SCHEDULE - 36C24226Q0329.docx
DOCX document 54 KB Posted
- Attached to
- B533--RFQ - Wastewater Lab Analysis / New Jersey Licensed Operator - Lyons Campus Federal contract opportunity
- Solicitation number
- 36C24226Q0329
About this file
This is a Price/Cost Schedule for GSA Schedule Contract 36C24226Q0329 with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 for wastewater treatment services at the Lyons Campus in New Jersey. The contract encompasses a base period of performance from April 1, 2026, through March 31, 2027, with four one-year option periods extending through March 31, 2031.
The schedule itemizes comprehensive wastewater treatment services organized across a base period and four option years, each containing identical line items. Services include full-time on-site wastewater plant operator coverage (S3/C1 licensed operator, 7 hours per day, 35 hours per week, Monday through Friday) billed monthly; monthly sludge sampling with analysis for pH, total solids, and total volatile solids; semi-annual composite sludge analysis with testing per specified NJDEP test codes; influent and effluent monitoring tests including CBOD5 (twice monthly), suspended solids (twice monthly), ammonia nitrogen, E. coli (twice monthly), total phosphorous (four times monthly), zinc and copper (quarterly); chronic toxicity (96-hour LC50) effluent testing semi-annually; semi-annual metals, pesticides, and acids testing; annual B/N, other metals, cyanide, and volatiles testing; completion of NJDEP Surface Water Discharge Monitoring Report forms monthly; fecal coliform testing (twice monthly); dissolved oxygen testing (twice monthly); and oil and grease testing (quarterly). All results require 72-hour turnaround and email reporting. The schedule also includes pricing lines for unscheduled emergency callbacks and expedited sample analysis, with contractors required to provide pricing for these contingent services. The principal NAICS code is 221320 (Sewage Treatment Facilities), and the Product/Service Code is B533 (Special Studies/Analysis - Water Quality).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SCHEDULE rev1.docx | DOCX document | |
| RESPONSE TO QUESTIONS.docx | DOCX document | |
| SOW - 36C24226Q0329 rev1.docx | DOCX document | |
| 36C24226Q0329 0001_1.docx | DOCX document | |
| Service Contract Act WD - 2015-4209.pdf | ||
| Limitations on Subcontracting.pdf | ||
| 36C24226Q0329.docx | DOCX document | |
| SOW - 36C24226Q0329.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
?.## PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wastewater Plant Operator:
Services are to include a S3/C1 full-time operator (LOIC) on site 7 hours per day, 35 hours per week, Monday thru Friday.
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027 PRINCIPAL NAICS CODE: 221320 - Sewage Treatment Facilities PRODUCT/SERVICE CODE: B533 - Special Studies/Analysis - Water Quality
| 12.00 |
| MO |
| __________________ |
| __________________ |
Sludge Sampling:
Analysis of One (1) sludge sample per month (before and after dewatering).
Samples to be of equal volume spaced one month apart. Test for pH, total solids, total volatile solids. Report on the average values complete Residuals Waste Characterization Report.
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 2.00 |
| YR |
| __________________ |
| __________________ |
Composite (5 Samples):
Analysis of one (l) composite (five samples of equal value/volume collected one day apart) sludge for parameters required and completion of Residuals DMR Submittal Form.
Two tests to be conducted on semi-annual basis period of January to June and period of July to December. To be conducted at the same time as the Chronic Toxicity (96) hour LC 50 effluent testing.
NJDEP Test Codes 00500, 00621, 49579, 78472, 82294, 00917, 78465, 78478, 01003, 01148, 46394, 61524, 61527, 78467, 78468, 78469, 78471, 78473.
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Influent and Effluent Monitoring Tests, and completion of Surface Water Discharge Monitoring Report:
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
0004AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, mg/L (80082 K) NJDEP Twice monthly 6 hr. composite
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
0004AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, kg/day (80082 G) NJDEP Twice monthly calculated.
