Scope_of_Service_Clean_Version_for_Sharepoint.docx

DOCX document 52 KB Posted

Attached to
Landfill Gas and Leachate Control Systems Monitoring, Reporting, and Well Installation Services
Solicitation number
RFP194618
Issued by
Santa Clara County, California

About this file

This is a Scope of Services document for the City of Palo Alto seeking a qualified consultant to perform landfill gas and leachate control systems monitoring, reporting, and well installation services for a closed municipal solid waste disposal site. The contract is for a 5-year term, covering a 126-acre landfill located at 2380 Embarcadero Road that ceased accepting waste in 2011 and underwent final capping in 2015. The services include routine monitoring of 91 landfill gas extraction wells and 24 leachate extraction wells, performing annual flare stack emissions sampling, compiling quarterly and annual regulatory reports, and potentially installing additional wells as needed. The consultant will be responsible for monitoring and reporting in compliance with Bay Area Air Quality Management District regulations, California Air Resources Board requirements, and EPA Greenhouse Gas Reporting Rule.

The scope of work encompasses detailed technical monitoring activities, including weekly well-head inspections, monthly methane and oxygen measurements, quarterly surface emissions monitoring, and annual reporting across multiple regulatory frameworks. The consultant will provide all necessary personnel, equipment, and expertise, with specified qualifications for senior technicians and technicians. Compensation will be based on hourly rates for a senior technician (estimated 613 hours per contract year), with additional management and support staff time. The project requires comprehensive data collection, reporting, and potential well installation services, with the city retaining a separate maintenance contractor for system repairs. The consultant will be responsible for training city staff, maintaining monitoring databases, and ensuring compliance with complex environmental regulations across multiple reporting requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Services

LANDFILL GAS AND LEACHATE CONTROL SYSTEMS, MONITORING AND REPORTING SERVICES

Purpose of This Scope of Services:

Through this Request for Proposals (RFP), the City of Palo Alto (CITY) is seeking a qualified and experienced firm (“CONSULTANT”) to perform monitoring and reporting services for the CITY Landfill’s gas collection environmental control systems (landfill gas and leachate collection systems) for a term of 5 years.

Background:

History and Phasing: The CITY owns and operates an unlined, class III municipal solid waste disposal site, located at 2380 Embarcadero Road in Palo Alto, California. The landfill reached refuse capacity and ceased accepting waste in 2011 and underwent final capping and regulatory closure in 2015. The landfill occupies approximately 126 acres of the 1800-acre, CITY owned Byxbee Park and Baylands parcel. The landfill is divided into phases - Phase I, Phase IIA, Phase IIB, and Phase IIC, based on the timing of closure and conversion to parkland. Phase I comprises approximately 29 acres and was closed and developed into parkland in 1990. Phases IIA (23 acres), IIB (24 acres) and IIC (51 acres) were closed and converted to parkland in 1992, 2000 and 2015 respectively. Smaller areas of the landfill are occasionally closed off to park users on an as-needed basis for control system maintenance and settlement repairs.

The environmental control systems within the landfill consist of a vertical landfill gas extraction system and a retrofitted vertical leachate extraction system.

Landfill Gas System: The CITY’s landfill gas (LFG) collection system consists of 91 vertical extraction wells. Most of the gas wells are spaced approximately 200 feet apart, have been constructed with a 4 to 6-inch diameter Schedule 40 PVC casings or high-density polyethylene (HDPE) casings placed within 24-inch diameter boreholes and have an average depth of approximately 35 feet below the landfill surface. An HDPE piping network collects and transmits gas from the extraction wells to a blower-flare facility where it is combusted. The blower-flare facility is located on Palo Alto Regional Water Quality Control Plant (PARWQCP) property near the landfill northwest boundary. The pipe network is below grade throughout the landfill facility, buried within the final cover system. In the Phases that were capped with a clay layer (Phase I, IIA, IIB), the gas collection system pipes are buried above the clay cap within a thickened vegetative soil layer. In Phase IIC the pipes are buried within a 4-ft thick layer of evapotranspirative cover material.

