.
during survey. Location shown
Fiber optic line not marked
102+62 to 112+21Remove existing asphalt1
N00°44'50"E
.0
P
O
JACKSON
COUNTY
Existing ground
Profile grade
Match Existing
SD FLAP CS23A(1)
Begin Project
101+18.00 axis of rotation
Profile grade and
RT EOP
+1.80%
(RT)
+2.20%
(LT)
+2.00%
(RT & LT)
LT EOP
97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00
2,530 2,530
2,540 2,540
2,550 2,550
2,560 2,560
2,570 2,570
-1.300%
-0.301%
.1
V
I
' VC130
130K =
'INFSSD =
,5
.9
101+18 104+00101+48
:4
N o v e m b e r
M a in li n e P la n
P la n
S h e e t] p w w o r k in g
\c e n tr a l0
\d
\P
N P
S
D F
L A
P C
S
A
.d g n
DELTA 01 ACCESS ROAD 101+18 TO 104+00
STATE PROJECT
NUMBER
SHEET
SD
C1
N
Existing edge of gravel
Protect in place
Existing pipe culvert
A
4" double yellow stripe
6" solid white stripe
100'50'0
Scale in Feet
Proposed edge of pavement
APN #688
John Paul Nuemann
Property Owner:
Buffalo Gap National Grassland
United States Forest Service
Property Owner:
CS-23A
Protect in place
Existing fence
Limits of construction
Limits of construction
Protect in place
Existing fence is approximate.
during survey. Location shown
Fiber optic line not marked
102+62 to 112+21
Profile grade Existing ground axis of rotation
Profile grade and
RT and LT EOP
R ip r a p
C la s s
R t.
E n d s e c ti o n s L t.
a n d R t.
e q u iv a le n t
R C
P
I n s ta ll in h
-i n c h C
M P
R e m o v e e x is ti n
.1
P
I
104+00 105+00 106+00 107+00 108+00 109+00 110+00 111+00
2,530 2,530
2,540 2,540
2,550 2,550
2,560 2,560
2,570 2,570
+0.459%
-1.051%
-0.301% +0.459%
.6
V
.3
V
' VC390
258.37K =
'909.93SSD =
' VC190
250K =
'INFSSD =
104+00 111+50
:3
N o v e m b e r
M a in li n e P la n
P la n
S h e p w w o r k in g
\c e n tr a l0
\d
\P
N P
S
D F
L A
P C
S
A
.d g n
DELTA 01 ACCESS ROAD 104+00 TO 111+50
STATE PROJECT
NUMBER
SHEET
SD
C2
N
Existing edge of gravel
4" double yellow stripe
6" solid white stripe
100'50'0
Scale in Feet
Proposed edge of pavement
APN #688
John Paul Nuemann
Property Owner:
Buffalo Gap National Grassland
United States Forest Service
Property Owner:
CS-23A
Protect in place
Existing fence
Protect in place
Existing fence
Limits of construction
Limits of construction between headwalls (typ.)
1/2" expansion joint is approximate.
during survey. Location shown
Fiber optic line not marked
102+62 to 112+21
N01°06'07"E axis of rotation
Profile grade and
RT and LT EOP
Existing ground
Profile grade
'L x
'W x
'W x
'H
R ip r a p C la s s
L t.
E n d s e c ti o n
R t.
H e a d w a ll
L t.
I n s ta ll in c h
R C
P
-i n c h C
M P
R e m o v e e x is ti
R ip r a p C la s s
L t.
E n d s e c ti o n s L t.
a n d R t.
I n s ta ll in c h
R C
P
-i n c h C
M P
R e m o v e e x is ti
'L x
'W x
'W x
'H
R ip r a p C la s s
L t.
E n d s e c ti o n
S R t.
H e a d w a ll
S L t.
I n s ta ll in c h
R C
P
-i n c h C
M P
R e m o v e e x is ti
112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00
2,530 2,530
2,540 2,540
2,550 2,550
2,560 2,560
2,570 2,570
+4.84 6%
-0.850%
-1.051%
+4.84 6%
.3
V
.4
V
' VC220
38.62K =
'299.50SSD =
' VC270
46K =
'237.46SSD =
111+50 119+00
:5 e b r u a r y
M a in li n e P la n
P la n
S h e p w w o r k in g
\c e n tr a l0
\d
\P
N P
S
D F
L A
P C
S
A
.d g n
DELTA 01 ACCESS ROAD 111+50 TO 119+00
STATE PROJECT
NUMBER
SHEET
SD
C3
J B
N
Existing edge of gravel
6" solid white stripe
Remove and reset
Delta-01 Visitor Parking"
National Historic Site
"Minuteman Missile
124+40, RT
W16-7p
Install W11-2 and
Remove R1-5
124+92, RT
Protect in place
Existing gate
A
Crosswalk
125+12
Protect in place
Existing pipe culvert
100'50'0
Scale in Feet
Proposed edge of pavement
4" double yellow stripe
Buffalo Gap National Grassland
United States Forest Service
Property Owner:
Minuteman Missile NHS
National Park Service
Property Owner:
W16-7p
Install W11-2 and
Remove R1-5
125+49, LT
CS-23A
Protect in place
Existing fence
Limits of construction
Protect in place
Existing fence
Limits of construction
APN #688
John Paul Nuemann
Property Owner:
Remove existing asphalt
Remove 5' 9" existing sidewalk panel
Protect in place
Existing cattle guard
End 6" solid white stripe
124+39
Begin 6" solid white stripe
125+34
N01°22'06"E
.8
P
I
.8
P
I
-2.00%
(RT)
+2.00%
(RT)
axis of rotation
Profile grade and
RT EOP
Existing ground
Profile grade
LT EOP
R ip r a p
C la s s
R t.