POP End: 03-31-2027
0004AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, percent Test (80082 1) NJDEP removal Twice monthly calculated
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
0004AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids (80082 1) NJDEP mg/L Twice monthly 6 hr. composite
POP End: 03-31-2027
0004AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 1) NJDEP kg/day Twice monthly Calculated
POP End: 03-31-2027
0004AF
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 K) NJDEP percent removal Twice monthly calculated
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Effluent Monitoring Tests, and completion of Surface Water Discharge Monitoring Report:
POP Begin: 04-01-2026 POP End: 03-31-2027
0005AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
Ammonia Nitrogen kg/d (00610 1) NJDEP
POP Begin: 04-01-2026 POP End: 03-31-2027
0005AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
E. coli (51040) NJDEP N per 100 ml terms Twice monthly grab per NJDEP Permit 72-hour turn around – results reported by e-mail
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
0005AC
| 48.00 |
| EA |
| __________________ |
| __________________ |
Total Phosphorous mg/l (00665 1) NJDEP 4 times a month per NJDEP Permit 6 Hour Composite 72-hour turn around – results reported by e-mail
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
0005AD
| 4.00 |
| EA |
| __________________ |
| __________________ |
Zinc, total recoverable (01094 1) NJDEP once per quarter 6 hr. composite
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
0005AE
| 4.00 |
| EA |
| __________________ |
| __________________ |
Copper, total recoverable (01119 1) NJDEP Once per quarter 6 hr. composite 72-hour turnaround-results reported by e-mail
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 2.00 |
| YR |
| __________________ |
| __________________ |
Chronic Toxicity (96) hour LC 50) effluent testing in accordance with NJDEP regulations and NJAC 7:18-6.
5.1 Contractor shall submit a written detailed description of the methodology to be used in conducting the tests, including equipment: retention time of wastewater in the treatment plant collection method of representative effluent sample and name source of test organisms.
5.2 Additionally, a schematic diagram will be provided by the contractor depicting the location where the effluent samples will be collected (the diagram can be hand drawn without regard to scale.)
Test to be performed during the period of:
- February to July
- August to January
(NJDEP CODE TBP3B1)
POP End: 03-31-2027
| 2.00 |
| YR |
| __________________ |
| __________________ |
Semiannual Metals, Pesticides and Acids to be performed at time of item 5 above Arsenic, Nickel, Silver, Cadmium, Lead, Chromium, Antimony.
NJDEP Test Codes:
00978, 01118, 01268,34205,34220,34220,34230,34230,34242,34247,34230,34242,34247, 34273,34278,34283,34292,34320,34336,34341,34346,34376,34381,34386,34396,34403, 34408,34428,34433,34438,34447,34461,34469,34521,34526,34536,34551,34556,34566, 34571,34581,34596,34611,34626,34631,34636,34696,39100,39110,39120,39530,39560, 39700,39702,39755,77163,77734,78200,78206,32102,32103,32104,32106,34010,34030, 34210,34215,34301,34306,34371,34413,34418,34423,34475,34488,34496,34501,34506, 34511,34516,34541,34546,34576,38693,39175,39180,39480,73609,85811,34452,39540, 77687,34259,34351,34356,34361,34366,34671,34675,39300,39310,39320,39330,39336, 39338,39340,39350,39380,39388,39390,39400,39410,39420,39488,39492,39496,39500, 39504,39508,39516,77969,34586,34591,34601,34606,34616,34621,34641,34646,34694, 39032,39580.
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual B/N, other metals, cyanide, and volatiles to be performed at a time of 5 above.
NJDEP Test Codes:
00720,00981, 00982, 00998, 71901,46000, 00948, POP End: 03-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Completion of NJDEP Surface Water Discharge Monitoring Report Submittal Forms for all of the above.
Total (N) 72 –hour turn around – results reported by e-mail.
POP End: 03-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Fecal coliform, (74005 1) NJDEP N per 100 ml in terms of geometric mean Twice monthly Grab 72 - hour turn around – results reported by e-mail
POP End: 03-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Dissolved oxygen mg/L (00300 1) NJDEP Twice monthly Grab 72 - hour turn around – results reported by e-mail
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Oil and Grease mg/L (00556 1) NJDEP Quarterly Grab 72 - hour turn around – results reported by e-mai
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 1.00 |
| EA |
| __________________ |
| __________________ |
UNSCHEDULED SERVICE:
If a callback is required for emergencies or other plant related matters
PROVIDE PRICING
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 1.00 |
| JB |
| __________________ |
| __________________ |
EXPEDITED SAMPLES - AS NEEDED
PROVIDE PRICING
Contract Period: Base POP Begin: 04-01-2026 POP End: 03-31-2027
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wastewater Plant Operator:
Services are to include a S3/C1 full-time operator (LOIC) on site 7 hours per day, 35 hours per week, Monday thru Friday.