Currently, 5 leachate wells are connected to the gas collection system due to the detection of methane above regulatory limits inside and/or outside those wells. During the term of this contract, the CITY may elect to place an additional 18 leachate wells under vacuum and add them to the landfill gas collection system. Any monitoring required under the regulations of landfill gas wells would include those leachate wells that have been hooked up to the landfill gas collection system.

Leachate System: The CITY’s Leachate Collection and Removal System (LCRS) consists of 24 vertical extraction wells. These wells are typically constructed with 6-inch diameter Schedule 80 PVC casings and strategically distributed throughout the landfill. Well spacing averages approximately 300 feet, with locations being selected based upon historic information and local leachate levels at the time of installation. Each well has a dedicated pneumatic pump, and compressed air is delivered to each well from a centrally located compressor via a network of welded HDPE piping. Leachate is collected from the wells and transported via the piping network to the CITY sanitary sewer main adjacent to the western boundary of the landfill.

Leachate elevations within the refuse mass are measured through a set of 17 vertical piezometers.

Condensate Collection: Gas condensate produced by the LFG collection system is collected in sumps and pumped into the facility’s LCRS via pneumatic submersible pumps. There are currently eleven (11) condensate sumps located in Phase I, Phase IIA, Phase IIB and Phase IIC, combined.

Appendices:

Appendix 1 – Permit To Operate issued by BAAQMD Appendix 2 – Landfill Gas Wellhead Detail Appendix 3 – As-Built Completion Log: LFG Extraction Well

General Requirements:

This scope of services includes: 1) Performing routine LFG collection and emission control system monitoring and reporting; 2) Performing annual landfill flare stack emissions sampling, analyses and reporting; 3) Compiling and preparing various LFG reports; 4) Installation of additional wells as needed and as Permit allows; and 5) Providing miscellaneous engineering support services.

CONSULTANT shall comply with all requirements of the Landfill’s Permit To Operate, Regulation 8, Rule 34 of the Bay Area Air Quality Management District’s (BAAQMD’s) regulations, including the regulations for Methane Emissions from Municipal Solid Waste Landfills, CCR Title 17, §95460-95476, and the EPA Greenhouse Gas Rule (40 CFR Part 98, Subpart HH) as well as all pertinent plans and specifications relating to work associated with maintenance and operation of the site’s environmental control systems.

CONSULTANT shall provide all necessary services, labor, tools, materials, equipment, vehicles, and instrumentation for the routine scope of services in this RFP including, but not limited to, monitoring equipment for detecting LFG and any other equipment necessary to perform the routine scope of services contained herein. This equipment is considered necessary items for CONSULTANT, and separate charges for use of these items in the course of the routine work, shall not be paid by CITY.

CITY will provide all applicable permits for work performed in accordance with this RFP. The CITY has a landfill maintenance CONSULTANT that will perform repairs to the gas and leachate collection systems as needed. All routine operation or monitoring work shall take place either aboveground or in buried shallow vaults (less than three feet in depth). CONSULTANT shall not be responsible for the overall quality of the gas with regard to trace components.

Expected personnel job titles and required experience levels to conduct the scope of services are listed below. All field personnel performing work listed in this RFP shall have the following minimum qualifications:

Senior Technician (or equivalent)

· Five (5) years experience performing work on LCRS and LFG systems;

· Ability to tune and optimize the vacuum on the LFG collection system without supervision or close oversight;

· Ability to detect LFG system and LCRS leaks and diagnose potential failures before they occur; and,

· General understanding of landfill regulations relating to the LCRS and LFG systems.

Technician (or equivalent)

· Two (2) years experience performing work on LCRS and LFG systems;

· Ability to detect LFG system and LCRS leaks and diagnose potential failures before they occur; and,

· General understanding of landfill regulations relating to the LCRS and LFG systems.

CITY will authorize site access for CONSULTANT personnel, equipment, and materials for the completion of the work. CONSULTANT personnel shall be responsible for communication and coordination of onsite work by notifying appropriate CITY personnel at the landfill office prior to beginning work onsite and upon leaving the site.

