Scope of work Spring 2023 Herbicide Post Treatment Bidbuy Item 1.pdf
PDF 2 MB Posted
- Solicitation number
- 23-422DNR-RESCO-B-35512
- Issued by
- Rock Island County, Illinois
About this file
This document is the Scope of Work for the Illinois Department of Natural Resources (IDNR) Forestry Division's post-herbicide treatment project for tree-planted acres in Spring 2023 and 2024. The project involves the herbicide treatment of approximately 54.5 acres across two sites - Burning Star (48 acres) and Ten Mile Creek (6.5 acres) - to suppress annual weed and grass competition without injuring the newly planted hardwood trees. The contractor must supply all necessary herbicide products, apply the treatments, and ensure at least 75% effectiveness by June 30th of each year. The contractor must have direct experience in post-herbicide application for tree seedling plantings and hold valid Illinois Department of Agriculture commercial pesticide applicator licenses. The project start date is no sooner than mid-April 2023 and 2024, with a completion date of no later than June 5th of each year.
The contractor will be required to sign a state contract and will be invoiced separately for each herbicide application area. There is no subcontracting allowed, and the contractor must have the ability to complete the herbicide application within three 12-hour days. The IDNR District Foresters, Ben Snyder and Jenny Lesko, will oversee the project and approve the herbicide choice, timing, and application completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDNR Forestry Division Post Herbicide Treatment of Tree Planted Acres Spring 2023/24 Burning Star and Ten Mile Creek
1 of 3 Mike Brunk
Janaury2023/DFR/mjb 1 of 3
ILLINOIS DEPARTMENT OF NATURAL RESOURCES ILLINOIS
DIVISION OF FOREST RESOURCES
Reforestation Areas
Region 5 / Jackson County, Elk Township
Burning Star 48 ac. Herbicide treat 2023/24
Region 5 / Hamilton County, Knight Prairie Township
Ten Mile Creek 6.5 ac. Herbicide treat 2023/24
Burning Star, 45 acre area, 37.884394, -89.194926 and 3 acre area 37.836495, -89.195171 Ten Mile Creek, 6.5 acre area, 38.081908, -88.614465
2023 and 2024 IDNR Reforestation Scope of Work: Two-year contract for spring herbicide treatments.
SUPPLIES AND / OR SERVICES REQUIRED:
Contractor must supply all herbicide products, necessary additives and adjuncts to treat up to 54.5 tree planted acres annually for two years; apply herbicide product or product mix by broadcast or in bands as specified; use herbicide products, application rates and timing recommended as per label and, agreed and approved in writing by the listed IDNR District Forester to suppress and control annual weed and grass competition without injuring trees; use aquatic safe herbicides when acres are adjacent to water bodies and or where necessary; wear appropriate Personal Protection Equipment when applying herbicide products or mixes; assure treatment is working and effective over 75% of the all treated acres by June 15, of each year unless otherwise approved in writing by an IDNR District Forester; and use only licensed herbicide products, rates and timing according to the original product labels for the target of releasing planted hardwood tree seedlings from grass and aggressive weeds present or expected.
The contractor is responsible for having the water necessary for specified herbicide applications. No well heads, spigots or water supply exists in the fields specified. If a State accessible water source is available to IDNR, the IDNR Forester will make this water source available to contractor.
The contractor will be required to sign and operate within the bounds of a signed state contract containing the information and documents within this procurement opportunity as well as ingress and egress standards, general rules for working on state land, operating and equipment protocols, requirements for having appropriate first-aid, emergency supplies, PPEs such as first aid kits, spill kits, protective wear and other standard contracting obligations.
The weed control and suppression must be at least 75% effective over each field by June 30th, of each year, as determined by District Forester, or be subject to a respray of specified areas and up to entire area within 10 days of notification that herbicide application was unsuccessful. The completion of the each of the project areas will be approved by June 30th, of each year, pending any necessary respray, by the oversight IDNR District Forester of that project area, Ben Snyder for Burning Star and Jenny Lesko for 10 Mile Creek.
Contractor and District Foresters are to discuss spring 2023 treatments after completion and note any suggested adjustments to be considered for spring 2024 treatments. Any suggested adjustments to spring 2024 treatments will be approved in writing by Mike Brunk prior to initiation of 2024 work.
Bidbuy Item #1
1 of 3 Mike Brunk
Janaury2023/DFR/mjb 2 of 3
The IDNR Division of Forest Resources must be specifically invoiced for each individual herbicide application area by the title, Post Herbicide Treatment of Tree Planted Acres Spring 2023/24 Burning Star or Post Herbicide Treatment of Tree Planted Acres Spring 2023/24, Ten Mile Creek, given to each in this Scope of Work for the herbicide application promptly after the work is completed and no later than June 30th of each year. All invoice billings for this contract shall be electronically mailed to Michael Brunk at michael.brunk@illinois.gov.
MILESTONES AND DELIVERABLES:
Start date – no sooner than mid-April 2023, and 2024 Completion date – no later than June 5, 2023, and 2024
VENDOR / STAFF SPECIFICATIONS:
The Illinois Department of Natural Resources, Division of Forest Resources (IDNR) seeks an experienced reforestation contractor (Contractor), having direct experience in post herbicide application to tree seedling plantings. Contractor must be an experienced reforestation herbicide applicator having treated planted fields of hardwood seedling to control grasses and weeds from around live hardwood seedlings.
Contractor is to provide at least two verifiable herbicide application references (mailing address or property legal description, and GPS coordinates) to verify this experience on 15 acres or more within the last 5 years. References are to include property owners name, valid phone number, mailing address and GPS coordinates of treated acres. Contractor shall also have no less than two tenured (1+ year) employees that hold a valid Illinois Department of Agriculture commercial pesticide applicators license which will be verified prior to awarding a bid and initiating a contract. Contractor should provide all references and experience documentation at time of bid. Contractor shall own or have available all equipment necessary for mechanized herbicide application to tree seedling plantings that are spaced 6 feet apart in rows that are spaced 10 feet between rows. Contract shall have the ability to complete herbicide application for specified acres in no more than three (3) 12-hour days.
Contractor is to complete herbicide application, no later than June 5th, of each year unless otherwise approved in writing by Mike Brunk; district forester will approve (by email or written signature with copy to Mike Brunk) contractor’s herbicide choice, timing /date of application which can be weather dependent; shall acquire District Forester signature upon herbicide treatment completions; the herbicide applications may not be sub-contracted, and contractor will complete this scope of work in the following described sites;
Burning Star IDNR District Forester – Ben Snyder, Benjamin.Snyder@illinois.gov, 618-534-9521, 618-565-2828 48 acre site 45 acre field (37.884394, -89.194926) and 3 acre field (37.836495, -89.195171).
These acres in Elk Township, Jackson County, Illinois were planted in the summer of 2021 and originally were 45 acre and 3 acre agricultural fields having groundcover of 2020 soybean stubble. Broadcast spray site to kill grasses and sedges in combination with a preemergent
10 Mile Creek District Forester - Jenny Lesko, Jennifer.Lesko@illinois.gov, 618-689-1221
6.5 acre site (38.081908, -88.614465); These acres located in Knight Prairie Township, Hamilton County, Illinois were planted in summer of 2021 and originally were a fallowed field having a mixed groundcover of mailto:michael.brunk@illinois.gov mailto:michael.brunk@illinois.gov mailto:Benjamin.Snyder@illinois.gov mailto:Jennifer.Lesko@illinois.gov
1 of 3 Mike Brunk
Janaury2023/DFR/mjb 3 of 3 broom sedge, goldenrod, cocklebur, other grass and some fescue (minor). There is a water spigot at Ten Mile Creek about ¼ mile away the contractor can use. NOTE - Spray only while the field is less than 25% standing water. These acres do flood sometimes and we do not want herbicide to drain into the creek. Herbicide shall be labeled aquatic safe. Broadcast spray entire site to kill grasses and sedges in combination with a preemergent.
TRANSPORTATOIN AND DELIVERY:
Contractor shall own or have available all equipment necessary for mechanized herbicide application to tree seedling plantings that are spaced 6 feet apart in rows that are spaced 10 feet between rows.
Contract shall have the ability to complete herbicide application for specified acres in no more than three
(3) 12-hour days.
SUBCONTRACTING:
Subcontracting is not allowed.
Source: Esri, Max USGS, AeroGRID
S
FI
R
ST
S T
FO
U
R
TH
S T
B A
R W
IC
K
R D
Burning Star Tree Planting Overview County: Jackson Acres: 64 Access from the south off Rt. 149 off Mine Road
KIRCHNER RD
45 Acre Tree Planting Site Decimal Degrees: -89.194926 37.884394
PFEASTER RD
3 Acre Tree Planting Site Decimal Degrees: -89.195171 37.836495
Legend Streams
Practices Tree Planting
1 inch = 4,167 feet
Burning Star 5 - State Site 0 0.25 0.5 1 Miles ar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, , IGN, and the GIS User Community
CON
L R D
E C
A R
TE
R
R
C A
N A
D A
R D
FU
N
K
H
IC
K S
K
EL
O
M O
R G
A N
-J A
C O
R D
P A R
K S
T G
EO
R
G E
ST
38.081908, -88.614465 *
Esri, HERE, Garmin, INCREMENT P, USGS, EPA, USDA, GeoEye, Maxar, Microsoft, Esri, HERE, iPC, Esri, HERE, Garmin, iPC
0 0.02
0.04 0.09 Miles Ten Mile Creek SFWA
6.5 tree planting acres ¯
| Reforestation Areas |
| MILESTONES AND DELIVERABLES: |
| Completion date – no later than June 5, 2023, and 2024 |
| Burning Star |
| 10 Mile Creek |
| TRANSPORTATOIN AND DELIVERY: |