Appendix A.pdf
PDF 332 KB Posted
- Solicitation number
- PE-66062-NONST-2027-000000471
- Issued by
- Fulton County, Atlanta City, Georgia
About this file
This is an Appendix A compliance document issued by the City of Atlanta, Office of Contract Compliance, for the SR-154 Memorial Drive Corridor Design Services project (RFP/PS/DOT/2605-1260223, P.I. 0007952). The document outlines the Small Business Opportunity (SBO) and Equal Employment Opportunity (EEO) program requirements that all bidders must satisfy to be considered for award. The project involves design services for expanding sidewalks along SR 154/Memorial Drive between Connally Street and Grant Street, including sidewalk reconnection, ADA upgrades, and planting strip installation to enhance pedestrian accessibility. All bidders are required to submit a Covenant of Non-Discrimination, outreach efforts documentation, and a completed Subcontractor Project Plan with their bid submissions. The dominant NAICS code for this solicitation is 541330 (Engineering Services).
The SBE participation goal for this project is 25% of the total contract value. Bidders must demonstrate non-discriminatory practices in soliciting and evaluating subcontractors and suppliers, with particular emphasis on certified Small Business Enterprises (SBEs). All SBEs listed on the Subcontractor Project Plan must be certified by or have a pending certification application with the City of Atlanta's Office of Contract Compliance prior to bid submission. Upon contract award, the successful bidder must submit monthly SBO program participation reports and comply with adopted EEO workforce availability percentages. Failure to submit required SBO documentation in full or to comply with non-discrimination requirements will result in the bid being deemed non-responsive and excluded from consideration. The subcontractor project plan cannot be modified after contract award without written approval from the Director of the Office of Contract Compliance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCOPE for SR 154 Memorial Drive Corridor_0508.pdf | ||
| Appendix B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Andre Dickens
Mayor
CITY OF ATLANTA
SUITE 5100
68 MITCHELL STREET
ATLANTA, GA 30303
(404) 330-6010 Fax: (404) 658-7359
Internet Home Page: www.atlantaga.gov
OFFICE OF CONTRACT COMPLIANCE
Rocsean Spencer Director
06/5/2026
RE: SR-154 Memorial Drive Corridor - P.I. 0007952 - Design Services
Dear Prospective City of Atlanta Bidder:
The Office of Contract Compliance (OCC) information is an integral part of every eligible City of
Atlanta bid. All Bidders are required to make efforts to ensure that businesses are not discriminated against on the basis of their race, ethnicity, or gender, and to demonstrate compliance with these program requirements at or prior to the time of Bid opening, or upon request by OCC.
Bidders are required to ensure that prospective subcontractors, vendors, suppliers, and other potential participants are not denied opportunities to compete for work on a City contract on the basis of their race, ethnicity, or gender, and must afford all firms, including Small Business
Enterprises (SBE) opportunities to participate in the performance of the business of the City to the extent of their availability, capacity, and willingness to compete. Please read all of the information very carefully. Pay close attention to the specific goals for SBE participation for this project and the SBO program reminders listed on page 6.
If you have any questions about the information included in this section of the solicitation, please contact the City of Atlanta Office of Contract Compliance at (404) 330-6010.
The City of Atlanta looks forward to the opportunity to do business with your company.
http://www.ci.atlanta.ga.us/
TABLE OF CONTENTS
Policy Statement
Implementation of SBO Policy
Determination of Non-discrimination During Bid Process
OCC Review of Bidder Submissions
Equal Business Opportunity Program Bid RFP Submittals
Monitoring of SBO Policy
Implementation of EEO Policy
Monitoring of EEO Policy
Small Business Opportunity SBE Goals for This Project
Small Business Opportunity Program Reminders
Covenant of Non-discrimination (SBO-1)
SBO Subcontractor Contact Form (SBO-2) ............................................................................... 8-9
SBO Subcontractor Utilization Plan (SBO-3)
Letter of Intent ........................................................................................................................ 11-12
Termination/Substitution Acknowledgement Form
WorkSource Atlanta Determination of Applicability
WorkSource Atlanta Program Policy Statement
First Source Jobs Information Forms ..................................................................................... 16-22 i.
