View the file

Other files

File Type Posted
Amend_0002 SPEC rev_26Mar.pdf PDF
Amend 0002.pdf PDF
Amend_0001 SPEC rev_24Mar.pdf PDF
Amend 0001.pdf PDF
N4008421B0400AA.pdf PDF
N4008421B0400BB.pdf PDF
N4008421B0400CC.pdf PDF
Schedule of Price.xlsx XLSX spreadsheet
N4008421B0400C.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOP

SCHEDULE OF PRICE

NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS¥-
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year.
From 1 Mar 2021 through 28 Feb 2022.
Item 0002Non-Recurring, Base Period1LS¥-
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 Mar 2021 through 28 Feb 2022.
Item 0003Recurring, First Option Period1LS¥-
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year.
From 1 Mar 2022 through 28 Feb 2023.
Item 0004Non-Recurring, First Option Period1LS¥-
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 Mar 2022 through 28 Feb 2023.
Item 0005Recurring, Second Option Period1LS¥-
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year.
From 1 Mar 2023 through 28 Feb 2024.
Item 0006Non-Recurring, Second Option Period1LS¥-
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 Mar 2023 through 28 Feb 2024.
Item 0007Recurring, Third Option Period1LS¥-
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year.
From 1 Mar 2024 through 28 Feb 2025.
Item 0008Non-Recurring, Third Option Period1LS¥-
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 Mar 2024 through 28 Feb 2025.
Item 0009Recurring, Fourth Option Period1LS¥-
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, Fountain Circulation Systems a period of one year.
From 1 Mar 2025 through 28 Feb 2026.
Item 0010Non-Recurring, Fourth Option Period1LS¥-
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 1 Mar 2025 through 28 Feb 2026.

TOTAL: (LINE ITEM 0001 through 0010) ¥-

CLIN 9000 Exhibit A (Base Period)

CLIN 9001 Exhibit B (First Option Period)

CLIN 9002 Exhibit C (Second Option Period)

CLIN 9003 Exhibit D (Third Option Period)

CLIN 9004 Exhibit E (Fourth Option Period)

NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.

Detail line items for task order is located in Attachment J-0200000-07

CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY
If you will use below comments for GE, Print area should be chainge.
Note:GE was formulated based on market research conducted for same or similar items, previous purchases of similar or same items, and experience of technical engineers for this requirement.

Schedule of Price

SCHEDULE OF PRICE

NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS¥ -
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year.
From 15 April 2021 through 14 April 2022.
Item 0002Non-Recurring, Base Period1LS¥ -
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 15 April 2021 through 14 April 2022.
Item 0003Recurring, First Option Period1LS¥ -
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year.
From 15 April 2022 through 14 April 2023.
Item 0004Non-Recurring, First Option Period1LS¥ -
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 15 April 2022 through 14 April 2023.
Item 0005Recurring, Second Option Period1LS¥ -
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year.
From 15 April 2023 through 14 April 2024.
Item 0006Non-Recurring, Second Option Period1LS¥ -
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 15 April 2023 through 14 April 2024.
Item 0007Recurring, Third Option Period1LS¥ -
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year.
From 15 April 2024 through 14 April 2025.
Item 0008Non-Recurring, Third Option Period1LS¥ -
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 15 April 2024 through 14 April 2025.
Item 0009Recurring, Fourth Option Period1LS¥ -
Provide PM program Services For
Swimming Pool, Bath, Fall & Pond, and Fountain a period of one year.
From 15 April 2025 through 14 April 2026.
Item 0010Non-Recurring, Fourth Option Period1LS¥ -
Provide Unit Priced Task Work(NTE)
upon receipt of a Task Order
From 15 April 2025 through 14 April 2026.

TOTAL: (LINE ITEM 0001 through 0010) ¥ -

CLIN 9000 Exhibit A (Base Period)

CLIN 9001 Exhibit B (First Option Period)

CLIN 9002 Exhibit C (Second Option Period)

CLIN 9003 Exhibit D (Third Option Period)

CLIN 9004 Exhibit E (Fourth Option Period)

NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.

Detail line items for task order is located in Attachment J-0200000-07

CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 B-3

Base Period Recurring

SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring - Base Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs A001 through A004