E n d s e c ti o n s L t.
a n d R t.
e q u iv a le n t
R C
P
I n s ta ll in h
-i n c h C
M P
R e m o v e e x is ti
119+00 120+00 121+00 122+00 123+00 124+00 125+00 126+00
2,540
2,550 2,550
2,560 2,560
2,570 2,570
2,580 2,580
+0.886%
+6.2 00%
.4
V
.4
V
.5
V
' VC120
36.92K =
'392.11SSD =
' VC190
109K =
'INFSSD = ' VC220
41K =
'220.24SSD =
124+00 124+75119+00 126+50
:3
N o v e m b e r
M a in li n e P la n
P la n
S h e p w w o r k in g
\c e n tr a l0
\d
\P
N P
S
D F
L A
P C
S
A
.d g n
DELTA 01 ACCESS ROAD 119+00 TO 126+50
STATE PROJECT
NUMBER
SHEET
SD
C4
N of gravel
Existing edge
E: 567467.03
N: 1539718.59
SD FLAP CS23A(1)
End Project
127+45.00
Remove and replace
R1-1
127+26
Remove and reset
Delta-01 Visitor Parking"
"Minuteman Missile National Historic Site
126+80, RT
End 6" solid white stripe
End 4" double yellow stripe
126+80
A
Protect in place
Existing pipe culvert
100'50'0
Scale in Feet of pavement
Proposed edge
Buffalo Gap National Grassland
United States Forest Service
Property Owner:
CS-23A
Modify existing gate (see detail)
127+05, RT
Limits of construction
APN #688
John Paul Nuemann
Property Owner:
aggregate
Transition to existing with roadway
127+30 to 127+45
Remove existing asphalt
Protect in place
Existing cattle guard and 7" roadway aggregate, method 2
End 4.5" asphalt concrete pavement
127+30
.3
P
E
STOP
-2.00%
(LT)
+2.00%
(RT)
LT EOP
RT EOP
Profile grade
Existing ground
Match Existing
SD FLAP CS23A(1)
End Project
127+45.00 axis of rotation
Profile grade and and 7" roadway aggregate, method 2
End 4.5" asphalt concrete pavement
127+30 aggregate
Transition to existing with roadway
127+30 to 127+45
127+00 128+00 129+00
2,560 2,560
2,570 2,570
2,580 2,580
2,590 2,590
+2.950
126+50 127+30
,5
.1
:4
N o v e m b e r
M a in li n e P la n
P la n
S h e p w w o r k in g
\c e n tr a l0
\d
\P
N P
S
D F
L A
P C
S
A
.d g n
DELTA 01 ACCESS ROAD 126+50 TO 127+45
STATE PROJECT
NUMBER
SHEET
SD
C5
J B
N
40'20'0
Scale in Feet longitudinal joint
Asphalt concrete pavement swale flowline
Asphalt concrete pavement
See special 615-A
Detectable warning panels
See special 615-A
Detectable warning panels
AND PEDESTRIAN RAMP
LAUNCH CONTROL DRIVEWAY
DELTA-1 ACCESS ROAD
N01°22'06"E
D
S h e e t
P la n
S h e p w w o rk in g \c e n tr a l0
\d
\P
L A
(S D
F L
A P
)C S
A
(1
.d g n
:5
N o v e m b e r
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
D1 structural section
See typical sections for
Finished grade according to Section 204
Backfill with material
See note 7
Geotextile filter structural section
See typical sections for
Finished grade according to Section 204
Backfill with material
NOTE:
1. Replace unsuitable material according to Subsection 204.07 unless otherwise specified.
2. Minimum subexcavation dimensions are 6 ft wide x 6 ft long.
3. Do not place backfill material within the structural section.
4. Widen top of subexcavation area to allow for bench width in bottom layers. Provide a 1 ft min. bench width for every 2 ft of subexcavation depth.
5. Daylight to drain when the excavation is within 4 ft of the subgrade hinge point. Slope the excavation bottom 2% toward the daylight for drainage, or match the existing roadway cross slope when steeper than
2%.
6. At daylight locations, match the existing fill slope or make slope adjustments to match the subgrade hinge point. Do not construct slopes steeper than 1V:2H unless approved by the CO.
