Cost_Proposal_Form_(RFP194618).pdf
PDF 92 KB Posted
- Attached to
- Landfill Gas and Leachate Control Systems Monitoring, Reporting, and Well Installation Services
- Solicitation number
- RFP194618
- Issued by
- Santa Clara County, California
About this file
This cost proposal form is for RFP194618, issued by the City of Palo Alto, California, for Landfill Gas and Leachate Control Systems Monitoring, Reporting, and Well Installation Services. The document outlines a 5-year contract for comprehensive landfill management services at the city's closed class III landfill located at 2380 Embarcadero Road. The scope of work includes routine landfill gas system and flare maintenance, wellhead and surface monitoring, flare stack emission sampling, analytical testing, report preparation (including Rule 8-34, Landfill Methane Rule, and Greenhouse Gas Emission Inventory reports), and well installation services.
The cost proposal form provides a detailed breakdown of estimated annual quantities and costs, with key line items including 613 hours of senior technician work, remote monitoring and control of the landfill flare, annual source testing, and various reporting requirements. The annual estimate for other engineering services is set at $20,000, with a placeholder for reimbursable expenses. The document is structured to allow vendors to fill in unit prices and calculate extended cost estimates for each task, with a total contract amount to be calculated for the 5-year period. The form is designed to capture comprehensive pricing for the full range of landfill management and monitoring services required by the City of Palo Alto.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor:___________________________________________________
Task # Task Description Estimated Annual
Quantity Unit Price
Extended Cost Estimate (Annual)
Routine LFG System and Flare Maintenance, Wellhead Monitoring, and Surface Monitoring and Reporting
A) Senior technician (or equivalent): 613 hours / year $__________ $__________
B) Management/Supervisor/Office support: -- Support Cost Estimate $__________
C) Remote Monitoring and Control of Landfill Flare: -- Annual Cost $__________
2 Routine Landfill Flare Stack Emission Sampling, Analytical Testing and Reporting
A) Annual Source Test 1 Lump Sum $__________
B) Annual Source Pre-Test 1 Lump Sum $__________
Routine Report Preparation
A) Preparation of: Rule 8-34 Report 1 Report Cost Estimate $__________
B) Landfill Methane Rule Report 1 Report Cost Estimate $__________
C) Greenhouse Gas Emission Inventory Report 1 Report Cost Estimate $__________
4 Well Installation (Includes Prevailing Wage Work) -- Example Project Estimate $__________
5 Other Engineering Services -- Annual Estimate $20,000
Reimbursable Expenses (For all tasks) $__________
Total Annual Cost $__________
Total Cost for 5 Years (Total Contract Amount) $__________
Annual Estimate
RFP194618 LANDFILL GAS AND LEACHATE CONTROL SYSTEMS MONITORING, REPORT, AND WELL INSTALLATION SERVICES
Sheet1
File details come from the government source that posted it. Updated .