Work To Be Performed Task 1 – Routine LFG System, Flare, Well-Head Monitoring, and Surface Monitoring and Reporting

Bid Item Definition For Task 1:

CONSULTANT shall provide a Senior Technician (or equivalent) with the experience and skill level defined above, billed at the hourly rates specified in the rate sheets submitted with the proposal, for the performance of routine LFG system monitoring, well-head monitoring and surface monitoring and reporting. CONSULTANT shall also provide on the bid schedule an estimate of the Manager/Supervisor/Office Support Staff time necessary to support this work.

A) Senior Technician (or equivalent) may spend up to 613 hours onsite per contract year. Field Time Estimate breakdown for Task 1 is expected to be:

· One 8-hour day (onsite) per week for well and component adjustment and monitoring (416 hours per year; CITY staff currently performs and will continue to perform the work described in Task 1, Subtasks a - c, however, in the instance where CITY cannot, CONSULTANT shall perform the work);

· Up to four 16-hour events (onsite) per year for surface and component monitoring (64 hours per year); and

· Miscellaneous additional follow-up time for adjusting high-oxygen LFG and Leachate wells (133 hours onsite per year; CITY staff currently performs and will continue to perform the work described in Task 1, Subtasks a - c, however, in the instance where CITY cannot, CONSULTANT shall perform the work).

At CITY’s request, CONSULTANT shall train CITY staff while completing the routine work performed by the Senior Technician.

B) Management/Supervisor/Office Support Staff to support Task 1.

C) Remote monitoring and control of landfill flare

General Scope of Services For Task 1 Unless otherwise specified by CITY, a date-specific schedule or a set day of the week schedule shall be submitted by CONSULTANT for approval by CITY, and shall specify when the LFG maintenance needs to occur as prescribed in the Permit To Operate, and/or Rule 8-34 regulations. Generally, Task 1 services shall include the following:

a. Monitoring, if needed by CITY, once per week of 91LFG well-heads, 6 (up to 24) leachate well-heads (connected to the gas collection system), 11 condensate sumps, flare station and other valves, fittings and components.

b. If needed by CITY, monthly measurement of methane and non-methane organic compounds (NMOC), oxygen concentration and pressure within each well-head (landfill gas wells and leachate wells which are connected to the gas collection system) in accordance with Regulation 8, Rule 34, and Title 17, Section 95469. If the well head does not meet the standards of Regulation 8, Rule 34, Section 305, and Title 17, §95469, then CONSULTANT shall document and make adjustments following Regulation 8, Rule 34, Section 414 scheduling requirements. It is anticipated that some follow up visits shall be necessary by the Senior Technician for the purpose of monitoring and adjusting wells with high oxygen content. CONSULTANT shall make recommendations to CITY for further repairs if necessary. CONSULTANT shall compile the well-head information, including all follow-up monitoring results and submit monthly reports to CITY, within 21 days from the end of each month. At CITY discretion, CONSULTANT shall train CITY while completing the field work portion of this work. The monitoring requirements of the rule are located in §95469 and §95470. These requirements are listed below:

i. Monthly well-head monitoring and requirement to achieve negative pressure at all wellheads, including corrective action/re-monitoring.

ii. Quarterly leak testing of LFG collection system components not under vacuum at a 500 ppmv methane limit, including corrective action/re-monitoring.

iii. Quarterly integrated surface sampling with a limit of 25 ppmv methane.

iv. Continuous flow and temperature monitoring.

v. Quarterly monitoring of flare components which contain landfill gas and/or which contain landfill gas under positive pressure.

c. If needed by CITY, adjust/tune and optimize the vacuum on the individual wells in order to maximize methane extraction while minimizing oxygen intrusion into the landfill; At CITY discretion, CONSULTANT shall train CITY while completing the field work portion of this work.

d. In addition to the monthly well-head monitoring, CONSULTANT shall monitor and compile records to support the LFG component quarterly leak monitoring requirements of the BAAQMD’s Regulation 8, Rule 34, Section 501 and 503 and Title 17, §95460-95476. Separate Quarterly Component Monitoring reports shall be submitted to CITY within 21 days from the end of each quarter. At CITY discretion, CONSULTANT shall train CITY while completing the field work portion of this work.