7. Furnish geotextile filter type conforming to subsection 714.01(a). See summary tables for class and type.
NO SCALE
SUBEXCAVATION
TYPICAL SECTION
BENCH DETAIL
See bench detail than 2 ft Bench if greater Varies (2 ft typ.)
Width of need
Total subexcavation width
1'
2 ft max.
See note 4 min.
SUBEXCAVATION
C204-51
:2
N o v e m b e r
C
S h e p w w o r k in g \c e n tr a l0
\d
\C
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
12/2012DETAIL APPROVED FOR USE
10/2020 08/2020 08/2014REVISED:
STATE PROJECT
NUMBER
SHEET
SD
F1
C251-50
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITHOUT DITCH
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITH DITCH
AT CULVERT OUTLETS
PLACED RIPRAP
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
2'
49.8
38.7
18.5
13.3
5.2
3.2
1.7
44.5
34.1
15.6
10.9
3.9
2.2
2'
38.6
29.9
15.2
10.8
4.5
2.7
1.4
35.6
27.3
13.4
9.3
3.6
0.9
NO SCALE
PLAN VIEW PLAN VIEW
END SECTION
CULVERT WITHOUT STANDARD
SECTION C-C
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r m in
S p a n
D ia o r
A A
B B
PLAN VIEW
Variable slope ground Original
END SECTION
CULVERT WITHOUT STANDARD
SECTION B-BSECTION A-A
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r
S p a n
D ia o r m in .)Variable slope ground Original m in
WITHOUT DITCH
PROTECTIVE APRON AT CULVERT OUTLET
WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET
C C
C
NOTE:
H
D
SECTION E-E
SECTION D-D
ground Original m in ditch slope
Match existing
D
H m in ground Original m in
D m in
H ditch slope
Match existing
D D EE
ground
Original
W id th
D it c h B o tt o m
W id th
D it c h B o tt o m
PLAN VIEW
or flatter
Sloped 1V:2H
Flowline not be measured for payment.
3. Excavation for placement of riprap will tables for class and type.
subsection 714.01(a). See summary
2. Furnish geotextile filter conforming to slopes of less than 10%.
Use for aprons serving culverts with 1.
See note 2 Geotextile filter
See note 2 Geotextile filter
See note 2 Geotextile filter
See note 2 Geotextile filter
See note 2 Geotextile filter
L
L
D D
D
H
H
D D
D
L
D
D
4D
D
D D
D
D D
(min.)
(min.)
:5
M a y
C p w w o r k in g \c e n tr a l0
\d
\C
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
DETAIL APPROVED FOR USE
09/2021 08/2020 08/2014REVISED:
STATE PROJECT
NUMBER
SHEET
SD
G1
HEADWALL FOR ELLIPTICAL PIPE
SIZE OF ELLIPTICAL PIPE CULVERT (SPAN x RISE)
A
B
C
D
F
H
S
Conc. Pipe
HEADWALL FOR CIRCULAR PIPE
DIAMETER OF PIPE CULVERT
A
B
C
D
F
Conc. Pipe
C.M. Pipe
1.
2.
3.
4.
5.
Quantities shown are for one headwall with pipe at right angles.
Construct headwalls using dimensions shown under values for 1V:1.5H slope, unless otherwise designated by the CO.
FRONT ELEVATION SIDE ELEVATION
spacing (all ways)
NOTE:
Fi ll S lo p e crushed aggregate
Aggregate base or
Orient all headwalls parallel to the roadway centerline unless otherwise indicated in the plans or by the CO.
When pipes are on a skew, adapt and lengthen headwalls as directed.
".4 3Chamfer all exposed corners not rounded to
CUBIC YARDS OF CONCRETE
2.904
5'-8"
13'-0"
5'-4"
0'-9"
3'-7"
3'-6"
2'-0"
1'-0"
68" x 43"
2.969
5'-0"
13'-0"
4'-11"
0'-9"
3'-2"
3'-3"
1'-11"
1'-0"
60" x 38"
2.801
4'-5"
12'-11"
4'-7"
0'-9"
2'-10"
2'-9"
1'-11"
1'-0"
53" x 34"
2.512
4'-1"
12'-1"
4'-5"
0'-9"
2'-8"
2'-8"
1'-11"
1'-0"
49" x 32"
2.101
3'-9"
10'-11"
4'-2"
0'-9"
2'-5"
2'-7"
1'-10"
1'-0"
45" x 29"
1.811
3'-6"
10'-2"
4'-0"
0'-9"
2'-3"
2'-5"
1'-9"
0'-11"
42" x 27"
1.500
3'-2"
9'-2"
3'-9"
0'-9"
2'-0"
2'-4"
1'-8"
0'-10"
38" x 24"
1.236
2'-10"
8'-6"
3'-7"
0'-9"
1'-10"
2'-1"
1'-6"
0'-10"
34" x 22"
0.855
2'-6"
7'-2"
3'-3"
0'-8"
1'-7"
1'-11"
1'-5"
0'-9"
30" x 19"
0.502
1'-11"
5'-5"
2'-10"
0'-8"
1'-2"
1'-8"
1'-2"
0'-8"
23" x 14"
CUBIC YARDS OF CONCRETE
0.257
0.241
3'-8"
2'-0"
0'-6"
1'-0"
1'-2"
0'-9"
0'-6"
6"
0.521
0.492
5'-0"
2'-11"
0'-8"
1'-3"
1'-7"
1'-1"
0'-8"
15"
0.739
0.697
6'-0"
3'-2"
0'-8"
1'-6"
1'-9"
1'-3"
0'-9"
18"
1.398
1.319
8'-0"
3'-9"
0'-9"
2'-0"
2'-2"
1'-6"
0'-11"
21" or 24"
2.198
2.067
10'-0"
4'-3"
0'-9"
2'-6"
2'-6"
1'-9"
1'-0"
27" or 30"
3.145
2.947
12'-0"
4'-9"
0'-9"
3'-0"
2'-9"
2'-0"
1'-0"
33" or 36"
#4 Bars at 9" max.