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

ACNIC, Spec Item 3
PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1

A001 Swimming Pool Systems, Spec Item 3.2.1& 3.1

A001ABldg. G23 ( Yokosuka Green Beach Pool)
A001AAStart up PM
A001AAAPool Cleaning1LS¥¥
A001AABEquipment PM1LS¥¥
A001ABSeason PM
A001ABADaily PM
A001ABAAEquipment PM120D¥¥
A001ABBWeekly PM
A001ABBAChemicals Replenishment1LO¥¥
A001ABBBEquipment PM17W¥¥
A001ABBCWater Quality Analysis17W¥¥
A001ABCMonthly PM
A001ABCAWater Quality Analysis4MO¥¥
A001ABDFixed Month PM
A001ABDAWater Quality Analysis1LS¥¥
A001ACCloseout PM
A001ACAEquipment PM1LS¥¥
A001ADOff Season PM
A001ADAQuarterly PM (Cleaning)4Q¥¥
A001AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A001BBldg. G23A (Yokosuka Green Beach, Wading Pool)
A001BAStart up PM
A001BAAPool Cleaning1LS¥¥
A001BABEquipment PM1LS¥¥
A001BBSeason PM
A001BBADaily PM
A001BBAAEquipment PM120D¥¥
A001BBBWeekly PM
A001BBBAChemicals Replenishment1LO¥¥
A001BBBBEquipment PM17W¥¥
A001BBBCWater Quality Analysis17W¥¥
A001BBCMonthly PM
A001BBCAWater Quality Analysis4MO¥¥
A001BBDFixed Month PM
A001BBDAWater Quality Analysis1LS¥¥
A001BCCloseout PM
A001BCAEquipment PM1LS¥¥
A001BDOff Season PM
A001BDAQuarterly PM (Cleaning)4Q¥¥
A001BEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A001CBldg. 674 (Ikego Pool)
A001CAStart up PM
A001CAAPool Cleaning1LS¥¥
A001CABEquipment PM1LS¥¥
A001CBSeason PM
A001CBADaily PM
A001CBAAChemicals Replenishment1LO¥¥
A001CBABEquipment PM120D¥¥
A001CBBWeekly PM
A001CBBAEquipment PM17W¥¥
A001CBBBWater Quality Analysis17W¥¥
A001CBCMonthly PM
A001CBCAWater Quality Analysis4MO¥¥
A001CBDFixed Month PM
A001CBDAWater Quality Analysis1LS¥¥
A001CCCloseout PM
A001CCAEquipment PM1LS¥¥
A001CDService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A001DBldg. 674 (Ikego Wading Pool)
A001DAStart up PM
A001DAAPool Cleaning1LS¥¥
A001DABEquipment PM1LS¥¥
A001DBSeason PM
A001DBADaily PM
A001DBAAChemicals Replenishment1LO¥¥
A001DBABEquipment PM120D¥¥
A001DBBWeekly PM
A001DBBAEquipment PM17W¥¥
A001DBBBWater Quality Analysis17W¥¥
A001DBCMonthly PM
A001DBCAWater Quality Analysis4MO¥¥
A001DBDFixed Month PM
A001DBDAWater Quality Analysis1LS¥¥
A001DCCloseout PM
A001DCAEquipment PM1LS¥¥
A001DDService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A001EBldg. 3354 (Purdy Pool)
A001EAOnce Two Days PM
A001EAAEquipment PM183D¥¥
A001EBWeekly PM
A001EBAEquipment PM52W¥¥
A001EBBWater Quality Analysis52W¥¥
A001ECMonthly PM
A001ECAChemicals Replenishment12MO¥¥
A001ECBEquipment PM12MO¥¥
A001ECCWater Quality Analysis12MO¥¥
A001EDQuarterly PM
A001EDAEquipment PM4Q¥¥
A001EEAnnual PM
A001EEAEquipment PM1A¥¥
A001EEBWater Quality Analysis - in the Fixed Month PM -1LS¥¥
A001EECEquipment PM - in the Fixed Month PM -1LS¥¥
A001EFService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A001 Total¥
A002Bath Systems, Spec Item 3.2.2 & 3.1
A002ABldg. 1922 (SRF)
A002AASemi-Monthly (Twice a Month) PM
A002AAAEquipment PM with Chemicals Replenishment24TM¥¥
A002ABSemiannual PM
A002ABAEquipment PM2SA¥¥
A002ABBWater Quality Analysis2SA¥¥
A002ACService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A002BBldg. 2043 (SRF)
A002BABi-Monthly (Every Two Month) PM
A002BAAEquipment PM with Chemicals Replenishment6MO¥¥
A002BBSemiannual PM
A002BBAEquipment PM2SA¥¥
A002BBBWater Quality Analysis2SA¥¥
A002BCService Orders, Spec Item 3.112MO¥¥
Sub Total
A002CBldg. 2067 (SRF)
A002CAMonthly PM
A002CAAEquipment PM with Chemicals Replenishment12MO¥¥
A002CBSemiannual PM
A002CBAEquipment PM2SA¥¥
A002CBBWater Quality Analysis2SA¥¥
A002CCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A002DBldg. 2068 (SRF)
A002DASemi-Monthly (Twice a Month) PM
A002DAAEquipment PM with Chemicals Replenishment24TM¥¥
A002DBSemiannual PM
A002DBAEquipment PM2SA¥¥
A002DBBWater Quality Analysis2SA¥¥
A002DCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A002EBldg. 2078 (SRF)
A002EAMonthly PM
A002EAAEquipment PM with Chemicals Replenishment12MO¥¥
A002EBSemiannual PM
A002EBAEquipment PM2SA¥¥
A002EBBWater Quality Analysis2SA¥¥
A002ECService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A002 Total¥
A003Fall & Pond Systems, Spec Item 3.2.3 & 3.1
A003ACarney Gate (Main Gate)
A003AAWeekly PM
A003AAAEquipment PM with Chemicals Replenishment52W¥¥
A003ABBi-Monthly (Every Two Month) PM
A003ABAFall & Pond Cleaning6MO¥¥
A003ACQuarterly PM
A003ACAEquipment PM4Q¥¥
A003ADSemi-Annual PM
A003ADAWater Quality Analysis2SA¥¥
A003AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A003 Total¥
A004Fountain Systems, Spec Item 3.2.4 & 3.1
A004ABldg. 4860 and 4861 (Ombudsman Park)
A004AAWeekly PM
A004AAAEquipment PM with Chemicals Replenishment52W¥¥
A004ABQuarterly PM
A004ABAFountain Cleaning4Q¥¥
A004ACSemi-Annual PM
A004ACAEquipment PM2SA¥¥
A004ACBWater Quality Analysis2SA¥¥
A004ADService Orders, Spec Item 3.112MO¥¥
Sub Total¥
A004 Total¥