CITY OF ATLANTA
SMALL BUSINESS OPPORTUNITY PROGRAM
POLICY STATEMENT
It is the policy of the City of Atlanta to promote full and equal business opportunities for all persons doing business with the City. The City must ensure that firms seeking to participate in contracting and procurement activities with the City are not prevented from doing so on the basis size as it relates to revenue and number of employees. The City is committed to ensuring that it is not a passive participant in any private scheme of discrimination. To ensure that businesses are not discriminated against with regard to prime contracting, subcontracting or other partnering opportunities with the City, the City has developed its’ various diversity inclusion programs. The purpose of the Small Business Opportunity Program is to ensure that the City of Atlanta has a robust race-neutral approach to promoting full and equal business opportunity for all persons doing business with the City of Atlanta, to promote commerce by assisting Small Business Enterprises
(SBEs) to actively participate in the City’s procurement process and ensure that the City of Atlanta utilizes programs that provide it with the best possible resources.
It is also the policy of the City of Atlanta to actively promote equal employment opportunities for minority and female workers and prohibit discrimination based upon race, religion, color, sex, national origin, marital status, physical handicap, or sexual orientation through the City's Equal
Employment Opportunity (EEO) Program. The purpose of these program is to mitigate the present and ongoing effects of the past and present discrimination against women and minority workers so that opportunity, regardless of race or gender, will become institutionalized in the Atlanta marketplace. It is important to note that all bidders, without exception, including firms that are
Small Business Enterprises themselves, must comply with the City of Atlanta's SBO and EEO
Program requirements. Goals for minority and female business enterprises are set for this project on page 6.
Implementation of SBO Policy
The Office of Contract Compliance will review information submitted by Bidders pertaining to efforts to promote opportunities for small businesses to compete for business as subcontractors and/or suppliers. A
Bidder is eligible to be further considered for award of a City contract upon a finding by OCC that the
Bidder has engaged in and provided with its bid submission documentation of efforts to ensure that its process of soliciting, evaluating, and awarding subcontracts, placing orders, and partnering with other companies has been non-discriminatory. To assist prime contractors in this effort, the Office of Contract
Compliance has set forth in this solicitation document the SBE goals within the relevant NAICS Codes, for this Project.
For subcontracting, the Subcontractor Project Plan must include all subcontractors (both small and non-small business enterprises) to be utilized on the project, detail the services to be performed, the dollar value of the work to be performed by each subcontractor, and the City of Atlanta SBE certification number and supplier id number as applicable.
For suppliers, the Subcontractor Project Plan must include all subcontractors (both small and non-small business enterprises), the supplies to be provided, including the dollar value of the supplies being provided and the City of Atlanta SBE certification number and supplier id number as applicable.
Determination of Non-discrimination During Bid Process
No Bidder shall be awarded a contract on an Eligible Project unless the Office of Contract Compliance determines that the Bidder has satisfied the non-discrimination requirements of section 2-1372 on such
Eligible Project. Accordingly, each Bidder shall submit with each Bid the following.
1. Covenant of Non-Discrimination. Each Bidder shall submit with her/his Bid a Covenant of Non-
Discrimination which is set forth herein as Exhibit SBO1.
2. Outreach efforts documentation. Each bidder shall submit with her/his bid written documentation demonstrating the bidder’s outreach efforts to identify, contact, contract with, or utilize businesses, including certified SBEs as subcontractors or suppliers on the contract. This information shall be set forth on Exhibit SBO2, which is included herein.
3. Subcontractor project plan. Each bidder shall submit with her/his bid a completed and signed subcontractor project plan, in a form approved and provided by the office of contract compliance, which lists the name, address, telephone number and contact person of each subcontractor or other business to be used in the contract, the NAICS Code and the type of work or service each business will perform, the dollar value of the work and the scope of work, the ownership of each business, certification number of each business, and any other information requested by the office of contract compliance. In order for the office of contract compliance to officially consider a firm to be an
SBE, the SBE firm must be certified by or have a certification application pending with the office of contract compliance prior to the bidder’s submission of the bid. The subcontractor project plan shall not be changed or altered after approval of the plan and award of the contract without the written approval of the director of the office of contract compliance. A written letter to the director of the office of contract compliance requesting approval to change the subcontractor project plan must be submitted prior to any change in the plan or termination of an SBE’s contract.