D
S
L
A
BD
F
C
H
(typ.
2"
(typ.)
2" ty p ty p
STANDARD APPROVED FOR USE 6/2005
3/2016 DRAFT:
REVISED:
601-4
SMALL PIPE CULVERT
CONCRETE HEADWALL FOR
S td p w w o r k in g \c e n tr a l0
\d
\S td .d g n
:2
N o v e m b e r
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
T1
1.
2.
3.
4.
5.
6.
MULTIPLE ROUND PIPE INSTALLATION SUPPLEMENTAL CONCRETE PIPE TIE
PIPING PLUG
TRENCH INSTALLATIONEMBANKMENT INSTALLATION
CONCRETE ROUND PIPE CULVERT LEGEND:
Bedding material (uncompacted).
Embankment material placed in layers
Impermeable backfill material.
FILL HEIGHT AND PIPE CLASS TABLE
BEDDING DEPTH
PIPE
SIZE
MINIMUM SPACING
EMBANKMENT TRENCHDIAMETER
DEPTHPIPE SIZE (H)
CLASS VCLASS IVCLASS IIICLASS II
TRENCH
CLASS VCLASS IVCLASS IIICLASS II
EMBANKMENT
Construct a piping plug of impermeable backfill material at the pipe inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.
Roadway embankment
Limits of pipe compaction
SECTION A-A
When directed, camber pipe culverts upwards from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length.
Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.
Measure minimum cover from the top of the pipe culvert to the subgrade for flexible pavements, and to the top of the pavement for rigid pavements.
Measure maximum fill height from the top of the pipe to the top of the pavement for both flexible and rigid pavements.
Pipe compaction limits shown are for pipe installation in an embankment. For pipe installation in a trench, the compaction limits shall be the walls of the trench.
Where unyielding or unstable material is encountered, install the pipe culvert according to the limits of pipe
Maximum fill heights for pipe culvert installations may be increased on approval of site-specific structural pipe designs meeting the criteria of
AASHTO Standard Specifications for Highway Bridges.
Use Supplemental Concrete Pipe Tie when specified in the contract documents.
A
A
Compacted backfill material placed in layers lean concrete backfill in accordance with Section 614
Bedding (See table)Bedding (See table)
Finished subgrade before trench excavation embankment height
Finished subgrade or to springline backfill
Compacted
Piping plug end treatment
Culvert
Embankment slope
High water elevation
Pipe culvert holes (typ.)
Concrete pipe tie when precast
Tapered holes permitted over pipe joint
Do not install fastener
O Ring if required
CULVERT INSTALLATION
CONCRETE PIPE
compaction shown on Standard 602-3.
INCHES
DIAMETER
INCHES
COVER
MINIMUM
MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE IN FEET
> 54"
12" TO 54"
6"
4"
OVER 96"
36"-96"
12"-36"
48"
0.5H
15"
72"
72"
2H
" min.2 12'-6 not exceeding 6" compacted depth.
not exceeding 6" compacted depth, or
" dia. hole for4
1" dia. Joint tie
NOTE:
H
Width
° 60°
H
H
H
H
(See table)
Minimum spacing
H
H H
2H2H
H H1
1'-0" (min.)
" max.2
2'-9 ty p ic a l m a x
1'-0"±
1'-3" min.
1'-5" max.
STANDARD APPROVED FOR USE 12/1993
6/2008 DRAFT:
6/2005 4/1994 REVISED:
602-7
S td p w w o r k in g \c e n tr a l0
\d
\S td .d g n
:2
S e p te m b e r
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
T2
Variations in design and dimensions are permitted to allow for manufacturer's standards.
Fabricate the outlet end section with a groove end and the inlet end section with a tongue end.
Warp embankment slopes to match the slope of the flared end section.
1.
2.
3.
