This is a Schedule of Items for the 2026 Sequoia National Forest Toilet Installation Project, managed by the Sequoia National Forest/Giant Sequoia National Monument across the Western Divide and Hume Lake Ranger Districts.
The project encompasses toilet facility replacements at 16 locations including Fir Campground, Cove Campground, Sandy Cove Day Use Site, Rowell Meadow Wilderness Trailhead, Big Meadows Wilderness Trailhead, Quail Flat, Big Meadows Winter Trailhead, Mill Flat Campground, Green Cabin Flat Campground, Camp 4 Campground, Wishon Campground, Redwood Meadow Campground, Holey Meadow Campground, Lower Peppermint Campground, Quaking Aspen Campground, and Long Meadow Campground. The schedule contains 48 line items organized by location, with pricing structured as lump sum and unit pricing. Work involves three primary categories repeated across locations: pumping and removing existing toilet buildings (various construction types including cinder block, precast concrete, and wood), supplying new precast concrete vault toilet buildings (single, double, or double with chase configurations), and installing the new toilet buildings. Quantities vary by location, ranging from single units to multiple installations. Pricing columns are provided for unit prices and totals, though specific dollar amounts are not populated in this schedule template. All work is designated under the GAOA (Great American Outdoors Act) funding or FDDS (Forest Development and Demonstration Sites) funding mechanisms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pay Item No.
Description Pay Unit Qty Unit Price Total
Pump and Remove existing double vault and toilet building (approx. 115 sq. ft. cinder block construction).
Lump Sum 2
Supply new precast concrete double Vault Toilet Building without chase.
Each 2
3 Install new double Vault Toilet Building. Lump Sum 2
Pump and Remove existing double vault toilet.
Lump Sum 1
Supply new precast concrete double Vault Toilet Building without chase.
Each 1
6 Install new double Vault Toilet Building. Lump Sum 1
Pump and Remove existing Romtec single vault and toilet building.
Lump Sum 1
Supply new precast concrete single Vault Toilet Building without chase.
Each 1
9 Install new single Vault Toilet Building. Lump Sum 1
Pump and Remove existing preccast concrete single vault and toilet building.
Lump Sum 1
Supply new precast concrete double Vault Toilet Building with chase.
Each 1
12 Install new double Vault Toilet Building. Lump Sum 1
Pump and Remove existing cinder block quad vault and toilet building .
Lump Sum 1
Supply new precast concrete double Vault Toilet Building with chase.
Each 2
15 Install new double Vault Toilet Building. Lump Sum 2
SCHEDULE OF ITEMS
2026 Sequoia NF Toilet Installation Project Sequoia National Forest / Giant Sequoia National Monument
Western Divide and Hume Lake Ranger Districts
Fir Campground
(GAOA) Fir CG Sub-total:
Cove Campground
Sandy Cove Day Use Site
(FDDS) Sandy Cove Day Use Site Sub-total:
(GAOA) Cove CG Sub-total:
Rowell Meadow Wilderness Trailhead
(GAOA) Rowell Meadow Wilderness Trailhead Sub-total:
Big Meadows Wilderness Trailhead
(FDDS) Big Meadows Wilderness Trailhead Sub-total:
Pump and Remove existing precast concrete single vault and toilet building .
Lump Sum 1
Supply new precast concrete double Vault Toilet Building with chase.
Each 2
18 Install new double Vault Toilet Building. Lump Sum 2
Pump and Remove existing precast concrete single vault and toilet building .
Lump Sum 1
Supply new precast concrete double Vault Toilet Building with chase.
Each 2
21 Install new double Vault Toilet Building. Lump Sum 2
Pump and Remove existing precast concrete single vault and toilet building.
Lump Sum 2
Supply new precast concrete single Vault Toilet Building without chase.
Each 2
24 Install new double Vault Toilet Building. Lump Sum 2
Pump and Remove existing precast concrete single vault and toilet building.
Lump Sum 1
Supply new precast concrete double Vault Toilet Building with chase.
Each 1
27 Install new double Vault Toilet Building. Lump Sum 1
Pump and Remove existing precast concrete single vault and toilet building.
Lump Sum 1
Supply new precast concrete single Vault Toilet Building without chase.
Each 1
30 Install new single Vault Toilet Building. Lump Sum 1
Pump and Remove existing vault and toilet building (double or quad toilet, wood construction).
Lump Sum 4
Supply new precast concrete double Vault Toilet Building without chase.
Each 2
33 Install new double Vault Toilet Building. Lump Sum 2
(GAOA) Green Cabin Flat Campground Sub-total:
Camp 4 Campground
(GAOA) Camp 4 Campground Sub-total:
Wishon Campground
(GAOA) Wishon CG Sub-Total:
(GAOA) Mill Flat Campground Sub-total:
Green Cabin Flat Campground
Quail Flat
(GAOA) Quail Flat Sub-total:
Big Meadows Winter Trailhead
(GAOA) Big Meadows Winter Trailhead Sub-total:
Mill Flat Campground
Pump and Remove existing vault and toilet building (double or quad toilet, wood construction).
Lump Sum 4
Supply new precast concrete double Vault Toilet Building without chase.
Each 2
36 Install new double Vault Toilet Building. Lump Sum 2
Pump and Remove existing vault and toilet building (single toilet, wood construction).
Lump Sum 1
Supply new precast concrete single Vault Toilet Building without chase.
Each 1
39 Install new single Vault Toilet Building. Lump Sum 1
Pump and Remove existing vault and toilet building (double or quad toilet, wood construction).
Lump Sum 2
Supply new precast concrete double Vault Toilet Building without chase.
Each 2
42 Install new double Vault Toilet Building. Lump Sum 2
Pump and Remove existing vault and toilet building (double toilet, wood construction).
Lump Sum 1
Supply new precast concrete double Vault Toilet Building without chase.
Each 1
45 Install new double Vault Toilet Building. Lump Sum 1
Pump and Remove existing quad vault and toilet building (approx. 155 sq. ft. wood construction).
Lump Sum 2
Supply new precast concrete double Vault Toilet Building without chase.
Each 3
48 Install new double Vault Toilet Building. Lump Sum 3
Total
(GAOA) Redwood Meadow CG Sub-total:
Holey Meadow Campground
(GAOA) Holey Meadow Sub-total:
Lower Peppermint Campground
(GAOA) Lower Peppermint CG Sub-total:
Quaking Aspen Campground
(GAOA) Quaking Aspen CG Sub-total:
Long Meadow Campground
(GAOA) Long Meadow CG Sub-total:
Redwood Meadow Campground