Schaumburg_Small_Diameter_ACP_Sewer_Rehabilitation_Project_Specifications.pdf
PDF 3 MB Posted
- Solicitation number
- 2025-IFB-051
- Issued by
- Cook County, Illinois
About this file
These specifications detail the Village of Schaumburg's Small Diameter Asbestos Cement Pipe (ACP) Sewer Rehabilitation Project, prepared by RJN Group, Inc. in May 2025. The project involves approximately 1,160 linear feet of sewer rehabilitation, including sewer cleaning, televising, one point repair, cutting two protruding taps using a Schwalm robot, reinstatement of fourteen lateral connections, and grouting of fourteen lateral connections. The project is scheduled for substantial completion within 60 calendar days, with final completion including landscaping restoration to be completed within 90 calendar days.
The contract is a unit price contract with a contingent cash allowance of $7,500 for unforeseen additional work. The project will utilize cured-in-place pipe (CIPP) lining technology, involving approximately 870 linear feet of 8" diameter sewer lining and 290 linear feet of 12" diameter sewer lining. The specifications include detailed requirements for materials, installation methods, testing, and quality control, with emphasis on maintaining sewer flow, protecting existing infrastructure, and minimizing disruption to residents. The contractor will be responsible for public notification, traffic control, restoration of surfaces, and providing comprehensive documentation including pre- and post-construction television inspections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
VILLAGE OF SCHAUMBURG
SMALL DIAMETER ASBESTOS CEMENT PIPE
SEWER REHABILITATION PROJECT
Prepared By:
RJN Group, Inc.
2655 Warrenville Rd Suite 225 Downers Grove, IL 60515
MAY 2025
This page intentionally left blank.
SMALL DIAMETER ASBESTOS CEMENT PIPE SEWER REHABILITATION
PROJECT
ILLINOIS
MAY 2025
I hereby state that these Contract Documents were prepared under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Illinois.
(Expiration Date: November 30th, 2025)
Professional Design Firm Registration 184.000813-0002 (Expiration Date: April 30th, 2027)
This page intentionally left blank.
SMALL DIAMETER ASBESTOS CEMENT PIPE SEWER
REHABILITATION PROJECT
INDEX OF SPECIAL PROVISIONS
TITLE PAGE NO.
STANDARDS
DEFINITIONS
LOCATION OF PROJECT
DESCRIPTION OF PROJECT
PROJECT TIMING
CCTV VIDEOS
CONSTRUCTION SCHEDULE
LIQUIDATED DAMAGES
UTILITY LOCATION
CONSTRUCTION OPERATIONS
EASEMENT AND ACCESS AGREEMENTS
MOBILIZATION
INSPECTION
PERMITS
HOLIDAYS
PUBLIC SAFETY AND CONVENIENCE
MAINTENANCE GUARANTEE
CONSTRUCTION SAFETY AND HEALTH STANDARDS
RESPONSIBILITY FOR VANDALISM
QUANTITIES & PAYMENTS
SHOP DRAWINGS AND SUBMITTALS
SUBSTITUTE OR “OR EQUAL” ITEMS
DATE OF MANUFACTURE
CLEAN UP
CONSTRUCTION DEBRIS
WATER USAGE
SEWER FLOW CONTROL
PROTECTION OF EXISTING DRAINAGE FACILITIES DURING CONSTRUCTION
TRENCH BACKFILL
PIPE BEDDING
RESTORATION - GENERAL
ROAD SIGN REMOVAL AND REPLACEMENT
TOPSOIL FURNISH AND PLACE, 4"
SEEDING
PRE-CONSTRUCTION MEETING
POST-CONSTRUCTION TELEVISION INSPECTION
ITEM #1: PRE-CONSTRUCTION SURFACE TELEVISING
ITEM #2: PRE-CONSTRUCTION CLEANING AND TELEVISING
ITEMS #3 TO 4: POINT REPAIRS
ITEM #5: FENCE REMOVAL AND REPLACEMENT
ITEMS #6 AND #7: TREE REMOVAL (OF UNIT DIAMETER SPECIFIED)
ITEM #8: CUT PROTRUDING TAPS USING SCHWALM ROBOT
ITEMS #9 TO #11: CURED-IN-PLACE SEWER LINER AND INTERNAL SERVICE
LATERAL REINSTATEMENT
ITEM #12: GROUT AND AIR TEST SERVICE CONNECTIONS, 5-FOOT
ITEM #13: TRAFFIC CONTROL AND PROTECTION
ITEM #14: PROJECT MANAGEMENT
ITEM #15: CONTINGENT CASH ALLOWANCE
APPENDIX A: CONSTRUCTABILITY REVIEW PHOTO REPORT
PROJECT SPECIAL PROVISIONS
FOR
SMALL DIAMETER ASBESTOS CEMENT PIPE (ACP)
SEWER REHABILITATION PROJECT
STANDARDS
Construction provisions shall follow the “Standard Specifications for Road and Bridge Construction”, adopted January 1, 2022 (referred to hereinafter as the Standard Specifications); the “Supplemental Specifications and Recurring Special Provisions”, adopted January 1, 2025; the latest edition of the “Manual on Uniform Traffic Control Devices For Streets and Highways” (MUTCD); the Illinois Supplemental to MUTCD, adopted November 2021; the “Standard Specifications for Water and Sewer Construction in Illinois”, 8th Edition, 2020 (referred to hereinafter as the Water and Sewer Specifications), except as modified herein; and the Village of Schaumburg Village Code, Chapter 151: Subdivision Control, and addenda thereto. Where a contradiction occurs with any part or parts of the specifications, the most stringent requirement shall take precedence, as determined by the Engineer. In case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern.
