Amend_0001 SPEC rev_24Mar.pdf
PDF 8 MB Posted
- Solicitation number
- N4008421B0400
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_0002 SPEC rev_26Mar.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| Schedule of Price-1.xlsx | XLSX spreadsheet | |
| N4008421B0400AA.pdf | ||
| N4008421B0400BB.pdf | ||
| N4008421B0400CC.pdf | ||
| Schedule of Price.xlsx | XLSX spreadsheet | |
| N4008421B0400C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI // FEDCON
SECTION C – 1502000
FACILITY INVESTMENT
1502000 – Facility Investment Spec Item
Title Description
2 Management and Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-1502000-01.
2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function.
2.2.1 Certification, Training, and Licensing
All maintenance and repair shall be performed by personnel trained and certified by the OEM, and by personnel who possess appropriate license or certification.
Personnel performing electrical work or working on electronic equipment shall be trained and certified per NAVFAC MO-200 or work shall be done with the electricians who have license of first grade electrician, "Dai-1-syu Denki Kohjishi", or second grade electrician, "Dai-2-syu Denki Kohjishi", shall perform electrical work.
Personnel maintaining, repairing, inspecting, testing, operating, or rigging WHE shall be qualified per NAVFAC P-307.
Personnel inspecting, certifying, and making recommendations for corrective action for backflow preventers shall be certified per UG-2029-ENV.
All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.
The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.
2.3 Special
Requirements
2.3.1 Workmanship
and Material Standards
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.
Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks.
Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.
ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
ELIN Product Name (120 Characters)
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price IMAP
CAC
A709 Perform Repainting Work for Swimming Pool
Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall provide all material, equipment, management supervision, tools and transportaion required perform and complete Repainting Work for Swimming Pool, which including but not limited to minor assosiated repair and painting/coating primer as ruquired, and top paitning/coating as applicable (e.g. FRP/FRE, epoxy, rethane resin, mild acrylic urethane resin, rubber chip pavement) The Contractor shall performe and complete the Repainting Work in accordance with all approcable requlation, safety quideline, and per section C and J. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.
1500 LM ¥ ¥
TOTAL NON-RECURRING PRICE ¥
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104
ELIN Product Name (120 Characters)
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price IMAP
CAC
B709 Perform Repainting Work for Swimming Pool
Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall provide all material, equipment, management supervision, tools and transportaion required perform and complete Repainting Work for Swimming Pool, which including but not limited to minor assosiated repair and painting/coating primer as ruquired, and top paitning/coating as applicable (e.g. FRP/FRE, epoxy, rethane resin, mild acrylic urethane resin, rubber chip pavement) The Contractor shall performe and complete the Repainting Work in accordance with all approcable requlation, safety quideline, and per section C and J. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.
1500 LM ¥ ¥
ELIN Product Name (120 Characters)
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price IMAP
CAC
C709 Perform Repainting Work for Swimming Pool
Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall provide all material, equipment, management supervision, tools and transportaion required perform and complete Repainting Work for Swimming Pool, which including but not limited to minor assosiated repair and painting/coating primer as ruquired, and top paitning/coating as applicable (e.g. FRP/FRE, epoxy, rethane resin, mild acrylic urethane resin, rubber chip pavement) The Contractor shall performe and complete the Repainting Work in accordance with all approcable requlation, safety quideline, and per section C and J. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.
1500 LM ¥ ¥
ELIN Product Name (120 Characters)
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price IMAP
CAC
D709 Perform Repainting Work for Swimming Pool
Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall provide all material, equipment, management supervision, tools and transportaion required perform and complete Repainting Work for Swimming Pool, which including but not limited to minor assosiated repair and painting/coating primer as ruquired, and top paitning/coating as applicable (e.g. FRP/FRE, epoxy, rethane resin, mild acrylic urethane resin, rubber chip pavement) The Contractor shall performe and complete the Repainting Work in accordance with all approcable requlation, safety quideline, and per section C and J. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.
1500 LM ¥ ¥
ELIN Product Name (120 Characters)
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price IMAP
CAC
E709 Perform Repainting Work for Swimming Pool
Perform Repainting Work for Swimming Pool, which include all pool lane markings, crosses and flip turn markings required to allow for safe swimming pool operations. The Contractor shall provide all material, equipment, management supervision, tools and transportaion required perform and complete Repainting Work for Swimming Pool, which including but not limited to minor assosiated repair and painting/coating primer as ruquired, and top paitning/coating as applicable (e.g. FRP/FRE, epoxy, rethane resin, mild acrylic urethane resin, rubber chip pavement) The Contractor shall performe and complete the Repainting Work in accordance with all approcable requlation, safety quideline, and per section C and J. The Contractor shall complete site works within 90 calendar days after receiving the request. The Contractor shall submit a Work Completion report with photographs as a part of the Monthly Summary report per Section F.
1500 LM ¥ ¥
ATTACHMENT J-1502000-05-03
POOL - DIAGRAMS, PLANS, AND SPECIFICATIONS
Bldg. 3354, 10/12
Bldg. 3354, 11/12
Bldg. 3354, 12/12
- Reference/Pictures: Bldg. 3354, 2nd Floor -
- Reference/Pictures: Bldg. 3354, 2nd Floor - 1/1
ATTACHMENT J-1502000-05-04
POOL - REFERENCES AND TECHNICAL REQUIREMENTS
| 006_C_1502FI_2.3.1 |
| 012_J_07ELINs_A-E709 |
| J_07ELINs_A709_rev23Mar 284 |
| J_07ELINs_B709_rev23Mar 293 |
| J_07ELINs_C709_rev23Mar 302 |
| J_07ELINs_D709_rev23Mar 311 |
| J_07ELINs_E709_rev23Mar 320 |
| 1502_J_05_Pool_03_SitePlans_3354Purdy |
| 1502_J_05_Pool_04_Photo |
File details come from the government source that posted it. Updated .