Scope of Work.1.pdf
PDF 1 MB Posted
- Attached to
- Rough River Boundary Line Maintenance
- Solicitation number
- W912QR25QA070
About this file
This is a Scope of Work (SOW) for a boundary line maintenance contract for the U.S. Army Corps of Engineers Louisville District. The contract requires the contractor to complete up to 90 miles of boundary line inspection and maintenance at Rough River Lake across Breckinridge, Grayson, and Hardin Counties in Kentucky. Specific tasks include marking trees with government-provided red paint, replacing missing orange plastic sleeves on boundary corner posts, and applying government-provided stickers to those sleeves.
The contract requires detailed daily documentation, including segment maps and aerial photos showing work progress, noting any encroachments, missing posts, or survey pins. The contractor must obtain permissions to cross private property, identify vehicles and employees, and work between 7:00 a.m. and 4:00 p.m. CST. The contract has a 120-calendar day performance period, with work to commence within 14 days of notice to proceed. Extensive security requirements are outlined, including background checks, security training, and compliance with government facility access protocols. The government will conduct 100% inspection of the completed work, with quality assurance checks performed after each 5-mile interval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
Maintenance of Boundary Line 14957 Falls of Rough Road
Falls of Rough, Kentucky, 40119-9801 Technical POC: Jon Fillingham, Project Manager
Phone: 270-257-2061
TP-1.1 GENERAL.
a. Description. The contractor shall furnish all materials, supplies, tools, equipment, labor, supervision, communication, and quality control to complete the work listed in Section “TP-3.1 GENERAL SPECIFICATIONS” below. All work will take place at the Rough River Lake, Breckinridge, Grayson, and Hardin Counties in Kentucky.
b. Work shall be provided in accordance with all Terms, Conditions, General, Specific and Technical Provision, Exhibits, Attachments, Maps, Drawings, etc. contained herein or incorporated by Reference. This includes all mandatory provisions of the Federal Acquisition Regulation (FAR), whether referenced or not, current at time of award.
c. Contractor Responsibility. Contractor’s work and responsibility shall include, but are not limited to, supply of equipment/materials, all planning, programming, administration, management, supervision, and inspection required to assure all equipment/materials are acquired and services are conducted in accordance with the contract and all applicable laws, regulations, or directives. The Contractor shall insure all work meets or exceeds specifications. The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract. All materials shall be installed in accordance with the manufacturer’s recommendations and/or applicable building standards unless specifically stated otherwise in the specifications.
d. Performance Required. Special consideration of the Contractor is directed to the fact that the required accuracy, thoroughness, safety, and progress of this work are essential to the intended purpose. The contractor must be cognizant of the difficulties involved and of the contingencies which may arise, and must make certain that their personnel, equipment, transportation facilities and supply of materials are always adequate to ensure complete compliance with all provisions of these specifications. The work shall be done under professional supervision by competent employees. All contract services shall be in accordance with the submitted documents, and any additions, revisions or deletions must be approved by the Contracting Officer or his/her authorized representative.
e. Completion of Work. Completion of work shall include acceptable performance of all aspects of this contract.
f. Conditions.
1. The Corps of Engineers reserves the right to cancel all, or part of the work described in this Request for Quote if costs exceed anticipated funding. Department of Labor Wage Rates applies to this work are attached at the end of this document. The Contractor is required to provide payroll documents for all work performed under this request.
2. Pre-Work Conference. The contractor will be required to attend a pre-work conference at least one week prior to beginning work, during which time the Contractor shall supply the Technical POC with an Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA), IAW EM385-1-1 covering contractor’s plan of work procedures, safety procedures, security, schedule, and equipment. This manual will be available at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/E M_385-1-1.pdf The Contractor shall supply material submittals as listed in T.P. 1.2 that will be used for this project, which must be approved by the Technical POC prior to start of work.
3. Damages: The contractor shall be responsible for all damages to government or private property during the course of this contract. The contractor shall have appropriate insurance to cover liability and damages.
4. Hours and Days of Work. Work may be conducted between the hours of 7:00 a.m.
and 4:00 p.m. CST, Monday through Sunday. No work shall be performed outside of these times, or on federal Holidays, unless approved by the Technical POC.
5. Payment Procedure/Additional Work. At no time should the contractor do additional work without prior authorization of the Contracting Officer, and no work shall be performed that will cause the Contractor to exceed the contract price. Work performed without a binding contract document authorizing such work shall result in the Contractor not being paid for that work performed. During the course of the contract, any additional work determined to be needed may be requested by the Project Manager to the Contracting Officer for a Contract Modification.