Where no conflict exists, the said Specifications shall apply to this Contract as if repeated in their entirety herein.
DEFINITIONS
Contractor. The individual, firm, partnership, joint venture, or corporation contracting with the Village of Schaumburg for performance of the prescribed work.
Department, Owner or Village. The Village of Schaumburg, Cook County, Illinois.
Engineer. The authorized representative of the Village of Schaumburg in immediate charge of the engineering details of a construction project.
LOCATION OF PROJECT
The proposed work is officially known as “SMALL DIAMETER ACP SEWER REHABILITATION PROJECT”, located throughout the Village of Schaumburg, County of Cook, State of Illinois, as shown on the Plans.
DESCRIPTION OF PROJECT
The work will consist of approximately 1,160 LF of sewer cleaning, televising, and lining (8” - 12” diameter), one (1) point repair, cutting two (2) protruding taps using Schwalm robot, reinstatement of fourteen (14) laterals, grouting of fourteen (14) laterals, traffic control and protection, restoration and other related and incidental work.
GENERAL SPECIAL PROVISIONS
PROJECT TIMING
Construction is scheduled to begin upon the proper execution of the contract documents, which includes the submission of insurance and bonds. The substantial completion for the project shall be on or before 60 calendar days. The final completion for all other ancillary work, including landscaping restoration or plantings, not including, any additional work, shall be completed and ready for final acceptance and payment on or before 90 calendar days.
CCTV VIDEOS
The CCTV videos used during the design process are available for use at the following OneDrive link: 2025 Schaumburg Small Diameter ACP Rehab Project CCTV.
CONSTRUCTION SCHEDULE
At the project pre-construction meeting, the Contractor shall submit for review and approval by the Engineer a detailed construction schedule that shall clearly indicate the sequential procedure of work proposed to be followed to complete the work as required by the contract documents. In preparing the construction schedule, the Contractor shall follow the required completion date, calendar days, or additional Special Provisions as specified relating to the construction schedule.
The construction schedule shall depict all work components and essential activities, the time required for the completion of each of the activities, and the sequence and interdependence of each of the activities in a project timetable which will translate each project day into an ordinary calendar day. The Contractor shall maintain the construction schedule and shall submit an updated schedule to the Engineer on a weekly, biweekly, or monthly basis as determined by the Engineer. No separate payment will be made to the Contractor for the creation and maintenance of the construction schedule.
The Village provides the public with construction schedule and project status through the Village's web page. The Contractor shall provide construction-related information in a format consisting of an E-mail, letter, or fax acceptable to the Engineer. The Contractor shall assume that this information shall be provided on a weekly basis during construction and may change to a shorter time frame based on construction activity changes or a longer time frame based on construction inactivity. The Engineer shall determine the time frame and format to be provided by the Contractor.
https://rjnmail-my.sharepoint.com/:f:/p/kiran_lantrip/Eqbfdfuus_tDgEGfwL_VVkEBEvzzZUPXuQJX_7tg3Avczw?e=ZCgoVj
LIQUIDATED DAMAGES
Should the Contractor fail to complete the work, including cleaning up, to the point of final acceptance of the work by the Engineer within the time specified in the Contract Documents for the Date of Completion and/or Date(s) of Substantial Completion, and agreed upon by the Contractor by accepting the Contract, or within such extra time as may be allowed in accordance with the Contract Documents, there shall be deducted from any monies due the Contractor, or that may become due the Contractor, the sum(s) of $750 per day for each and every calendar day, including Sundays and holidays, that the work remains uncompleted.
This sum shall be considered and treated not as a penalty but as fixed, agreed, and liquidated damages due the Village from the Contractor by reason of inconvenience to the public, added cost of supervision, and other items which may have caused an expenditure of funds resulting from their failure to complete the work within the time specified.
The Village shall charge the Contractor and may deduct from partial and final payments for the project, for all Engineering and Inspection expenses incurred by the Village in connection with any work accomplished after the Date of Completion specified in the Contract Documents.
Permitting the Contractor to continue and finish the work, or any part of it after the time fixed for its completion, or after the date to which the time of completion may have been extended, shall in no way operate as a waiver on the part of the Village of any of its rights under the Contract.
UTILITY LOCATION
The Contractor must exercise extreme caution while working around existing utilities. The Contractor shall notify JULIE (1-800-892-0123), a minimum of 48 hours before commencing construction for utility locations within the scope of the project. It is recommended that the Contractor conduct a joint utility meet. It is the responsibility of the Contractor to contact all agencies who may or may not be part of the JULIE system to verify the location of their facilities.
The Village does not guarantee the accuracy or completeness of this existing utility information. The Contractor shall make their own investigation to determine the existence, nature, and location of all utility lines and appurtenances within the limits of the improvement. The Contractor shall locate all utilities far enough in advance to avoid all conflicts in grade separation between existing utilities and the proposed improvements. If the Contractor encounters a conflict between the proposed improvements and existing utility that was not located in advance by the Contractor, then the Contractor shall, at no cost to the Village, relocate the proposed improvements and/or the utility to avoid the conflict.
