This Scope of Work document is issued by the Troup County Board of Commissioners for the construction of a 1st Tee Clubhouse Building at 1220-B LaFayette Parkway, LaGrange, Georgia. The project encompasses approximately 1,277 heating square feet and requires a licensed Georgia General Contractor to provide all materials, supplies, labor, equipment, and machinery necessary for complete construction. The contractor must submit a detailed project proposal including proposed construction drawings, specifications, schedule, and comprehensive fixture and appliance lists. A final set of construction drawings and specifications must be submitted for review and approval prior to construction. The project is not a design/build engagement, and contractors may submit identical plans and documents supplied in the RFP without requiring stamped construction drawings. Troup County will obtain all required permits, provide site preparation including grading and staking, conduct soil testing and compaction, implement erosion and sedimentation control measures, and furnish all temporary utilities from the existing clubhouse during construction. A pre-construction meeting will be held with the selected contractor to coordinate jobsite safety, laydown areas, schedules, and temporary facilities.

The scope specifies construction standards including a monolithic concrete slab foundation compliant with the International Building Code, 16-inch on-center structural framing, fiber-cement exterior finishes, 30-year architectural shingles, vinyl windows with low-E double pane technology, insulation with R-13 fiberglass batts and open-cell spray foam, LVP flooring at $8.00 per square foot installed, painted wood kitchen cabinets with 3cm Black Pearl granite countertops, a 50-gallon electric water heater, 200-amp electrical service with heat pump HVAC, ADA-compliant accessibility features including 3/0 doors and grab bars, fire life safety systems with interconnected smoke detectors and emergency lighting, and landscaping and concrete sidewalk allowances of $10,000 and $5,000 respectively. The contractor is responsible for connecting to existing City of LaGrange underground utilities, cleaning up construction debris, protecting surrounding areas from damage, and obtaining all required product warranties and contractor workmanship guarantees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Troup County Board of Commissioners

1st Tee Clubhouse Building (+/- 1,277 HSF) - RFP (5/28/2026)

1220-B LaFayette Parkway, LaGrange, Ga 30240

Scope of Work - Quote/Bid Proposal – 1st Tee Clubhouse Building (+/- 1,277 HSF):

• General Contractor shall be licensed with the State of Georgia.

• Provide and install all required/necessary materials, supplies, labor, equipment, machinery, etc.

for the construction project, per the scope of work.

• Submit a detailed project proposal to include the following: proposed construction drawings, proposed construction specifications, proposed construction schedule, list of all bathroom accessories, list of all plumbing fixtures, list of all electrical fixtures, and list of all appliances.

• Submit a final set of detailed construction drawings for review and approval, prior to construction.

• Submit a final set of construction specifications, materials and product information for review and approval, prior to construction.

• This project is NOT a design/build. A contractor may submit the same exact plans/documents/specifications/scope of work, as supplied in the RFP.

• Stamped construction drawings/plans/documents are NOT required for this project.

• Troup County (Owner) will obtain all required Permits.

• Troup County (Owner) will pay for all required Permits.

• See attached Site Plan for jobsite location (1220-B LaFayette Parkway, LaGrange, Ga 3240).

• Troup County (Owner) will provide all sitework, grading, and staking.

• Troup County (Owner) will provide all soil density testing and soil compaction testing.

• Troup County (Owner) will provide all Erosion & Sedimentation Control Requirements (BMP’s).

• The construction site will be “pad ready”.

• Troup County (Owner) will have an on-site pre-construction meeting with the selected Contractor to discuss job site safety, laydown areas, temporary facilities & utilities, schedules, etc.

• Troup County (Owner) will provide all temporary utilities during construction; utilities will be provided from the existing clubhouse building.

• Monolithic concrete slab foundation shall comply with the IBC and the local Building Official having jurisdiction over the project.

• All structural framing (walls, ceilings, roof system) shall be 16” oc.

• All sheathing (walls & roof) shall be 7/16” OSB. Vapor barrier (wrap) shall be installed per the IBC.

• Smooth fiber-cement cornice/siding/soffit/fascia/ceilings/bands and other exterior trim / columns

(per the plans & elevations).