PLAN PLAN
ELEVATIONELEVATION
SECTION A-A SECTION B-B
END SECTIONS FOR ROUND PIPE CULVERT
PIPE
SIZE
T A B C L W F R1 R2 R3
NO SCALE
A
A B
B
CL CL
CLCL
NOTE:
INCHES
DIMENSIONS
INCHES
DIAMETER
12 2
"2
24 8
13 8
FOR ROUND PIPE
CONCRETE END SECTION
A
T D ia m e te r T
F
A
BC
TWT
TDia.T
R
TDia.T
TWT
TWT TWT
BC
L
T D ia m e te r T
T
T
STANDARD APPROVED FOR USE 12/1993
6/2005 4/1994 REVISED:
602-8
S td p w w o r k in g \c e n tr a l0
\d
\S td .d g n
:2
S e p te m b e r
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
T3
(IN.)
ROUND SIZE
EQUIVALENT
SPAN X RISE
SPAN X RISE
1 - 13 14 - 21
HE - III HE - I V
1 - 13 14 - 21 22 - 29
VE - III VE - I V VE - V
68 x 106
63 x 98
58 x 91
53 x 83
48 x 76
43 x 68
38 x 60
34 x 53
32 x 49
29 x 45
SPAN
RISE
SPAN
RISE
MAX. HEIGHT OF COVER IN FEET MAX. HEIGHT OF COVER IN FEET
HORIZONTAL INSTALLATION VERTICAL INSTALLATION
106 x 68
98 x 63
91 x 58
83 x 53
76 x 48
68 x 43
60 x 38
53 x 34
49 x 32
45 x 29
42 x 27
38 x 24
34 x 22
30 x 19
23 x 14
ELLIPTICAL CONCRETE PIPE COVER TABLES FOR H-20 LIVE LOAD
M E
T H
O D
A
B
E D
D
IN
G
M E
T H
O D
A
B
E D
D
IN
G
M E
T H
O D
A
B
E D
D
IN
G
M E
T H
O D
A
B
E D
D
IN
G
M E
T H
O D
A
B
E D
D
IN
G measure maximum fill height from the top of the pipe culvert to the top of the pavement.
cover from the top of the pipe culvert to the top of the pavement. For all roadway surface types, of the pipe culvert to the bottom of the roadway subgrade. For rigid pavement measure minimum
4. For flexible pavement and aggregate surface roadways, measure minimum cover from the top under entrances and median crossovers is 9 inches.
the standard height have been exhausted. Ensure minimum finished height of cover for pipes minimum finished cover height of 12 inches will be allowed only if all possible means to obtain whichever is greater. In cases in which these cover heights cannot be achieved, an absolute of the span or 2 feet,2
13. Standard minimum finished height of cover for all pipes is with a cut.
minimum of 10 times the span plus 3 feet on each side of the pipe or to the intersection greater. Extend cover the full length of the pipe. Extend the approach fill ramp to a of the span or 3 feet, whichever is2 1 allowing construction traffic to cross installation are
2. To protect pipe during construction, ensure the minimum heights of cover prior to
1. Cover heights indicated in the Tables are for finished construction.
NOTES:
602-ASTANDARD PC-1, PAGE 107.06
VIRGINIA DEPARTMENT OF TRANSPORTATION
ADOPTED FROM:
NO SCALE
ELLIPTICAL CONCRETE PIPE
Sheet 1 of 3
D e lt a S p e c ia l S h e e t p w w o r k in g
\c e n tr a l0
\d
\s p d e ta il .d g n
:5 e b r u a r y
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY SPECIAL
STATE PROJECT
T4
(R/2) + 12"
4"
(R/2) + 12"
4"
MAX. 24"
MIN. 8",
1' OF H
" PER 2
(R/2) + 12"
MAX. 24"
MIN. 8",
1' OF H
" PER 2
(R/2) + 12" (R/2) + 12"
(R/2) + 12"
PIPE WHERE DIRECTED BY THE CO.
MAY BE ELIMINATED UNDER ENTRANCE
AS SHOWN ON TABLES
FLEXIBLE PIPE
WHEN H IS LESS THAN OR EQUAL TO 30'
RIGID PIPE
NOTED ON PLANS:
USED AS FOLLOWS UNLESS OTHERWISE
METHOD "A" PIPE BEDDING SHALL BE
X= S + 36"
CULVERTS WHERE S = 36" AND OVER
X= S + 24"
CULVERTS LESS THAN S = 36"
STANDARD PB-1, PAGE 107.02
VIRGINIA DEPARTMENT OF TRANSPORTATION
ADOPTED FROM:
TOP OF FILL
EARTH
FOUNDATION FILL *
TO TOP OF PIPE
"X" DIMENSION TO BE MAINTAINED
MIN. 1/10 R
S
S
X
R/2
R
H
GROUND LINE
TOP OF FILL
LINE
GROUND
EARTH
FOUNDATION FILL *
MIN. 1/10 R
X
R/2 R
MIN. S1 MIN. S 1S
S
MIN. 1/10 R
R
R/2
MIN. S1 MIN. S1
LINE
GROUND
SOIL
UNYEILDING
ROCK OR
X
S
S
H
TOP OF FILL
R
R/2
MIN. 1/10 R BEDDING MATERIAL
EARTH
LINE
GROUNDMIN. S
MIN. S1 S1
S2
H
TOP OF FILL
b
TO TOP OF PIPE
TO BE MAINTAINED
"X" DIMENSION
EARTH
GROUND LINE
TOP OF FILL
R/2
R b
MIN. 1/10 R
S
S2
H
X
TOP OF FILL
GROUND LINE
SOIL
UNYEILDING
ROCK ORR/2
R
MIN. 1/10 R
TO TOP OF PIPE
"X" DIMENSION TO BE MAINTAINED
X
H
S
S2
BEARING SOIL.