OCC Review of Bidder Submissions
The Office of Contract Compliance shall determine whether a Bidder has satisfied the non-discrimination requirements of section 2-1448 based on its review of the Covenant of Non-
Discrimination, the Outreach Efforts Documentation, the Subcontractor Project Plan, and its review of other relevant facts and circumstances, including complaints received as part of the bid process. In reviewing the documents submitted by a Bidder to determine whether the Bidder has satisfied the non-discriminatory practices requirement of this section, the Office of Contract
Compliance will consider, among other things, the total project dollars subcontracted to or expended for services performed by other businesses, including certified SBEs, whether such businesses perform Commercially Useful Functions in the work of the contract based upon standard industry trade practices, whether any amounts paid to Supplier businesses are for goods customarily and ordinarily used based upon standard industry trade practices, and the availability of certified SBEs within the relevant NAICS Codes for such Eligible Project.
(a) Receipt of Complaint of Discrimination in the Bid Process
The office of contract compliance shall accept complaints of alleged discrimination during the bid process regarding any participant in the bid process. Where the complaint of discrimination is specific to the procurement, which is under consideration by the city, the office of contract compliance may investigate said complaint, determine its validity, and determine whether the actions complained of impact the bidder’s responsiveness on the specific procurement. Allegations of discrimination based on events, incidents or occurrences which are unrelated to the specific procurement will be placed in the bidder’s file maintained in the vendor relations database and handled in accordance with the procedure established in the city’s vendor relations subdivision, section 2-1465, et seq.
(b) Determination of Violation of SBO Process
Where the office of contract compliance investigates a complaint of discrimination that is related to the specific bid process, the details of that investigation, including findings, shall be recorded, and maintained in the vendor relations database, pursuant to section 2-1471.
(c) Office of Contract Compliance Determination of Non-Compliance
When, based upon the totality of the circumstances, the office of contract compliance determines that a bidder fails to satisfy the requirements of section 2-1448(a) of a city bid solicitation, the director of the office of contract compliance shall present a written determination of non-compliance to the Chief Procurement Officer which states the determination and lists the reasons for the determination. A bid that does not comply with the requirements set forth in section 2-1448(a) shall be deemed non-responsive and rejected.
Small Business Opportunity Program Bid/RFP Submittals
The Office of Contract Compliance will make any determination of non-responsiveness. The covenant of non-discrimination, the outreach efforts documentation, the subcontractor project plan, and any other information required by OCC in the solicitation document pursuant to section 2-1448 must be completed in their entirety by each bidder and submitted with the other required bid documents in order for the bid to be considered as a responsive bid. Failure to timely submit these forms, fully completed, will result in the bid being considered as a non-responsive bid, and therefore excluded from consideration.
Monitoring Of SBO Policy
Upon execution of a contract with the City of Atlanta, the successful bidder's SBE Project
Participation Plan will become a part of the contract between the bidder and the City of Atlanta.
The SBE Project Participation Plan, all executed subcontract agreements, operating agreements, other contract governing documents, along with all other pertinent records required by OCC as deemed necessary will be placed on file. Said documentation shall be in a format that is established by the Office of Contract Compliance and will be monitored by the City of Atlanta's Office of
Contract Compliance for adherence with the plan. The successful bidder will be required to provide specific SBE information on a monthly basis that demonstrates the use of subcontractors and suppliers as indicated on the Subcontractor Project Plan. The failure of the successful bidder to provide the specific SBO information by the specified date each month shall be sufficient cause for the City to withhold approval of the successful bidder’s invoices for progress payments, increase the amount of the successful bidder’s retainage, require joint check issuance, or evoke any other penalties as set forth in the City of Atlanta Code of Ordinances, Section 2-1373.
Implementation of EEO Policy
The City effectuates its EEO policy by adopting racial and gender work force availability for every contractor performing work for the City of Atlanta. These percentages are derived from the work force demographics set forth in the 2000 Census EEO file prepared by the United States
Department of Commerce for the applicable labor pool normally utilized for the contract.