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Sludge Sampling:
Samples to be of equal volume spaced one month apart. Test for pH, total solids, total volatile solids. Report on the average values complete Residuals Waste Characterization Report.
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 2.00 |
| YR |
| __________________ |
| __________________ |
Composite (5 Samples):
Analysis of one (l) composite (five samples of equal value/volume collected one day apart) sludge for parameters required and completion of Residuals DMR Submittal Form.
Two tests to be conducted on semi-annual basis period of January to June and period of July to December. To be conducted at the same time as the Chronic Toxicity (96) hour LC 50 effluent testing.
NJDEP Test Codes 00500, 00621, 49579, 78472, 82294, 00917, 78465, 78478, 01003, 01148, 46394, 61524, 61527, 78467, 78468, 78469, 78471, 78473.
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Influent and Effluent Monitoring Tests, and completion of Surface Water Discharge
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1004AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, mg/L (80082 K) NJDEP
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1004AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, kg/day (80082 G) NJDEP
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1004AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, percent Test (80082 1) NJDEP
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1004AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids (80082 1) NJDEP
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1004AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 1) NJDEP
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1004AF
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 K) NJDEP
Twice monthly calculated
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Effluent Monitoring Tests, and completion of Surface Water Discharge Monitoring Report:
POP Begin: 04-01-2027 POP End: 03-31-2028
1005AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
Ammonia Nitrogen kg/d (00610 1) NJDEP
POP Begin: 04-01-2027 POP End: 03-31-2028
1005AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
E. coli (51040) NJDEP
Twice monthly grab per NJDEP Permit 72-hour turn around – results reported by e-mail
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1005AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
Total Phosphorous mg/l (00665 1) NJDEP
6 Hour Composite 72-hour turn around – results reported by e-mail
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1005AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Zinc, total recoverable (01094 1) NJDEP
6 hr. composite Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
1005AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Copper, total recoverable (01119 1) NJDEP
6 hr. composite 72-hour turnaround-results reported by e-mail
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 2.00 |
| YR |
| __________________ |
| __________________ |
Chronic Toxicity (96) hour LC 50) effluent testing in accordance with NJDEP regulations and NJAC 7:18-6.
5.1 Contractor shall submit a written detailed description of the methodology to be used in conducting the tests, including equipment: retention time of wastewater in the treatment plant collection method of representative effluent sample and name source of test organisms.
5.2 Additionally, a schematic diagram will be provided by the contractor depicting the location where the effluent samples will be collected (the diagram can be hand drawn without regard to scale.)
Test to be performed during the period of:
- February to July
POP End: 03-31-2028
| 2.00 |
| YR |
| __________________ |
| __________________ |
Semiannual Metals, Pesticides and Acids to be performed at time of item 5 above
NJDEP Test Codes:
00978, 01118, 01268,34205,34220,34220,34230,34230,34242,34247,34230,34242,34247, 34273,34278,34283,34292,34320,34336,34341,34346,34376,34381,34386,34396,34403, 34408,34428,34433,34438,34447,34461,34469,34521,34526,34536,34551,34556,34566, 34571,34581,34596,34611,34626,34631,34636,34696,39100,39110,39120,39530,39560, 39700,39702,39755,77163,77734,78200,78206,32102,32103,32104,32106,34010,34030, 34210,34215,34301,34306,34371,34413,34418,34423,34475,34488,34496,34501,34506, 34511,34516,34541,34546,34576,38693,39175,39180,39480,73609,85811,34452,39540, 77687,34259,34351,34356,34361,34366,34671,34675,39300,39310,39320,39330,39336, 39338,39340,39350,39380,39388,39390,39400,39410,39420,39488,39492,39496,39500, 39504,39508,39516,77969,34586,34591,34601,34606,34616,34621,34641,34646,34694, 39032,39580.