TOTAL RECURRING LINE ITEMS TOTAL ¥

D =Daily
W =Weekly
MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot
LS =Lump Sum
TM =Time

&"Times New Roman,Regular"&UATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

Base Period Non-Recurring

SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring - Base Period
Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4

ELINs A700 through A709

ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order.600HR¥¥
A701Material Costs- MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A 7001LS¥ 8,000,000¥ 8,000,000
A702Fall & Pond OperationStart and/or Stop Fall & Pond circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F.10EA¥¥
A703Fountain OperationStart and/or Stop Fountain circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F.10EA¥¥
A704Perform Cleaning
Work for Fall & PondPerform cleaning work to remove soiled and debris for the Fall and Pond, which include but not limited to: 1) Wall of fall and pond, 2) Signs, 3) Water storage tank, 4) Pump pits and electrodes, 5) Drain ditch, 6) Overflow pipe of pond, 7) Drain pipe of pond, 8) Upper spot lights (Wiped cleaning only, do not hit high pressure water), 9) Beam lights (Wiped cleaning only, do not use high pressure water). The Contractor shall complete cleaning works within 10 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line.6EA¥¥
A705Replace Upper Beam

Lighting Bulb of Light Up for Signs in

Pond for Fall SystemReplace existing beam lightning bulb of light up for signs in pond for fall system with new one. The Contractor shall complete replacement work within seven (7) calendar days after. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.20EA¥¥
A706Replace Foot

Lightning Bulb at Walking Deck for Fall

SystemReplace existing foot lightning bulb at walking deck for fall system with new one. The Contractor shall complete replacement work at job site within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.17EA¥¥
A707Perform Cleaning
Work for FountainPerform cleaning works for the fountain, which include but not limited to: 1) U-ditch, 2) Concrete pit, 3) Strainer of circulation pumps, 4) Drain pipe, 5) Communication pipe, 6) Surfaces of electrodes, 7) Concrete floor around pond utilizing high pressure water, 8) Vacuum equipment, specified area at J-1502000-08, and removal works for debris at hair catcher. The Contractor shall complete cleaning works within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line.6EA¥¥
A708Replace Lighting

Bulb of Imitation

Bench for FountainReplace the existing lightning bulb of imitation bench for fountain with new one. The Contractor shall complete replacement work within 30 calendar days after ordered. Submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.6EA¥¥
A709Perform Repainting Work for Swimming PoolPerform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.1500LM¥¥
TOTAL NON-RECURRING PRICE¥

&"Times New Roman,Regular"&UATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

1st OP Recurring

SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0003 Recurring - First Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs B001 through B004

