SCOPE for SR 154 Memorial Drive Corridor_0508.pdf
PDF 364 KB Posted
- Solicitation number
- PE-66062-NONST-2027-000000471
- Issued by
- Fulton County, Atlanta City, Georgia
About this file
This is a Scope of Work document for a preliminary design project involving the City of Atlanta, Georgia Department of Transportation (GDOT), and Fulton County. The project, identified as SR 154/Memorial Drive Corridor Improvements (PI 0007952), proposes sidewalk expansion and improvement on State Route 154/Memorial Drive between Connally Street and Grant Street. The scope includes connecting missing, broken, and damaged sidewalk portions, upgrading infrastructure to meet ADA standards where required, installing planting strips between new sidewalks and existing curb radius returns, and maintaining existing curb conditions where feasible. The project is in the preliminary design phase, with the concept report having received approval in October 2022. The Notice to Proceed for preliminary design work is pending determination by the City of Atlanta Department of Transportation.
The project is anticipated to deliver multiple benefits, including improved pedestrian accessibility throughout the rapidly changing Memorial Drive corridor, enhanced ADA compliance, and reduced pedestrian crash risk through the installation of protective planting strips. The initiative is located in GDOT District 7 and is sponsored by the City of Atlanta. No specific pricing terms, funding sources, contract award dates, or term information is detailed in this scope document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A.pdf | ||
| Appendix B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SR 154/Memorial Drive Corridor Improvements
PI 0007952 - Fulton County
GDOT District: 7 Phase: Preliminary Design
Environmental Document Type: CE Project Sponsor: City of Atlanta
Scope
The proposed project will expand sidewalks on SR 154/Memorial Drive between Connally Street and Grant Street to connect missing, broken and/or damaged sidewalk portions and upgrade to ADA standards where required. Existing curb will remain where possible, and a planting strip will be installed between the new sidewalks and the existing curb radius return.
Benefits
Improve pedestrian accessibility to a rapidly changing corridor by expanding sidewalks on Memorial Drive to connect missing or damaged sidewalk portions
Upgrade ADA standards where required Reduce pedestrian crashes by installing a planting strip between new sidewalks
Project Status
Concept report approved in October 2022.
Notice to proceed for Preliminary Design to be determined by the City of Atlanta
Department of Transportation.
File details come from the government source that posted it. Updated .