5YR LANDFILL MONITORING
Solicitation number
140A0926Q0016
Issued by

About this file

This is a Scope of Work for landfill inspections and evaluations issued by the Bureau of Indian Affairs (BIA), Navajo Region, Branch of Environmental Management (BEM).

The BIA seeks an experienced environmental engineering contractor to conduct Engineer Inspections and Evaluations of 34 BIA-owned landfills located on the Navajo Indian Reservation in Arizona, New Mexico, and Utah, with a 120-day period of performance from notice to proceed. The contractor must demonstrate documented experience in solid waste landfill operations and closure, prior work on the Navajo Nation, and expertise in USEPA and Tribal Environmental Protection Agency RCRA compliance regulations, including the mandatory 30-year monitoring requirements of 40 CFR 241 and 40 CFR 258. Work is divided into five tasks: (1) Pre-Submittals including a work plan, Health and Safety Plan per 29 CFR 1910.120 with HazWOPER certification requirements, and notification letter to the Navajo Nation Environmental Protection Agency; (2) Mobilization to review landfill files and maps at the Navajo Regional Office and coordinate site visits with facility managers; (3) Landfill Categories covering five open landfills requiring closure plan design and cost estimates, landfills closed with 40 CFR 241 standard covers, landfills closed after October 9, 1997 using 40 CFR 258.60(a) standards, and landfills using alternative covers per EPA guidance; and (4) Engineering Evaluation and Cost Analysis (EE/CA) to provide repair or closure cost estimates. Task 5 requires final reports as government property, submitted in draft for approval with bi-weekly progress updates to the Contracting Officer Representative, signed and stamped by a Professional Engineer, and delivered in editable MS Office format within two weeks of draft approval.

View the file

Other files

File Type Posted
Question__3_0003.pdf PDF
Question_2_0003.pdf PDF
15-5497_San_Juan_County_Utah_0003.txt TXT text file
Sol_140A0926Q0016_Amd_0003.pdf PDF
BIA_Landfill_Inspection_Report_7-2022_0003.pdf PDF
Questions_1_0003.pdf PDF
Sol_140A0926Q0016_Amd_0002.pdf PDF
Sol_140A0926Q0016_Amd_0001.pdf PDF
LandfillGEC_1.xls XLS spreadsheet
IA_-_IEE_Representation_Form.pdf PDF
15-5451_McKinley.txt TXT text file
B08_Solicitation_Q0016.pdf PDF
15-5465_Coconino.txt TXT text file
15-5477_Apache.txt TXT text file
Sol_140A0926Q0016.pdf PDF
15-5445_San_Juan.txt TXT text file
15-5477_Navajo.txt TXT text file
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Landfill Inspections and Evaluations

Navajo Region-Branch of Environmental Management (BEM)

Introduction: The Bureau of Indian Affairs (BIA), Navajo Region, Branch of Environmental

Management (BEM) requesting the services of experience environmental engineer to conduct an

Engineer Inspection and Evaluation of Landfills covers for 34 BIA owned landfills located on the Navajo Indian Reservation in Arizona, New Mexico & Utah and an Engineer Evaluation

Cost Analysis (EE/CA) for Repair/Closure of Landfills is requested. These landfills are included in the DOI Environmental Disposal liability with associated costs.

The BIA formally operated approximately 55 solid waste landfills at various locations throughout the Navajo Indian Reservation to dispose of solid waste generated by BIA agencies and schools. From 1991 to 2009, twenty-two (22) of the 55 landfills were closed.

The BIA operated their landfills by excavating trenches and the waste was collected and deposited in the trenches (cells). There was no solid waste collection system in place for the local communities, so BIA permitted community residents to deposit household waste into the cells.

A visual survey conducted in 1991, found that the waste included both school waste (books, papers, boxes, institutional-sized food cans, kitchen food waste) and residential waste (household appliances, old clothes, furniture, food waste and other miscellaneous household items).

History: In 1991, USEPA announced that it would be promulging new regulations for the operation of landfills. Subsequently, Navajo Regional Office sent a notice to all BIA agencies and schools alerting them of proposed changes to the existing Code of Federal Regulations (40

CFR 241). These new regulations would substantially change the regulation, and existing landfills would no longer continue operations without upgrades. The new 40 CFR 258 regulations provided definitions for the type of solid waste that could be deposited, daily cover requirements, groundwater monitoring and final cover design changes for compliance landfills. It also allowed the landfill operators to close their sites as an alternative compliance method. BIA chose to close most of its landfills. Today, BIA continues to monitor 34 landfills for compliance, cover integrity and to assure that these sites remain closed with no solid waste occurring at each location.