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

BCNIC, Spec Item 3
PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1

B001 Swimming Pool Systems, Spec Item 3.2.1& 3.1

B001ABldg. G23 ( Yokosuka Green Beach Pool)
B001AAStart up PM
B001AAAPool Cleaning1LS¥¥
B001AABEquipment PM1LS¥¥
B001ABSeason PM
B001ABADaily PM
B001ABAAEquipment PM120D¥¥
B001ABBWeekly PM
B001ABBAChemicals Replenishment1LO¥¥
B001ABBBEquipment PM17W¥¥
B001ABBCWater Quality Analysis17W¥¥
B001ABCMonthly PM
B001ABCAWater Quality Analysis4MO¥¥
B001ABDFixed Month PM
B001ABDAWater Quality Analysis1LS¥¥
B001ACCloseout PM
B001ACAEquipment PM1LS¥¥
B001ADOff Season PM
B001ADAQuarterly PM (Cleaning)4Q¥¥
B001AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B001BBldg. G23A (Yokosuka Green Beach, Wading Pool)
B001BAStart up PM
B001BAAPool Cleaning1LS¥¥
B001BABEquipment PM1LS¥¥
B001BBSeason PM
B001BBADaily PM
B001BBAAEquipment PM120D¥¥
B001BBBWeekly PM
B001BBBAChemicals Replenishment1LO¥¥
B001BBBBEquipment PM17W¥¥
B001BBBCWater Quality Analysis17W¥¥
B001BBCMonthly PM
B001BBCAWater Quality Analysis4MO¥¥
B001BBDFixed Month PM
B001BBDAWater Quality Analysis1LS¥¥
B001BCCloseout PM
B001BCAEquipment PM1LS¥¥
B001BDOff Season PM
B001BDAQuarterly PM (Cleaning)4Q¥¥
B001BEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B001CBldg. 674 (Ikego Pool)
B001CAStart up PM
B001CAAPool Cleaning1LS¥¥
B001CABEquipment PM1LS¥¥
B001CBSeason PM
B001CBADaily PM
B001CBAAChemicals Replenishment1LO¥¥
B001CBABEquipment PM120D¥¥
B001CBBWeekly PM
B001CBBAEquipment PM17W¥¥
B001CBBBWater Quality Analysis17W¥¥
B001CBCMonthly PM
B001CBCAWater Quality Analysis4MO¥¥
B001CBDFixed Month PM
B001CBDAWater Quality Analysis1LS¥¥
B001CCCloseout PM
B001CCAEquipment PM1LS¥¥
B001CDService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B001DBldg. 674 (Ikego Wading Pool)
B001DAStart up PM
B001DAAPool Cleaning1LS¥¥
B001DABEquipment PM1LS¥¥
B001DBSeason PM
B001DBADaily PM
B001DBAAChemicals Replenishment1LO¥¥
B001DBABEquipment PM120D¥¥
B001DBBWeekly PM
B001DBBAEquipment PM17W¥¥
B001DBBBWater Quality Analysis17W¥¥
B001DBCMonthly PM
B001DBCAWater Quality Analysis4MO¥¥
B001DBDFixed Month PM
B001DBDAWater Quality Analysis1LS¥¥
B001DCCloseout PM
B001DCAEquipment PM1LS¥¥
B001DDService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B001EBldg. 3354 (Purdy Pool)
B001EAOnce Two Days PM
B001EAAEquipment PM183D¥¥
B001EBWeekly PM
B001EBAEquipment PM52W¥¥
B001EBBWater Quality Analysis52W¥¥
B001ECMonthly PM
B001ECAChemicals Replenishment12MO¥¥
B001ECBEquipment PM12MO¥¥
B001ECCWater Quality Analysis12MO¥¥
B001EDQuarterly PM
B001EDAEquipment PM4Q¥¥
B001EEAnnual PM
B001EEAEquipment PM1A¥¥
B001EEBWater Quality Analysis - Once the Fixed Month PM -1LS¥¥
B001EECEquipment PM - Once the Fixed Month PM -1LS¥¥
B001EFService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B001 Total¥
B002Bath Systems, Spec Item 3.2.2 & 3.1
B002ABldg. 1922 (SRF)
B002AASemi-Monthly (Twice a Month) PM
B002AAAEquipment PM with Chemicals Replenishment24TM¥¥
B002ABSemiannual PM
B002ABAEquipment PM2SA¥¥
B002ABBWater Quality Analysis2SA¥¥
B002ACService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B002BBldg. 2043 (SRF)
B002BABi-Monthly (Every Two Month) PM
B002BAAEquipment PM with Chemicals Replenishment6MO¥¥
B002BBSemiannual PM
B002BBAEquipment PM2SA¥¥
B002BBBWater Quality Analysis2SA¥¥
B002BCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B002CBldg. 2067 (SRF)
B002CAMonthly PM
B002CAAEquipment PM with Chemicals Replenishment12MO¥¥
B002CBSemiannual PM
B002CBAEquipment PM2SA¥¥
B002CBBWater Quality Analysis2SA¥¥
B002CCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B002DBldg. 2068 (SRF)
B002DASemi-Monthly (Twice a Month) PM
B002DAAEquipment PM with Chemicals Replenishment24TM¥¥
B002DBSemiannual PM
B002DBAEquipment PM2SA¥¥
B002DBBWater Quality Analysis2SA¥¥
B002DCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B002EBldg. 2078 (SRF)
B002EAMonthly PM
B002EAAEquipment PM with Chemicals Replenishment12MO¥¥
B002EBSemiannual PM
B002EBAEquipment PM2SA¥¥
B002EBBWater Quality Analysis2SA¥¥
B002ECService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B002 Total¥
B003Fall & Pond Systems, Spec Item 3.2.3 & 3.1
B003ACarney Gate (Main Gate)
B003AAWeekly PM
B003AAAEquipment PM with Chemicals Replenishment52W¥¥
B003ABBi-Monthly (Every Two Month) PM
B003ABAFall & Pond Cleaning6MO¥¥
B003ACQuarterly PM
B003ACAEquipment PM4Q¥¥
B003ADSemi-Annual PM
B003ADAWater Quality Analysis2SA¥¥
B003AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B003 Total¥
B004Fountain Systems, Spec Item 3.2.4 & 3.1
B004ABldg. 4860 and 4861 (Ombudsman Park)
B004AAWeekly PM
B004AAAEquipment PM with Chemicals Replenishment52W¥¥
B004ABQuarterly PM
B004ABAFountain Cleaning4Q¥¥
B004ACSemi-Annual PM
B004ACAEquipment PM2SA¥¥
B004ACBWater Quality Analysis2SA¥¥
B004ADService Orders, Spec Item 3.112MO¥¥
Sub Total¥
B004 Total¥

TOTAL RECURRING LINE ITEMS TOTAL ¥

D =Daily
W =Weekly
MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot
LS =Lump Sum
TM =Time

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

1st OP Non-Recurring

SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0004 Non-Recurring - First Option Period
Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4

ELINs B700 through B709

ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order.600HR¥¥
B701Material Costs- MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B 7001LS¥ 8,000,000¥ 8,000,000
B702Fall & Pond OperationStart and/or Stop Fall & Pond circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F.10EA¥¥
B703Fountain OperationStart and/or Stop Fountain circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F.10EA¥¥
B704Perform Cleaning
Work for Fall & PondPerform cleaning work to remove soiled and debris for the Fall and Pond, which include but not limited to: 1) Wall of fall and pond, 2) Signs, 3) Water storage tank, 4) Pump pits and electrodes, 5) Drain ditch, 6) Overflow pipe of pond, 7) Drain pipe of pond, 8) Upper spot lights (Wiped cleaning only, do not hit high pressure water), 9) Beam lights (Wiped cleaning only, do not use high pressure water). The Contractor shall complete cleaning works within 10 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line.6EA¥¥
B705Replace Upper Beam

Lighting Bulb of Light Up for Signs in

Pond for Fall SystemReplace existing beam lightning bulb of light up for signs in pond for fall system with new one. The Contractor shall complete replacement work within seven (7) calendar days after. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.20EA¥¥
B706Replace Foot