The Contractor will be required to cooperate with all utility companies involved in connection with the removal, temporary relocation, reconstruction, or abandonment by these companies of any and all services or facilities owned or operated by them within the limits of this improvement.
Before doing any work, which will damage, disturb, or leave unsupported or unprotected utility lines, the Contractor shall notify the respective Owner. The Owner will make all arrangements for relocating, adjusting, or otherwise maintaining or abandoning service on lines that fall within the limits of the proposed construction without cost to the Contractor. This includes the removal of all cables, manhole covers, and other appurtenances which the Owner desires to salvage. After such arrangements have been made, the Contractor will proceed with the work as directed by the Engineer. All utility lines and appurtenances which are abandoned by the Owner shall be removed and disposed of by the Contractor.
No extra compensation will be allowed to the Contractor for any expense incurred by complying with these requirements or because of delays, inconvenience, or interruptions in their work resulting from the failure of any utility company to remove, relocate, reconstruct, or abandon their services. The Contractor shall be responsible for prompt and timely removal, relocation, reconstruction, or abandonment of their facilities by all utility companies involved, and the coordination of their own work with that of these companies to end that work on this improvement is not delayed because of necessary changes in the existing utilities, public or private.
CONSTRUCTION OPERATIONS
In order to minimize the effect of construction noise on the area surrounding the improvement, the Contractor and their subcontractors shall comply with the following requirements. Any changes to this schedule will not be accepted unless approved by the Engineer.
• All engines and engine driven equipment used for hauling or construction shall be equipped with an adequate muffler in constant operation and properly maintained to prevent excessive or unusual noises. Any machine or device or part there of which is regulated by or becomes regulated by Federal or State of Illinois noise standard shall conform to those standards.
• Construction operations shall be confined to the daylight hours between 7:00 AM and 5:00 PM Monday through Saturday. No work of any kind shall be done on Sundays in residential areas unless previously approved by the Engineer. These time restrictions shall not apply to maintenance or operation of safety and traffic control devices such as barricades, signs, and lighting, or to construction of an emergency nature. If the Contractor requires additional time to complete a portion of the work on any given day or if they foresee the need to work extended hours for a number of days to comply with the construction schedule, they must receive the approval of the Engineer.
• The Contractor shall take all precautions necessary to protect the general public and their employees from hazardous locations that might occur within the limits of the improvements. The Village is not responsible for site safety. The Bidder is solely and exclusively responsible for construction means, methods, technologies, and site safety.
• It shall be the Contractor's responsibility to protect open cut trenches as may be required by OSHA, Illinois Department of Labor, State, or Federal Law. Trenches in pavements or near the improved streets or roadways shall be sheeted or braced in a substantial and effective manner. Sheeting may be removed after backfilling has been completed to such an elevation as to permit its safe removal. Sheeting and bracing left in place must be removed for a distance of three (3) feet below the established street grade. The cost of furnishing, placing, and removing sheeting and/or bracing shall be incidental to construction and included in the contract unit price for the work being done.
• The Contractor shall schedule and conduct their operations so that the closure time of existing driveways along the route of the improvement is kept to a minimum.
All homeowners shall be given a minimum 24 hours written notice prior to initial removal of their driveway apron. The Contractor shall make every effort to keep driveways open including temporary grading and placement of gravel.
• Beginning on the date that the Contractor begins work on this project, they shall assume responsibility for normal maintenance of all existing roadways within the limits of the improvement. This normal maintenance shall include all repair work deemed necessary by the Engineer. Traffic control and protection for this work will be provided by the Contractor as required by the Engineer. The work involved in maintaining the existing pavement and shoulders will not be paid for separately at the contract unit prices for the various items of work involved, unless otherwise specified elsewhere in these Special Provision.
• If items of work have not been provided for in the Contract, or are not otherwise specified for payment, such items will be paid for in accordance with Article 109.04 of the Standard Specifications.
EASEMENT AND ACCESS AGREEMENTS
The Village will obtain easements and access agreements for all work to be performed within private property (outside public right-of-way). Working easements shall be staked by the Village prior to commencement of construction. Extreme caution shall be exercised to protect the existing trees, signs, light posts, etc. within or near the limits of all work. This shall be considered incidental to the Contract.
MOBILIZATION
Mobilization shall be according to Section 671 of the Standard Specifications except as modified herein.
Revise Article 671.02, Basis of Payment, to read:
“671.02 Basis of Payment. Mobilization will not be paid for separately but shall be included in the unit bid prices of the items for which this work applies.”
INSPECTION
All phases of the improvements will be subject to inspection by representatives of the Village's Engineering and Public Works Department, or Village authorized Consulting Engineer. Projects will not be accepted by the Village without the final approval of the Village's Engineering and Public Works Department.
The Contractor shall be bound by these specifications and by all Village ordinances and codes.
PERMITS
The Contractor shall execute all necessary permit forms and execute and comply with all insurance and performance guarantee requirements. The Contractor shall provide and pay for any fee and bond requirements. The permits necessary for this project shall be with the Cook County Department of Transportation Highway (CCDOTH) and Illinois Department of Transportation (IDOT). See plan sheets 6 through 10 for site access and permit agency jurisdiction. Work required to comply with these permit requirements shall be included as part of the contract.