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual B/N, other metals, cyanide, and volatiles to be performed at a time of 5 above.
POP End: 03-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Completion of NJDEP Surface Water Discharge Monitoring Report Submittal Forms for all of the above.
POP End: 03-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Fecal coliform, (74005 1) NJDEP
Twice monthly
POP End: 03-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Dissolved oxygen mg/L (00300 1) NJDEP
Grab 72 - hour turn around – results reported by e-mail
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Oil and Grease mg/L (00556 1) NJDEP
Grab 72 - hour turn around – results reported by e-mai
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 1.00 |
| EA |
| __________________ |
| __________________ |
UNSCHEDULED SERVICE:
PROVIDE PRICING
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 1.00 |
| JB |
| __________________ |
| __________________ |
EXPEDITED SAMPLES - AS NEEDED
Contract Period: Option 1 POP Begin: 04-01-2027 POP End: 03-31-2028
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wastewater Plant Operator:
Services are to include a S3/C1 full-time operator (LOIC) on site 7 hours per day, 35 hours per week, Monday thru Friday.
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Sludge Sampling:
Samples to be of equal volume spaced one month apart. Test for pH, total solids, total volatile solids. Report on the average values complete Residuals Waste Characterization Report.
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 2.00 |
| YR |
| __________________ |
| __________________ |
Composite (5 Samples):
Analysis of one (l) composite (five samples of equal value/volume collected one day apart) sludge for parameters required and completion of Residuals DMR Submittal Form.
Two tests to be conducted on semi-annual basis period of January to June and period of July to December. To be conducted at the same time as the Chronic Toxicity (96) hour LC 50 effluent testing.
NJDEP Test Codes 00500, 00621, 49579, 78472, 82294, 00917, 78465, 78478, 01003, 01148, 46394, 61524, 61527, 78467, 78468, 78469, 78471, 78473.
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Influent and Effluent Monitoring Tests, and completion of Surface Water Discharge
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
2004AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, mg/L (80082 K) NJDEP
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
2004AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, kg/day (80082 G) NJDEP
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
2004AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, percent Test (80082 1) NJDEP
POP End: 03-31-2029
2004AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids (80082 1) NJDEP
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
2004AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 1) NJDEP
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
2004AF
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 K) NJDEP
Twice monthly calculated
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Effluent Monitoring Tests, and completion of Surface Water Discharge Monitoring Report:
POP Begin: 04-01-2028 POP End: 03-31-2029
2005AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
Ammonia Nitrogen kg/d (00610 1) NJDEP
POP Begin: 04-01-2028 POP End: 03-31-2029
2005AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
E. coli (51040) NJDEP
Twice monthly grab per NJDEP Permit 72-hour turn around – results reported by e-mail
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
2005AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
Total Phosphorous mg/l (00665 1) NJDEP
6 Hour Composite 72-hour turn around – results reported by e-mail
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
2005AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Zinc, total recoverable (01094 1) NJDEP
6 hr. composite Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
2005AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Copper, total recoverable (01119 1) NJDEP
6 hr. composite 72-hour turnaround-results reported by e-mail
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 2.00 |
| YR |
| __________________ |
| __________________ |
Chronic Toxicity (96) hour LC 50) effluent testing in accordance with NJDEP regulations and NJAC 7:18-6.
5.1 Contractor shall submit a written detailed description of the methodology to be used in conducting the tests, including equipment: retention time of wastewater in the treatment plant collection method of representative effluent sample and name source of test organisms.
5.2 Additionally, a schematic diagram will be provided by the contractor depicting the location where the effluent samples will be collected (the diagram can be hand drawn without regard to scale.)