Lightning Bulb at Walking Deck for Fall

SystemReplace existing foot lightning bulb at walking deck for fall system with new one. The Contractor shall complete replacement work at job site within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.17EA¥¥
B707Perform Cleaning
Work for FountainPerform cleaning works for the fountain, which include but not limited to: 1) U-ditch, 2) Concrete pit, 3) Strainer of circulation pumps, 4) Drain pipe, 5) Communication pipe, 6) Surfaces of electrodes, 7) Concrete floor around pond utilizing high pressure water, 8) Vacuum equipment, specified area at J-1502000-08, and removal works for debris at hair catcher. The Contractor shall complete cleaning works within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line.6EA¥¥
B708Replace Lighting

Bulb of Imitation

Bench for FountainReplace the existing lightning bulb of imitation bench for fountain with new one. The Contractor shall complete replacement work within 30 calendar days after ordered. Submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.6EA¥¥
B709Perform Repainting Work for Swimming PoolPerform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.1500LM¥¥
TOTAL NON-RECURRING PRICE¥

&"Times New Roman,Regular"&UATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

2nd OP Recurring

SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0005 Recurring - Second Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs C001 through C004

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

C001CNIC, Spec Item 3
PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1

C001 Swimming Pool Systems, Spec Item 3.2.1& 3.1

C001ABldg. G23 ( Yokosuka Green Beach Pool)
C001AAStart up PM
C001AAAPool Cleaning1LS¥¥
C001AABEquipment PM1LS¥¥
C001ABSeason PM
C001ABADaily PM
C001ABAAEquipment PM120D¥¥
C001ABBWeekly PM
C001ABBAChemicals Replenishment1LO¥¥
C001ABBBEquipment PM17W¥¥
C001ABBCWater Quality Analysis17W¥¥
C001ABCMonthly PM
C001ABCAWater Quality Analysis4MO¥¥
C001ABDFixed Month PM
C001ABDAWater Quality Analysis1LS¥¥
C001ACCloseout PM
C001ACAEquipment PM1LS¥¥
C001ADOff Season PM
C001ADAQuarterly PM (Cleaning)4Q¥¥
C001AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C001BBldg. G23A (Yokosuka Green Beach, Wading Pool)
C001BAStart up PM
C001BAAPool Cleaning1LS¥¥
C001BABEquipment PM1LS¥¥
C001BBSeason PM
C001BBADaily PM
C001BBAAEquipment PM120D¥¥
C001BBBWeekly PM
C001BBBAChemicals Replenishment1LO¥¥
C001BBBBEquipment PM17W¥¥
C001BBBCWater Quality Analysis17W¥¥
C001BBCMonthly PM
C001BBCAWater Quality Analysis4MO¥¥
C001BBDFixed Month PM
C001BBDAWater Quality Analysis1LS¥¥
C001BCCloseout PM
C001BCAEquipment PM1LS¥¥
C001BDOff Season PM
C001BDAQuarterly PM (Cleaning)4Q¥¥
C001BEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C001CBldg. 674 (Ikego Pool)
C001CAStart up PM
C001CAAPool Cleaning1LS¥¥
C001CABEquipment PM1LS¥¥
C001CBSeason PM
C001CBADaily PM
C001CBAAChemicals Replenishment1LO¥¥
C001CBABEquipment PM120D¥¥
C001CBBWeekly PM
C001CBBAEquipment PM17W¥¥
C001CBBBWater Quality Analysis17W¥¥
C001CBCMonthly PM
C001CBCAWater Quality Analysis4MO¥¥
C001CBDFixed Month PM
C001CBDAWater Quality Analysis1LS¥¥
C001CCCloseout PM
C001CCAEquipment PM1LS¥¥
C001CDService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C001DBldg. 674 (Ikego Wading Pool)
C001DAStart up PM
C001DAAPool Cleaning1LS¥¥
C001DABEquipment PM1LS¥¥
C001DBSeason PM
C001DBADaily PM
C001DBAAChemicals Replenishment1LO¥¥
C001DBABEquipment PM120D¥¥
C001DBBWeekly PM
C001DBBAEquipment PM17W¥¥
C001DBBBWater Quality Analysis17W¥¥
C001DBCMonthly PM
C001DBCAWater Quality Analysis4MO¥¥
C001DBDFixed Month PM
C001DBDAWater Quality Analysis1LS¥¥
C001DCCloseout PM
C001DCAEquipment PM1LS¥¥
C001DDService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C001EBldg. 3354 (Purdy Pool)
C001EAOnce Two Days PM
C001EAAEquipment PM183D¥¥
C001EBWeekly PM
C001EBAEquipment PM52W¥¥
C001EBBWater Quality Analysis52W¥¥
C001ECMonthly PM
C001ECAChemicals Replenishment12MO¥¥
C001ECBEquipment PM12MO¥¥
C001ECCWater Quality Analysis12MO¥¥
C001EDQuarterly PM
C001EDAEquipment PM4Q¥¥
C001EEAnnual PM
C001EEAEquipment PM1A¥¥
C001EEBWater Quality Analysis - Once the Fixed Month PM -1LS¥¥
C001EECEquipment PM - Once the Fixed Month PM -1LS¥¥
C001EFService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C001 Total¥
C002Bath Systems, Spec Item 3.2.2 & 3.1
C002ABldg. 1922 (SRF)
C002AASemi-Monthly (Twice a Month) PM
C002AAAEquipment PM with Chemicals Replenishment24TM¥¥
C002ABSemiannual PM
C002ABAEquipment PM2SA¥¥
C002ABBWater Quality Analysis2SA¥¥
C002ACService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C002BBldg. 2043 (SRF)
C002BABi-Monthly (Every Two Month) PM
C002BAAEquipment PM with Chemicals Replenishment6MO¥¥
C002BBSemiannual PM
C002BBAEquipment PM2SA¥¥
C002BBBWater Quality Analysis2SA¥¥
C002BCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C002CBldg. 2067 (SRF)
C002CAMonthly PM
C002CAAEquipment PM with Chemicals Replenishment12MO¥¥
C002CBSemiannual PM
C002CBAEquipment PM2SA¥¥
C002CBBWater Quality Analysis2SA¥¥
C002CCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C002DBldg. 2068 (SRF)
C002DASemi-Monthly (Twice a Month) PM
C002DAAEquipment PM with Chemicals Replenishment24TM¥¥
C002DBSemiannual PM
C002DBAEquipment PM2SA¥¥
C002DBBWater Quality Analysis2SA¥¥
C002DCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C002EBldg. 2078 (SRF)
C002EAMonthly PM
C002EAAEquipment PM with Chemicals Replenishment12MO¥¥
C002EBSemiannual PM
C002EBAEquipment PM2SA¥¥
C002EBBWater Quality Analysis2SA¥¥
C002ECService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C002 Total¥
C003Fall & Pond Systems, Spec Item 3.2.3 & 3.1
C003ACarney Gate (Main Gate)
C003AAWeekly PM
C003AAAEquipment PM with Chemicals Replenishment52W¥¥
C003ABBi-Monthly (Every Two Month) PM
C003ABAFall & Pond Cleaning6MO¥¥
C003ACQuarterly PM
C003ACAEquipment PM4Q¥¥
C003ADSemi-Annual PM
C003ADAWater Quality Analysis2SA¥¥
C003AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C003 Total¥
C004Fountain Systems, Spec Item 3.2.4 & 3.1
C004ABldg. 4860 and 4861 (Ombudsman Park)
C004AAWeekly PM
C004AAAEquipment PM with Chemicals Replenishment52W¥¥
C004ABQuarterly PM
C004ABAFountain Cleaning4Q¥¥
C004ACSemi-Annual PM
C004ACAEquipment PM2SA¥¥
C004ACBWater Quality Analysis2SA¥¥
C004ADService Orders, Spec Item 3.112MO¥¥
Sub Total¥
C004 Total¥