HOLIDAYS
Revise the list of legal holidays in Article 107.09 of the Standard Specifications to read:
New Year’s Day Thanksgiving Day Easter Thanksgiving Friday Memorial Day Christmas Eve Independence Day Christmas Day Labor Day New Year’s Eve
PUBLIC SAFETY AND CONVENIENCE
The Contractor shall maintain entrances along the proposed improvement. Interference with traffic movements and inconvenience to Village and abutting property and the public shall be kept to a minimum. Delays and inconveniences to the Contractor caused by complying with these requirements shall be considered included in the cost of the contract and no additional compensation will be allowed.
The Contractor is to plan their work so at the end of each workday, there will be no open holes. It will be the Contractor’s responsibility to notify any residents or businesses, at least 24 hours in advance, who will have no or limited driveway/backyard access due to work performed by the Contractor.
MAINTENANCE GUARANTEE
The Contractor shall execute and deliver to the Village, before final payment will be issued, a written warranty, in a form satisfactory to the Village, which guarantees that the work is in accordance with the Contract Documents and will not be defective. This warranty shall guarantee this work for a period of one (1) year from the date of acceptance of the work and final payment by the Village.
The Contractor shall furnish a warranty bond in an amount equal to ten percent (10%) of the contract amount, or $100,000, whichever is greater, by a surety satisfactory to the Village to guarantee Contractor’s warranty to repair defective work.
If within the guarantee period, any work is found to be defective, as determined by the Village, the Contractor shall promptly and without cost to the Village, correct or repair such defective work, or remove and replace the defective work in accordance with the Special Provisions for the items in question.
CONSTRUCTION SAFETY AND HEALTH STANDARDS
It is a condition of this contract and shall be made a condition of each subcontract entered into pursuant to this contract that the Contractor and any Subcontractor shall not require any laborer or mechanic employed in performance of that contract to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous to their health or safety, as determined under Federal Construction Safety and Health Standards.
The Contractor shall observe and enforce upon subcontractors all applicable sections of the Occupational Safety and Health Act of 1970 as amended and shall be subject to inspection by authorized officials for compliance.
RESPONSIBILITY FOR VANDALISM
The contractor shall be responsible for the defacement of any concrete pours before they have set up. Concrete pavement, sidewalk, driveway, or curbing that has been defaced, in the opinion of the Engineer, shall be removed and replaced by the contractor at Contractor’s own expense.
QUANTITIES & PAYMENTS
The total quantities of work included in the bid tab portion of these bidding documents are approximate. Payment shall be based on actual wheeled distances from center of upstream manhole to center of downstream manhole. If located in backyards or areas with other obstructions, distances shall be based on GIS maps from the Village and verified by the documented camera footage.
The Contractor shall submit daily work tickets to the Engineer every day that work has been performed.
All work, which will be inspected and accepted by the Engineer, will be approved for payment, less 10% retainage which shall be released at the end of the project in the form of a final payout, once all punch list items have been completed satisfactorily. The Contractor shall provide monthly bills for work completed, which must be verified by submitted video and electronic reports. A detailed breakdown of segments cleaned and televised and lined or grouted for each invoice shall be required including MH to MH segment, pipe size, length and date work was performed.
The Village will base payment on unit bid prices and will not pay for downtime, overtime, or travel time. The cost for any specialty items, which are outside the scope of the specifications, shall be negotiated prior to performing the work.
SHOP DRAWINGS AND SUBMITTALS
Prior to fabrication of materials, the Contractor shall submit shop drawings of the materials to the Engineer for review. Shop drawings shall consist of complete descriptive literature on the materials including all pertinent dimensions, material specifications, and data. Prior to submitting shop drawings to the Engineer, the Contractor shall first review the shop drawings and make corrections or revisions which are appropriate.
The Contractor shall always be required to maintain a complete set of shop drawings on the job site while work is in progress and shall make them available to the Engineer upon request.
Provide complete copies of required submittals and deliver to the Engineer as follows:
1. Construction progress schedule: (1) electronic copy
a. Initial work schedule
b. Revisions to work schedule
2. Pre-construction surface televising: (1) electronic copy
3. Material Data Sheet Submittals: (1) electronic copy. All materials data sheets are to be submitted to the Engineer and approved before rehabilitation can proceed.
a. PVC sewer pipes: Shall conform to ASTM D3034 SDR 26.
b. Non-shear couplings with stainless steel bands: Fernco RC 5000 series
Shielded couplings equipped with stainless steel bands or approved equal.
c. Liner Design Work Sheets
d. Liner End Seals Data Sheet
4. Pre & Post construction internal television inspection: Two (2) External USB powered hard drives containing:
a. Digital video files (MPEG format)
b. PDFs of digital reports
c. PACP export Digital database with observation data
d. Master spreadsheet with hyperlinks to video and PDF reports
5. One set of “red-line” field changes on construction plans.
6. Typical set-up for flow bypassing.
7. Specific bypass pumping plan.
8. Traffic Control Plans (1) electronic copy.
9. Other required submittals: (1) electronic copy of as-built drawings, pre and post inspection CDs and/or DVDs shall be submitted to the Village of Schaumburg by the Contractor within two (2) weeks of final acceptance of said work. As-Built drawings will include the identification of the work completed by the Contractor including installed length, number of services reconnected in each installation length and location of services reconnected including distance from upstream manhole and clock position and shall be prepared on one set of Contract Drawings provided to the Contractor at the onset of the project
This is a non-exhaustive list. The Contractor shall provide all shop drawings that are required in the specifications.
