SOP
SCHEDULE OF PRICE
| NAME OF OFFEROR OR CONTRACTOR: | | | | |
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT |
| NO. | | | | |
| Item 0001 | Recurring, Base Period | 1 | LS | ¥- |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year. | | | |
| From 1 Mar 2021 through 28 Feb 2022. | | | |
| Item 0002 | Non-Recurring, Base Period | 1 | LS | ¥- |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 1 Mar 2021 through 28 Feb 2022. | | | |
| Item 0003 | Recurring, First Option Period | 1 | LS | ¥- |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year. | | | |
| From 1 Mar 2022 through 28 Feb 2023. | | | |
| Item 0004 | Non-Recurring, First Option Period | 1 | LS | ¥- |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 1 Mar 2022 through 28 Feb 2023. | | | |
| Item 0005 | Recurring, Second Option Period | 1 | LS | ¥- |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year. | | | |
| From 1 Mar 2023 through 28 Feb 2024. | | | |
| Item 0006 | Non-Recurring, Second Option Period | 1 | LS | ¥- |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 1 Mar 2023 through 28 Feb 2024. | | | |
| Item 0007 | Recurring, Third Option Period | 1 | LS | ¥- |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year. | | | |
| From 1 Mar 2024 through 28 Feb 2025. | | | |
| Item 0008 | Non-Recurring, Third Option Period | 1 | LS | ¥- |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 1 Mar 2024 through 28 Feb 2025. | | | |
| Item 0009 | Recurring, Fourth Option Period | 1 | LS | ¥- |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year. | | | |
| From 1 Mar 2025 through 28 Feb 2026. | | | |
| Item 0010 | Non-Recurring, Fourth Option Period | 1 | LS | ¥- |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 1 Mar 2025 through 28 Feb 2026. | | | |
TOTAL: (LINE ITEM 0001 through 0010) ¥-
CLIN 9000 Exhibit A (Base Period)
CLIN 9001 Exhibit B (First Option Period)
CLIN 9002 Exhibit C (Second Option Period)
CLIN 9003 Exhibit D (Third Option Period)
CLIN 9004 Exhibit E (Fourth Option Period)
| NOTE: | The number of Placeholders established depends on the maximum number of lines |
| of accounting anticipated on an individual task order. |
Detail line items for task order is located in Attachment J-0200000-07
| CLIN = CONTRACT LINE ITEM |
| LS = LUMP SUM |
| NTE = NOT-TO-EXCEED |
| Q'TY = QUANTITY |
| If you will use below comments for GE, Print area should be chainge. |
| Note: | GE was formulated based on market research conducted for same or similar items, previous purchases of similar or same items, and experience of technical engineers for this requirement. |
Schedule of Price
SCHEDULE OF PRICE
| NAME OF OFFEROR OR CONTRACTOR: | | | | |
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT |
| NO. | | | | |
| Item 0001 | Recurring, Base Period | 1 | LS | ¥ - |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year. | | | |
| From 15 April 2021 through 14 April 2022. | | | |
| Item 0002 | Non-Recurring, Base Period | 1 | LS | ¥ - |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 15 April 2021 through 14 April 2022. | | | |
| Item 0003 | Recurring, First Option Period | 1 | LS | ¥ - |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year. | | | |
| From 15 April 2022 through 14 April 2023. | | | |
| Item 0004 | Non-Recurring, First Option Period | 1 | LS | ¥ - |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 15 April 2022 through 14 April 2023. | | | |
| Item 0005 | Recurring, Second Option Period | 1 | LS | ¥ - |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year. | | | |
| From 15 April 2023 through 14 April 2024. | | | |
| Item 0006 | Non-Recurring, Second Option Period | 1 | LS | ¥ - |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 15 April 2023 through 14 April 2024. | | | |
| Item 0007 | Recurring, Third Option Period | 1 | LS | ¥ - |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year. | | | |
| From 15 April 2024 through 14 April 2025. | | | |
| Item 0008 | Non-Recurring, Third Option Period | 1 | LS | ¥ - |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 15 April 2024 through 14 April 2025. | | | |
| Item 0009 | Recurring, Fourth Option Period | 1 | LS | ¥ - |
| Provide PM program Services For | | | |
| Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year. | | | |
| From 15 April 2025 through 14 April 2026. | | | |
| Item 0010 | Non-Recurring, Fourth Option Period | 1 | LS | ¥ - |
| Provide Unit Priced Task Work | | (NTE) | |
| upon receipt of a Task Order | | | |
| From 15 April 2025 through 14 April 2026. | | | |
TOTAL: (LINE ITEM 0001 through 0010) ¥ -
CLIN 9000 Exhibit A (Base Period)
CLIN 9001 Exhibit B (First Option Period)
CLIN 9002 Exhibit C (Second Option Period)
CLIN 9003 Exhibit D (Third Option Period)
CLIN 9004 Exhibit E (Fourth Option Period)
| NOTE: | The number of Placeholders established depends on the maximum number of lines |
| of accounting anticipated on an individual task order. |
Detail line items for task order is located in Attachment J-0200000-07
| CLIN = CONTRACT LINE ITEM |
| LS = LUMP SUM |
| NTE = NOT-TO-EXCEED |
| Q'TY = QUANTITY |
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 B-3
Base Period Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Recurring - Base Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs A001 through A004 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| A | CNIC, Spec Item 3 |
| PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1 |
A001 Swimming Pool Systems, Spec Item 3.2.1& 3.1
| A001A | Bldg. G23 ( Yokosuka Green Beach Pool) | | | | |
| A001AA | Start up PM | | | | |
| A001AAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| A001AAB | Equipment PM | 1 | LS | ¥ | ¥ |
| A001AB | Season PM | | | | |
| A001ABA | Daily PM | | | | |
| A001ABAA | Equipment PM | 120 | D | ¥ | ¥ |
| A001ABB | Weekly PM | | | | |
| A001ABBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| A001ABBB | Equipment PM | 17 | W | ¥ | ¥ |
| A001ABBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| A001ABC | Monthly PM | | | | |
| A001ABCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| A001ABD | Fixed Month PM | | | | |
| A001ABDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| A001AC | Closeout PM | | | | |
| A001ACA | Equipment PM | 1 | LS | ¥ | ¥ |
| A001AD | Off Season PM | | | | |