DEPTH AS SHOWN ON PLANS OR TO FIRM
OUTSIDE RISE OF PIPE.
INSIDE SPAN OF PIPE.
OUTSIDE SPAN OF PIPE.
DRAINAGE STRUCTURE TO FINISHED GRADE.
HEIGHT OF COVER MEASURED FROM TOP OF
b =
R =
S =
S =
H =
OTHERWISE UNSUITABLE MATERIAL
FOUNDATION SOFT, YIELDING, OR
OTHERWISE UNSUITABLE MATERIAL
FOUNDATION SOFT, YIELDING, OR
ROCK FOUNDATIONNORMAL EARTH FOUNDATION
NORMAL EARTH FOUNDATION ROCK FOUNDATION
PIPE PROJECTION ABOVE GROUND LINE
NO PROJECTION OF PIPE ABOVE GROUND LINE
EMBANKMENT
BORROW MATERIAL IN ACCORDANCE WITH SUBSECTION 209.09
SUITABLE ROADWAY EXCAVATION OR UNCLASSIFIED
SUBSECTIONS 209.09 AND 704.03
BACKFILL MATERIAL IN ACCORDANCE WITH
SUBSECTIONS 209 AND 704.01
FOUNDATION FILL MATERIAL IN ACCORDANCE WITH
CULVERT INSTALLATION
ELLIPTICAL CONCRETE PIPE
602-A
Sheet 2 of 3
D e lt a
S p e c ia l p w w o r k in g
\c e n tr a l0
\d
\s p d e ta il .d g n
:0 e b r u a r y
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY SPECIAL
STATE PROJECT
T5
STANDARD ES-1A, PAGE 102.02
VIRGINIA DEPARTMENT OF TRANSPORTATION
ADOPTED FROM:
END SECTION DIMENSIONS
6'-0"
5'-6"
5'-0"
4'-0"
2'-8"
E
END VIEW
SPAN X RISE
23" X 14"
30" X 19"
38" X 24"
42" X 27"
45" X 29"
53" X 34" 15"
13"
12"
10"
9"
6"
A B
2'-3"
2'-11"
3'-8"
4'-8"
4'-11"
5'-3" 2'-11"
3'-3"
1'-8"
2'-6"
3'-2"
3'-10"
C L
6'-1"
6'-1"
6'-2"
6'-2"
8'-2"
8'-2"
3'-6"
R is e
Span
E
X
E
X
C B
2:1 SLOPE
APPROX.
A
L of Pipe
Length C
B
SLOPE DETAIL
SECTION X-X
PLAN VIEW
Spigot End on Inlet End-Sections Hub End on Outlet End-Sections
Shoulder
Culvert
Length of Pipe
Fabric Reinforcement
Bar or Steel
End Section
FOR ELLIPTICAL PIPE
CONCRETE END SECTION
602-A
NOTE:
of 4,000 pounds per square inch (psi) Use concrete with a minimum strength
Sheet 3 of 3
D e lt a
S p e c ia l p w w o r k in g
\c e n tr a l0
\d
\s p d e ta il .d g n
:0 e b r u a r y
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY SPECIAL
STATE PROJECT
T6
NOTE:
.2
"1.6"-2.4" c-c
TRUNCATED DOME
SECTION
of base diameter
Top diameter of 50% - 65%
0.9"-1.4"
Base diameter of
RETROFIT
DETECTABLE WARNING PANEL
NO SCALE 615-A
Truncated dome
5'
.6 m in
1.6" - 2.4" c-c
.6
.4 c c
PLAN
WITH TRUNCATED DOMES
DETECTABLE WARNING FIELD
EAST CROSSWALK APPROACH
WEST CROSSWALK APPROACH
Existing sidewalk with truncated domes detectable warning field
Retrofit surface applied
Proposed edge of driveway
Proposed edge of road concrete pavement
Replace with asphalt to be removed.
Existing sidewalk panel
Existing sidewalk with truncated domes detectable warning field
Retrofit surface applied approval prior to purchase and installation.
in yellow color. Submit color sample to CO for review and
2. Detectable warning surface are to be polymer surface applied from the edge of existing concrete sidewalk end.
Install truncated dome surfaces a minimum of 6-inches1.
s p p w w o r k in g
\c e n tr a l0
\d
\s p
A
.d g n :5 c to b e r
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY SPECIAL
STATE PROJECT
T7
619-A
C GATE AND ROADL
NOTES:
MODIFY EXISTING GATE
See note 2
Install retroreflecitve delineation.
horizontal bar.
measured horizontally along the full width of the top stripes alternatively red and white at 16-inch intervals
Install retroreflective delineation consisting of vertical
EXISTING GATE
ELEVATION
3.
