Schedule B.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
WYAO ROCKFALL RISK MITIGATION IDIQ
Solicitation number
140R4020R0001
Issued by

View the file

Other files

File Type Posted
Schedule B Amend 001 - Revised_0001.xlsx XLSX spreadsheet
Questions for Clarification Final Version (1)_0001.pdf PDF
Sol_140R4020R0001_Amd_0001.pdf PDF
Sol_140R4020R0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Vendors:
Instructions:
1. For CLINS 1 - 11 on each Schedule 1 - 5 - Vendors shall enter ONLY the Unit Rate (COLUMN E), and the Total will automatically fill
2. For CLIN 12 on each Schedule 1 - 5 Vendors shall enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) and the Total will automtically fill
3. For CLINS 1 - 11 on Schedule 6 - Vendors shall enter ONLY the Unit Rate (COLUMN E) for the proposed task order, and the Total will automatically fill
4. For CLIN 12 on Schedule 6 - Vendors shall enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) for the proposed task order, and the Total will automatically fill
5. Vendors are reminded that Schedules 1 -5 Shall be reflective of MAXIMUM VALUES that will ever be charged for any task issued during that ordering period
6. Vendors shall indicate below by marking below each state with an X, which states for which they are proposing for award.
Please mark with an X which States you are applying to receive award for:
MontanaWyomingColorado

Schedule 1

Schedule 1 - 2021 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimted QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 1$0.00

Schedule 2

Schedule 2 - 2022 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimted QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 1$0.00

Schedule 3

Schedule 3 - 2023 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimted QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 1$0.00

Schedule 4

Schedule 4 - 2024 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimted QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 1$0.00

Schedule 5

Schedule 5 - 2025 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimted QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 1$0.00

Task Order 1

Schedule 1 - 2021 (Performance Dates Upon Award of Contract)
CLINServices/MaterialsEstimted QuantityUnit of MeasureUnit PriceAmount
1-1Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND)180Crew Hours$0.00
1-2#8 Grade 150 All-Thread Galvanized Bolt600LF$0.00
1-3#11 Grade 150 All-Thread Galvanized Bolt300LF$0.00
1-43mm Mesh1500SF$0.00
1-51/2" Diameter Stainless Steel Cable / Rope200LF$0.00
1-6Anchors190Each$0.00
1-7Rockfall Barrier System1LS$0.00
1-8Wet-Mix Reinforced Shotcrete6000SF/IN$0.00
1-9Steel Fiber Reinforcement6000SF/IN$0.00
1-10Strip-drain (6” wide)200LF$0.00
1-11Drilled PVC Horizontal Drains300LF$0.00
1-12Design of Rockfall MitigationHR$0.00
Total of Schedule 1$0.00
Location of Task Order:
GSA Per Diem Rate Approved for Location:
GSA Lodging Rate Approved or Location:
Number of Days on Site (Include Arrival and Departure Days):
Airfare:1Total$0.00
Rental Car Rate:Total Days$0.00
Per Diem First Day (3/4)1GSA 1st Day Per Diem$0.00
Per Diem Full DayGSA Full Per Diem$0.00
Per Diem Last Day (3/4)1GSA Last Day Per Diem$0.00
Lodging Total (Excludes Taxes):Daily Rate$0.00
Total of Travel Items$0.00
Other Direct Costs As Listed Below
$0.00
$0.00
$0.00
$0.00
$0.00
Total Other Direct Costs$0.00

Grand Total of First Task Order $0.00

File details come from the government source that posted it. Updated .