The document is an engineering inspection report and scope of work prepared by Voelkel Engineering for the Santa Rosa County Housing Department, detailing rehabilitation requirements for a residential property located at 2721 Burlwood Drive in Milton, Florida. The comprehensive inspection, conducted on September 24, 2024, identified numerous deficiencies requiring extensive repairs and replacements, including all nine windows, front and rear doors, HVAC system, water heater, bathroom fixtures, flooring, kitchen appliances, and septic system components. The scope of work encompasses replacing windows with vinyl options, installing new doors with wind-borne debris protection, replacing interior doors, installing a new 2.5-ton HVAC system, adding attic insulation, replacing the water heater, installing bathroom exhaust fans, addressing moisture and mold issues, repairing floor decking, replacing deck stairs, updating kitchen appliances, installing an attic fan, and replacing crawlspace vents and septic drainlines.
The Santa Rosa County Board of County Commissioners is seeking quotes from licensed and insured contractors for this housing rehabilitation project, with a mandatory pre-bid meeting scheduled for December 4, 2024, at 9:30 am at the project site. Contractors must submit questions through the procurement portal by December 27, 2024, at 12:00 pm, and quotes must be submitted through the same portal by January 3, 2025, at 10:00 am. The county encourages participation from all segments of the business community, including small businesses, minority/women-owned businesses, and disadvantaged business enterprises, and reserves the right to waive irregularities, reject bids, and select the bid deemed most beneficial to Santa Rosa County.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
If this document is digitally signed, printed copies are not considered signed and sealed and the SHA authentication code must be verified on any electronic copies.
103 Bay Bridge Drive, Gulf Breeze, FL 32561 Phone: 850.288.0333 www.VoelkelEngineering.com info@VoelkelEngineering.com FLCA35353 • FLCGC1530838
October 4, 2024
To: Santa Rosa County Housing Department
6051 Old Bagdad Hwy, Suite 201 Milton, Florida 32583
Subject Address:
2721 Burlwood Drive Milton, FL 32583
Per the request of the Santa Rosa County Housing Department, Voelkel Engineering has performed an inspection at the subject address. Attached is a report detailing the findings from the site visit dated September 24, 2024.
Please feel free to contact me with any additional questions or concerns.
Sincerely, J. Christian Voelkel
FLPE # 82229
Attachments:
Engineering Inspection Report Dated October 4, 2024 Cost Estimate
ENGINEERING REPORT
2721 Burlwood Drive Milton, FL 32583
Date of Site Visit: September 24, 2024 Time: 10:00 AM Sunny
Year of Construction: 1989 (Per Property Appraiser)
Scope of Inspection: Inspect requested portions of the home for deficiencies of major systems and components.
Note that some portions of home were inaccessible. Only visible items were inspected. Hidden or subsurface conditions were not inspected. Unattached exterior structures were not inspected. Sidewalks and driveways were not inspected. This report does not include engineered drawings or specifications.
General Condition: The home is in below average general condition for a home of this age. The home was professionally constructed. The deficiencies noted are related to substandard repairs, age of systems normal wear and tear, and lack of upkeep.
Specific Conditions & Deficiencies:
1. Windows/Doors
a. Deficiency: All (9) existing windows have come to the end of their useful lives and need to be replaced.
Recommendation: Remove all (9) existing windows and shutters and replace with new vinyl windows of equal sizes. Contractor to verify final sizes. New window wind-borne debris protection to be installed at new windows. Install new shutters beyond wind-borne debris protection anchors.
b. Deficiency: The front half-glass door and rear double French doors, door jambs, hardware, trim, and decorative moulding are damaged and need to be replaced.
Recommendation: Remove and replace the existing front half-glass door and rear double French doors, door jambs, hardware, trim, and decorative moulding with new of same likeness and size.
Prime and paint to match. New window wind-borne debris protection to be installed at new doors with windows.
c. Deficiency: The interior doors at the master bedroom, master bathroom, bedroom 2, bedroom 3, and the hall bathroom are warped from lack of humidification control throughout the house and no longer function properly.