Monitoring of EEO Policy
Upon award of a contract with the City of Atlanta, the successful bidder must submit a Contract
Employment Report (CER), describing the racial and gender make-up of the firm's work force. If the CER indicates that the firm's demographic composition does not meet the adopted EEO goals, the firm will be required to submit an affirmative action plan setting forth the steps to be taken to reach the adopted goals. The CER and the affirmative action plan, if necessary, will become a part of the contract between the successful bidder and the City of Atlanta. Compliance with the EEO requirements will be monitored by the Office of Contract Compliance.
Small Business Opportunity SBE GOALS for this Project
Project No.: RFP/PS/DOT/2605-1260223, SR-154 Memorial Drive Corridor - P.I. 0007952 -
Design Services
The dominant NAICS code and trade to be engaged for the above referenced solicitation is:
541330 – Engineering Services
The above referenced dominant NAICS code(s) was/were used for the purposes of calculating the appropriate participation goal(s). However, COA certified SBE Prime proponents responding to this solicitation may consider any COA certified SBE firm(s) that performs a commercially useful function in the execution of the project to be eligible for participation credit.
The availability of certified SBE firms for the procurement categories in the various scopes associated with this project is:
25% SBE
Please be reminded that no Bidder shall be awarded a contract on an Eligible Project unless the
Office of Contract Compliance determines that the Bidder has satisfied the non-discrimination requirements of section 2-1448 on such Eligible Project. Details of the O.C.C. review process for determination of non-discrimination are detailed on page 2 of this document.
Small Business Opportunity Program Reminders
1. Certification. It is the prime contractor's responsibility to verify that all SBEs included on the
Subcontractor Project Plan are certified by the City of Atlanta’s Office of Contract Compliance or have a certification application pending with the City of Atlanta’s Office of Contract
Compliance.
2. Reporting. The successful bidder must submit monthly SBO program participation reports to the Office of Contract Compliance in a manner as prescribed by the OCC monitor of Record.
3. Subcontractor Contact Form. It is required that bidders list and submit information on all subcontractors they solicit for quotes, all subcontractors who contact them with regard to the project, and all subcontractors they have discussions with regarding the project. Failure to provide complete information on this form will result in your bid being declared non-responsive. For your convenience, fillable versions of Appendix A documents are available on the OCC webpage should you require additional pages.
4. SBO/EBO Ordinance. The SBO Program is governed by the provisions of the SBO/EBO
Ordinance set forth in the City of Atlanta Code Division 12, section 2 - 1356 through 2 -1480.
The ordinance can be obtained from the City of Atlanta Clerk's Office at (404) 330-6032.
5. Supplier Participation. In order to receive full SBE credit, suppliers must manufacture or warehouse the materials, supplies, or equipment being supplied for use on the Eligible Project.
6. OCC Registry of Certified Firms. To access OCC's real time registry of vendors (certified or non- certified), visit our SDMS Compliance Management portal at:
www.atlantaga.gob2g.com.
7. Contract Assurance. The Contractor shall not discriminate on the basis of race, color, national origin, sex, religion, or sexual orientation in the performance of this contract. The contractor shall carry out applicable requirements of City ordinance 2-1448 a (2) in the award and administration of any eligible City contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the City of Atlanta deems appropriate.
Anti-discrimination provisions based upon religion and sexual orientation are enforceable through the City of Atlanta regulations.
http://www.atlantaga.gob2g.com/
COVENANT OF NON-DISCRIMINATION
The undersigned understands that it is the policy of the City of Atlanta to promote full and equal business opportunities for all people doing business with the City of Atlanta. The undersigned covenants that we have not discriminated against, on the basis of race, gender, or ethnicity, with regard to prime contracting, subcontracting, or partnering opportunities. The undersigned further covenants that we have completed truthfully and fully the required forms SBO-2 and SBO-3. Set forth below is the signature of an officer of the bidding entity with the authority to bind the entity.
Signature of Attesting Party
Title of Attesting Party
On this day of , 20 , before me appeared , the person who signed the above covenant in my presence.
Notary Public
Seal
FORM SBO-1
SUBCONTRACTOR CONTACT FORM
List all subcontractors or suppliers (SBE and Non-SBE Certified) that were contacted regarding this project.