TOTAL RECURRING LINE ITEMS TOTAL ¥

D =Daily
W =Weekly
MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot
LS =Lump Sum
TM =Time

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

2nd OP Non-Recurring

SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0004 Non-Recurring - Second Option Period
Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4

ELINs C700 through C703

ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
C700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order.600HR¥¥
C701Material Costs- MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN C 7001LS¥ 8,000,000¥ 8,000,000
C702Fall & Pond OperationStart and/or Stop Fall & Pond circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F.10EA¥¥
C703Fountain OperationStart and/or Stop Fountain circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F.10EA¥¥
C704Perform Cleaning
Work for Fall & PondPerform cleaning work to remove soiled and debris for the Fall and Pond, which include but not limited to: 1) Wall of fall and pond, 2) Signs, 3) Water storage tank, 4) Pump pits and electrodes, 5) Drain ditch, 6) Overflow pipe of pond, 7) Drain pipe of pond, 8) Upper spot lights (Wiped cleaning only, do not hit high pressure water), 9) Beam lights (Wiped cleaning only, do not use high pressure water). The Contractor shall complete cleaning works within 10 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line.6EA¥¥
C705Replace Upper Beam

Lighting Bulb of Light Up for Signs in

Pond for Fall SystemReplace existing beam lightning bulb of light up for signs in pond for fall system with new one. The Contractor shall complete replacement work within seven (7) calendar days after. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.20EA¥¥
C706Replace Foot

Lightning Bulb at Walking Deck for Fall

SystemReplace existing foot lightning bulb at walking deck for fall system with new one. The Contractor shall complete replacement work at job site within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.17EA¥¥
C707Perform Cleaning
Work for FountainPerform cleaning works for the fountain, which include but not limited to: 1) U-ditch, 2) Concrete pit, 3) Strainer of circulation pumps, 4) Drain pipe, 5) Communication pipe, 6) Surfaces of electrodes, 7) Concrete floor around pond utilizing high pressure water, 8) Vacuum equipment, specified area at J-1502000-08, and removal works for debris at hair catcher. The Contractor shall complete cleaning works within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line.6EA¥¥
C708Replace Lighting

Bulb of Imitation

Bench for FountainReplace the existing lightning bulb of imitation bench for fountain with new one. The Contractor shall complete replacement work within 30 calendar days after ordered. Submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.6EA¥¥
C709Perform Repainting Work for Swimming PoolPerform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.1500LM¥¥
TOTAL NON-RECURRING PRICE¥

&"Times New Roman,Regular"&UATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

3rd OP Recurring

SOLICITATION/CONTRACT #
EXHIBIT D - CLIN 9003
Line Item 0007 Recurring - Third Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs D001 through D004