Recommendation: Remove the interior doors, door jambs and trim at the master bedroom, master bathroom, bedroom 2, bedroom 3, and the hall bathroom and replace with (5) new prehung, prefinished doors with hardware.
2. HVAC
a. Deficiency: The packaged HVAC unit is beyond its useful life and needs to be replaced. Existing ductwork to remain.
Recommendation: Remove and replace packaged HVAC system, all components, and registers, with new 2.5-ton packaged HVAC system. Clean and inspect ducts and return air trunk line for deficiencies and repair or replace as needed. Secure access under the house with lattice and screen.
b. Deficiency: It is required that the insulation in the attic is brought up to a required depth of R-38 after installation.
Recommendation: Add blown insulation throughout entire attic to achieve R-38 after installation of new HVAC system.
3. Water Heater
a. Deficiency: The existing water heater is beyond its useful life and needs to be replaced. Unit was not accessible at time of visit.
Recommendation: Remove and replace the existing electric water heater, connection lines, drip pan, and overflow drain line with a new 40-gallon electric water heater of same likeness, connection line, drip pan, and overflow drain line.
4. Bathrooms
a. Deficiency: The master bathroom and hall bathroom do not have adequate ventilation, causing moisture and mold.
Recommendation: Install an exhaust fan and switch in each bathroom vented through soffit.
b. Deficiency: The master bathroom and hall bathroom walls and ceilings show signs of mold due to inadequate ventilation.
Recommendation: Contact Servpro to complete their cleaning process as outlined in their attached report. None of the sheetrock removal, as listed in the report, will be completed.
Servpro will only be completing the dehumidifing and cleaning portion of their report.
c. Deficiency: The master bathroom showerhead, fixture and valve and bathroom 2 bathtub faucet, fixtures, showerhead, and valve have all come to the end of their useful lives and need to be replaced.
Recommendation: Remove and replace the existing master bathroom showerhead, fixture and valve and bathroom 2 bathtub faucet, fixtures, showerhead, and valve with new of same likeness and sizes.
5. Floors
a. Deficiency: Approximately 4’x10’ floor decking is water damaged and spongy at the back double
French doors. Approximately 3’x3’ floor decking is water damaged in front of the shower in the master bathroom. Approximately 3’x3’ floor decking is spongy at the bedroom 3 entry doorway.
Recommendation: Pull back existing carpet and padding and remove approximately 4’x10’ of water damaged floor decking at the back double French doors. Inspect floor joists and beams in effected areas and replace as needed. Install new plywood floor decking of like thickness and reinstall existing carpet and padding. Remove approximately 3’x3’ existing tile and water damaged floor decking in front of the shower in the master bathroom. Inspect floor joists and beams in effected areas and replace as needed. Install new plywood floor decking of same thickness and new tile of same likeness and size. Pull back existing carpet and padding and remove approximately 3’x3’ of water damaged floor decking at bedroom 3 entry doorway.
Inspect floor joists and beams in effected areas and replace as needed. Install new plywood floor decking of like thickness and reinstall existing carpet and padding.
b. Deficiency: The rear deck stairs are unstable and need to be replaced.
Recommendation: Remove existing rear deck stairs and replace with new wood stairs with handrails handrails.
6. Appliances
a. Deficiency: The electric stove and refrigerator are both beyond their useful lives and need to be replaced.
Recommendation: Remove and replace electric stove with a new stove of same likeness and size.
Remove and replace refrigerator of same likeness and size.
7. Ventilation & Septic
a. Install new attic fan to ensure proper attic ventilation also remove and replace crawlspace vents around perimeter of home
b. Install 462 sq ft of new septic drainlines as stated in the attached Health Department permit.
Seed & hay any disturbed areas. Any fencing that needs to be removed to complete this repair will need to be replaced.