Name of Sub-contractor/ Supplier
Contact Name, Address and Phone
Number
City Of Atlanta
Business License?
(Yes or No)
Type of Work
Solicited for
Business Ownership (see code below)
Certification No. and
Expiration Date
Results of Contact
FORM SBO-2 (Page 1 of 2)
Supplier
Contact Name, Address and Phone
Number
City Of Atlanta
Business License?
(Yes or No)
Type of Work
Solicited for
Business Ownership (see code below)
Certification No. and
Expiration Date
Results of Contact
Business Ownership Code: AABE - African American Business Enterprise, HABE – Hispanic Business Enterprise, FBE – Female Business Enterprise, APABE – Asian (Pacific Islander) American Business Enterprise
Company Name: Project Name: Contract#:
Contact Name (Print): Date:
SBO-2 (Page 2 of 2)
SMALL BUSINESS OPPORTUNITY SUBCONTRACTOR PROJECT PLAN
SUBCONTRACTOR/SUPPLIER UTILIZATION
List all Majority, SBE Certified, and Non-SBE Certified subcontractors/suppliers, including lower tiers, to be used on this project.
Supplier
Contact Name, Address and Phone Number
City of Atlanta
Business License?
(yes or no)
NAICS
Code
Type of Work to be Performed
Ethnicity of
SBE
Ownership (see code below)
SBE
Certification
No. and Expiration
Date
Dollar ($) Value of Work and Scope of
Work
Percentage (%) of Total Bid Amount
Business Ownership Code: AABE - African American Business Enterprise, HABE – Hispanic Business Enterprise, FBE – Female Business Enterprise, APABE –
Asian (Pacific Islander) American Business Enterprise (M/FBE and DBE Certification will NOT Suffice for this Procurement)
Dollar Value of Prime Proponent Self-Performance $ Total SBE%
Proponent Company Name: Project Name: Contract #:
Proponent’s Contact Number: Contact Name (Print):
SBO-3
(THIS PAGE SHALL BE SUBMITTED FOR EACH SUB FIRM)
LETTER OF INTENT
Contract #
Proponent Name:
Address:
City: State: Zip:
Subcontracting Firm: Firm Name:
Sub firm Contact Person: Name: Phone: ( )
Firm is performing as: Non-certified Sub Certified Sub Joint Venture Team Member
If Certified, Certification # and Expiration Date:
Work item(s) to be performed by
Sub
Description of Work Item
Dollar(s) Value of Work and
Scope of Work
Percentage (%) of
Total Bid Amount
TOTAL Diversity% Credit Claimed for this Contractor
The bidder/offeror is committed to utilizing the above-named Subcontractor firm for the work described above. The estimated participation is as follows:
Subcontractor amount: $ Percent of total contract: %
AFFIRMATION:
The above-named Subcontractor firm affirms that it will perform the portion of the contract for the estimated dollar value as stated above.
By:
(Print name) (Title)
(signature) (date)
* In the event the bidder/offeror does not receive award of the prime contract, any and all representations in this Letter of Intent and Affirmation shall be null and void.
(THIS PAGE SHALL BE SUBMITTED FOR EACH SUB FIRM)
LETTER OF INTENT
Contract #
Proponent Name:
Subcontracting Firm: Firm Name:
Sub firm Contact Person: Name: Phone: ( )
Firm is performing as: Non-certified Sub Certified Sub Joint Venture Team Member
If Certified, Certification # and Expiration Date:
Work item(s) to be performed by
Sub
Description of Work Item
Dollar(s) Value of Work and
Scope of Work
Percentage (%) of
Total Bid Amount
TOTAL Diversity% Credit Claimed for this Contractor
The bidder/offeror is committed to utilizing the above-named Subcontractor firm for the work described above. The estimated participation is as follows:
Subcontractor amount: $ Percent of total contract: %
AFFIRMATION:
The above-named Subcontractor firm affirms that it will perform the portion of the contract for the estimated dollar value as stated above.
By:
(Print name) (Title)
(signature) (date)
* In the event the bidder/offeror does not receive award of the prime contract, any and all representations in this Letter of Intent and Affirmation shall be null and void.
File details come from the government source that posted it. Updated .