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

DCNIC, Spec Item 3
PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1

D001 Swimming Pool Systems, Spec Item 3.2.1& 3.1

D001ABldg. G23 ( Yokosuka Green Beach Pool)
D001AAStart up PM
D001AAAPool Cleaning1LS¥¥
D001AABEquipment PM1LS¥¥
D001ABSeason PM
D001ABADaily PM
D001ABAAEquipment PM120D¥¥
D001ABBWeekly PM
D001ABBAChemicals Replenishment1LO¥¥
D001ABBBEquipment PM17W¥¥
D001ABBCWater Quality Analysis17W¥¥
D001ABCMonthly PM
D001ABCAWater Quality Analysis4MO¥¥
D001ABDFixed Month PM
D001ABDAWater Quality Analysis1LS¥¥
D001ACCloseout PM
D001ACAEquipment PM1LS¥¥
D001ADOff Season PM
D001ADAQuarterly PM (Cleaning)4Q¥¥
D001AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D001BBldg. G23A (Yokosuka Green Beach, Wading Pool)
D001BAStart up PM
D001BAAPool Cleaning1LS¥¥
D001BABEquipment PM1LS¥¥
D001BBSeason PM
D001BBADaily PM
D001BBAAEquipment PM120D¥¥
D001BBBWeekly PM
D001BBBAChemicals Replenishment1LO¥¥
D001BBBBEquipment PM17W¥¥
D001BBBCWater Quality Analysis17W¥¥
D001BBCMonthly PM
D001BBCAWater Quality Analysis4MO¥¥
D001BBDFixed Month PM
D001BBDAWater Quality Analysis1LS¥¥
D001BCCloseout PM
D001BCAEquipment PM1LS¥¥
D001BDOff Season PM
D001BDAQuarterly PM (Cleaning)4Q¥¥
D001BEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D001CBldg. 674 (Ikego Pool)
D001CAStart up PM
D001CAAPool Cleaning1LS¥¥
D001CABEquipment PM1LS¥¥
D001CBSeason PM
D001CBADaily PM
D001CBAAChemicals Replenishment1LO¥¥
D001CBABEquipment PM120D¥¥
D001CBBWeekly PM
D001CBBAEquipment PM17W¥¥
D001CBBBWater Quality Analysis17W¥¥
D001CBCMonthly PM
D001CBCAWater Quality Analysis4MO¥¥
D001CBDFixed Month PM
D001CBDAWater Quality Analysis1LS¥¥
D001CCCloseout PM
D001CCAEquipment PM1LS¥¥
D001CDService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D001DBldg. 674 (Ikego Wading Pool)
D001DAStart up PM
D001DAAPool Cleaning1LS¥¥
D001DABEquipment PM1LS¥¥
D001DBSeason PM
D001DBADaily PM
D001DBAAChemicals Replenishment1LO¥¥
D001DBABEquipment PM120D¥¥
D001DBBWeekly PM
D001DBBAEquipment PM17W¥¥
D001DBBBWater Quality Analysis17W¥¥
D001DBCMonthly PM
D001DBCAWater Quality Analysis4MO¥¥
D001DBDFixed Month PM
D001DBDAWater Quality Analysis1LS¥¥
D001DCCloseout PM
D001DCAEquipment PM1LS¥¥
D001DDService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D001EBldg. 3354 (Purdy Pool)
D001EAOnce Two Days PM
D001EAAEquipment PM183D¥¥
D001EBWeekly PM
D001EBAEquipment PM52W¥¥
D001EBBWater Quality Analysis52W¥¥
D001ECMonthly PM
D001ECAChemicals Replenishment12MO¥¥
D001ECBEquipment PM12MO¥¥
D001ECCWater Quality Analysis12MO¥¥
D001EDQuarterly PM
D001EDAEquipment PM4Q¥¥
D001EEAnnual PM
D001EEAEquipment PM1A¥¥
D001EEBWater Quality Analysis - Once the Fixed Month PM -1LS¥¥
D001EECEquipment PM - Once the Fixed Month PM -1LS¥¥
D001EFService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D001 Total¥
D002Bath Systems, Spec Item 3.2.2 & 3.1
D002ABldg. 1922 (SRF)
D002AASemi-Monthly (Twice a Month) PM
D002AAAEquipment PM with Chemicals Replenishment24TM¥¥
D002ABSemiannual PM
D002ABAEquipment PM2SA¥¥
D002ABBWater Quality Analysis2SA¥¥
D002ACService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D002BBldg. 2043 (SRF)
D002BABi-Monthly (Every Two Month) PM
D002BAAEquipment PM with Chemicals Replenishment6MO¥¥
D002BBSemiannual PM
D002BBAEquipment PM2SA¥¥
D002BBBWater Quality Analysis2SA¥¥
D002BCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D002CBldg. 2067 (SRF)
D002CAMonthly PM
D002CAAEquipment PM with Chemicals Replenishment12MO¥¥
D002CBSemiannual PM
D002CBAEquipment PM2SA¥¥
D002CBBWater Quality Analysis2SA¥¥
D002CCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D002DBldg. 2068 (SRF)
D002DASemi-Monthly (Twice a Month) PM
D002DAAEquipment PM with Chemicals Replenishment24TM¥¥
D002DBSemiannual PM
D002DBAEquipment PM2SA¥¥
D002DBBWater Quality Analysis2SA¥¥
D002DCService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D002EBldg. 2078 (SRF)
D002EAMonthly PM
D002EAAEquipment PM with Chemicals Replenishment12MO¥¥
D002EBSemiannual PM
D002EBAEquipment PM2SA¥¥
D002EBBWater Quality Analysis2SA¥¥
D002ECService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D002 Total¥
D003Fall & Pond Systems, Spec Item 3.2.3 & 3.1
D003ACarney Gate (Main Gate)
D003AAWeekly PM
D003AAAEquipment PM with Chemicals Replenishment52W¥¥
D003ABBi-Monthly (Every Two Month) PM
D003ABAFall & Pond Cleaning6MO¥¥
D003ACQuarterly PM
D003ACAEquipment PM4Q¥¥
D003ADSemi-Annual PM
D003ADAWater Quality Analysis2SA¥¥
D003AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D003 Total¥
D004Fountain Systems, Spec Item 3.2.4 & 3.1
D004ABldg. 4860 and 4861 (Ombudsman Park)
D004AAWeekly PM
D004AAAEquipment PM with Chemicals Replenishment52W¥¥
D004ABQuarterly PM
D004ABAFountain Cleaning4Q¥¥
D004ACSemi-Annual PM
D004ACAEquipment PM2SA¥¥
D004ACBWater Quality Analysis2SA¥¥
D004ADService Orders, Spec Item 3.112MO¥¥
Sub Total¥
D004 Total¥