2.
1.
(modify existing gate).
the pay item 61902-2100 Gate, Metal, 30 feet width delineation, ect. shown on this detail are included in
All items, including concrete, rest posts, retroreflective new retroreflective material.
Remove existing retroreflecitve material prior to installing
Existing Sign
Rest Post, 2 req'd.
Weld eye bolts to post
'' Std. link chain2
Weld chain to eye bolt
Weld
Concrete
Std. 4'' Iron Pipe
Std. 4'' Coupling
Gate arm in open position
'' x 2'' Std. Eye Bolts with nuts4
1'-0"
Std. 4" Galv. Pipe cap
REST POST DETAIL
Closed Gate Position
Rest Post Rest Post
Open Gate Position
Direction
Travel
GATE PLAN
Existing Parking Lot
Edge of Roadway rest post
Remove existing
U.S CUSTOMARY SPECIAL
NPS.GOV/MIMI
FOR INFORMATION PLEASE VISIT:
PARK CLOSED
F ie ld V e ri fy
:1 c to b e r
S p
A
S h e p w w o r k in g
\c e n tr a l0
\d
\s p
A
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
SD
T8
W
3W
H
H
W 4
W 4 W 4
W
W 6
W
W
W m in
6' (min.)
m in
W
W of curb
Front face
** See Note 3
* See Note 2 pavement
Edge of
6' (min.)
m in shoulder
Edge of
6' (min.)
m in pavement
Edge of
POST TYPE
POST
SINGLE
POST
DOUBLE
POST
TRIPLE
POST
QUADRUPLE
POST SIZE TABLE
MAXIMUM SIGN AREA (SQFT)
SIZE
POST
2" 12 ga.
2" 12 ga.
10*
10*
24**
SIGN STRUCTURES
m a x
H /5 o r m a x
H /5 o r m a x
H /5 o r
SINGLE POST DOUBLE POST TRIPLE POST QUADRUPLE POST
(min.)
2'
W
ROADSIDE SIGN IN RURAL DISTRICT
WITHOUT SHOULDER WITH SHOULDER
WITH ADVISORY SPEED PLAQUE
OR RESIDENTIAL DISTRICT
ROADSIDE SIGN IN BUSINESS
Steel
Square Tubular m a x
W
W
W
(typ.)
2" (max.)
(typ.)
2" (max.)
(typ.)
2" (max.)
NOTES:
additional information.
Refer to Section 2A.21 of the MUTCD, latest edition, for tubular steel posts.
Refer to Detail Sheet 3 of 3 for bracing details for square for square tubular steel posts.
Refer to Detail Sheet 2 of 3 for breakaway support details according to manufacturer's recommendations.
panel area is equal to 24 square feet, use slip base
For square tabular steel double posts for which the sign square feet or less but W is over 4 feet, use double posts.
For square tubular for which the sign panel area is 10
Uniform Traffic Control Devices" (MUTCD), latest edition.
Locate and set sign height according to the "Manual on
6.
5.
4.
3.
2.
1.
633-A
Sheet 1 of 3
EFLHD STANDARD DETAIL E633-02
ADOPTED FROM:NO SCALE
STOP
SPEED
LIMIT
M PH
A p w w o r k in g
\c e n tr a l0
\d
\s p d e ta il .d g n
:2
A p r il
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY SPECIAL
STATE PROJECT
T9
Existing ground m in
Tr af fic fl ow
SQUARE TUBULAR STEEL POST
BREAKAWAY SIGN SUPPORT
m in
WOOD AND STEEL POSTS
BREAKAWAY SIGN SUPPORT
m a x th is fa ce o f p os t)
(M ou nt si gn p an el on
See Notes 5 and 6
Galvanized steel corner bolt
See Notes 5 and 6
Anchor (12 ga. min.)
Square tubular sign post
8.
7.
6.
5.
4.
3.
2.
1.
latest edition, for additional information.
Refer to Section 2A.21 of the MUTCD, bracing details.
Refer to Detail Sheet 3 of 3 for sign mounting details.
Refer to Detail 6Sheet 1 of 3 for sign latest edition of the MUTCD.
Signs and Markings" as specified in the standards in the "Standard Highway
For sign punching details, see the blank position.
Maintain the post assembly in a plumb accept the post size specified.
manufacturer's recommendations to
Size the anchor according to the to the manufacturer's recommendations.
the anchor with a corner bolt according
Attach the square tubular steel post to non-breakaway signs.
barrier. Do not place holes in posts of the clear zone or shield with approved
Place non-breakaway signs outside signs placed behind protective barriers.
Breakaway sign support is not required for
STATE PROJECT
633-A
EFLHD STANDARD DETAIL E633-03
ADOPTED FROM:NO SCALE
Sheet 2 of 3
A p w w o r k in g
\c e n tr a l0
\d
\s p d e ta il .d g n
:1 e b r u a r y
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY SPECIAL
STATE PROJECT
T10
Sign panel
Sign post
Sign bracing
SIGN BRACING
5.