| A001ADA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| A001AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| A001B | Bldg. G23A (Yokosuka Green Beach, Wading Pool) | | | | |
| A001BA | Start up PM | | | | |
| A001BAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| A001BAB | Equipment PM | 1 | LS | ¥ | ¥ |
| A001BB | Season PM | | | | |
| A001BBA | Daily PM | | | | |
| A001BBAA | Equipment PM | 120 | D | ¥ | ¥ |
| A001BBB | Weekly PM | | | | |
| A001BBBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| A001BBBB | Equipment PM | 17 | W | ¥ | ¥ |
| A001BBBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| A001BBC | Monthly PM | | | | |
| A001BBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| A001BBD | Fixed Month PM | | | | |
| A001BBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| A001BC | Closeout PM | | | | |
| A001BCA | Equipment PM | 1 | LS | ¥ | ¥ |
| A001BD | Off Season PM | | | | |
| A001BDA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| A001BE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| A001C | Bldg. 674 (Ikego Pool) | | | | |
| A001CA | Start up PM | | | | |
| A001CAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| A001CAB | Equipment PM | 1 | LS | ¥ | ¥ |
| A001CB | Season PM | | | | |
| A001CBA | Daily PM | | | | |
| A001CBAA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| A001CBAB | Equipment PM | 120 | D | ¥ | ¥ |
| A001CBB | Weekly PM | | | | |
| A001CBBA | Equipment PM | 17 | W | ¥ | ¥ |
| A001CBBB | Water Quality Analysis | 17 | W | ¥ | ¥ |
| A001CBC | Monthly PM | | | | |
| A001CBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| A001CBD | Fixed Month PM | | | | |
| A001CBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| A001CC | Closeout PM | | | | |
| A001CCA | Equipment PM | 1 | LS | ¥ | ¥ |
| A001CD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| A001D | Bldg. 674 (Ikego Wading Pool) | | | | |
| A001DA | Start up PM | | | | |
| A001DAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| A001DAB | Equipment PM | 1 | LS | ¥ | ¥ |
| A001DB | Season PM | | | | |
| A001DBA | Daily PM | | | | |
| A001DBAA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| A001DBAB | Equipment PM | 120 | D | ¥ | ¥ |
| A001DBB | Weekly PM | | | | |
| A001DBBA | Equipment PM | 17 | W | ¥ | ¥ |
| A001DBBB | Water Quality Analysis | 17 | W | ¥ | ¥ |
| A001DBC | Monthly PM | | | | |
| A001DBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| A001DBD | Fixed Month PM | | | | |
| A001DBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| A001DC | Closeout PM | | | | |
| A001DCA | Equipment PM | 1 | LS | ¥ | ¥ |
| A001DD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| A001E | Bldg. 3354 (Purdy Pool) | | | | |
| A001EA | Once Two Days PM | | | | |
| A001EAA | Equipment PM | 183 | D | ¥ | ¥ |
| A001EB | Weekly PM | | | | |
| A001EBA | Equipment PM | 52 | W | ¥ | ¥ |
| A001EBB | Water Quality Analysis | 52 | W | ¥ | ¥ |
| A001EC | Monthly PM | | | | |
| A001ECA | Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| A001ECB | Equipment PM | 12 | MO | ¥ | ¥ |
| A001ECC | Water Quality Analysis | 12 | MO | ¥ | ¥ |
| A001ED | Quarterly PM | | | | |
| A001EDA | Equipment PM | 4 | Q | ¥ | ¥ |
| A001EE | Annual PM | | | | |
| A001EEA | Equipment PM | 1 | A | ¥ | ¥ |
| A001EEB | Water Quality Analysis - in the Fixed Month PM - | 1 | LS | ¥ | ¥ |
| A001EEC | Equipment PM - in the Fixed Month PM - | 1 | LS | ¥ | ¥ |
| A001EF | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | A001 Total | ¥ |
| A002 | Bath Systems, Spec Item 3.2.2 & 3.1 | | | | |
| A002A | Bldg. 1922 (SRF) | | | | |
| A002AA | Semi-Monthly (Twice a Month) PM | | | | |
| A002AAA | Equipment PM with Chemicals Replenishment | 24 | TM | ¥ | ¥ |
| A002AB | Semiannual PM | | | | |
| A002ABA | Equipment PM | 2 | SA | ¥ | ¥ |
| A002ABB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| A002AC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| A002B | Bldg. 2043 (SRF) | | | | |
| A002BA | Bi-Monthly (Every Two Month) PM | | | | |
| A002BAA | Equipment PM with Chemicals Replenishment | 6 | MO | ¥ | ¥ |
| A002BB | Semiannual PM | | | | |
| A002BBA | Equipment PM | 2 | SA | ¥ | ¥ |
| A002BBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| A002BC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | |
| A002C | Bldg. 2067 (SRF) | | | | |
| A002CA | Monthly PM | | | | |
| A002CAA | Equipment PM with Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| A002CB | Semiannual PM | | | | |
| A002CBA | Equipment PM | 2 | SA | ¥ | ¥ |
| A002CBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| A002CC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| A002D | Bldg. 2068 (SRF) | | | | |
| A002DA | Semi-Monthly (Twice a Month) PM | | | | |
| A002DAA | Equipment PM with Chemicals Replenishment | 24 | TM | ¥ | ¥ |
| A002DB | Semiannual PM | | | | |
| A002DBA | Equipment PM | 2 | SA | ¥ | ¥ |
| A002DBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| A002DC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| A002E | Bldg. 2078 (SRF) | | | | |
| A002EA | Monthly PM | | | | |
| A002EAA | Equipment PM with Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| A002EB | Semiannual PM | | | | |
| A002EBA | Equipment PM | 2 | SA | ¥ | ¥ |
| A002EBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| A002EC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | A002 Total | ¥ |
| A003 | Fall & Pond Systems, Spec Item 3.2.3 & 3.1 | | | | |
| A003A | Carney Gate (Main Gate) | | | | |
| A003AA | Weekly PM | | | | |
| A003AAA | Equipment PM with Chemicals Replenishment | 52 | W | ¥ | ¥ |
| A003AB | Bi-Monthly (Every Two Month) PM | | | | |
| A003ABA | Fall & Pond Cleaning | 6 | MO | ¥ | ¥ |
| A003AC | Quarterly PM | | | | |
| A003ACA | Equipment PM | 4 | Q | ¥ | ¥ |
| A003AD | Semi-Annual PM | | | | |
| A003ADA | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| A003AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | A003 Total | ¥ |
| A004 | Fountain Systems, Spec Item 3.2.4 & 3.1 | | | | |
| A004A | Bldg. 4860 and 4861 (Ombudsman Park) | | | | |
| A004AA | Weekly PM | | | | |
| A004AAA | Equipment PM with Chemicals Replenishment | 52 | W | ¥ | ¥ |
| A004AB | Quarterly PM | | | | |
| A004ABA | Fountain Cleaning | 4 | Q | ¥ | ¥ |
| A004AC | Semi-Annual PM | | | | |
| A004ACA | Equipment PM | 2 | SA | ¥ | ¥ |