e. Quarterly measurement of methane and NMOC concentration on the landfill surface in accordance with site surface monitoring plan and Regulation 8, Rule 34, Section 501 and 506 and including the regulations for Surface Emissions Monitoring (SEM), CCR Title 17, §95469 listed below:

i. Quarterly instantaneous SEM at 25-foot spacing with a 500 ppmv methane limit, including testing of cover penetrations, with corrective action/re-monitoring. (Under the rule, the site is currently required to perform the SEM annually, however, if there is an exceedance, SEM will need to return to quarterly).

ii. Quarterly leak testing of LFG collection system components not under vacuum at a 500 ppmv methane limit, including corrective action/re-monitoring.

iii. Quarterly integrated surface sampling with a limit of 25 ppmv methane.

f. CONSULTANT shall establish a portable wind station or obtain measurements from the Palo Alto Airport to document compliance with meteorological conditions during the monitoring events. A detailed written report summarizing the results of the monitoring activities shall be provided to CITY within 21 days of the end of each quarter. A date-specific schedule shall be developed by CONSULTANT and submitted for approval by CITY.

g. Weekly monitoring of the flare station, including download of the data logger. Document and collect all data including all startup, shutdown and malfunction paperwork:

i. Date, time, and monitoring personnel.

ii. Meteorological condition (i.e., wind velocity, barometric pressure ambient temperature, weather conditions, etc.).

iii. Extraction blower operating inlet and outlet temperatures and pressures.

iv. Methane gas, oxygen gas, carbon dioxide and balance gas concentrations at flare inlet or Regional Water Quality Control Plant Incinerator as required by the BAAQMD.

v. Flare exit gas temperature (only when flare operational).

vi. LFG flow rate to flare, or CITY incinerator.

vii. Flare combustion louver (only when flare is operational).

viii. Flow control valve positions.

ix. Check pilot ignition system propane storage tank level.

x. LFG control system blowers, flame arresters, flares, control panel, well fields, and condensate pump systems shall be observed for the following:

· Accessibility.

· Vandalism.

· Malfunctions.

· Leaks.

xi. Weekly record blower running hours;

h. Once per quarter, hydrogen sulfide (H2S) shall be tested by CONSULTANT at the Flare Station inlet utilizing field Draeger test tubes; Inspect flame arrester; and, inspect burner heads.

i. Compile all data from the tasks listed above to be utilized by CONSULTANT in preparing the required annual reports (Task 3).

j. CONSULTANT shall provide computer or web database for CITY and CONSULTANT use to record, store, and analyze all collected monitoring data.

k. CONSULTANT shall provide one (1) copy of all field records generated during on-site service before leaving the site for the day.

Task 2 – Routine Landfill Flare Stack Emission Sampling, Analytical Testing and Reporting

A) Annual Source Test

· CONSULTANT shall conduct the flare source test on the Flare located at the Regional Water Quality Control Plant in accordance with the Permit To Operate. Additionally, because the landfill is subject to the AB32 Landfill Methane Rule (see Task 3 of this Scope of Services), the flare must be tested annually to document compliance with Rule’s 99% methane destruction requirement, as specified in Section §95471 of the Rule. CONSULTANT shall perform the annual flare testing while the contract is in place. In accordance with Item No. 15 of the Permit To Operate, CONSULTANT shall notify the Bay Area Air Quality Management District (BAAQMD) at least 14 days in advance of the test and shall submit to BAAQMD the compliance plan for the source test. CONSULTANT shall submit a report summarizing the results of the source test to CITY and BAAQMD within 45 days of completion of the test.

B) Annual Source Pre-Test

· In addition to the annual Source Test test, CONSULTANT shall perform an annual source test “pre-test” one day prior to the official source test to identify compliance issues, troubleshoot, and tune the flare as necessary to ensure optimal performance and compliant source test results. The pre-test does not require a report or notification to BAAQMD.

Task 3 – Routine Report Preparation

Task 3 is outlined below and includes report preparation in compliance with Bay Area Air Quality Management District (BAAQMD) Rule 8-34, AB32 Landfill Methane Rule, and EPA Greenhouse Gas Reporting Rule, as listed below. CONSULTANT shall provide a draft of each report to CITY for review prior to submittal to BAAQMD, and shall incorporate CITY’s comments into the final reports for submittal. The final reports and certifications shall be signed by the responsible CITY official, where required.