6. Contract Start and Completion Dates. Work should commence within 14 calendar days of receipt of notice to proceed and may proceed at any mutually agreeable time within that time frame. Work will be completed within one hundred twenty calendar
(120) days of notice to proceed. All services will be completed as scheduled, unless weather or circumstances beyond the control of either party occur requiring a delay in the work. The Government reserves the right to delay or stop work as needed to accommodate higher priorities, time allowed for completion will be adjusted accordingly.
7. Wage Rates: Department of Labor wage rates apply to this work and are included.
The contractor is required to provide payroll documents for all work performed under this contract.
8. The Contractor shall, at all times prior to delivery, take care to protect and preserve all materials, supplies, and equipment of every description (including material and property which may be Government owned) and all work performed. All reasonable requests of the Technical POC or his/her authorized representative to enclose or specially protect such property shall be complied with. If so determined by the Technical POC, material, equipment, supplies, and work performed are not adequately protected by the Contractor, such property may be protected by the Government and the cost thereof may be charged to the Contractor.
9. The Contractor will notify the Technical POC or his/her authorized representative, upon commencement of work activities, and difficulties, interruption, or suspension of work, and when the required work has been completed. The Contractor shall update the Technical POC, or their authorized representative, no less than once weekly on status of work being done. Work will commence when the funds are allocated, and work orders have been received from the Technical POC or his/her authorized representative.
TP-1.2 CONTRACTOR SUBMITTAL. Unless otherwise specified, the Contractor shall submit the following information to the Technical POC prior to the pre-work conference for this contract:
a. Safety Plans. The Contractor shall submit, for acceptance by the Technical POC, an accident prevention plan and Activity Hazard Analysis (AHA) in accordance with the requirements of the Corps of Engineer’s Safety and Health Requirements Manual, EM385-1-1, hereinafter referred to as the Safety Manual, current at the time of award. See link at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf.
b. Certification of Employees Qualified to Administer First Aid and CPR. The Contractor shall submit proof the appropriate number of employees, as required in the Safety Manual, are certified to administer First Aid and CPR
TP-1.3 SAFETY.
a. General Safety. The Contractor shall comply with the safety standards contained in Corps of Engineers Manual, EM 385-1-1, “Safety and Health Requirements Manual”, current at the time of award, as well as all current provisions of the Occupational Safety and Health Act
(OSHA).
b. Safety Manual Requirements. The Contractor and employees shall comply with all pertinent sections of the Corps of Engineer’s Safety and Health Requirements Manual, EM 385- 1-1, current at the time of award, and any subsequent revisions. This manual will be available on the Internet at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf.
c. Personal Protective Apparel and Equipment. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize hazards to personnel. As a minimum, each employee shall wear a sleeved shirt, long trousers and safety-toe shoes or boots during all contract work. Hard hats, face shields, safety glasses with side-shields, or goggles, and hearing protection shall be worn by employees when required by the safety manual. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards shall also be provided and easily accessible to all employees.
d. Contractor Employees Certified in First Aid & CPR. The Contractor shall schedule employees so the appropriate numbers of certified personnel are on duty to administer First Aid and CPR as required by the Safety Manual. Copies of their certification shall be provided in accordance with TP-1.2.
TP-1.4 ACCIDENT REPORTING. The Contractor shall maintain accurate accident records and report accidents as prescribed by the Technical POC. Accidents shall be reported within 24 hours of occurrence, and all serious accidents (those resulting in death or injury requiring medical attention or lost time) shall be reported immediately.
TP-1.5 DAMAGE REPORTS. In all instances where Government property, equipment, natural features, landscape, or trees are damaged by contract employees, an immediate notification shall be made to the Technical POC. A full report of the incident and extent of such damage shall be submitted to the Technical POC within two working days of occurrence, excluding weekends and holidays.
TP-1.6 CONTRACT EMPLOYEES. All contract employees shall conduct themselves in a proper and courteous manner at all times. Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of the work under this contract. Being under the influence of or consuming alcoholic beverages or controlled substances by the Contractor or employees while on duty is prohibited.
TP-2.1 SPECIAL REQUIREMENTS:
a. Security.
1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
2. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
3. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
4. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
b. SUPPLEMENTAL SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Louisville District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Louisville District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.
FOR ALL LOUISVILLE DISTRICT CONTRACTS:
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.
The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security Access Form each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.
The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.
Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite.
The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security Office for background purposes.
FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). Fingerprints are captured electronically at the closest Army Recruiting Station to the contractor’s home of record or at the USACE, Louisville District Security Office.
Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Louisville District Security Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Louisville District Security Office will make recommendations to the PCO or their Designated Representative. The Louisville District Security Office cannot give approval due to unfavorable report(s). The Louisville District Security Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information.
The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to
Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation, or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:
CELRL-SM
600 Martin Luther King Jr. Pl Louisville, KY 40202
Primary Email: DLL-CELRL-Security-SM@usace.army.mil
Alternate (if no response in 72 hours):
James R. Milner, phone (502) 315-6916; James.R.Milner@usace.army.mil Jason Almodovar, phone (502) 315-6754; Jason.Almodovar@usace.army.mil
c. Payment. Payment will be made by Electronic Funds Transfer (EFT), upon acceptance of the completed work and providing final invoice and labor records. DUNS Number and SAM Registration: The successful offeror will be required to provide a (DUNS) Dun & Bradstreet number, (http://dnb.com), and will be required to be registered with (SAM) System for Award Management, (https://www.sam.gov/) to do business with the government.
(NOTE: Pay careful attention when typing in the SAM website address on your browser). In order to register with SAM, you must have a DUNS number. If you are unsure of your DUNS number, or have questions regarding this, you can call 1-800-333-0505 for assistance.
Offerors must complete their registration in SAM in order to be eligible to quote under this contract.
c. Failure to provide all information requested on the quote sheet and to complete SAM registration may be grounds for considering the quote unresponsive.
TP-3.1 GENERAL SPECIFICATIONS:
a. Work to be performed. The work to be performed is as follows:
CLIN 0001: Complete up to 90 Miles of Boundary Line Inspection and Maintenance
1. Boundary Line Maintenance in all areas will consist of marking trees with paint (provided by the government) according to Exhibit A and replacing orange plastic sleeves (provided by the government) where they are missing on the government fee boundary corners.
2. The Contractor shall place the orange plastic sleeve over the existing metal post on each boundary corner where they are missing. The sleeve shall be flush with the top of the post. The government will provide stickers that are to be neatly placed on each individual plastic sleeve by the Contractor. Position of sticker on the plastic sleeve shall be installed as directed by the Technical Representative.
3. Trees must be painted according to Exhibit A. When possible, trees should be painted a minimum of every 25 feet along the boundary line, including “in-line” trees.
4. The Contractor shall keep a daily work record on segment maps and aerial photos (provided by the government) showing the starting and ending points for that day.
Anything unusual will be noted, such as encroachments, tree cutting, or fence lines on government land. In these instances, the contractor shall take photos of the area and mark the location on the maps provided. The location of missing posts and survey pins will be noted as well. Upon the completion of each day of boundary line work, the Contractor shall supply the Government with a fresh, clean segment map indicating all missing posts and survey pins, as well as any encroachments and trespasses noted and the areas that have been completed. In any week where work is completed, the daily work orders shall be turned in to the technical point of contact by close of business on Friday.
5. It will be the Contractor’s responsibility to obtain any permission required to cross private property to access Government Property. The Contractor’s vehicle(s) will be identified with the company logo clearly displayed on the vehicle door, or a letter left on the dash that indicates the work that the contractor is performing and a telephone # that can be called to verify the Contractor’s employment. Additionally, employees will wear a shirt and hat identifying themselves as employees of the Contractor.
b. Government Furnished Items. – Unless otherwise specified, the Government shall furnish:
1. Red tree marking “gun type” boundary paint that will be used to mark the trees specified in the scope of work.
2. Orange plastic sleeves and stickers that will be placed on the existing posts at each boundary corner.
3. All maps which will describe the locations of boundary corners. Clean duplicate maps will be furnished, which will be submitted with any field notes after each 5-mile interval.
TP-3.2 GOVERNMENT INSPECTION: The method of government surveillance used will be 100% inspection. Surveillance by 100% inspection requires that every occurrence of a performed service be monitored. Contract requirements using these evaluations are generally those that occur infrequently, or are essential, or are costly to perform, or at the Government's discretion. These results are then compared to the specific performance standards. When a section of boundary line is finished (5 miles), the contractor will ensure that all logs and work records for that section have been completed and submitted to the Technical Representative to perform the Quality Assurance (QA) Inspections. The contractor will not move into another section of line to perform contract services until the Technical Representative has instructed them to do so. Typically, this will require completion of the QA inspection of the area and acceptance of the work. However, in some circumstances, the contractor may be allowed to begin work in subsequent areas with the understanding that he may be required to return to an area if work is not accepted by the government.
END OF SPECIFICATIONS