| A004ACB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| A004AD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | A004 Total | ¥ |
TOTAL RECURRING LINE ITEMS TOTAL ¥
| D = | Daily |
| W = | Weekly |
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
| LS = | Lump Sum |
| TM = | Time |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
Base Period Non-Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Non-Recurring - Base Period |
| Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 |
ELINs A700 through A709
| | | ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| | | A700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. | 600 | HR | ¥ | ¥ | |
| | | A701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A 700 | 1 | LS | ¥ 8,000,000 | ¥ 8,000,000 | |
| | | A702 | Fall & Pond Operation | Start and/or Stop Fall & Pond circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F. | 10 | EA | ¥ | ¥ | |
| | | A703 | Fountain Operation | Start and/or Stop Fountain circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F. | 10 | EA | ¥ | ¥ | |
| | | A704 | Perform Cleaning | | | | | | |
| Work for Fall & Pond | Perform cleaning work to remove soiled and debris for the Fall and Pond, which include but not limited to: 1) Wall of fall and pond, 2) Signs, 3) Water storage tank, 4) Pump pits and electrodes, 5) Drain ditch, 6) Overflow pipe of pond, 7) Drain pipe of pond, 8) Upper spot lights (Wiped cleaning only, do not hit high pressure water), 9) Beam lights (Wiped cleaning only, do not use high pressure water). The Contractor shall complete cleaning works within 10 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line. | 6 | EA | ¥ | ¥ | | | | | |
| | | A705 | Replace Upper Beam | | | | | | |
Lighting Bulb of Light Up for Signs in
| Pond for Fall System | Replace existing beam lightning bulb of light up for signs in pond for fall system with new one. The Contractor shall complete replacement work within seven (7) calendar days after. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 20 | EA | ¥ | ¥ |
| | | A706 | Replace Foot | |
Lightning Bulb at Walking Deck for Fall
| System | Replace existing foot lightning bulb at walking deck for fall system with new one. The Contractor shall complete replacement work at job site within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 17 | EA | ¥ | ¥ |
| | | A707 | Perform Cleaning | |
| Work for Fountain | Perform cleaning works for the fountain, which include but not limited to: 1) U-ditch, 2) Concrete pit, 3) Strainer of circulation pumps, 4) Drain pipe, 5) Communication pipe, 6) Surfaces of electrodes, 7) Concrete floor around pond utilizing high pressure water, 8) Vacuum equipment, specified area at J-1502000-08, and removal works for debris at hair catcher. The Contractor shall complete cleaning works within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line. | 6 | EA | ¥ | ¥ |
| | | A708 | Replace Lighting | |
Bulb of Imitation
| Bench for Fountain | Replace the existing lightning bulb of imitation bench for fountain with new one. The Contractor shall complete replacement work within 30 calendar days after ordered. Submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 6 | EA | ¥ | ¥ | | | | |
| | | A709 | Perform Repainting Work for Swimming Pool | Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 1500 | LM | ¥ | ¥ |
| | | | | TOTAL NON-RECURRING PRICE | | | | ¥ |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
1st OP Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 9001 |
| Line Item 0003 Recurring - First Option Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs B001 through B004 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| B | CNIC, Spec Item 3 |
| PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1 |
B001 Swimming Pool Systems, Spec Item 3.2.1& 3.1
| B001A | Bldg. G23 ( Yokosuka Green Beach Pool) | | | | |
| B001AA | Start up PM | | | | |
| B001AAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| B001AAB | Equipment PM | 1 | LS | ¥ | ¥ |
| B001AB | Season PM | | | | |
| B001ABA | Daily PM | | | | |
| B001ABAA | Equipment PM | 120 | D | ¥ | ¥ |
| B001ABB | Weekly PM | | | | |
| B001ABBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| B001ABBB | Equipment PM | 17 | W | ¥ | ¥ |
| B001ABBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| B001ABC | Monthly PM | | | | |
| B001ABCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| B001ABD | Fixed Month PM | | | | |
| B001ABDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| B001AC | Closeout PM | | | | |
| B001ACA | Equipment PM | 1 | LS | ¥ | ¥ |
| B001AD | Off Season PM | | | | |
| B001ADA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| B001AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| B001B | Bldg. G23A (Yokosuka Green Beach, Wading Pool) | | | | |
| B001BA | Start up PM | | | | |
| B001BAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| B001BAB | Equipment PM | 1 | LS | ¥ | ¥ |
| B001BB | Season PM | | | | |
| B001BBA | Daily PM | | | | |
| B001BBAA | Equipment PM | 120 | D | ¥ | ¥ |
| B001BBB | Weekly PM | | | | |
| B001BBBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| B001BBBB | Equipment PM | 17 | W | ¥ | ¥ |
| B001BBBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| B001BBC | Monthly PM | | | | |
| B001BBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| B001BBD | Fixed Month PM | | | | |
| B001BBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| B001BC | Closeout PM | | | | |
| B001BCA | Equipment PM | 1 | LS | ¥ | ¥ |
| B001BD | Off Season PM | | | | |
| B001BDA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| B001BE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| B001C | Bldg. 674 (Ikego Pool) | | | | |
| B001CA | Start up PM | | | | |
| B001CAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| B001CAB | Equipment PM | 1 | LS | ¥ | ¥ |
| B001CB | Season PM | | | | |
| B001CBA | Daily PM | | | | |
| B001CBAA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| B001CBAB | Equipment PM | 120 | D | ¥ | ¥ |
| B001CBB | Weekly PM | | | | |
| B001CBBA | Equipment PM | 17 | W | ¥ | ¥ |
| B001CBBB | Water Quality Analysis | 17 | W | ¥ | ¥ |
| B001CBC | Monthly PM | | | | |
| B001CBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| B001CBD | Fixed Month PM | | | | |