A. Annual Rule 8-34 Report (One Report Annually)

CONSULTANT shall prepare the Rule 8-34 annual reports required by the BAAQMD. CONSULTANT shall collect the necessary data to complete the reports under Section 411 of Rule 8-34. The reports shall be developed in the format prescribed by the BAAQMD. The reporting period covers December 1st through November 30th. The report is due the last day of the month after the end of the reporting period. The annual reports shall contain the following information, as required:

1) Operating Records Required by Section 501:

a) All collection system downtime, including individual well shutdown times, length of time for shutdown, and the reason for the shutdown. All periods greater than five (5) days when the collection system was not operating.

b) All emission control system downtime, length of time for shutdown, and the reason for the shutdown. Description and duration of all periods when the control device was not operating for greater than one (1) hour and the length of time that the device was not operating.

c) Continuous temperature records (data logger) for all operating flares and any enclosed combustors with a listing of the dates/times when flare temperature went below permitted limits and any times when temperature gauge was off-line or not operational.

d) Monthly LFG flow meter readings.

e) Records of all quarterly LFG system component leak testing, including monitoring dates, leak concentration by volume if in excess of 1,000 parts per million, by volume (ppmv), location of leak, date of discovery, the actions taken by the City or its maintenance CONSULTANT to repair the leak, date of repair, date of any required re-monitoring, and the re-monitored concentration in ppmv.

f) Continuous gas flow rate records (data logger information) with a listing of the dates/times when flow rate went above permitted limits and any times when the flow meter was off-line or not operational.

g) Records of all quarterly surface emissions monitoring, including monitoring dates, surface emission concentration by volume if in excess of 500 ppmv, location of exceedance, date of discovery, the actions taken by the CITY or its maintenance CONSULTANT to repair the exceedance, date of repair, date of any required re-monitoring, and the re-monitored concentration in ppmv.

h) For monthly wellhead monitoring (temperature, vacuum, and oxygen or nitrogen content), records of all monitoring dates and any excesses of the limits stated in Section 8-34-305, Title 17, §95460-§95476, and below (or approved alternative limits), including well identification number, the measured excess, the action taken by the CITY or its maintenance CONSULTANT to repair the excess, and the date of repair, date of any required re-monitoring, and the re-monitored value.

Gas wells

i) A minimum of monthly recording of gauge pressure at all wellheads (all wells must operate under negative pressure conditions).

ii) Monthly monitoring of oxygen or nitrogen concentrations at all wellheads (oxygen must not exceed 5 percent or nitrogen over 20 percent).

iii) Monthly monitoring of temperatures at all wellheads (temperature shall not exceed 55C (131F)).

Leachate wells (connected to the LFG collection system)

i) A minimum of monthly recording of gauge pressure, oxygen content, methane content, and temperature at each wellhead (the well(s) must be connected to vacuum if any pressure is detected);

iv) Monthly monitoring of oxygen concentrations at wellheads (oxygen must not exceed 15 percent by volume). If the oxygen concentration exceeds 15 percent by volume the vacuum to the leachate well may be turned off;

v) Monthly monitoring of temperatures at all wellheads (temperature shall not exceed 55C (131F)). If temperature exceeds 55C (131F) the vacuum to the leachate well may be turned off;

2) Calibration information for monitoring equipment used for the various monitoring activities listed above (e.g., OVA, GEM-5000 unit, flow meter, temperature, etc.).

3) Description and duration of all periods when the gas stream was diverted from the control device through a bypass line to the WQCP incineration.

4) The date of installation and location of all wells or system expansions as the result of monitoring exceedances during previous reporting period.

5) Data upon which the density of well and equipment sizing were based.

6) Gas generation rate estimates.

7) Provisions for increasing LFG extraction capacity as gas generation increases.

8) The provisions for the control of LFG migration.

B. AB32 – Landfill Methane Rule Annual Reporting (One Report Annually)

CITY is subject to the AB32 Landfill Methane Rule (Title 17 California Code of Regulations (CCR), Chapter 10, Article 4, Sub-article 6, §95462 through §95476), which has an annual reporting requirement. The required annual report under this Rule must be submitted by March 15 of each year for the previous calendar year data.