Test to be performed during the period of:
- February to July
POP End: 03-31-2029
| 2.00 |
| YR |
| __________________ |
| __________________ |
Semiannual Metals, Pesticides and Acids to be performed at time of item 5 above
NJDEP Test Codes:
00978, 01118, 01268,34205,34220,34220,34230,34230,34242,34247,34230,34242,34247, 34273,34278,34283,34292,34320,34336,34341,34346,34376,34381,34386,34396,34403, 34408,34428,34433,34438,34447,34461,34469,34521,34526,34536,34551,34556,34566, 34571,34581,34596,34611,34626,34631,34636,34696,39100,39110,39120,39530,39560, 39700,39702,39755,77163,77734,78200,78206,32102,32103,32104,32106,34010,34030, 34210,34215,34301,34306,34371,34413,34418,34423,34475,34488,34496,34501,34506, 34511,34516,34541,34546,34576,38693,39175,39180,39480,73609,85811,34452,39540, 77687,34259,34351,34356,34361,34366,34671,34675,39300,39310,39320,39330,39336, 39338,39340,39350,39380,39388,39390,39400,39410,39420,39488,39492,39496,39500, 39504,39508,39516,77969,34586,34591,34601,34606,34616,34621,34641,34646,34694, 39032,39580.
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual B/N, other metals, cyanide, and volatiles to be performed at a time of 5 above.
POP End: 03-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Completion of NJDEP Surface Water Discharge Monitoring Report Submittal Forms for all of the above.
POP End: 03-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Fecal coliform, (74005 1) NJDEP
Twice monthly
POP End: 03-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Dissolved oxygen mg/L (00300 1) NJDEP
Grab 72 - hour turn around – results reported by e-mail
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Oil and Grease mg/L (00556 1) NJDEP
Grab 72 - hour turn around – results reported by e-mai
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 1.00 |
| EA |
| __________________ |
| __________________ |
UNSCHEDULED SERVICE:
PROVIDE PRICING
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 1.00 |
| JB |
| __________________ |
| __________________ |
EXPEDITED SAMPLES - AS NEEDED
Contract Period: Option 2 POP Begin: 04-01-2028 POP End: 03-31-2029
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wastewater Plant Operator:
Services are to include a S3/C1 full-time operator (LOIC) on site 7 hours per day, 35 hours per week, Monday thru Friday.
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Sludge Sampling:
Samples to be of equal volume spaced one month apart. Test for pH, total solids, total volatile solids. Report on the average values complete Residuals Waste Characterization Report.
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 2.00 |
| YR |
| __________________ |
| __________________ |
Composite (5 Samples):
Analysis of one (l) composite (five samples of equal value/volume collected one day apart) sludge for parameters required and completion of Residuals DMR Submittal Form.
Two tests to be conducted on semi-annual basis period of January to June and period of July to December. To be conducted at the same time as the Chronic Toxicity (96) hour LC 50 effluent testing.
NJDEP Test Codes 00500, 00621, 49579, 78472, 82294, 00917, 78465, 78478, 01003, 01148, 46394, 61524, 61527, 78467, 78468, 78469, 78471, 78473.
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Influent and Effluent Monitoring Tests, and completion of Surface Water Discharge
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
3004AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, mg/L (80082 K) NJDEP
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
3004AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, kg/day (80082 G) NJDEP
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
3004AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, percent Test (80082 1) NJDEP
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
3004AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids (80082 1) NJDEP
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
3004AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 1) NJDEP
POP End: 03-31-2030
3004AF
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 K) NJDEP
Twice monthly calculated Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Effluent Monitoring Tests, and completion of Surface Water Discharge Monitoring Report:
POP Begin: 04-01-2029 POP End: 03-31-2030
3005AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
Ammonia Nitrogen kg/d (00610 1) NJDEP
POP Begin: 04-01-2029 POP End: 03-31-2030
3005AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
E. coli (51040) NJDEP
Twice monthly grab per NJDEP Permit 72-hour turn around – results reported by e-mail Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
3005AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
Total Phosphorous mg/l (00665 1) NJDEP
6 Hour Composite 72-hour turn around – results reported by e-mail
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
3005AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Zinc, total recoverable (01094 1) NJDEP
6 hr. composite Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
3005AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Copper, total recoverable (01119 1) NJDEP
6 hr. composite 72-hour turnaround-results reported by e-mail
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 2.00 |
| YR |
| __________________ |
| __________________ |
Chronic Toxicity (96) hour LC 50) effluent testing in accordance with NJDEP regulations and NJAC 7:18-6.
