Scope of Work HVAC ANT Colfax.docx
DOCX document 19 KB Posted
- Solicitation number
- 4196926Q0000007
About this file
This is a Scope of Work document for a construction project involving the installation of a new Heating, Ventilation, and Air Conditioning (HVAC) system at the Aids to Navigation Team (ANT) Colfax Workshop located at 350 Control House Road, Colfax, Louisiana 71417. The project addresses the workshop's current lack of adequate climate control by providing a complete, standalone HVAC system that delivers both heating and cooling to the entire workshop space. The contractor is responsible for all labor, materials, tools, and equipment necessary to design, furnish, install, and commission the system to full operational status.
The contractor must perform comprehensive load calculations and submit detailed design drawings and specifications for government approval prior to work commencement. The scope includes installation of a new high-efficiency HVAC unit with complete ductwork, registers, grilles, programmable thermostat, and all associated components in accordance with approved designs and manufacturer instructions. Additional requirements include electrical and plumbing connections, system testing and balancing, operator training, and provision of a minimum one-year warranty on all parts and labor. Deliverables include a site-specific safety plan, design documents, testing and commissioning reports, operation and maintenance manuals, and warranty documentation. The contractor must obtain all necessary permits and licenses, comply with federal, state, and local codes, OSHA regulations, and U.S. Coast Guard safety requirements. A site visit is strongly encouraged to verify dimensions and existing conditions. The Contracting Officer's Representative is MK1 Dustin Truax (cell: 443-617-9295; work: 318-542-0308; email: Dustin.J.Truax@uscg.mil). The government will provide worksite access and utilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Question and Answers.docx | DOCX document | |
| Constructions.Solicitation.docx | DOCX document | |
| Scope of Work HVAC ANT Colfax.1.docx | DOCX document | |
| SF1442-14b.solicitation.offer.and.award.docx | DOCX document | |
| Constructions.Solicitation.docx | DOCX document | |
| la51.txt | TXT text file | |
| SF1442-14b.solicitation.offer.and.award.docx | DOCX document | |
| Constructions.Solicitation.docx | DOCX document | |
| Construction Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work: HVAC System Installation for Aids to Navigation Team Colfax Workshop
1.0 Project Title:
Installation of a new Heating, Ventilation, and Air Conditioning (HVAC) system for the workshop area at Aids to Navigation Team (ANT) Colfax 350 Control House rd. Colfax, LA 71417.
2.0 Background:
The workshop at ANT Colfax currently lacks a dedicated or adequate climate control system. This project will provide a new, appropriately sized HVAC system to ensure a safe and comfortable working environment for personnel, protect sensitive equipment, and improve overall operational readiness. The system will provide both heating and cooling to the entire workshop space.
3.0 Scope of Work:
The contractor shall provide all necessary labor, materials, tools, and equipment to design, furnish, install, and commission a complete and operational HVAC system for the ANT Colfax workshop. The system will be a new, standalone system and will not interfere with any existing systems in the facility.
4.0 General Requirements:
· Site Visit: The contractor is highly encouraged to conduct a site visit to verify all dimensions, existing conditions, and access points for equipment and personnel.
· Permits and Licenses: The contractor shall be responsible for obtaining all necessary permits and licenses required for the project.
· Compliance: All work shall be performed in accordance with applicable federal, state, and local codes, and industry best practices.
· Safety: The contractor shall comply with all applicable OSHA and US Coast Guard safety regulations. A site-specific safety plan shall be submitted to the government representative prior to the start of work.
· Cleanup: The contractor shall be responsible for daily cleanup of the work area and removal of all construction debris from the site upon completion of the project.
5.0 Specific Tasks:
The contractor shall perform the following specific tasks:
· 5.1 Design and Engineering:
· Perform a comprehensive load calculation to determine the appropriate size and capacity of the HVAC system.
· Provide detailed drawings and specifications for the proposed system, including equipment placement, ductwork layout, and electrical and plumbing connections.
· All design documents shall be submitted to the government representative for review and approval prior to the start of any work.
· 5.2 Equipment and Materials:
· Furnish a new, high-efficiency HVAC unit.
· Provide all necessary ductwork, registers, grilles, thermostats, and other materials for a complete installation.
· All materials shall be new and of a quality that meets or exceeds industry standards.
· 5.3 Installation:
· Install the HVAC unit, ductwork, and all associated components in accordance with the approved design and manufacturer's instructions.
· Make all necessary electrical and plumbing connections to the new system.
· Install a new programmable thermostat in a location approved by the government representative.
· 5.4 Testing and Commissioning:
· Perform a complete system startup and functional test to ensure that the system is operating as designed.
· Balance the system to ensure proper airflow to all areas of the workshop.
· Provide a written report of the testing and commissioning results to the government representative.
· 5.5 Training:
· Provide training to government personnel on the operation and maintenance of the new HVAC system.
· 5.6 Warranty:
· Provide a minimum one-year warranty on all parts and labor.
· Provide all manufacturer warranty documentation to the government representative.
6.0 Deliverables:
The contractor shall provide the following deliverables:
· Specific safety plan.
· Design drawings and specifications.
· Testing and commissioning report.
· Operation and maintenance manuals for all equipment.
· Warranty documentation.
7.0 Period of Performance:
The period of performance for this project will be determined at the time of award.
8.0 Government-Furnished Equipment/Information:
The government will provide access to the worksite and electrical and water utilities.
9.0 Contracting Officer’s Representative (COR):
The Contracting Officer will appoint a Contracting Officer’s Representative (COR) to act as a liaison between the Contractor and the Government. The COR will be responsible for monitoring the Contractor’s performance, inspecting and accepting deliverables, and ensuring compliance with the terms and conditions of this contract. The COR is not authorized to make any commitments or changes that affect price, quantity, quality, or delivery schedule.
The COR for this contract is POC is MK1 Dustin Truax cell: 443-617-9295. work 318-542-0308 email address: Dustin.J.Truax@uscg.mil.