| B001CBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| B001CC | Closeout PM | | | | |
| B001CCA | Equipment PM | 1 | LS | ¥ | ¥ |
| B001CD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| B001D | Bldg. 674 (Ikego Wading Pool) | | | | |
| B001DA | Start up PM | | | | |
| B001DAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| B001DAB | Equipment PM | 1 | LS | ¥ | ¥ |
| B001DB | Season PM | | | | |
| B001DBA | Daily PM | | | | |
| B001DBAA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| B001DBAB | Equipment PM | 120 | D | ¥ | ¥ |
| B001DBB | Weekly PM | | | | |
| B001DBBA | Equipment PM | 17 | W | ¥ | ¥ |
| B001DBBB | Water Quality Analysis | 17 | W | ¥ | ¥ |
| B001DBC | Monthly PM | | | | |
| B001DBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| B001DBD | Fixed Month PM | | | | |
| B001DBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| B001DC | Closeout PM | | | | |
| B001DCA | Equipment PM | 1 | LS | ¥ | ¥ |
| B001DD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| B001E | Bldg. 3354 (Purdy Pool) | | | | |
| B001EA | Once Two Days PM | | | | |
| B001EAA | Equipment PM | 183 | D | ¥ | ¥ |
| B001EB | Weekly PM | | | | |
| B001EBA | Equipment PM | 52 | W | ¥ | ¥ |
| B001EBB | Water Quality Analysis | 52 | W | ¥ | ¥ |
| B001EC | Monthly PM | | | | |
| B001ECA | Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| B001ECB | Equipment PM | 12 | MO | ¥ | ¥ |
| B001ECC | Water Quality Analysis | 12 | MO | ¥ | ¥ |
| B001ED | Quarterly PM | | | | |
| B001EDA | Equipment PM | 4 | Q | ¥ | ¥ |
| B001EE | Annual PM | | | | |
| B001EEA | Equipment PM | 1 | A | ¥ | ¥ |
| B001EEB | Water Quality Analysis - Once the Fixed Month PM - | 1 | LS | ¥ | ¥ |
| B001EEC | Equipment PM - Once the Fixed Month PM - | 1 | LS | ¥ | ¥ |
| B001EF | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | B001 Total | ¥ |
| B002 | Bath Systems, Spec Item 3.2.2 & 3.1 | | | | |
| B002A | Bldg. 1922 (SRF) | | | | |
| B002AA | Semi-Monthly (Twice a Month) PM | | | | |
| B002AAA | Equipment PM with Chemicals Replenishment | 24 | TM | ¥ | ¥ |
| B002AB | Semiannual PM | | | | |
| B002ABA | Equipment PM | 2 | SA | ¥ | ¥ |
| B002ABB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| B002AC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| B002B | Bldg. 2043 (SRF) | | | | |
| B002BA | Bi-Monthly (Every Two Month) PM | | | | |
| B002BAA | Equipment PM with Chemicals Replenishment | 6 | MO | ¥ | ¥ |
| B002BB | Semiannual PM | | | | |
| B002BBA | Equipment PM | 2 | SA | ¥ | ¥ |
| B002BBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| B002BC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| B002C | Bldg. 2067 (SRF) | | | | |
| B002CA | Monthly PM | | | | |
| B002CAA | Equipment PM with Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| B002CB | Semiannual PM | | | | |
| B002CBA | Equipment PM | 2 | SA | ¥ | ¥ |
| B002CBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| B002CC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| B002D | Bldg. 2068 (SRF) | | | | |
| B002DA | Semi-Monthly (Twice a Month) PM | | | | |
| B002DAA | Equipment PM with Chemicals Replenishment | 24 | TM | ¥ | ¥ |
| B002DB | Semiannual PM | | | | |
| B002DBA | Equipment PM | 2 | SA | ¥ | ¥ |
| B002DBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| B002DC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| B002E | Bldg. 2078 (SRF) | | | | |
| B002EA | Monthly PM | | | | |
| B002EAA | Equipment PM with Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| B002EB | Semiannual PM | | | | |
| B002EBA | Equipment PM | 2 | SA | ¥ | ¥ |
| B002EBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| B002EC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | B002 Total | ¥ |
| B003 | Fall & Pond Systems, Spec Item 3.2.3 & 3.1 | | | | |
| B003A | Carney Gate (Main Gate) | | | | |
| B003AA | Weekly PM | | | | |
| B003AAA | Equipment PM with Chemicals Replenishment | 52 | W | ¥ | ¥ |
| B003AB | Bi-Monthly (Every Two Month) PM | | | | |
| B003ABA | Fall & Pond Cleaning | 6 | MO | ¥ | ¥ |
| B003AC | Quarterly PM | | | | |
| B003ACA | Equipment PM | 4 | Q | ¥ | ¥ |
| B003AD | Semi-Annual PM | | | | |
| B003ADA | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| B003AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | B003 Total | ¥ |
| B004 | Fountain Systems, Spec Item 3.2.4 & 3.1 | | | | |
| B004A | Bldg. 4860 and 4861 (Ombudsman Park) | | | | |
| B004AA | Weekly PM | | | | |
| B004AAA | Equipment PM with Chemicals Replenishment | 52 | W | ¥ | ¥ |
| B004AB | Quarterly PM | | | | |
| B004ABA | Fountain Cleaning | 4 | Q | ¥ | ¥ |
| B004AC | Semi-Annual PM | | | | |
| B004ACA | Equipment PM | 2 | SA | ¥ | ¥ |
| B004ACB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| B004AD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | B004 Total | ¥ |
TOTAL RECURRING LINE ITEMS TOTAL ¥
| D = | Daily |
| W = | Weekly |
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
| LS = | Lump Sum |
| TM = | Time |
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
1st OP Non-Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 9001 |
| Line Item 0004 Non-Recurring - First Option Period |
| Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 |
ELINs B700 through B709
| | | ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| | | B700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. | 600 | HR | ¥ | ¥ | |
| | | B701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B 700 | 1 | LS | ¥ 8,000,000 | ¥ 8,000,000 | |
| | | B702 | Fall & Pond Operation | Start and/or Stop Fall & Pond circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F. | 10 | EA | ¥ | ¥ | |
| | | B703 | Fountain Operation | Start and/or Stop Fountain circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F. | 10 | EA | ¥ | ¥ | |
| | | B704 | Perform Cleaning | | | | | | |
| Work for Fall & Pond | Perform cleaning work to remove soiled and debris for the Fall and Pond, which include but not limited to: 1) Wall of fall and pond, 2) Signs, 3) Water storage tank, 4) Pump pits and electrodes, 5) Drain ditch, 6) Overflow pipe of pond, 7) Drain pipe of pond, 8) Upper spot lights (Wiped cleaning only, do not hit high pressure water), 9) Beam lights (Wiped cleaning only, do not use high pressure water). The Contractor shall complete cleaning works within 10 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line. | 6 | EA | ¥ | ¥ | | | | | |
| | | B705 | Replace Upper Beam | | | | | | |
Lighting Bulb of Light Up for Signs in
| Pond for Fall System | Replace existing beam lightning bulb of light up for signs in pond for fall system with new one. The Contractor shall complete replacement work within seven (7) calendar days after. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 20 | EA | ¥ | ¥ |
| | | B706 | Replace Foot | |
Lightning Bulb at Walking Deck for Fall
| System | Replace existing foot lightning bulb at walking deck for fall system with new one. The Contractor shall complete replacement work at job site within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 17 | EA | ¥ | ¥ |
| | | B707 | Perform Cleaning | |
| Work for Fountain | Perform cleaning works for the fountain, which include but not limited to: 1) U-ditch, 2) Concrete pit, 3) Strainer of circulation pumps, 4) Drain pipe, 5) Communication pipe, 6) Surfaces of electrodes, 7) Concrete floor around pond utilizing high pressure water, 8) Vacuum equipment, specified area at J-1502000-08, and removal works for debris at hair catcher. The Contractor shall complete cleaning works within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line. | 6 | EA | ¥ | ¥ |
| | | B708 | Replace Lighting | |
Bulb of Imitation
| Bench for Fountain | Replace the existing lightning bulb of imitation bench for fountain with new one. The Contractor shall complete replacement work within 30 calendar days after ordered. Submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 6 | EA | ¥ | ¥ | | | | |
| | | B709 | Perform Repainting Work for Swimming Pool | Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 1500 | LM | ¥ | ¥ |
| | | | | TOTAL NON-RECURRING PRICE | | | | ¥ |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
2nd OP Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 9002 |
| Line Item 0005 Recurring - Second Option Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs C001 through C004 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| C001 | CNIC, Spec Item 3 |
| PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1 |
C001 Swimming Pool Systems, Spec Item 3.2.1& 3.1
| C001A | Bldg. G23 ( Yokosuka Green Beach Pool) | | | | |
| C001AA | Start up PM | | | | |
| C001AAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| C001AAB | Equipment PM | 1 | LS | ¥ | ¥ |
| C001AB | Season PM | | | | |
| C001ABA | Daily PM | | | | |
| C001ABAA | Equipment PM | 120 | D | ¥ | ¥ |
| C001ABB | Weekly PM | | | | |
| C001ABBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| C001ABBB | Equipment PM | 17 | W | ¥ | ¥ |
| C001ABBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| C001ABC | Monthly PM | | | | |
| C001ABCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| C001ABD | Fixed Month PM | | | | |
| C001ABDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| C001AC | Closeout PM | | | | |
| C001ACA | Equipment PM | 1 | LS | ¥ | ¥ |
| C001AD | Off Season PM | | | | |
| C001ADA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| C001AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| C001B | Bldg. G23A (Yokosuka Green Beach, Wading Pool) | | | | |
| C001BA | Start up PM | | | | |
| C001BAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| C001BAB | Equipment PM | 1 | LS | ¥ | ¥ |
| C001BB | Season PM | | | | |
| C001BBA | Daily PM | | | | |
| C001BBAA | Equipment PM | 120 | D | ¥ | ¥ |
| C001BBB | Weekly PM | | | | |
| C001BBBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| C001BBBB | Equipment PM | 17 | W | ¥ | ¥ |
| C001BBBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| C001BBC | Monthly PM | | | | |
| C001BBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| C001BBD | Fixed Month PM | | | | |
| C001BBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| C001BC | Closeout PM | | | | |
| C001BCA | Equipment PM | 1 | LS | ¥ | ¥ |
| C001BD | Off Season PM | | | | |
| C001BDA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| C001BE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| C001C | Bldg. 674 (Ikego Pool) | | | | |
| C001CA | Start up PM | | | | |
| C001CAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| C001CAB | Equipment PM | 1 | LS | ¥ | ¥ |
| C001CB | Season PM | | | | |
| C001CBA | Daily PM | | | | |
| C001CBAA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| C001CBAB | Equipment PM | 120 | D | ¥ | ¥ |
| C001CBB | Weekly PM | | | | |
| C001CBBA | Equipment PM | 17 | W | ¥ | ¥ |
| C001CBBB | Water Quality Analysis | 17 | W | ¥ | ¥ |
| C001CBC | Monthly PM | | | | |
| C001CBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| C001CBD | Fixed Month PM | | | | |
| C001CBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| C001CC | Closeout PM | | | | |
| C001CCA | Equipment PM | 1 | LS | ¥ | ¥ |
| C001CD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| C001D | Bldg. 674 (Ikego Wading Pool) | | | | |
| C001DA | Start up PM | | | | |
| C001DAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| C001DAB | Equipment PM | 1 | LS | ¥ | ¥ |
| C001DB | Season PM | | | | |
| C001DBA | Daily PM | | | | |
| C001DBAA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| C001DBAB | Equipment PM | 120 | D | ¥ | ¥ |
| C001DBB | Weekly PM | | | | |
| C001DBBA | Equipment PM | 17 | W | ¥ | ¥ |
| C001DBBB | Water Quality Analysis | 17 | W | ¥ | ¥ |
| C001DBC | Monthly PM | | | | |
| C001DBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| C001DBD | Fixed Month PM | | | | |
| C001DBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| C001DC | Closeout PM | | | | |
| C001DCA | Equipment PM | 1 | LS | ¥ | ¥ |
| C001DD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| C001E | Bldg. 3354 (Purdy Pool) | | | | |
| C001EA | Once Two Days PM | | | | |
| C001EAA | Equipment PM | 183 | D | ¥ | ¥ |
| C001EB | Weekly PM | | | | |
| C001EBA | Equipment PM | 52 | W | ¥ | ¥ |
| C001EBB | Water Quality Analysis | 52 | W | ¥ | ¥ |
| C001EC | Monthly PM | | | | |
| C001ECA | Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| C001ECB | Equipment PM | 12 | MO | ¥ | ¥ |
| C001ECC | Water Quality Analysis | 12 | MO | ¥ | ¥ |
| C001ED | Quarterly PM | | | | |
| C001EDA | Equipment PM | 4 | Q | ¥ | ¥ |
| C001EE | Annual PM | | | | |
| C001EEA | Equipment PM | 1 | A | ¥ | ¥ |