• 30-year architectural shingles (color to be selected by owner).

• Aluminum gutters (5”) and downspouts (3”x4”) (color to be selected by owner).

• Vinyl exterior shutters (per the plans & elevations) (style & color to be selected by owner).

• Vinyl single-hung windows (double pane, Low-E, .30 U Factor - .25 SHGC, GBG, with screens) with wood jambs (sizes/locations per the plans & elevations).

• Smooth fiberglass exterior doors (insulated 6-panel) with wood jambs (double bored & PVC exterior trim) (3/0 outswing for ADA Accessibility per the plans & elevations).

• Insulation: R-13 fiberglass battens at all exterior walls & spray foam insulation at the room system

(5.5” thick open cell foam). Caulk/foam as required by the National Energy Code and the local

Building Official having jurisdiction over the project.

• Sheetrock walls and ceilings (1/2”, smooth finished).

• Interior trim (4 ¼” baseboards, 3” window & door casings).

• Interior doors (3/0 smooth hollow core for ADA Accessibility).

• Painting (exterior & interior, prime plus two coats of semi-gloss satin latex paint, colors to be selected by owner).

• Lockout hardware (Schlage, brushed chrome, lever handle sets for ADA Accessibility).

• LVP floor covering all rooms (allowance = $8.00 per square foot installed, materials & labor).

• Kitchenette cabinet layout (base cabinets & wall cabinets) per the plan. Kitchenette cabinets shall be painted-wood fronts (doors & faces) with laminated plywood boxes.

• Kitchenette has a stainless-steel double bowl kitchen sink with brushed chrome kitchen faucet, handheld sprayer, garbage disposal, and refrigerator (with waterline & ice maker).

• Kitchenette countertop shall be 3cm granite (color = Black Pearl).

• Vinyl coated wire shelving (four stacked shelves) provided and installed in the kitchenette closet

(per the plans).

• 200-amp electrical underground service and panel.

• Electrical/Lighting layout and light fixtures per the plans.

• Troup County (Owner) will provide the low voltage data/cabling/networking/communications.

• Electric HVAC / Heat Pump unit (provide manufacturer & size & efficiency rating).

• Bathroom venting per the plans & IBC.

• 50-gallon electric water heater located in the attic.

• Plumbing layout and plumbing fixtures per the plans.

• Plumbing stub-outs shall be ten (10) feet for the water supply line and the sanitary sewer line.

• Troup County (Owner) will provide all underground utilities (pre-existing) to the jobsite.

• Contractor shall connect to the existing City of LaGrange underground electrical supply, water supply, and sewer tap.

• Fire Life Safety Requirements (hard wired with battery backup): Exit Combo Lights at all exterior doors (+2), Emergency (bug eye) Lights at all other rooms (+6), Fire Extinguisher & Wall Mounted

Cabinets (+2), and Interconnected Smoke Detectors with Strobes (audio-visual) at all rooms (+7).

• ADA Accessibility Requirements: All 3/0 interior doors, compliant restrooms (layout, grab bars, plumbing fixtures), all exterior doors shall be 3/0 outswing with ADA compliant panic bars/hardware/closures, and sidewalks.

• Ceiling height = 9’ AFF, except for the vaulted front entry room.

• Provide and install all lockout & door hardware.

• Provide and install all required bathroom accessories.

• Landscaping Allowance = $10,000.00

• Concrete Sidewalk Allowance = $5,000.00

• All work shall be coordinated with Troup County Staff.

• Comply with all applicable Building Codes, National Electric Codes, National Energy Codes, Fire Life

Safety Codes, and ADA Handicap Accessibility Codes.

• Provide a copy of all manufacturers’ product warranties and the contractor’s written warranty covering all labor, installation, and workmanship.

• Clean-up & dispose of all construction debris and/or trash, according to Local/State/Federal regulations.

• Protect surrounding areas from damage & debris.

• NO materials/equipment/labor shall be allowed on the golf course areas/surfaces.

• Submit a Quote/Bid Proposal to include all required/necessary materials, supplies, labor, equipment, machinery, etc. for the complete construction project, per the scope of work.