Annual Reports must include the following information, as specified in §95470 of the Rule:

· General site information

· Total volume of LFG collected (reported in standard cubic feet (scf)),

· Average composition of LFG collected over the reporting period (reported in percent methane and percent carbon dioxide by volume),

· Gas control device type, installation, rating, fuel type, and total LFG combusted in each control device,

· Date LFG collection system installed

· Percent methane destruction efficiency

· Volume and composition of gas shipped off-site

· Type and amount of supplemental fuels burned with the LFG.

· Recent topographic map, and

· All required monitoring data.

CONSULTANT shall compile the required data into a report in a format suitable for submittal to the California Air Resources Board (CARB) Executive Officer. CONSULTANT shall provide a draft of the report to CITY for review. CONSULTANT shall incorporate CITY comments into the final report and submit to CARB on behalf of the CITY.

C. EPA – Greenhouse Gas Annual Reporting (One Report Annually Submitted Online)

CITY is required under the EPA GHG reporting rule, 40 CFR Part 98, Subpart HH, to submit a report annually. CONSULTANT shall compile the required data and input into an appropriate electronic format in accordance with EPA GHG rule specifications for upload to the EPA’s online reporting tool (e-GRRT). CONSULTANT shall submit draft data file to CITY for review. CONSULTANT shall incorporate CITY comments into the final report and submit to EPA via e-GRRT. CONSULTANT will be added to the website as CITY agent and shall manage the website reports on behalf of CITY.

The data to be reported is for calendar year 2025, 2026, 2027, 2028, and 2029, and the reporting deadline is March 30 of the following year. As specified in the EPA Rule, the following information is required:

· Landfill Operations (Open/closed/Year)

· Waste Disposal Calculations

· Waste Composition (If Available)

· Modeling Parameters Used

· Methane Data

· Landfill Area, Cover Types by Area, and Oxidation Fractions Used

· LFG Modeling Results

· Emissions from stationary combustion units.

· Flow of collected LFG

· Methane content of LFG

· Temperature and pressure data for LFG

· Description of control device(s) both on- and off-site

· Control device operating hours

· Description of LFG collection system, landfill areas and waste depths

· Computed methane volume captured

· Computed methane generated (corrected for oxidation using EPA model)

· Computed methane generated (corrected for oxidation using LFG recovery flow and collection efficiency)

· Methane Emissions, Method 1 (Modeling)

· Methane Emissions, Method 2 (Gas Captured and Estimated Collection Efficiency) Task 4 – Installation of Wells

As requested by CITY, CONSULTANT shall coordinate and perform all aspects of new or replacement LFG and leachate well installations. This could include, but is not limited to: Comment by Fitzgerald, Sarah: When Nanette reviews will ask her to confirm this text is sufficient to call out the prevailing wage needs of this Task.

· Engineering of well;

· Preparation of drawings;

· Coordination of subcontractors;

· Drilling and completion of well;

· Providing well installation oversight and boring installation logs;

· Final as-builts; and

· Well installation reports.

CONSULTANT shall provide specific prevailing wage rates for laborer(s) and technician(s) for work associated with well installation projects. If CONSULTANT cannot perform the well drilling and completion work in house, CONSULTANT shall include qualified subcontractor(s) and separate subcontractor rate sheets with the submittal to this RFP.

Prior to the commencement of any well drilling project, CONSULTANT shall submit a Site-Specific Health and Safety Plan (SSHASP) two weeks prior to the start of work for review and approval by the City. The SSHASP shall include landfill specific considerations.

For the purposes of cost analysis and budgeting of this task, submit a detailed cost estimate for installing 1 gas well. Provide all coordination, oversight, materials, equipment, and labor to drill and complete well to the specifications on Appendix 3, As-Built Completion Log.

Task 5 – Other Engineering Services

On occasion, CITY may ask CONSULTANT to evaluate the performance and design of the gas system using the services of a qualified LFG engineer. CONSULTANT shall provide engineering services for duties including, but not limited to, possible LFG and LCRS system design, permitting, and equipment change-out. Work on these engineering services requires written approval from CITY prior to CONSULTANT working on or billing to these subtasks. Typically, CONSULTANT shall develop and submit a written cost estimate prior to work on these subtasks.

End Scope of services

File details come from the government source that posted it. Updated .