In 1997, the 40 CFR 258 regulations were enacted which included regulations for final closure and cover for landfills or to construct and install the new regulatory requirements. BIA closed its existing landfills by installing a 40 CFR 241 cover. Unfortunately, there were a few isolated locations where residents did not have access to an alternative waste disposal system, so the BIA landfills remained open until an alternative disposal system was developed. When the alternative systems were developed, BIA then closed additional landfills in accordance to with 40 CFR

258.60(a) requirements. The USEPA then issued the Draft Site-Specific Flexibility Guidance for

Municipal Solid Waste Landfills for Indian Country (using alternative covers such as capillary barrier or evaporation transpiration (ET)). BIA then closed a few more landfills using flexibility guidelines.

Work: The Bureau of Indian Affairs requires the services of a contractor with documented experience for solid waste landfill operations and closure with demonstrated work on Navajo

Nation applying both USEPA and Tribal Environmental Protection Agency Resource

Conservation and Recovery Act (RCRA) compliance regulations. The contractor must have experience in conducting inspections and to evaluate landfill covers to include the mandatory 30-year monitoring requirements of both 40 CFR 241 and 40 CFR 258. The contractor shall independently travel to each of the 30 locations and inspect each landfill to determine the integrity of the final cover. The contractor will photograph the site, GPS the landfill boundaries, identify the number of cells at each location and test the existing cover for verification of the final cover depth by hand auger or other acceptable means of measuring the landfill cover depth to assure the cover meets the regulatory standards.

The investigation should be designed to collect and provide the necessary information and field data to enable the contractor to develop cost estimates to return the site into compliance with applicable regulatory closure standard. This may include, but not limited to, repair or replacement of the existing cover, construction of drainage and erosion control measures and any removal debris caused by illegal dumping.

The 34 sites include five (5) sites that are open (Black Mesa, Dennehotso, Old Shonto, New

Shonto and Rock Point), located in Arizona. The 28 remaining sites have been closed or have an administrative cover or were covered using the 40 CFR 241 standards (prior to October 9, 1997) or 258.60(a) cover. Attached is a spread sheet which identifies the names and type of cover on the landfills to be inspected.

The Period of Performance shall be 120 days from notice to proceed.

Task 1: Pre Submittals

A. Contractor shall provide a work plan and work schedule for the conduct of the engineering evaluations/inspections.

B. The Contractor shall prepare and submit to BIA; Health and Safety Plan (HASP) in accordance with 29 CFR 1910.120 for the protection of workers and the public. HASP is to be developed under the aegis of the Hazardous Waste Operations and Response regulations based on the potential for unknown hazardous waste deposited at or near the site. It shall include the safety procedures to address the presence of venomous reptiles and insects known to inhabit these remote locations. Workers must have certification in HazWOPER to provide additional assurance for worker protection.

C A letter prepared for signature from BIA to the Navajo Nation Environmental Protection

Agency (NNEPA), Resource Conservation and Recovery act (RCRA) Enforcement Division notifying the program of the upcoming inspections/evaluations shall be prepared by the contactor for BIA signature.

Task 2: Mobilization

A. The Contractor shall visit the Navajo Regional Office to review landfill files and maps.

Most files contain UTM coordinates but haven't been field-verified for accuracy. A directory for each of the school locations and the Agency Facility Manager contact will be provided to the contractor at this time.

B. The Contactor shall coordinate site visits with each Agency BIE Facility Manager for all landfill locations. There are multiple sites at Many Farms High School (2); Wingate Elementary

School (3), Shonto Boarding School (2), and Navajo Mountain (2). A telephone directory shall be provided for the use of the successful contractor.

Task 3: Landfill Categories

A. The five (5) open landfills that receive waste are not closed (Black Mesa, Dennehotso, Old

Shonto, New Shonto and Rock Point Landfills). These landfills are included in evaluation and inspection as the open landfills to characterize and quantify waste and to identify an existing boundary. The contractor shall design a closure plan by a Professional Engineer in accordance with 40 CFR 258 with closure cost estimates.

B. Landfills closed with 40 CFR 241 Standard Covers; Closed Before October 9, 1997

1. The contractor shall conduct a geophysical/mechanical study (hand auger, direct push drill, geo-probe or other BIA approved method) to verify the depth of existing cover meets the 40 CFR 241 closure standards;

2. The contractor shall prepare a drawing and table to document the findings and identify where the testing was conducted

3. The contractor will provide GPS coordinates in tabular format to locate the landfill corners and center of each site. The landfill boundaries will also be plotted on a USGS

Topographic map. The map shall include the quadrant name and scale.

