This document is a Scope Clarifications document for the Rockwell Hall Courtyard Landscaping project at Colorado State University (CSU). The project involves landscaping and irrigation work, with specific requirements for bidders including importing soil for new planting areas, removing existing plantings, and preparing landscape zones. Work hours are restricted to 6:00 AM and 8:00 PM, and the contractor will be responsible for permits, traffic control, and potential lane closures on Laurel Street.
Key technical specifications include using existing sleeves for new main line installations, installing new sleeves as needed, and ensuring protection of existing exterior paving, turf, and landscaping. The contractor must repair any construction-related damage and will work within a tunnel enclosure provided by CSU. Additional notable requirements include disregarding certain pot irrigation details, understanding existing paving may vary between 4-6 inches, and removing existing plantings and furniture (which will be replaced by the owner). The contractor will also be responsible for cleaning any equipment-related black marks on surfaces and managing all landscape demolition and infill work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope Clarifications: DQ-2025-017-BC / 230623C / Rockwell Hall
Courtyard Landscaping
• All Pots will be irrigated per detail 5/L3.1. Disregard pot irrigation detail on IR2.1
• Bidders shall include import for new planting areas as required.
• Furniture will be removed and replaced by owner and not part of scope of project.
• Existing paving is not defined and shall be assumed to vary between 4-6”.
• Re-use existing sleeve for installation of new main line from back flow preventer.
• Bidders shall include new sleeves as required. Sleeves will be installed by Others.
• Removal of existing plantings, infill & demo for the landscape areas shall be included in this bid. Demo and pour-back of paved areas by Others.
• Permits, tra4ic control, and associated costs for lane closures on Laurel Street will be the responsibility of the Contractor, if needed.
• Protection of existing exterior paving surfaces, turf, and landscaping will be the responsibility of the contractor. If black marks from the contractor’s equipment occur, the contractor will be responsible for cleaning them o4.
• CSU will provide a tunnel enclosure through the building interior. The enclosure completed by CSU will be in e4ect a tunnel with walls and ceilings. The floor will also be protected. Any damage during construction will be repaired by contractor.
• Work hours are between 6:00 AM and 8:00 PM