5.1 Contractor shall submit a written detailed description of the methodology to be used in conducting the tests, including equipment: retention time of wastewater in the treatment plant collection method of representative effluent sample and name source of test organisms.
5.2 Additionally, a schematic diagram will be provided by the contractor depicting the location where the effluent samples will be collected (the diagram can be hand drawn without regard to scale.)
Test to be performed during the period of:
- February to July
POP End: 03-31-2030
| 2.00 |
| YR |
| __________________ |
| __________________ |
Semiannual Metals, Pesticides and Acids to be performed at time of item 5 above
NJDEP Test Codes:
00978, 01118, 01268,34205,34220,34220,34230,34230,34242,34247,34230,34242,34247, 34273,34278,34283,34292,34320,34336,34341,34346,34376,34381,34386,34396,34403, 34408,34428,34433,34438,34447,34461,34469,34521,34526,34536,34551,34556,34566, 34571,34581,34596,34611,34626,34631,34636,34696,39100,39110,39120,39530,39560, 39700,39702,39755,77163,77734,78200,78206,32102,32103,32104,32106,34010,34030, 34210,34215,34301,34306,34371,34413,34418,34423,34475,34488,34496,34501,34506, 34511,34516,34541,34546,34576,38693,39175,39180,39480,73609,85811,34452,39540, 77687,34259,34351,34356,34361,34366,34671,34675,39300,39310,39320,39330,39336, 39338,39340,39350,39380,39388,39390,39400,39410,39420,39488,39492,39496,39500, 39504,39508,39516,77969,34586,34591,34601,34606,34616,34621,34641,34646,34694, 39032,39580.
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual B/N, other metals, cyanide, and volatiles to be performed at a time of 5 above.
POP End: 03-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Completion of NJDEP Surface Water Discharge Monitoring Report Submittal Forms for all of the above.
POP End: 03-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Fecal coliform, (74005 1) NJDEP
Twice monthly
POP End: 03-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Dissolved oxygen mg/L (00300 1) NJDEP
Grab 72 - hour turn around – results reported by e-mail
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Oil and Grease mg/L (00556 1) NJDEP
Grab 72 - hour turn around – results reported by e-mai
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 1.00 |
| EA |
| __________________ |
| __________________ |
UNSCHEDULED SERVICE:
PROVIDE PRICING
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 1.00 |
| JB |
| __________________ |
| __________________ |
EXPEDITED SAMPLES - AS NEEDED
Contract Period: Option 3 POP Begin: 04-01-2029 POP End: 03-31-2030
| 12.00 |
| MO |
| __________________ |
| __________________ |
Wastewater Plant Operator:
Services are to include a S3/C1 full-time operator (LOIC) on site 7 hours per day, 35 hours per week, Monday thru Friday.
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Sludge Sampling:
Samples to be of equal volume spaced one month apart. Test for pH, total solids, total volatile solids. Report on the average values complete Residuals Waste Characterization Report.
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 2.00 |
| YR |
| __________________ |
| __________________ |
Composite (5 Samples):
Analysis of one (l) composite (five samples of equal value/volume collected one day apart) sludge for parameters required and completion of Residuals DMR Submittal Form.
Two tests to be conducted on semi-annual basis period of January to June and period of July to December. To be conducted at the same time as the Chronic Toxicity (96) hour LC 50 effluent testing.
NJDEP Test Codes 00500, 00621, 49579, 78472, 82294, 00917, 78465, 78478, 01003, 01148, 46394, 61524, 61527, 78467, 78468, 78469, 78471, 78473.
