Schedule B.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- WYAO ROCKFALL RISK MITIGATION IDIQ
- Solicitation number
- 140R4020R0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule B Amend 001 - Revised_0001.xlsx | XLSX spreadsheet | |
| Questions for Clarification Final Version (1)_0001.pdf | ||
| Sol_140R4020R0001_Amd_0001.pdf | ||
| Sol_140R4020R0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Vendors: | |||
| Instructions: | |||
| 1. For CLINS 1 - 11 on each Schedule 1 - 5 - Vendors shall enter ONLY the Unit Rate (COLUMN E), and the Total will automatically fill | |||
| 2. For CLIN 12 on each Schedule 1 - 5 Vendors shall enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) and the Total will automtically fill | |||
| 3. For CLINS 1 - 11 on Schedule 6 - Vendors shall enter ONLY the Unit Rate (COLUMN E) for the proposed task order, and the Total will automatically fill | |||
| 4. For CLIN 12 on Schedule 6 - Vendors shall enter both the number of Hours (COLUMN C) and the Hourly Rate (COLUMN E) for the proposed task order, and the Total will automatically fill | |||
| 5. Vendors are reminded that Schedules 1 -5 Shall be reflective of MAXIMUM VALUES that will ever be charged for any task issued during that ordering period | |||
| 6. Vendors shall indicate below by marking below each state with an X, which states for which they are proposing for award. | |||
| Please mark with an X which States you are applying to receive award for: | |||
| Montana | Wyoming | Colorado |
Schedule 1
| Schedule 1 - 2021 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimted Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 1 | $0.00 |
Schedule 2
| Schedule 2 - 2022 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimted Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 1 | $0.00 |
Schedule 3
| Schedule 3 - 2023 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimted Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 1 | $0.00 |
Schedule 4
| Schedule 4 - 2024 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimted Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 1 | $0.00 |
Schedule 5
| Schedule 5 - 2025 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimted Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 1 | $0.00 |
Task Order 1
| Schedule 1 - 2021 (Performance Dates Upon Award of Contract) | |||||
| CLIN | Services/Materials | Estimted Quantity | Unit of Measure | Unit Price | Amount |
| 1-1 | Provide a crew of three (3) Level I or II certified SPRAT or IRATA rope access technicians, and provide one (1) Level III SPRAT or IRATA rope access supervisor to perform rockfall risk mitigation to perform rockfall risk mitigation (FULLY BURDEND) | 180 | Crew Hours | $0.00 | |
| 1-2 | #8 Grade 150 All-Thread Galvanized Bolt | 600 | LF | $0.00 | |
| 1-3 | #11 Grade 150 All-Thread Galvanized Bolt | 300 | LF | $0.00 | |
| 1-4 | 3mm Mesh | 1500 | SF | $0.00 | |
| 1-5 | 1/2" Diameter Stainless Steel Cable / Rope | 200 | LF | $0.00 | |
| 1-6 | Anchors | 190 | Each | $0.00 | |
| 1-7 | Rockfall Barrier System | 1 | LS | $0.00 | |
| 1-8 | Wet-Mix Reinforced Shotcrete | 6000 | SF/IN | $0.00 | |
| 1-9 | Steel Fiber Reinforcement | 6000 | SF/IN | $0.00 | |
| 1-10 | Strip-drain (6” wide) | 200 | LF | $0.00 | |
| 1-11 | Drilled PVC Horizontal Drains | 300 | LF | $0.00 | |
| 1-12 | Design of Rockfall Mitigation | HR | $0.00 | ||
| Total of Schedule 1 | $0.00 |
| Location of Task Order: |
| GSA Per Diem Rate Approved for Location: |
| GSA Lodging Rate Approved or Location: |
| Number of Days on Site (Include Arrival and Departure Days): |
| Airfare: | 1 | Total | $0.00 | |
| Rental Car Rate: | Total Days | $0.00 | ||
| Per Diem First Day (3/4) | 1 | GSA 1st Day Per Diem | $0.00 | |
| Per Diem Full Day | GSA Full Per Diem | $0.00 | ||
| Per Diem Last Day (3/4) | 1 | GSA Last Day Per Diem | $0.00 | |
| Lodging Total (Excludes Taxes): | Daily Rate | $0.00 | ||
| Total of Travel Items | $0.00 |
| Other Direct Costs As Listed Below | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| $0.00 | |
| Total Other Direct Costs | $0.00 |
Grand Total of First Task Order $0.00