4. The contractor shall take pictures to document the existing condition of the landfill.

5. A north arrow will be imposed on the picture for reference and a written footnote included on each photo to explain the key points of the picture.

6. A written report shall be prepared to include all the findings, GPS coordinates, maps and a drawing and photographs and the list of contacts

C. Closed after October 9, 1997; Cover Design Using 40 CFR 258.60(a) Standard

1. The contractor will conduct a geophysical study or mechanical study to verify the depth of cover to assure it meets the 40 CFR 258.60(a) closure standards,

2. The contractor shall prepare a drawing and table to document the findings and identify where the testing was conducted

3. The contractor will provide GPS coordinates to locate the landfill and the corners of each site and locate the landfill on a USGS Topographic map. The map shall include the quadrant name and scale,

4. The contractor shall take pictures to document the existing condition of the landfill.

5. A north arrow will be imposed on the picture for reference and a written footnote included on each photo to explain the key points of the picture.

D. Closed using the Draft Site-Specific Flexibility Guidance for Municipal Solid Waste

Landfills for Indian Country provided by U.S. Environmental Protection Agency (using alternative covers such as capillary barrier or evaporation transpiration (ET)

1. The contractor will conduct geophysical studies or mechanical studies to validate the final cover requirements,

2. The contractor shall prepare a drawing and table to document the findings and identify where the testing was conducted,

3. The contractor will provide GPS coordinates to locate the landfill and the corners of each site and locate the landfill on a USGS Topographic map. The map shall include the quadrant name and scale,

4. The contractor shall take pictures to document the existing condition of the landfill and,

5. A north arrow will be imposed on the picture for reference and a written footnote included on each photo to explain the key points of the picture.

Task 4: Engineering Evaluation Cost Analysis (EE/CA) Report

A. The Contractor shall prepare an Engineer Evaluation and Cost Analysis. EECA to provide a cost estimate

1. To repair any existing caps which require work and appropriate compaction of waste.

2. Close any open landfills

a. By recycling materials

b. Screening waste to remove dirt from the solid waste (from daily cover applications)

c. Clean closure action

3. The EECA format shall be as follows:

a. Executive summary

b. Site Characterization

1. Site characterization

2. Site Description and background

3. Previous closure actions

4. Source, nature and extent of solid waste area

c. Identification of closure action objectives

1. Statutory requirements/limits of closure/removal actions

2. Determination of final closure scope

3. Planned closure/removal activities

d. Identification and analysis of closure/removal action alternatives

1. Effectiveness

2. Implement ability

3. Cost

e. Comparative analysis of closure/removal action alternatives

f. Recommended closure/removal action alternative

Task 5: Final Report, Copies, Data Management

A. All reports are the property of the US Government, Bureau of Indian Affairs

1. Any reports generated by the contractor shall be initially submitted as a draft for approval/concurrence by the CO/COR. One electronic copy will be provided.

2. Contractor shall submit a bi-weekly report of progress and expenditures to the

COR or schedule an MSTeams call with CO/COR on the progress of the project.

3. Final reports will be due within two weeks of the return of a draft. One read only copy and one original electronic file copy capable of editing shall be provided in MSOffice software. The original file copy is the property of the Department of Interior, Bureau of Indian

Affairs, Navajo Region and shall not be copyrighted or distributed by the contractor without the permission of the BIA, NRO, BEM.

4. If reports are lost, the contractor shall reissue copies at his/her expense.

5. All final reports shall be signed and stamped into by a Professional Engineer.

6. All correspondence shall be protected and secured. It shall not be made available to the public or any other agency without the permission of the BIA.

Acceptance Requirements: The COR, in consultation with the Branch of Environmental, Management (BEM) and possibly representatives of the United States Environmental Protection

Agency (USEPA) and Navajo Nation Environmental Protection Agency (NNEPA), will determine the acceptability of work performed. If, and when, any agent of the Navajo Nation, or any other Native American government, communicates with the contractor, BEM shall be immediately informed.

Special Conditions: Full documentation shall be maintained for all field testing, results and project completions. During field situations, the contractor shall maintain a daily log and record all events relevant to a task order. Any additional sub-contractors shall do likewise. The logs will be signed up and closed daily. The logs shall become the property of BIA. A copy of all bills, receipts and time sheets shall be maintained, in case there is ever a possible claim for cost recovery.