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Influent and Effluent Monitoring Tests, and completion of Surface Water Discharge
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
4004AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, mg/L (80082 K) NJDEP
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
4004AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, kg/day (80082 G) NJDEP
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
4004AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
CBOD5, percent Test (80082 1) NJDEP
POP End: 03-31-2031
4004AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids (80082 1) NJDEP
POP End: 03-31-2031
4004AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 1) NJDEP
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
4004AF
| 24.00 |
| EA |
| __________________ |
| __________________ |
Suspended solids Test (00530 K) NJDEP
Twice monthly calculated
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Effluent Monitoring Tests, and completion of Surface Water Discharge Monitoring Report:
POP Begin: 04-01-2030 POP End: 03-31-2031
4005AA
| 24.00 |
| EA |
| __________________ |
| __________________ |
Ammonia Nitrogen kg/d (00610 1) NJDEP
POP Begin: 04-01-2030 POP End: 03-31-2031
4005AB
| 24.00 |
| EA |
| __________________ |
| __________________ |
E. coli (51040) NJDEP
Twice monthly grab per NJDEP Permit 72-hour turn around – results reported by e-mail
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
4005AC
| 24.00 |
| EA |
| __________________ |
| __________________ |
Total Phosphorous mg/l (00665 1) NJDEP
6 Hour Composite 72-hour turn around – results reported by e-mail
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
4005AD
| 24.00 |
| EA |
| __________________ |
| __________________ |
Zinc, total recoverable (01094 1) NJDEP
6 hr. composite
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
4005AE
| 24.00 |
| EA |
| __________________ |
| __________________ |
Copper, total recoverable (01119 1) NJDEP
6 hr. composite 72-hour turnaround-results reported by e-mail
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 2.00 |
| YR |
| __________________ |
| __________________ |
Chronic Toxicity (96) hour LC 50) effluent testing in accordance with NJDEP regulations and NJAC 7:18-6.
5.1 Contractor shall submit a written detailed description of the methodology to be used in conducting the tests, including equipment: retention time of wastewater in the treatment plant collection method of representative effluent sample and name source of test organisms.
5.2 Additionally, a schematic diagram will be provided by the contractor depicting the location where the effluent samples will be collected (the diagram can be hand drawn without regard to scale.)
Test to be performed during the period of:
- February to July
POP End: 03-31-2031
| 2.00 |
| YR |
| __________________ |
| __________________ |
Semiannual Metals, Pesticides and Acids to be performed at time of item 5 above
NJDEP Test Codes:
00978, 01118, 01268,34205,34220,34220,34230,34230,34242,34247,34230,34242,34247, 34273,34278,34283,34292,34320,34336,34341,34346,34376,34381,34386,34396,34403, 34408,34428,34433,34438,34447,34461,34469,34521,34526,34536,34551,34556,34566, 34571,34581,34596,34611,34626,34631,34636,34696,39100,39110,39120,39530,39560, 39700,39702,39755,77163,77734,78200,78206,32102,32103,32104,32106,34010,34030, 34210,34215,34301,34306,34371,34413,34418,34423,34475,34488,34496,34501,34506, 34511,34516,34541,34546,34576,38693,39175,39180,39480,73609,85811,34452,39540, 77687,34259,34351,34356,34361,34366,34671,34675,39300,39310,39320,39330,39336, 39338,39340,39350,39380,39388,39390,39400,39410,39420,39488,39492,39496,39500, 39504,39508,39516,77969,34586,34591,34601,34606,34616,34621,34641,34646,34694, 39032,39580.
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 1.00 |
| YR |
| __________________ |
| __________________ |
Annual B/N, other metals, cyanide, and volatiles to be performed at a time of 5 above.
POP End: 03-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Completion of NJDEP Surface Water Discharge Monitoring Report Submittal Forms for all of the above.
POP End: 03-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Fecal coliform, (74005 1) NJDEP
Twice monthly
POP End: 03-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Dissolved oxygen mg/L (00300 1) NJDEP
Grab 72 - hour turn around – results reported by e-mail
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 12.00 |
| MO |
| __________________ |
| __________________ |
Oil and Grease mg/L (00556 1) NJDEP
Grab 72 - hour turn around – results reported by e-mai
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 1.00 |
| EA |
| __________________ |
| __________________ |
UNSCHEDULED SERVICE:
PROVIDE PRICING
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| 1.00 |
| JB |
| __________________ |
| __________________ |
EXPEDITED SAMPLES - AS NEEDED
Contract Period: Option 4 POP Begin: 04-01-2030 POP End: 03-31-2031
| GRAND TOTAL |
| __________________ |
File details come from the government source that posted it. Updated .