SUBSTITUTE OR “OR EQUAL” ITEMS
The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without evaluation of Equipment Alternatives listed in the Unit Price Bid and without evaluation of possible substitute or “or equal” items.
Whenever it is specified or described in the Bidding Documents that an Equipment Alternative listed in the Unit Price Bid or that a substitute or “or equal” item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be evaluated by Engineer until after the Effective Date of the Agreement.
Brand names, which may be mentioned in the contract specifications, are used only as a reference to the type and quality of equipment and/or materials desired. However, any deviation from or substitution in a brand name stated in the contract specifications shall be listed as required under the above paragraph of this section.
The Village reserves the right to determine whether any deviations and substitutions listed by the bidder are within the intent of the contract specifications and will reasonably meet the service requirements of the using department.
A bidder's failure to list any deviations from or substitutions in the contract specifications as required under this section may result in the rejection of the bid.
DATE OF MANUFACTURE
All manufactured materials furnished under this contract, including, but not limited to, pipe, drainage and utility structures, castings, fire hydrants, valves, stops, and fittings, shall have been manufactured no earlier than one (1) year before the date of installation.
CLEAN UP
The cost of cleanup operations shall be spread evenly through the bid items on the proposal. Clean up shall consist of removing all debris from the job site, and removal of all excess dirt, pipe pieces, lumber scraps, paper cups, etc., left by the Contractor's forces. Clean up shall be performed as the work progresses, and a final clean up shall be done after all operations are completed.
CONSTRUCTION DEBRIS
All spoil and waste materials must be removed from site and properly disposed. Disposal of all waste and spoil shall be considered incidental to the contract. For bidding purposes, it shall be assumed that all spoils are residential and can be disposed of at a CCDD facility. The Village will sign LPC-662 form to be prepared by Contractor. Contractor shall provide a representative soil sample for pH testing. The pH testing will be performed by an independent third party at the Contractor’s expense. Removal of landscaping materials, and protection of the homeowners’ property is considered a part of this contract and will be incidental to the contract pay items.
WATER USAGE
Use of fire hydrants as a water source shall be coordinated with Jon Schmidt at Village of Schaumburg, Engineering and Public Works. The Contractor shall contact him at (847) 923-6633. Water usage shall be tracked with a meter. The Contractor will not be charged for water usage.
The Contractor shall identify the hydrants to which they request access. Village staff shall evaluate each location request and either approve access or deny access and provide an alternative available hydrant location. Hydrant location requests must be at least two (2) business days in advance of the requested access time.
SEWER FLOW CONTROL
This work shall include control of sanitary sewer flow during closed circuit television (CCTV) inspection, sewer cleaning operations, manhole rehabilitation, manhole installation and all other sewer maintenance, inspection or construction activities. The Contractor shall be fully responsible for maintaining sewer service during these operations and shall not be allowed to backup or flood any sewer system user, building or property. The Contractor shall be solely liable for property damages that result from the work being performed.
During sewer cleaning operations, only 25% of the internal pipe diameter flow or “limited sewage flow” is acceptable. Flows shall be reduced by plugging, blocking, manually operating pump stations or bypass pumping. During sewer televising operations, NASSCO Standards must be followed and only 5% of the internal pipe diameter flow is acceptable. During manhole installation, manhole rehabilitation and point repairs, no flows will be allowed.
Since complete stoppage or bypassing of flow may be required during installation of new sewers, point repairs and manhole rehabilitation work, the Contractor may be required to submit drawings and complete design data showing methods and equipment to be utilized in bypass and dewatering operations. The bypass plan shall include the following information:
1. Location of temporary sewer plugs and bypass discharge lines indicated on plans
2. Capacities of pumps, prime movers, and standby equipment
3. Type of standby power source
4. Traffic control plan
The Contractor shall indicate where and when flow bypassing is anticipated and provide a typical set-up as a submittal. When pumping and bypassing is required, the Contractor shall furnish all temporary pumps, conduits, and other equipment to divert the flow of sewage around the sewer section in which work is to be performed. The bypass system shall have enough capacity to handle existing flow plus additional flow that may occur during peak flow periods or from precipitation. The Contractor shall construct bypass system of material to prevent leakage during pumping operation.
The Contractor shall equip all engines with mufflers and/or enclose to keep noise level less than 50 decibels, or 10 decibels above ambient noise levels when measured at building closest to noise source.
The Contractor shall maintain sufficient labor, equipment, and materials on site to ensure continuous and successful operation of bypass and dewatering systems including the following:
1. Keep standby pumps fueled and operational at all times.
2. Maintain on site sufficient number of valves, tees, elbows, connections, tools, sewer plugs, piping, and other parts or system hardware to ensure immediate repair or modification of any part of system as necessary.
3. Provide piping, joints and accessories designed to withstand at least twice the maximum system pressure or 50 psi (345 kPa), whichever is greater.
4. In areas where flows are bypassed, all discharge flow shall be returned to the sanitary sewer. No bypassing to ground surface, receiving waters, storm drains, or bypassing which results in groundwater contamination or potential health hazards shall be permitted.