TOTAL RECURRING LINE ITEMS TOTAL ¥

D =Daily
W =Weekly
MO =Monthly
SA =Semi-Annual
Q =Quarterly
A =Annual
LO =Lot
LS =Lump Sum
TM =Time

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

3rd OP Non-Recurring

SOLICITATION/CONTRACT #
EXHIBIT D - CLIN 9003
Line Item 0004 Non-Recurring - Third Option Period
Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4

ELINs D700 through D70

ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
D700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order.600HR¥¥
D701Material Costs- MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN D 7001LS¥ 8,000,000¥ 8,000,000
D702Fall & Pond OperationStart and/or Stop Fall & Pond circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F.10EA¥¥
D703Fountain OperationStart and/or Stop Fountain circulation pump. The Contractor shall respond within 24 hours after receiving the request for the coordination. The Contractor shall submit a Work Completion report as a part of the Monthly Summary report per Section F.10EA¥¥
D704Perform Cleaning
Work for Fall & PondPerform cleaning work to remove soiled and debris for the Fall and Pond, which include but not limited to: 1) Wall of fall and pond, 2) Signs, 3) Water storage tank, 4) Pump pits and electrodes, 5) Drain ditch, 6) Overflow pipe of pond, 7) Drain pipe of pond, 8) Upper spot lights (Wiped cleaning only, do not hit high pressure water), 9) Beam lights (Wiped cleaning only, do not use high pressure water). The Contractor shall complete cleaning works within 10 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line.6EA¥¥
D705Replace Upper Beam

Lighting Bulb of Light Up for Signs in

Pond for Fall SystemReplace existing beam lightning bulb of light up for signs in pond for fall system with new one. The Contractor shall complete replacement work within seven (7) calendar days after. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.20EA¥¥
D706Replace Foot

Lightning Bulb at Walking Deck for Fall

SystemReplace existing foot lightning bulb at walking deck for fall system with new one. The Contractor shall complete replacement work at job site within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.17EA¥¥
D707Perform Cleaning
Work for FountainPerform cleaning works for the fountain, which include but not limited to: 1) U-ditch, 2) Concrete pit, 3) Strainer of circulation pumps, 4) Drain pipe, 5) Communication pipe, 6) Surfaces of electrodes, 7) Concrete floor around pond utilizing high pressure water, 8) Vacuum equipment, specified area at J-1502000-08, and removal works for debris at hair catcher. The Contractor shall complete cleaning works within seven (7) calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F. Note: Unless otherwise authorized by the KO, the Contractor shall not use any chemicals and detergents. Unless otherwise specified or authorized by the KO, any sludge and debris generated by cleaning works shall not be disposed through sewer/drain line.6EA¥¥
D708Replace Lighting

Bulb of Imitation

Bench for FountainReplace the existing lightning bulb of imitation bench for fountain with new one. The Contractor shall complete replacement work within 30 calendar days after ordered. Submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.6EA¥¥
D709Perform Repainting Work for Swimming PoolPerform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.1500LM¥¥
TOTAL NON-RECURRING PRICE¥

&"Times New Roman,Regular"&UATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

4th OP Recurring

SOLICITATION/CONTRACT #
EXHIBIT E - CLIN 9004
Line Item 0009 Recurring - Fourth Option Period
Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3
ELINs E001 through E004

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

ECNIC, Spec Item 3
PM Program, Spec Item 3.2 & Service Orders, Spec Item 3.1

E001 Swimming Pool Systems, Spec Item 3.2.1& 3.1

E001ABldg. G23 ( Yokosuka Green Beach Pool)
E001AAStart up PM
E001AAAPool Cleaning1LS¥¥
E001AABEquipment PM1LS¥¥
E001ABSeason PM
E001ABADaily PM
E001ABAAEquipment PM120D¥¥
E001ABBWeekly PM
E001ABBAChemicals Replenishment1LO¥¥
E001ABBBEquipment PM17W¥¥
E001ABBCWater Quality Analysis17W¥¥
E001ABCMonthly PM
E001ABCAWater Quality Analysis4MO¥¥
E001ABDFixed Month PM
E001ABDAWater Quality Analysis1LS¥¥
E001ACCloseout PM
E001ACAEquipment PM1LS¥¥
E001ADOff Season PM
E001ADAQuarterly PM (Cleaning)4Q¥¥
E001AEService Orders, Spec Item 3.112MO¥¥
Sub Total¥

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .