30986.0000 Wampee Convenience Center REV2 2025-07-09 (2) (2).pdf

PDF 42 MB Posted

Attached to
Re-Bid Wampee Convenience Center Hwy 90
Solicitation number
2025-26-008
Issued by
Horry County, Lugoff CDP, South Carolina

About this file

This document is a comprehensive Site Development Plan for the Wampee Convenience Center project in Horry County, South Carolina, prepared by Thomas & Hutton Engineering on September 7, 2023, and revised on July 9, 2025. The project involves site development across 13.4 acres, with 7.1 acres to be disturbed, and will include clearing, grading, drainage improvements, installation of water, wastewater, and stormwater systems, and road construction associated with the development. The project is located at PIN# 348-00-00-0008 and will increase the site's impervious area from 0% to 32.8%, with specific focus on improvements along U.S. Highway 90.

The project's technical specifications include detailed erosion control measures, stormwater management plans, and landscaping requirements. The site will involve tree removal (totaling 55 inches in diameter), with a fee in lieu calculation of $3,300 for replacement trees. The development will interface with local infrastructure, including drainage systems that ultimately discharge into the Waccamaw River, and will require comprehensive environmental controls throughout the construction process. The site is located in FEMA Flood Zone X and will involve multiple phases of construction, including land clearing, grading, utility installation, road construction, and final stabilization, with strict adherence to South Carolina Department of Health and Environmental Control (DHEC) regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISION HISTORY

SUBMITTAL HISTORY

J-

6.

9/ 7/

W

A M

PE

E

C O

N V

EN

IE

N C

E C

EN

TE

R

Know what'sbelow.

before you dig.Call

R

SITE DEVELOPMENT PLANS

OF

WAMPEE CONVENIENCE CENTER

HORRY COUNTY, SOUTH CAROLINA

PREPARED FOR:

HORRY COUNTY

4401 PRIVETTS ROAD

CONWAY, SOUTH CAROLINA 29526

SEPTEMBER 7, 2023

REVISED: JULY 9, 2025

PIN# 348-00-00-0008

J-30986.0000

VICINITY MAP

SCALE: 1" = 2000'

PREPARED BY:

611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 p.843.839.3545 www.thomasandhutton.com

Sheet List Table

SHEET NUMBER SHEET TITLE

C0 COVER SHEET

G1.1 GENERAL NOTES AND INDEX

C1.1 SITE PLAN

CD1.1 DEMOLITION PLAN

EC0.1 EROSION CONTROL NOTES

EC0.2 EROSION CONTROL CHARTS

EC1.1 EROSION CONTROL - INITIAL LAND

DISTURBANCE

EC2.1 EROSION CONTROL - CONSTRUCTION

EC3.1 EROSION CONTROL - STABILIZATION

EC4.1 EROSION CONTROL DETAILS

EC4.2 EROSION CONTROL DETAILS

C2.1 WATER & SEWER PLAN

C2.2 WATER & SEWER PLAN

C2.3 WATER & SEWER PLAN

C2.4 FORCEMAIN PROFILES

C2.5 WATER & SEWER DETAILS

C2.6 WATER & SEWER DETAILS

C3.1 PAVING, GRADING, & DRAINAGE PLAN

C3.2 PAVING, GRADING, & DRAINAGE PLAN

C3.3 PAVING, GRADING, & DRAINAGE PLAN

C3.4 ROAD PROFILES

C3.5 DRAINAGE PROFILES

C3.6 DRAINAGE PROFILES

C3.7 U.S. HWY 90 CROSS SECTIONS

C3.8 U.S. HWY 90 CROSS SECTIONS

C3.9 U.S. HWY 90 CROSS SECTIONS

C3.10 U.S. HWY 90 CROSS SECTIONS

C3.11 U.S. HWY 90 CROSS SECTIONS

C3.12 U.S. HWY 90 CROSS SECTIONS

C3.13 U.S. HWY 90 CROSS SECTIONS

C3.14 U.S. HWY 90 CROSS SECTIONS

C3.15 U.S. HWY 90 CROSS SECTIONS

C3.16 U.S. HWY 90 CROSS SECTIONS

C3.17 U.S. HWY 90 CROSS SECTIONS

C3.18 U.S. HWY 90 CROSS SECTIONS

C3.19 U.S. HWY 90 CROSS SECTIONS

C3.20 U.S. HWY 90 CROSS SECTIONS

C3.21 U.S HWY 90 CROSS SECTIONS

C3.22 U.S HWY 90 CROSS SECTIONS

C3.23 U.S HWY 90 CROSS SECTIONS

C3.24 U.S HWY 90 CROSS SECTIONS

C3.25 PAVING, GRADING, & DRAINAGE DETAILS

C3.26 PAVING, GRADING, & DRAINAGE DETAILS

C3.27 PAVING, GRADING, & DRAINAGE DETAILS

C3.28 PAVING, GRADING, & DRAINAGE DETAILS

C3.29 SCDOT NOTES & DETAILS

C3.30 SCDOT NOTES & DETAILS

C4.1 STAKING, SIGNING, & MARKING PLAN

C4.2 STAKING, SIGNING, & MARKING PLAN

C4.3 STAKING, SIGNING, & MARKING PLAN

C4.4 TRAFFIC CONTROL PLAN

L1.1 LANDSCAPE PLAN

L2.1 GENERAL NOTES AND DETAILS

L2.2 LANDSCAPE SPECIFICATIONS

http://www.thomasandhutton.com

ONLYONLY

ONLY

611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545 www.thomasandhutton.com

611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545

TREES TO REMAIN

POINT # DESCRIPTION SPECIES DBH

7449 13" WHO WHITE OAK 13

7457 18" LAO LAUREL OAK 18

10446 18" BGUM BLACK GUM 18

TREES TO REMOVE

POINT # DESCRIPTION SPECIES DBH

10442 17" BGUM BLACK GUM 17

10448 17" BGUM BLACK GUM 17

10449 21" LAO LAUREL OAK 21

Total DBH 55

Fee in Lieu Calculation

Total DBH (in) Total

Replacement trees (RT)

Fee in Lieu

DBH/2.5=RT RT*150=F

55 22 $ 3,300.00

611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545

611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545 www.thomasandhutton.com

I. SITE DESCRIPTION

A. PROJECT DESCRIPTION

A.1. PROJECT AREA 13.4 ACRES

A.2. AREA DISTURBED 7.1 ACRES

A.3. PERCENT IMPERVIOUS AREA BEFORE CONSTRUCTION 0 %

A.4. RUNOFF COEFFICIENT BEFORE CONSTRUCTION 81 CN

A.5. PERCENT IMPERVIOUS AREA AFTER CONSTRUCTION 32.8%

A.6. RUNOFF COEFFICIENT AFTER CONSTRUCTION 86 CN

B. DESCRIPTION OF CONSTRUCTION ACTIVITY

WORK CONSISTS OF CLEARING, GRADING, DRAINAGE IMPROVEMENTS, GRASSING,

INSTALLATION OF WATER, WASTEWATER, AND STORM WATER SYSTEM, AND RODS

ASSOCIATED WITH DEVELOPMENT.

C. RUNOFF DATA

C.1. SOIL CLASSIFICATIONS: EULONIA (C/D), HOBCAW (B/D), OGEECHEE

(B/D), SUMMERTON (C), YAUHANNAH (B/D)

C.2. LAND USE(S): RESIDENTIAL

D. RECEIVING WATERS

D.1. CLOSEST RECEIVING WATERS: UNNAMED TRIBUTARY

D.2. ULTIMATE RECEIVING WATERS: WACCAMAW RIVER

E. FLOOD

E.1. FEMA FLOOD ZONE(S): X

E.2. FEMA FLOOD INSURANCE MAP(S): 45051C0605K

II. CONTROL MEASURES

1. EROSION AND SEDIMENT CONTROLS

PRIOR TO START OF CONSTRUCTION, ALL EXTERIOR SILT FENCE WILL BE INSTALLED AS

SHOWN ON THE PLANS.

1.1. CLEARING

1.1.1. AS CLEARING IS COMPLETED, ADDITIONAL SILT FENCE WILL BE INSTALLED WHERE

NECESSARY, SUCH AS POINTS WHERE FLOWS BECOME CHANNELIZED, AND OTHER

POINTS WHERE EXCESSIVE RUNOFF VELOCITIES MAY OCCUR.

1.1.2. INSTALL CONSTRUCTION ENTRANCES / EXITS BEFORE BEGINNING CLEARING

1.1.3. CONSTRUCTION DELAYS IN ANY ONE AREA GREATER THAN 14 DAYS PRIOR TO START OF

ROUGH GRADING WILL MANDATE STABILIZATION PROCEDURES. ACCEPTABLE METHODS

OF STABILIZATION INCLUDE MULCHING AND TEMPORARY SEEDING.

1.1.4. MAINTAIN EXISTING VEGETATION WHENEVER POSSIBLE AND MINIMIZE THE AREA OF

DISTURBANCE. RETAIN AND PROTECT TREES TO ENHANCE FUTURE LANDSCAPING

EFFORTS AND REDUCE RAINDROP IMPACT.

1.1.5. INSTALL ALL SEDIMENT CONTROL PRACTICES PRIOR TO ANY UP-SLOPE SOIL

DISTURBING ACTIVITIES.

1.1.6. PHASE CONSTRUCTION ACTIVITIES TO MINIMIZE THE AREAS DISTURBED AT ONE TIME.

THIS WILL ALSO ALLOW COMPLETED AREAS TO BE STABILIZED AND RE-VEGETATED

BEFORE DISTURBING ADJACENT SITES. THE NEED FOR TEMPORARY EROSION CONTROL

MEASURES MAY BE AVOIDED BY COMPLETING A PHASE AND INSTALLING PERMANENT

EROSION CONTROL MEASURES WHEN THE FINAL GRADE IS ATTAINED.

1.1.7. MAINTAIN AND PROTECT ALL NATURAL WATERWAYS. RETAIN AT LEAST A 35-FOOT

UNDISTURBED BUFFER OF NATURAL VEGETATION ALONG ALL WATERWAYS TO FILTER

OUT SEDIMENT AND OTHER POLLUTANTS. MAINTAIN A 45-FOOT UNDISTURBED BUFFER

AROUND SENSITIVE WATERS.

1.1.8. INSTALL SILT FENCE (OR BIO ROLLS/ROCK SOCK PRODUCTS) ON THE DOWN-SLOPE

PERIMETER OF ALL DISTURBED AREAS PRIOR TO ANY SOIL DISTURBING ACTIVITIES

(INCLUDING CLEARING AND GRUBBING). SILT FENCE CAN TREAT A MAXIMUM OF 100

SQUARE FEET PER LINEAL FOOT OF FENCE. INSTALL SILT FENCE IN SHORTER REACHES

ON THE CONTOUR WITH EACH END TURNED UP-SLOPE . SWALES AND SHORELAND

AREAS SHOULD ALSO BE PROTECTED WITH SILT FENCE, BIO ROLLS, OR ROCK SOCKS.

1.1.9. IN AREAS OF CONCENTRATED FLOW INSTALL STRAW BALE CHECKS, ROCK CHECK DAMS,

TRIANGULAR DIKES, BIO ROLL BLANKETS, OR ROCK SOCKS TO SLOW RUNOFF AND TRAP

SEDIMENT.

1.1.10. USE TEMPORARY SLOPE DRAINS OR ROCK CHUTES TO MOVE WATER DOWN STEEP

SLOPES.

1.1.11. CONSTRUCT SEDIMENT BASINS FOR DRAINAGE AREAS GREATER THAN 10 ACRES

1.2. ROUGH GRADING

1.2.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING ROUGH GRADING, DELAYS OF

GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE

STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE

MULCHING AND TEMPORARY SEEDING.

1.2.2. ALL AREAS NOT SUBJECT TO FURTHER CONSTRUCTION (DRAINAGE, SANITARY SEWER,

ROADS, WATER DISTRIBUTION SYSTEMS, OR STORM WATER FACILITIES) SHALL BE

GRASSED WITH A PERMANENT COVER.