In the event sewage is released into a storm drainage system or street, the Contractor shall immediately stop the release, notify IEPA, and take all necessary actions to clean up and disinfect spillage to satisfaction of the Engineer.
During plugging or bypass pumping operations the Contractor shall utilize sewer plugs specifically designed so that all or any portion of sewage can be released. During sewer flow control operations, reduce flow to comply with requirements as describe above. After cleaning, inspection, installation or rehabilitation work has been completed, restore the flow to normal. All plugging, bypass pumping and sewer flow control operations shall be considered incidental to the Contract and shall not be compensated for separately.
Basis of Payment. The cost of sewer flow control will not be paid for separately but shall be considered as included in the unit bid prices of the contract, and additional compensation will not be allowed.
PROTECTION OF EXISTING DRAINAGE FACILITIES DURING CONSTRUCTION
Unless otherwise noted in the contract plans, the existing drainage facilities shall remain in use during the period of construction.
Locations of existing drainage structures and sewers, if shown on the contract plans, are approximate. Prior to commencement of work, the Contractor, at their own expense, shall determine the exact location of existing structures which are within the proposed construction site.
All drainage structures are to be kept free from any debris resulting from construction operations. All work and materials necessary to prevent accumulation of debris in the drainage structure resulting from construction operations shall be removed at the Contractor’s own expense, and no extra compensation will be allowed.
Unless reconstruction or adjustment of an existing manhole, catch basin, or inlet is called for in the contract plans or ordered by the Engineer, the proposed work shall meet the existing elevations of these structures. Should reconstruction or adjustment of a drainage structure be required by the Engineer in the field, the necessary work and payment shall be done in accordance with Section 602 and Article 104.02 respectively, of the Standard Specifications.
Existing frames and grates are to remain unless otherwise noted in the contract plans or as directed by the Engineer. Frames and grates that are missing or damaged prior to construction shall be replaced. The type of replacements frame or grate shall be determined by the Engineer, and replacement and payment for same shall be in accordance with Section 604 and Article 104.02 respectively, of the Standard Specifications unless otherwise noted in the plans or special provisions.
TRENCH BACKFILL
Description. This item is associated with point repairs. This work shall conform to Section 208 of the “Standard Specifications”, and shall consist of furnishing, placing, compacting and transporting coarse aggregate gradation CA-6 for backfilling material for all trenches made beneath or within three feet (3’) of the roadway or driveways. The material shall conform to Article 1004.5. Recycled materials or crushed concrete will not be permitted.
The Contractor shall maintain trenches flush with existing surfaces until permanent patches are installed or site restoration is completed. No additional compensation will be provided to the Contractor for trench maintenance.
For all other areas not adjacent to pavement, excavated earth free from organic materials shall be used. Costs associated with earthen backfill shall be considered incidental to the Point Repairs.
The Contractor shall also place granular material backfill within influence zone under new or existing roads, sidewalks, paved surface, driveways, or foundations and footings.
Extend backfill from surface of cover material to top of existing pavement structure to allow backfill to function as temporary aggregate roadway. The Contractor shall replace backfill displaced by traffic movement as necessary until temporary bituminous pavement or permanent pavement is installed at no additional cost to the Village.
The Contractor shall not use frozen material for backfill or place backfill on frozen sub-grade. Care shall be taken to not exert undue stresses on new piping or existing utilities when dumping, spreading, and/or compacting backfill materials. Hand spreading and hand tamping may be required to adequately protect new pipe and existing utilities.
Where pipes leave structures, protect by backfilling pipe influence zone down to undisturbed soil as specified above for support of underground structure. Do not backfill structures until new concrete has properly cured.
Compaction of Backfill. The trench backfill shall be compacted only by Method 1 as defined in Article 550.07 of the Standard Specifications.
The standard test to define maximum densities of all compaction work shall be ASTM D- 1557. All densities shall be expressed as a percentage of the maximum density obtained in the laboratory by the ASTM D-1557 standard procedure. Each layer shall be compacted by mechanical means to 95 percent of the maximum dry density.
The Contractor shall start trench compaction at the point of lowest elevation of trench and work along the complete length of the trench. Backfill shall be placed around the pipe immediately after installation and inspection unless delay is approved by the Engineer.
The select granular backfill material shall be placed and compacted in 12-inch maximum layers of the specified materials as shown on the Drawings and installed from the top of bedding to the existing finished grade. Care shall be taken during compaction to prevent disturbance or injury of the pipe and other utilities.
Existing Material Disposal. This item also includes the disposal of the surplus excavated material which is replaced by trench backfill. Such disposal shall be made in accordance with Article 202.03 of the “Standard Specifications”.
Measurement. The work will be measured in the field and computed in cubic yards. It will be measured in linear feet along the centerline of the pipe and the area computed in square yards multiple by the depth (top of the trench bedding to bottom of base), with a maximum allowable width of 6 feet for mainline and service pipes.
Basis of Payment. This work will be incidental to POINT REPAIRS.
PIPE BEDDING
Description. The Contractor shall furnish, place, compact and transport coarse aggregate as detailed hereinafter for pipe bedding to a minimum depth of 4” below the bell of the pipe and 12” above the bell of the pipe.
Construction Methods. The bedding for pipe installation shall be as shown on the Drawings. The aggregate gradations for bedding depending on the pipe material shall be as follows:
- PVC Pipe: CA 7 or 11, ¾-1” washed gravel,
- Concrete Pipe: CA 7, 1” washed gravel,
- Ductile Iron Pipe: CA 7, 1” washed gravel,
- Cables, Copper Water Services: CA 7, 1” washed gravel,
- Trench bottom stabilization: CA 7, 1” washed gravel.
Basis of Payment. This work will be incidental to POINT REPAIRS.
RESTORATION - GENERAL
Description. All damage to lawns shall be restored with topsoil, seed and blanket. All lawn restoration shall be considered incidental to the cost of the cured-in-place pipelining, point repairs, and bypass activities. To minimize damage to lawns, the Contractor shall utilize Duramats or other means (protective pads) to buffer equipment traveling across private property. Any equipment required for construction work located on lawns must be rubber-tired or rubber-tracked vehicles only.
All work required to trim or remove trees or bushes shall be considered incidental to the contract.
All work required to move or protect overhead wires and utility poles shall be considered incidental to the contract.
Any claims for additional work must be presented to the Village and the Engineer immediately. Failure of the contractor to notify them will be reason to deny any claims for extra work.
All work covered under this contract is subject to inspection by the Village of Schaumburg and the Engineer.
The Contractor is responsible for coordinating access to private property with the homeowners. All work associated with coordinating restoration on private property shall be compensated as outlined in pay item PROJECT MANAGEMENT.
ROAD SIGN REMOVAL AND REPLACEMENT
Description. This work pertains to all the work regarding road signs associated with point repairs.
Basis of Payment: Road sign removal and replacement shall be considered incidental to the Contract and shall not be compensated for separately.
TOPSOIL FURNISH AND PLACE, 4"
Description. This item is associated with point repairs. This work shall be according to Article 211 of the Standard Specifications and the following:
The Contractor shall take precautions so as not to unnecessarily damage lawns. In areas that are designated to be restored with seed and blanket, the existing soil shall be shaped and graded. The area to be restored with seed and blanket shall then have a layer of good quality, pulverized topsoil which has been approved by the Engineer prior to placement, spread and fine raked in such a manner as to result in a top dressing of the parkway having an average thickness of four inches (4") of topsoil.
Any excavation and grading of the parkway which is required to give a uniform slope from the limit of seed and blanket restoration to the top of the curb shall be included in this item. The Contractor shall be responsible for removing any weeds prior to the placement of the seed and blanked. The method of weed removal must be approved by the Engineer.
The topsoil and subgrade shall be thoroughly compacted along newly installed concrete or asphalt by a compaction method approved by the Engineer. If proper compaction is not achieved, the Engineer may direct the Contractor to remove any soil backfill that the Contractor has placed and replace it with a granular stone backfill.
Basis of Payment. This work shall be considered incidental to the contract and shall not be compensated for separately.
SEEDING
Description. This item is associated with point repairs. This work shall be according to Article 250 of the Standard Specifications and the following:
The work shall consist of seeding on all landscaped areas disturbed by construction as shown on the Plans or as directed by the Engineer. Any excessive or unnecessary damage to the parkway will be restored by the Contractor at their own expense. All areas designated to be seeded shall be prepared with application of 4” of topsoil. A seed mix Type 1 shall be used on all disturbed areas. A modified mixture for shade application shall be submitted to the Engineer for approval to be used at locations where directed by the Engineer.
The rate of application of the seed will be judged by the density of growth of the grass after germination has taken place. Areas in which the seed does not take root shall be re-seeded at no additional cost to the Village. It shall be the Contractor’s responsibility to ensure the applied topsoil has proper nutrients to sustain growth of the grass. Any necessary applications of fertilizer to the topsoil shall be considered incidental. Installation of knitted straw blanket shall be considered incidental.
Basis of Payment. This work shall be considered incidental to the contract and shall not be compensated for separately.
PRE-CONSTRUCTION MEETING
Description. After contract award, the Engineer will schedule a pre-construction meeting for the project. The Contractor shall have their General Superintendent and Supervisor present at the pre-construction meeting to discuss all details of the project.
The contractor shall submit a Performance Work Statement (PWS) at the pre-construction meeting, which clearly defines the project product delivery in conformance with the requirements of these contract documents. The PWS shall, at a minimum, contain the following:
1. Clearly indicate that all work will conform to the project requirements as outlined in the Description of Work and as delineated in these specifications.
2. A detailed installation schedule shall be prepared, submitted and conform to the requirements of this contract.
3. Contractor’s description of the proposed CIPP lining technology, including a detailed plan for identifying all active service connections maintaining service, during mainline installation, to each home connected to the section of pipe being lined, including temporary service if required by the contract.
4. The PWS shall list the tools and equipment needed for the work and shall identify which tools and equipment will be redundant on the job site in the event of equipment breakdown. The Contractor shall outline the mitigation procedure to be implemented in the event of key equipment failure during the installation process.
5. Outline specific repair or replacement procedures for potential defects that may occur in the installed CIPP or rehabilitated manholes. Repair/Replacement procedures shall be as recommended by the manufacturers.
6. A detailed description of the Contractor’s proposed procedures for removal of any existing blockages in the pipeline that may be encountered during the cleaning process.
7. A detailed public notification plan shall be prepared and submitted including detailed staged notification to residences affected by the rehabilitation work
8. An odor control plan shall be prepared and submitted including detailed staged notification to residences affected by the rehabilitation work.
POST-CONSTRUCTION TELEVISION INSPECTION
Description. Post-construction internal television inspection shall follow the same guidelines as PRE-CONSTRUCTION TELEVISING described hereinafter and shall be conducted on all sewers receiving sewer repairs, new sewer installations and sewer rehabilitation. This inspection must identify all defects with observations and must be done in the presence of the Village or the Engineer and shall be per NASSCO standards by PACP certified operators.
Digital video inspections of the post-construction/rehabilitation television inspection for each sewer section shall be provided to the Engineer and the Village as described below:
Deliverables. The Contractor shall provide the Village with two (2) portable USB powered external hard drives containing each video file and associated PDF report, which shall document, to the satisfaction of the Engineer, the condition of the sewer line segment both before and after all rehabilitation work is completed.
The hard drives shall include a master Excel spreadsheet with hyperlinks to each video file and associated PDF report as well as a master digital database of all observation data. One (1) copy of the digital video data and logs shall become the property of the VILLAGE and one (1) copy shall remain with the Engineer.
• The Master Spreadsheet shall have a record for each line segment televised to date. The spreadsheet shall be in MS Excel format and shall have hyperlinks to both the video files and the associated “.pdf” of the PACP & Pipe Segment View report for each section of sewer televised. The spreadsheet shall include the following information for each record - Upstream and Downstream Structure Numbers, Date Televised, Televised Length, Pipe Size, work performed, and links to both the Video and the “.pdf” files.
• The Database, in the latest PACP Version 7, format shall detail location, type, and severity of all defects and shall be Microsoft Access V07 Database files with all tables linked by appropriate I.D. numbers, and links to video and “.pdf” report files.
All data shall be linked to the pipe segment ID number.
Basis of Payment. POST-CONSTRUCTION TELEVISION INSPECTION and all deliverables shall be considered incidental to the Contract and shall not be compensated for separately.
SPECIAL PROVISIONS FOR CONTRACT ITEMS
This shall be a unit price contract and shall include all work mentioned in the Project’s Plans and Specifications and any other work, not specifically mentioned, that is necessary for constructing the improvement in a skilled and professional manner. Any conflicts or omissions in the Plans or Specifications shall be brought to the attention of the Engineer.
The Engineer’s decision in resolving such matters shall be final. The Contractor shall in no manner take advantage of conflicts or omissions should they occur, and it shall be the Contractor’s responsibility to bring such components of the Contract to the attention of the Engineer so that they can be properly resolved.
The quantities bid upon in the Proposal are estimated quantities, except where an item is noted to be supplied “complete.” The Contractor shall be paid for actual quantities, in place, as measured and agreed upon by the Engineer and Contractor. The Contractor shall be paid in full for items to be supplied “complete” when said item is finished, or at a percentage of the bid amount agreed upon by the Owner, Engineer and Contractor if the item is not complete.
ITEM #1: PRE-CONSTRUCTION SURFACE TELEVISING
Description. This work consists of performing color video and audio recording of the project area and other areas which may be impacted by construction, specifically excavation or any work that requires backyard access.
Preconstruction video recordings will include coverage of the project area and all other areas which may be impacted by construction. Video recordings will also include construction easements when applicable. Video recordings will provide a visual record of all physical features within those areas, including, but not limited to, roadways, pavements, curbs, gutters, driveways, driveway aprons, sidewalks, carriage walks, parkways, trees, landscaping, shrubbery, plantings, landscaping walls, retaining walls, signs, sign posts, fences, utility poles, light poles, utilities, equipment, manholes, b-boxes, cleanouts, valves, curb structures, pipelines, buildings, mailboxes, and any other features located within the project area.
Video recordings will begin with an audio narrative which provides the current date and time, the name of Owner and name of project, and a description of both the starting location and the location or locations to be recorded, including street name or names, street addresses, and any additional information which may be necessary to describe the location and subject of viewing.
Video recordings will maintain viewer orientation by means of an audio commentary in the audio track of each video recording which provides an explanation of what is being viewed; and by videotaping landmarks and readily identifiable objects (property addresses, street signs, etc.) at appropriate intervals.
Preconstruction surface televising will be recorded at a rate of travel not exceeding 48 feet per minute and zooming and panning rates will be controlled to provide clarity of features during playback. The finished product will be provided with bright, clear pictures and accurate colors free from distortion, tearing, rolls, or other forms of picture imperfection. The audio will have proper volume and clarity. All recordings will be performed at times of satisfactory visibility, and when no more than ten percent of ground is obscured by snow, leaves, or other cover.
If any element within or portion of the project area is not adequately documented by the preconstruction surface televising so as to definitively demonstrate its condition prior to the start of construction, Contractor will assume responsibility for the repair, restoration or replacement of that element or portion of the project area. Such repair, restoration or replacement will be to equal or better condition than previously existing and will further comply with all standards and provisions which govern the work in question.
Schedule. Pre-construction surface televising will be performed according to the following schedule:
a. Pre-construction surface televising will take place after a Notice to Proceed has been issued.
b. Pre-construction surface televising will take place after the Joint Utility Locating Information for Excavators (JULIE) request for the project area has cleared.
c. Pre-construction surface televising will take place before any equipment,…