4.
3.
2.
1.
TOLERANCES
BRACING INSTALLATION
latest edition, for additional information.
Refer to Section 2A.21 of the MUTCD, mounting details.
Refer to Detail Sheet 1 of 3 for sign and the steel washer.
the sign panel's retroreflective sheeting
Use neoprene or nylon washers between latest edition of the MUTCD.
Signs and Markings" as specified in the standards in the "Standard Highway
For sign punching details, see the blank when specified or as directed by the CO.
braces on signs with widths of 36 inches of 48 inches or greater. Install sign
Install sign braces on signs with widths
633-AEFLHD STANDARD DETAIL E633-04
ADOPTED FROM:NO SCALE
Sign panel head bolt, nut, and washers (typ.)
" dia. x 1" long galvanized hex 4 head bolt, nut, and washers (typ.)
" long galvanized hex 2
" dia. x 38 sign bracing " Galvanized steel 8
SQUARE TUBULAR STEEL POST
Square tubular sign post in sign panel (typ.)
" dia. hole 16
Field drill
Sheet 3 of 3
" to 2"2 t o
A p w w o r k in g
\c e n tr a l0
\d
\s p d e ta il .d g n
:1 e b r u a r y
SPECIAL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY SPECIAL
STATE PROJECT
T11
C634-50
4 4
White edge line center line
Broken yellow
White edge line yellow center line
Broken and solid
White edge line yellow center line
Solid double
White edge line
White edge line yellow center line
Solid double yellow center line
Solid double
PAVEMENT JOINT
AND TOP LIFT
CENTERLINE STRIPING
4" or as required by the state.
NO SCALE
L w
L w
DETAIL C
Two-way traffic
No passing zone both directions
L w
L w and top lift pavement joint
Striped centerline
Shoulder is applied. See note 2
To be used on curves where curve widening centerline
Staked design
Shoulder is applied. See note 2
To be used on curves where curve widening centerline
Staked design
Shoulder
DETAIL A
Shoulder
DETAIL B
Shoulder w /2
Staked Centerline and top lift pavement joint
Striped centerline
Staked centerline
CURVE WIDENING ON SIMPLE CURVES (INSIDE)
CURVE WIDENING ON SPIRAL CURVES
CURVE STRIPING DETAIL ON SIMPLE CURVES
(normal edge of shoulder)
Edgeline striping
(normal edge of shoulder)
Edgeline striping
(normal edge of shoulder)
Edgeline striping
(normal edge of shoulder)
Edgeline striping
Two-way traffic
Passing zone both directions
Two-way traffic
No passing zone single lane direction
(Staked)
(Staked)
ON SPIRAL CURVES
STRIPING DETAIL
NOTE:
to curve widening on simple curves.
Centerline offset striping is only applicable curve widening.
widths remain constant throughout the widths within the traveled way. Shoulder curve widening to achieve equal lane
Paint centerline striping on curves with ranges and quantities for pavement markings.
See Summary for tables showing station normal edge of shoulder.
way and curve widening, 2" (max.) from the
5. Paint the edgeline striping outside the travel
4.
3.
2.
1.
40'
30'10'
10'
40'
30'
No Passing Zone
No Passing Zone
Travel way (L)Travel way (L) curve widening (w) guardrail offset shoulder (s) shoulder (s) w/2 shoulder (s)
Travel way (L) curve widening (w/2)
Travel way (L) guardrail offset curve widening (w/2) shoulder (s) s s L
L
Length of curve widening
L L s s s s
L w /2
L w /2
2L w
2L w s s s s
2L w
Length of curve widening
L L
L L
2L w s s w /2
L w /2
L w /2 s s s s
Paved ditchPaved ditch
:0
N o v e m b e r
C p w w o r k in g \c e n tr a l0
\d
\C
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
07/2004DETAIL APPROVED FOR USE
08/2021 01/2018 08/2014 08/2006REVISED:
STATE PROJECT
NUMBER
SHEET
SD
T12 or alternative methods approved by CO daily single lane closures and flaggers
Construction to be completed using
123+60 to 127+45
600'300'0
Scale in Feet
N
1 2 3 4 5
1 2 3
W20-1 W20-4 W3-3 R10-6 G20-2
Phase 1 Construction
Phase 2 Construction flagging area
Single lane closure with
Legend:
Temporary traffic control signal
Temporary traffic control signal
Channelizing device (typ.)
NOTE:
3. Maintain one lane of traffic at all times.
with flaggers as needed.
2. Coordinate signalized lane closure and daily single lane closures nstall all traffic control devices according to the standard details.1. I
PHASING PLAN
TEMPORARY TRAFFIC CONTROL
WORK
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
STOP
HERE ON
RED ROAD WORK
END
:0
N o v e m b e r
T T
C P h a s in g P la n
S h e p w w o r k in g \c e n tr a l0
\d
\T
C P
S
D F
L A
P C
S A
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
SD
DELTA-01 ACCESS ROAD
T13
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .