SCDOT Permit -284729 (1).pdf
PDF 278 KB Posted
- Attached to
- Re-Bid Wampee Convenience Center Hwy 90
- Solicitation number
- 2025-26-008
- Issued by
- Horry County, Lugoff CDP, South Carolina
About this file
The document is an Encroachment Permit issued by the South Carolina Department of Transportation (SCDOT) for Horry County, specifically for a commercial driveway project located on SC Highway 90 between Water Tower Road and Long Bay Road. The permit (No. 284729) was issued on September 27, 2024, with an expiration date of September 27, 2025, and is for the Wampee Convenience Center project. The permit authorizes Horry County to perform work in the public right-of-way, with specific provisions governing construction, drainage, traffic control, and site restoration.
The permit includes extensive special provisions detailing requirements for construction, including third-party testing for storm drainage and asphalt installation, maintenance of positive drainage, traffic safety measures, and pavement marking replacement. The applicant (Horry County) is responsible for all costs associated with repairs, traffic control, safety measures, and restoration of the right-of-way. Additional requirements include submitting as-built construction plans, maintaining 70% grass regrowth and 100% stabilization in disturbed areas, and adhering to winter and holiday work restrictions. The permit emphasizes the need for careful site management, safety protocols, and compliance with SCDOT specifications and policies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Permit Number : 284729 Page: 1 of 2
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
Encroachment Permit
Permit No : 284729 Permit Decision Date :
9/27/2024 Expiration Date : 9/27/2025
Type Permit :DRIVEWAY -
COMMERCIAL
Location:
District Work County Type Route Aux Begin MP End MP
5 Horry, SC SC 90 None 2.321 2.321
Contact Information Applicant: HorryCounty Phone: (843)915-6962
Contact: Andy Markunas
Address: 4401 Privetts Road, City: Conway State: SC Zip: 29526
Comments Off Hwy 90 in between Water Tower Road and Long Bay Road
Special Provisions:
0005 - APPLICANT SHALL PROVIDE TO THE DEPARTMENT THE OPPORTUNITY OF
ATTENDING ANY PRE-CONSTRUCTION MEETING PRIOR TO THE BEGINNING OF
WORK.
0123 - ALL WORK PERFORMED IN CONNECTION WITH THIS PERMIT SHALL
CONFORM TO THE SCDOT "A POLICY FOR ACCOMODATING UTILITIES ON
HIGHWAY RIGHT-OF-WAY" MOST CURRENT EDITION.
0202 - PAVEMENT DESIGN SHALL BE AS SHOWN ON ATTACHED
DOCUMENTATION
0301 - THE DITCHES AND/OR SHOULDERS DISTURBED DURING THE
INSTALLATION SHALL BE RE-ESTABLISHED TO PROPER GRADE, ORIGINAL
CROSS SECTION, STABILIZED, AND ALL DRAIN PIPES CLEARED.
0304 - PAVEMENT MARKINGS ALTERED DURING THIS INSTALLATION SHALL BE
RESTORED BY THE APPLICANT.
0310 - FIELD CHANGES, IF NECESSARY, MUST BE APPROVED IN WRITING
BEFORE ACTUAL CONSTRUCTION OF PROPOSED CHANGES.
0312 - THE PERMITTEE SHALL HOLD THE DEPARTMENT HARMLESS FOR
DAMAGES TO BOTH UPSTREAM AND DOWNSTREAM PROPERTIES.
0318 - THE APPLICANT SHALL BE RESPONSIBLE FOR IMMEDIATE REMOVAL OF
SUCH TRAFFIC HAZARDS AS MUD, DEBRIS, LOOSE STONE, AND TRASH AS MAY
BE WASHED OR SPILLED ON THE TRAVELED ROADWAY AS A RESULT OF THE
PROPOSED WORK.
ADDITIONAL SPECIAL PROVISIONS
SCDOT PERMIT #284729
Wampee Convenience Center
September 27, 2024
1) ENCLOSED IS A COPY OF YOUR SOUTH CAROLINA DEPARTMENT OF
TRANSPORTATION (SCDOT) ENCROACHMENT PERMIT APPLICATION, WHICH
WILL ENABLE YOU TO PERFORM WORK IN PUBLIC RIGHT-OF-WAY AS YOU HAVE
REQUESTED. AS THE PERMITTEE AND/OR CONTRACTOR WORKING FOR THE
PERMITTEE, IT IS ESSENTIAL YOU READ AND UNDERSTAND ALL REGULATIONS
AND PROVISIONS GOVERNING WORK DESCRIBED WITHIN THIS PERMIT
APPLICATION. THE SPECIAL PROVISIONS CAN BE FOUND ON THE APPLICATION
SHEET OF THIS PERMIT, ON THE INCLUDED PROVISIONS ATTACHEMENTS AND
SHOWN ON ANY DRAWINGS OR SKETCHES. IF ANY PORTION OF THESE
REQUIREMENTS ARE NOT COMPLIED WITH ONE OR MORE OF THE FOLLOWING
CONDITIONS MAY BE ENACTED.
2) THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE
RIGHT TO IMPOSE ADDITIONAL CONDITIONS, PROVISIONS, AND/OR
REQUIREMENTS ON THIS PERMIT TO RESPOND TO ANY UNFORESEEN, SPECIFIC
PROBLEMS THAT MIGHT ARISE DURING THE LIFE OF THIS PERMIT, AND TO TAKE
ANY ENFORCEMENT ACTION NECESSARY TO ENSURE COMPLIANCE WITH SCDOT
SPECIFICATIONS, STANDARDS OR POLICIES.
3) A COPY OF THIS PERMIT APPLICATION WITH ALL SUPPORTING DOCUMENTATION
SHALL BE ON SITE AT ALL TIMES WHEN CONSTRUCTION IS IN PROGRESS WITHIN
T H E SCDOT RIGHT-OF-WAY.
4) THE PERMITTEE/CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ANY
ROADWAY ASPHALT, DRAINAGE, SHOULDER, DITCHLINE, OR ANY OTHER
STRUCTURES DAMAGED WITHIN THE RIGHT OF WAY DUE TO THE
CONSTRUCTION OF THIS DRIVEWAY OR THE CONSTRUCTION WITHIN THE
PROJECT. REPAIRS SHALL BE COMPLETED BEFORE RELEASE OF THE PERMIT AT
NO COST TO THE DEPARTMENT.
5) THE DEPARTMENT RESERVES THE RIGHT TO TEMPORARILY SUSPEND ALL WORK
UNDER THIS PERMIT APPLICATION IN THE EVENT OF INCLEMENT WEATHER OR
OTHER CIRCUMSTANCES DEEMED NECESSARY AT THE DEPARTMENT’S
DISCRETION. ANY SUCH SUSPENSION OF WORK SHALL BE REQUESTED BY THE
DEPARTMENT IN WRITING.
6) ALL WORK PERFORMED IN CONNECTION WITH THIS PERMIT SHALL CONFORM TO
THE SCDOT "A POLICY FOR ACCOMODATING UTILITIES ON HIGHWAY RIGHT-OF-
WAY" MOST CURRENT EDITION.
7) ANY REQUEST FOR REVISIONS AND/OR AMENDMENTS TO THIS PERMIT SHALL
BE MADE IN WRITING FROM THE ENGINEER WITH PROPER SUPPORTING
DOCUMENTATION. ALLOW A MINIMUM OF TWO WEEKS FOR REVIEW FOR
ANY SUCH AMENDMENTS.
8) 70% GRASS REGROWTH AND 100% STABILIZATION IS REQUIRED IN
ALL DISTURBED AREAS OF THE RIGHT OF WAY.
9) THE CONTRACTOR WILL MAINTAIN POSITIVE DRAINAGE AT ALL
TIMES DURING CONSTRUCTION AND UNTIL FINAL INSPECTION
APPROVAL IS GIVEN BY THE DEPARTMENT.
10) NO STEEL TRACKED VEHICLES SUCH AS A TRACKHOE, BULLDOZER,
OR OTHER LIKE EQUIPMENT WILL BE ALLOWED IN THE ASPHALT
ROADWAY WITHOUT WRITTEN APPROVAL FROM THE DEPARTMENT.
11) DEWATERING OF ANY EXCAVATED AREAS ON THE SITE SHALL NOT
DISCHARGE DIRECTLY TO THE SCDOT RIGHT OF WAY. IT SHALL PASS
THROUGH A SEDIMENT CONTROL DEVICE PRIOR TO ENTERING
RECEIVING WATERS INCLUDING THE SCDOT RIGHT OF WAY.
12) ALL TRAFFIC CONTROL, ROAD DETOURS, NOTIFICATION TO THE PUBLIC,
PEDESTRIAN/MOTORIST SAFETY, AND DAMAGE INCURRED DUE TO THIS
INSTALLATION SHALL BE THE RESPONSIBILITY OF THE PERMITTEE. ANY
REPAIRS NEEDED SHALL BE DONE SO AT NO COST TO THE DEPARTMENT.
13) APPLICANT SHALL PROVIDE A SAFE DRIVING ENVIRONMENT FOR MOTORIST
USING THIS ROADWAY WHILE CONSTRUCTION IS IN PROGRESS. FLAGMAN
SHALL BE FURNISHED AT APPLICANTS EXPENSE. FLAGMAN SHALL WEAR A
REFLECTIVE VEST, HARD HAT, AND HAVE STOP/SLOW PADDLE BOARD ON A SIX
FOOT (6’) STAFF. FLAGMAN SHALL STAND AT A LOCATION SUITABLE TO THE
EFFECTIVE FLOW OF TRAFFIC WHILE CONSTRUCTION IS NEEDED OR WHEN
BLOCKING A LANE. REFERENCE CURRENT STANDARD DRAWINGS.
14) FOR ANY PROJECT REQUIRING AN OVERLAY: TRAVEL LANES, TURN LANES, AND
ACCEL/DECEL LANES INVOLVED ARE REQUIRED TO HAVE ALL RAISED
PAVEMENT MARKINGS AND/OR PAINTED PAVEMENT MARKINGS REPLACED AT
THE APPLICANTS' EXPENSE. TEMPORARY LINE PAINT IS REQUIRED TO BE
INSTALLED BEFORE THE TRAVEL/TURN LANE IS OPENED BACK UP TO THE
PUBLIC. THERMO PLASTIC OR EPOXY PAINT MUST HAVE PRECERTIFICATION
PAPERWORK THAT IS SUBMITTED TO SCDOT FOR RECORD KEEPING. DEPENDING
ON THE TYPE OF PAINT, THE APPROPRIATE GRACE PERIOD SHALL BE ALLOWED
BEFORE INSTALLATION. THE APPLICANT IS REQUIRED TO PROVIDE NECESSARY
TRAFFIC CONTROL FOR PAINT INSTALLATION. WINTER WORK RESTRICTIONS
AND HOLIDAY WORK RESTRICTIONS MUST BE ADHERED TO.
15) THIRD PARTY TESTING IS REQUIRED AT THE APPLICANT’S EXPENSE FOR ALL
STORM DRAINAGE INSTALLATION. INSPECTIONS SHALL INCLUDE, BUT ARE
NOT LIMITED TO, BEDDING, SPRINGLINE, AND EVERY 6” OF MATERIAL
FOLLOWING IN ACCORDANCE WITH SUPPLEMENTAL TECHNICAL
SPECIFICATION SC-M-714. ALL RESULTS ARE TO BE SUBMITTED IN WRITING TO
THE SCDOT FOR REVIEW THE FOLLOWING DAY.
16) THIRD PARTY TESTING IS REQUIRED AT THE APPLICANT'S EXPENSE ON SUB-
GRADE, BASE, AND ASPHALT. ONE THIRD PARTY INSPECTOR SHALL TAKE
DENSITY READINGS AT RANDOM STATION NUMBERS. A THIRD PARTY
INSPECTOR/TESTER SHALL BE AT THE ASPHALT PLANT TESTING THE ASPHALT
AT THE TIME THAT SURFACE ASPHALT IS BEING PRODUCED AND PUT DOWN ON
THE JOB. CORE SAMPLES SHALL BE TAKEN RANDOMLY AND WEIGHED BY THE
THIRD PARTY INSPECTOR. ALL RESULTS ARE TO BE SUBMITTED IN WRITING TO
SCDOT FOR REVIEW THE FOLLOWING DAY. WINTER WORK RESTRICTIONS AND
HOLIDAY WORK RESTRICTIONS MUST BE ADHERED TO. SEE PERMIT FOR MORE
DETAILS.
17) THE SCDOT SHALL RECEIVE A SET OF FINAL AS-BUILT CONSTRUCTION PLANS.
AS-BUILT PLANS SHOULD BE PREPARED IN ACCORDANCE WITH THE SCDOT
PUBLICATION “INSTRUCTIONS FOR THE PREPARATION OF AS-BUILT PLANS”,
LATEST EDITION.