| C001EEB | Water Quality Analysis - Once the Fixed Month PM - | 1 | LS | ¥ | ¥ |
| C001EEC | Equipment PM - Once the Fixed Month PM - | 1 | LS | ¥ | ¥ |
| C001EF | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | C001 Total | ¥ |
| C002 | Bath Systems, Spec Item 3.2.2 & 3.1 | | | | |
| C002A | Bldg. 1922 (SRF) | | | | |
| C002AA | Semi-Monthly (Twice a Month) PM | | | | |
| C002AAA | Equipment PM with Chemicals Replenishment | 24 | TM | ¥ | ¥ |
| C002AB | Semiannual PM | | | | |
| C002ABA | Equipment PM | 2 | SA | ¥ | ¥ |
| C002ABB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| C002AC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| C002B | Bldg. 2043 (SRF) | | | | |
| C002BA | Bi-Monthly (Every Two Month) PM | | | | |
| C002BAA | Equipment PM with Chemicals Replenishment | 6 | MO | ¥ | ¥ |
| C002BB | Semiannual PM | | | | |
| C002BBA | Equipment PM | 2 | SA | ¥ | ¥ |
| C002BBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| C002BC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| C002C | Bldg. 2067 (SRF) | | | | |
| C002CA | Monthly PM | | | | |
| C002CAA | Equipment PM with Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| C002CB | Semiannual PM | | | | |
| C002CBA | Equipment PM | 2 | SA | ¥ | ¥ |
| C002CBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| C002CC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| C002D | Bldg. 2068 (SRF) | | | | |
| C002DA | Semi-Monthly (Twice a Month) PM | | | | |
| C002DAA | Equipment PM with Chemicals Replenishment | 24 | TM | ¥ | ¥ |
| C002DB | Semiannual PM | | | | |
| C002DBA | Equipment PM | 2 | SA | ¥ | ¥ |
| C002DBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| C002DC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| C002E | Bldg. 2078 (SRF) | | | | |
| C002EA | Monthly PM | | | | |
| C002EAA | Equipment PM with Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| C002EB | Semiannual PM | | | | |
| C002EBA | Equipment PM | 2 | SA | ¥ | ¥ |
| C002EBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| C002EC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | C002 Total | ¥ |
| C003 | Fall & Pond Systems, Spec Item 3.2.3 & 3.1 | | | | |
| C003A | Carney Gate (Main Gate) | | | | |
| C003AA | Weekly PM | | | | |
| C003AAA | Equipment PM with Chemicals Replenishment | 52 | W | ¥ | ¥ |
| C003AB | Bi-Monthly (Every Two Month) PM | | | | |
| C003ABA | Fall & Pond Cleaning | 6 | MO | ¥ | ¥ |
| C003AC | Quarterly PM | | | | |
| C003ACA | Equipment PM | 4 | Q | ¥ | ¥ |
| C003AD | Semi-Annual PM | | | | |
| C003ADA | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| C003AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | C003 Total | ¥ |
| C004 | Fountain Systems, Spec Item 3.2.4 & 3.1 | | | | |
| C004A | Bldg. 4860 and 4861 (Ombudsman Park) | | | | |
| C004AA | Weekly PM | | | | |
| C004AAA | Equipment PM with Chemicals Replenishment | 52 | W | ¥ | ¥ |
| C004AB | Quarterly PM | | | | |
| C004ABA | Fountain Cleaning | 4 | Q | ¥ | ¥ |
| C004AC | Semi-Annual PM | | | | |
| C004ACA | Equipment PM | 2 | SA | ¥ | ¥ |
| C004ACB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| C004AD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | C004 Total | ¥ |
TOTAL RECURRING LINE ITEMS TOTAL ¥
| D = | Daily |
| W = | Weekly |
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
| LS = | Lump Sum |
| TM = | Time |
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
2nd OP Non-Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 9002 |
| Line Item 0004 Non-Recurring - Second Option Period |
| Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 |
ELINs C700 through C703
| | | ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| | | C700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. | 600 | HR | ¥ | ¥ | |
| | | C701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN C 700 | 1 | LS | ¥ 8,000,000 | ¥ 8,000,000 | |
| | | C702 | Fall & Pond Operation | Start and/or Stop Fall & Pond circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F. | 10 | EA | ¥ | ¥ | |
| | | C703 | Fountain Operation | Start and/or Stop Fountain circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F. | 10 | EA | ¥ | ¥ | |
| | | C704 | Perform Cleaning | | | | | | |
| Work for Fall & Pond | Perform cleaning work to remove soiled and debris for the Fall and Pond, which include but not limited to: 1) Wall of fall and pond, 2) Signs, 3) Water storage tank, 4) Pump pits and electrodes, 5) Drain ditch, 6) Overflow pipe of pond, 7) Drain pipe of pond, 8) Upper spot lights (Wiped cleaning only, do not hit high pressure water), 9) Beam lights (Wiped cleaning only, do not use high pressure water). The Contractor shall complete cleaning works within 10 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line. | 6 | EA | ¥ | ¥ | | | | | |
| | | C705 | Replace Upper Beam | | | | | | |
Lighting Bulb of Light Up for Signs in
| Pond for Fall System | Replace existing beam lightning bulb of light up for signs in pond for fall system with new one. The Contractor shall complete replacement work within seven (7) calendar days after. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 20 | EA | ¥ | ¥ |
| | | C706 | Replace Foot | |
Lightning Bulb at Walking Deck for Fall
| System | Replace existing foot lightning bulb at walking deck for fall system with new one. The Contractor shall complete replacement work at job site within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 17 | EA | ¥ | ¥ |
| | | C707 | Perform Cleaning | |
| Work for Fountain | Perform cleaning works for the fountain, which include but not limited to: 1) U-ditch, 2) Concrete pit, 3) Strainer of circulation pumps, 4) Drain pipe, 5) Communication pipe, 6) Surfaces of electrodes, 7) Concrete floor around pond utilizing high pressure water, 8) Vacuum equipment, specified area at J-1502000-08, and removal works for debris at hair catcher. The Contractor shall complete cleaning works within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line. | 6 | EA | ¥ | ¥ |
| | | C708 | Replace Lighting | |
Bulb of Imitation
| Bench for Fountain | Replace the existing lightning bulb of imitation bench for fountain with new one. The Contractor shall complete replacement work within 30 calendar days after ordered. Submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 6 | EA | ¥ | ¥ | | | | |
| | | C709 | Perform Repainting Work for Swimming Pool | Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 1500 | LM | ¥ | ¥ |
| | | | | TOTAL NON-RECURRING PRICE | | | | ¥ |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
3rd OP Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 9003 |
| Line Item 0007 Recurring - Third Option Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs D001 through D004 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| D | CNIC, Spec Item 3 |
| PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1 |
D001 Swimming Pool Systems, Spec Item 3.2.1& 3.1
| D001A | Bldg. G23 ( Yokosuka Green Beach Pool) | | | | |
| D001AA | Start up PM | | | | |
| D001AAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| D001AAB | Equipment PM | 1 | LS | ¥ | ¥ |
| D001AB | Season PM | | | | |
| D001ABA | Daily PM | | | | |
| D001ABAA | Equipment PM | 120 | D | ¥ | ¥ |
| D001ABB | Weekly PM | | | | |
| D001ABBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| D001ABBB | Equipment PM | 17 | W | ¥ | ¥ |
| D001ABBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| D001ABC | Monthly PM | | | | |
| D001ABCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| D001ABD | Fixed Month PM | | | | |
| D001ABDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| D001AC | Closeout PM | | | | |
| D001ACA | Equipment PM | 1 | LS | ¥ | ¥ |
| D001AD | Off Season PM | | | | |
| D001ADA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| D001AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| D001B | Bldg. G23A (Yokosuka Green Beach, Wading Pool) | | | | |
| D001BA | Start up PM | | | | |
| D001BAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| D001BAB | Equipment PM | 1 | LS | ¥ | ¥ |
| D001BB | Season PM | | | | |
| D001BBA | Daily PM | | | | |
| D001BBAA | Equipment PM | 120 | D | ¥ | ¥ |
| D001BBB | Weekly PM | | | | |
| D001BBBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| D001BBBB | Equipment PM | 17 | W | ¥ | ¥ |
| D001BBBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| D001BBC | Monthly PM | | | | |
| D001BBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| D001BBD | Fixed Month PM | | | | |
| D001BBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| D001BC | Closeout PM | | | | |
| D001BCA | Equipment PM | 1 | LS | ¥ | ¥ |
| D001BD | Off Season PM | | | | |
| D001BDA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| D001BE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| D001C | Bldg. 674 (Ikego Pool) | | | | |
| D001CA | Start up PM | | | | |
| D001CAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| D001CAB | Equipment PM | 1 | LS | ¥ | ¥ |
| D001CB | Season PM | | | | |
| D001CBA | Daily PM | | | | |
| D001CBAA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| D001CBAB | Equipment PM | 120 | D | ¥ | ¥ |
| D001CBB | Weekly PM | | | | |
| D001CBBA | Equipment PM | 17 | W | ¥ | ¥ |
| D001CBBB | Water Quality Analysis | 17 | W | ¥ | ¥ |
| D001CBC | Monthly PM | | | | |
| D001CBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| D001CBD | Fixed Month PM | | | | |
| D001CBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| D001CC | Closeout PM | | | | |
| D001CCA | Equipment PM | 1 | LS | ¥ | ¥ |
| D001CD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| D001D | Bldg. 674 (Ikego Wading Pool) | | | | |
| D001DA | Start up PM | | | | |
| D001DAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| D001DAB | Equipment PM | 1 | LS | ¥ | ¥ |
| D001DB | Season PM | | | | |
| D001DBA | Daily PM | | | | |
| D001DBAA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| D001DBAB | Equipment PM | 120 | D | ¥ | ¥ |
| D001DBB | Weekly PM | | | | |
| D001DBBA | Equipment PM | 17 | W | ¥ | ¥ |
| D001DBBB | Water Quality Analysis | 17 | W | ¥ | ¥ |
| D001DBC | Monthly PM | | | | |
| D001DBCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| D001DBD | Fixed Month PM | | | | |
| D001DBDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| D001DC | Closeout PM | | | | |
| D001DCA | Equipment PM | 1 | LS | ¥ | ¥ |
| D001DD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| D001E | Bldg. 3354 (Purdy Pool) | | | | |
| D001EA | Once Two Days PM | | | | |
| D001EAA | Equipment PM | 183 | D | ¥ | ¥ |
| D001EB | Weekly PM | | | | |
| D001EBA | Equipment PM | 52 | W | ¥ | ¥ |
| D001EBB | Water Quality Analysis | 52 | W | ¥ | ¥ |
| D001EC | Monthly PM | | | | |
| D001ECA | Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| D001ECB | Equipment PM | 12 | MO | ¥ | ¥ |
| D001ECC | Water Quality Analysis | 12 | MO | ¥ | ¥ |
| D001ED | Quarterly PM | | | | |
| D001EDA | Equipment PM | 4 | Q | ¥ | ¥ |
| D001EE | Annual PM | | | | |
| D001EEA | Equipment PM | 1 | A | ¥ | ¥ |
| D001EEB | Water Quality Analysis - Once the Fixed Month PM - | 1 | LS | ¥ | ¥ |
| D001EEC | Equipment PM - Once the Fixed Month PM - | 1 | LS | ¥ | ¥ |
| D001EF | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | D001 Total | ¥ |
| D002 | Bath Systems, Spec Item 3.2.2 & 3.1 | | | | |
| D002A | Bldg. 1922 (SRF) | | | | |
| D002AA | Semi-Monthly (Twice a Month) PM | | | | |
| D002AAA | Equipment PM with Chemicals Replenishment | 24 | TM | ¥ | ¥ |
| D002AB | Semiannual PM | | | | |
| D002ABA | Equipment PM | 2 | SA | ¥ | ¥ |
| D002ABB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| D002AC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| D002B | Bldg. 2043 (SRF) | | | | |
| D002BA | Bi-Monthly (Every Two Month) PM | | | | |
| D002BAA | Equipment PM with Chemicals Replenishment | 6 | MO | ¥ | ¥ |
| D002BB | Semiannual PM | | | | |
| D002BBA | Equipment PM | 2 | SA | ¥ | ¥ |
| D002BBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| D002BC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| D002C | Bldg. 2067 (SRF) | | | | |
| D002CA | Monthly PM | | | | |
| D002CAA | Equipment PM with Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| D002CB | Semiannual PM | | | | |
| D002CBA | Equipment PM | 2 | SA | ¥ | ¥ |
| D002CBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| D002CC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| D002D | Bldg. 2068 (SRF) | | | | |
| D002DA | Semi-Monthly (Twice a Month) PM | | | | |
| D002DAA | Equipment PM with Chemicals Replenishment | 24 | TM | ¥ | ¥ |
| D002DB | Semiannual PM | | | | |
| D002DBA | Equipment PM | 2 | SA | ¥ | ¥ |
