Schedule of Supplies - 70Z03825QB0000061.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 70Z03825QB0000061
About this file
The document is a Schedule of Supplies for Solicitation 70Z03825QB0000061, issued by the US Coast Guard for MH-65 Spare Parts. The solicitation is a Total Small Business Set-Aside for newly manufactured commercial aviation parts with two primary performance periods: a base period and an option period, each lasting one year. The procurement covers various light capsules, switch bodies, cap assemblies, and switch assemblies, with first article testing required for some components. All parts must have clear traceability to Original Equipment Manufacturers (OEMs) and meet Federal Aviation Administration (FAA) guidelines.
Key solicitation details include a closing date of 07 April 2025 at 12:00pm EST, with quotes to be submitted via email to destiny.a.ornelas2@uscg.mil. The anticipated award will be a firm-fixed price purchase order, with the small business size standard set at 1,250 employees. The government requires Certificate of Conformance (COC) and strict OEM traceability. Notably, no drawings, specifications, or schematics are available from the agency. The solicitation emphasizes ensuring procurement without compromising quality or flight safety, utilizing only airworthy commercial or standard military specification parts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE
| PERIOD OF PERFORMANCE: Purchase Order Award through one year from Date of Award | |||||
| CLIN | ITEM DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | AMOUNT |
| 0001 | NON-RECURRING EXPENSE (NRE) | 1 | EA | $0.00 | $0.00 |
| 0002 | LIGHT CAPSULE, "1…2" FIRST ARTICLE | 2 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.2 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 0003 | SWITCH BODY, "1…2" FIRST ARTICLE | 2 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.2 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 0004 | LIGHT CAPSULE | 82 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.2 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 0005 | SWITCH BODY | 82 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.2 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 0006 | PRODUCT/ENGINEERING CHANGE LABOR RATE | TBD | EA |
| HOURLY RATE: $____________________ |
The guaranteed minimum order quantity under this requirement is for the Non-Reoccurring Expense and First Articles (CLINS 0001-0006) for a value to be determined at time of award.
&"Arial,Bold"&12
SCHEDULE OF SUPPLIES/SERVICES
70Z03825QB0000061
OP1
| PERIOD OF PERFORMANCE: OPTION PERIOD 1 | |||||
| EFFECTIVE DATE OF OPTION EXERCISE THRU ONE (1) YEAR FROM DATE OF EXERCISE | |||||
| CLIN | ITEM DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | AMOUNT |
| 1001 | CAP ASSEMBLY "FAIL" | 200 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.1 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 1002 | CAP ASSEMBLY "CLOSED" | 100 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.1 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 1003 | CAP ASSEMBLY, "OPEN" | 100 | EA | $0.00 | $0.00 |
| IAW S0W Section 7.1 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 1004 | SWITCH ASSEMBLY, "LIMIT" | 100 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.1 | |||||
| NSN: TBD | |||||
| P/N: TBD | |||||
| 1005 | SWITCH ASSEMBLY, "WARNING" | 100 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.1 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 1006 | SWITCH ASSEMBLY, "1…2" | 100 | EA | $0.00 | $0.00 |
| IAW SOW Section 7.1 | |||||
| NSN: TBD | |||||
| P/N: TBD |
| 1007 | PRODUCT/ENGINEERING CHANGE LABOR RATE | TBD | EA | NOT SEPARATELY PRICED (NSP) |
| IAW SOW Section 4.3 | ||||
| HOURLY RATE: $____________________ |
| OPTION PERIOD TOTAL | $0.00 |
| GRAND TOTAL | ERROR:#REF! |
&"Arial,Bold"&12
SCHEDULE OF SUPPLIES/SERVICES
70Z02821QB2000055
File details come from the government source that posted it. Updated .