Figures from 09/24/24 Site Visit
Photo 1: Windows/Doors Photo 2: Windows/Doors
Photo 3: Windows/Doors Photo 4: Windows/Doors
Photo 5: Windows/Doors Photo 6: Windows/Doors
Photo 7: Windows/Doors Photo 8: Windows/Doors
Photo 9: Windows/Doors Photo 10: Windows/Doors
Photo 11: Windows/Doors Photo 12: Windows/Doors
Photo 13: Windows/Doors Photo 14: Windows/Doors
Photo 15: Windows/Doors Photo 16: Windows/Doors
Photo 17: Windows/Doors Photo 18: Windows/Doors
Photo 19: HVAC Photo 20: HVAC
Photo 21: HVAC Photo 22: HVAC
Photo 23: HVAC Photo 24: HVAC
Photo 25: Attic Photo 26: Attic
Photo 27: Attic Photo 28: Attic
Photo 29: Water Heater Photo 30: Master Bathroom
Photo 31: Master Bathroom Photo 32: Master Bathroom
Photo 33: Master Bathroom Photo 34: Master Bathroom
Photo 35: Master Bathroom Photo 36: Master Bathroom
Photo 37: Master Bathroom Photo 38: Master Bathroom
Photo 39: Master Bathroom Photo 40: Hall Bathroom
Photo 41: Hall Bathroom Photo 42: Hall Bathroom
Photo 43: Hall Bathroom Photo 44: Hall Bathroom
Photo 45: Hall Bathroom Photo 46: Kitchen
Photo 47: Kitchen Photo 48: Kitchen
Photo 49: Kitchen Photo 50: Kitchen
Photo 51: Kitchen Photo 52: Kitchen
Photo 53: Kitchen Photo 54: Kitchen
Scope of Work Cost 2721 Burlwood Drive, Milton, FL 32583 Item Description
1a
Remove all (9) existing windows and shutters and replace with new vinyl windows of equal sizes.
Contractor to verify final sizes. New window wind-borne debris protection to be installed at new windows. Reinstall existing shutters beyond wind-borne debris protection anchors.
1b
Remove and replace the existing front half-glass door and rear double French doors, door jambs, hardware, trim, and decorative moulding with new of same likeness and size. Prime and paint to match.
New window wind-borne debris protection to be installed at new doors with windows.
1c
Remove the interior doors, door jambs and trim at the master bedroom, master bathroom, bedroom 2, bedroom 3, and the hall bathroom and replace with (5) new prehung, prefinished doors with hardware.
2a
Remove and replace packaged HVAC system, all components, and registers, with new 2.5-ton packaged HVAC system. Clean and inspect ducts and return air trunk line for deficiencies and repair or replace as needed. Secure access under the house with lattice and screen.
2b Add blown insulation throughout entire attic to achieve R-38 after installation of new HVAC system.
3a
Remove and replace the existing electric water heater, connection lines, drip pan, and overflow drain line with a new 40-gallon electric water heater of same likeness, connection line, drip pan, and overflow drain line.
4a Install an exhaust fan and switch in each bathroom vented through soffit.
4b
Contact Servpro to complete their cleaning process as outlined in their attached report. None of the sheetrock removal, as listed in the report, will be completed. Servpro will only be completing the dehumidify and cleaning portion of their report.
4c Remove and replace the existing master bathroom showerhead, fixture and valve and bathroom 2 bathtub faucet, fixtures, showerhead, and valve with new of same likeness and sizes.
5a
Pull back existing carpet and padding and remove approximately 4’x10’ of water damaged floor decking at the back double French doors. Inspect floor joists and beams in effected areas and replace as needed.
Install new plywood floor decking of like thickness and reinstall existing carpet and padding. Remove approximately 3’x3’ existing tile and water damaged floor decking in front of the shower in the master bathroom. Inspect floor joists and beams in effected areas and replace as needed. Install new plywood floor decking of same thickness and new tile of same likeness and size. Pull back existing carpet and padding and remove approximately 3’x3’ of water damaged floor decking at bedroom 3 entry doorway.
Inspect floor joists and beams in effected areas and replace as needed. Install new plywood floor decking of like thickness and reinstall existing carpet and padding.
5b Remove existing rear deck stairs and replace with new wood stairs with handrails.
6a Remove and replace electric stove with a new stove of same likeness and size. Remove and replace refrigerator of same likeness and size.
7a Install new attic fan to ensure proper attic ventilation also remove and replace crawlspace vents around perimeter of home
7b Install 462 sq ft of new septic drainlines as stated in the attached Health Dept permit.