| D002DBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| D002DC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| D002E | Bldg. 2078 (SRF) | | | | |
| D002EA | Monthly PM | | | | |
| D002EAA | Equipment PM with Chemicals Replenishment | 12 | MO | ¥ | ¥ |
| D002EB | Semiannual PM | | | | |
| D002EBA | Equipment PM | 2 | SA | ¥ | ¥ |
| D002EBB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| D002EC | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | D002 Total | ¥ |
| D003 | Fall & Pond Systems, Spec Item 3.2.3 & 3.1 | | | | |
| D003A | Carney Gate (Main Gate) | | | | |
| D003AA | Weekly PM | | | | |
| D003AAA | Equipment PM with Chemicals Replenishment | 52 | W | ¥ | ¥ |
| D003AB | Bi-Monthly (Every Two Month) PM | | | | |
| D003ABA | Fall & Pond Cleaning | 6 | MO | ¥ | ¥ |
| D003AC | Quarterly PM | | | | |
| D003ACA | Equipment PM | 4 | Q | ¥ | ¥ |
| D003AD | Semi-Annual PM | | | | |
| D003ADA | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| D003AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | D003 Total | ¥ |
| D004 | Fountain Systems, Spec Item 3.2.4 & 3.1 | | | | |
| D004A | Bldg. 4860 and 4861 (Ombudsman Park) | | | | |
| D004AA | Weekly PM | | | | |
| D004AAA | Equipment PM with Chemicals Replenishment | 52 | W | ¥ | ¥ |
| D004AB | Quarterly PM | | | | |
| D004ABA | Fountain Cleaning | 4 | Q | ¥ | ¥ |
| D004AC | Semi-Annual PM | | | | |
| D004ACA | Equipment PM | 2 | SA | ¥ | ¥ |
| D004ACB | Water Quality Analysis | 2 | SA | ¥ | ¥ |
| D004AD | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
| | | | D004 Total | ¥ |
TOTAL RECURRING LINE ITEMS TOTAL ¥
| D = | Daily |
| W = | Weekly |
| MO = | Monthly |
| SA = | Semi-Annual |
| Q = | Quarterly |
| A = | Annual |
| LO = | Lot |
| LS = | Lump Sum |
| TM = | Time |
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
3rd OP Non-Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 9003 |
| Line Item 0004 Non-Recurring - Third Option Period |
| Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 |
ELINs D700 through D70
| | | ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| | | D700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. | 600 | HR | ¥ | ¥ | |
| | | D701 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN D 700 | 1 | LS | ¥ 8,000,000 | ¥ 8,000,000 | |
| | | D702 | Fall & Pond Operation | Start and/or Stop Fall & Pond circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F. | 10 | EA | ¥ | ¥ | |
| | | D703 | Fountain Operation | Start and/or Stop Fountain circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F. | 10 | EA | ¥ | ¥ | |
| | | D704 | Perform Cleaning | | | | | | |
| Work for Fall & Pond | Perform cleaning work to remove soiled and debris for the Fall and Pond, which include but not limited to: 1) Wall of fall and pond, 2) Signs, 3) Water storage tank, 4) Pump pits and electrodes, 5) Drain ditch, 6) Overflow pipe of pond, 7) Drain pipe of pond, 8) Upper spot lights (Wiped cleaning only, do not hit high pressure water), 9) Beam lights (Wiped cleaning only, do not use high pressure water). The Contractor shall complete cleaning works within 10 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line. | 6 | EA | ¥ | ¥ | | | | | |
| | | D705 | Replace Upper Beam | | | | | | |
Lighting Bulb of Light Up for Signs in
| Pond for Fall System | Replace existing beam lightning bulb of light up for signs in pond for fall system with new one. The Contractor shall complete replacement work within seven (7) calendar days after. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 20 | EA | ¥ | ¥ |
| | | D706 | Replace Foot | |
Lightning Bulb at Walking Deck for Fall
| System | Replace existing foot lightning bulb at walking deck for fall system with new one. The Contractor shall complete replacement work at job site within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 17 | EA | ¥ | ¥ |
| | | D707 | Perform Cleaning | |
| Work for Fountain | Perform cleaning works for the fountain, which include but not limited to: 1) U-ditch, 2) Concrete pit, 3) Strainer of circulation pumps, 4) Drain pipe, 5) Communication pipe, 6) Surfaces of electrodes, 7) Concrete floor around pond utilizing high pressure water, 8) Vacuum equipment, specified area at J-1502000-08, and removal works for debris at hair catcher. The Contractor shall complete cleaning works within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line. | 6 | EA | ¥ | ¥ |
| | | D708 | Replace Lighting | |
Bulb of Imitation
| Bench for Fountain | Replace the existing lightning bulb of imitation bench for fountain with new one. The Contractor shall complete replacement work within 30 calendar days after ordered. Submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 6 | EA | ¥ | ¥ | | | | |
| | | D709 | Perform Repainting Work for Swimming Pool | Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. | 1500 | LM | ¥ | ¥ |
| | | | | TOTAL NON-RECURRING PRICE | | | | ¥ |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
4th OP Recurring
| SOLICITATION/CONTRACT # |
| EXHIBIT E - CLIN 9004 |
| Line Item 0009 Recurring - Fourth Option Period |
| Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3 |
| ELINs E001 through E004 |
ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| E | CNIC, Spec Item 3 |
| PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1 |
E001 Swimming Pool Systems, Spec Item 3.2.1& 3.1
| E001A | Bldg. G23 ( Yokosuka Green Beach Pool) | | | | |
| E001AA | Start up PM | | | | |
| E001AAA | Pool Cleaning | 1 | LS | ¥ | ¥ |
| E001AAB | Equipment PM | 1 | LS | ¥ | ¥ |
| E001AB | Season PM | | | | |
| E001ABA | Daily PM | | | | |
| E001ABAA | Equipment PM | 120 | D | ¥ | ¥ |
| E001ABB | Weekly PM | | | | |
| E001ABBA | Chemicals Replenishment | 1 | LO | ¥ | ¥ |
| E001ABBB | Equipment PM | 17 | W | ¥ | ¥ |
| E001ABBC | Water Quality Analysis | 17 | W | ¥ | ¥ |
| E001ABC | Monthly PM | | | | |
| E001ABCA | Water Quality Analysis | 4 | MO | ¥ | ¥ |
| E001ABD | Fixed Month PM | | | | |
| E001ABDA | Water Quality Analysis | 1 | LS | ¥ | ¥ |
| E001AC | Closeout PM | | | | |
| E001ACA | Equipment PM | 1 | LS | ¥ | ¥ |
| E001AD | Off Season PM | | | | |
| E001ADA | Quarterly PM (Cleaning) | 4 | Q | ¥ | ¥ |
| E001AE | Service Orders, Spec Item 3.1 | 12 | MO | ¥ | ¥ |
| | | | Sub Total | ¥ |
This is the start of the file's text. The full file is on GovTribe.