1.2.3. COVER ANY STOCK PILED TOPSOIL WITH PLASTIC (OR OTHER IMPERVIOUS COVERING)

OR USE A TEMPORARY SEED MIX. USE STOCKPILED TOPSOIL AS EARTHEN BERMS TO

SERVE AS TEMPORARY SEDIMENT BASINS.

1.3. DRAINAGE

1.3.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING DRAINAGE INSTALLATION.

1.3.2. CONSTRUCTION DRAINAGE WILL BE ROUTED THROUGH LAKES, WHICH WILL ACT AS

SEDIMENT BASINS OR OTHER ACCEPTABLE SEDIMENT BASINS/TRAPS.

1.3.3. STORM DRAIN INLET PROTECTION AS SHOWN ON DETAIL SHEET SHALL BE INSTALLED

ON ALL CURB INLETS, STORM DRAIN MANHOLES, JUNCTION BOXES, AND GRATE INLETS.

1.3.4. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF THE NEXT CONSTRUCTION

SEQUENCE WILL MANDATE STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF

STABILIZATION INCLUDE MULCHING AND TEMPORARY SEEDING.

1.3.5. ALL STORM LINES NOT IN STREETS OR OTHER PAVED AREAS ARE TO BE MULCHED AND

SEEDED WITHIN 5 DAYS AFTER BACKFILL.

1.4. WASTE DISTRIBUTION SYSTEM INSTALLATION

1.4.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING INSTALLATION OF THE WATER

DISTRIBUTION SYSTEM.

1.4.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE

STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE

MULCHING AND TEMPORARY SEEDING.

1.5. WASTEWATER COLLECTION SYSTEM INSTALLATION

1.5.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING INSTALLATION OF THE

WASTEWATER SYSTEM.

1.5.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE

STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE

MULCHING AND TEMPORARY SEEDING.

1.6. CONSTRUCTION OF ROADS

1.6.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING ROAD CONSTRUCTION.

1.6.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE

STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE

MULCHING AND TEMPORARY SEEDING.

1.7. GRASSING

1.7.1. ALL EXISTING CONTROLS WILL BE MAINTAINED UNTIL GRASSING IS ESTABLISHED

1.7.2. ANY AREAS THAT ERODE OR WHERE GRASS DOES NOT ESTABLISH ITSELF SHALL BE

RE-GRADED AND RE-GRASSED.

2. STORM WATER MANAGEMENT

RUNOFF FROM THIS PROJECT WILL DISCHARGE INTO A STORM WATER MANAGEMENT SYSTEM.

TREATMENT WILL OCCUR IN STORM WATER DETENTION PONDS.

3. OTHER CONTROLS

3.1. WASTE DISPOSAL

3.1.1. NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL BE DISCHARGED TO ANY

RECEIVING WATERS.

3.1.2. OFFSITE VEHICLE TRACKING OF SEDIMENTS AND THE GENERATION OF DUST SHALL BE

MINIMIZED.

3.1.3. THIS PLAN SHALL COMPLY WITH STATE AND/OR LOCAL WASTE DISPOSAL, SANITARY

SEWER OR SEPTIC SYSTEM REGULATIONS.

3.1.4. DUST CONTROL ON DISTURBED AREAS - CONTROLLING SURFACE AND AIR MOVEMENT OF

DUST ON CONSTRUCTION SITE AND HAUL ROUTES. THE PURPOSE OF THE MEASURE IS

TO REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES, WHICH MAY BE HARMFUL OR

INJURIOUS TO HUMAN HEALTH, WELFARE OR SAFETY, OR TO ANIMALS OR PLANT LIFE.

III. MAINTENANCE

1. MAINTENANCE PROGRAM

1.1. THE SITE SUPERINTENDENT, OR HIS/HER REPRESENTATIVE, SHALL MAKE VISUAL

INSPECTIONS OF ALL MECHANICAL CONTROLS AND NEWLY STABILIZED AREAS (I.E.

SEEDED AND MULCHED AND/OR SODDED AREAS) ON A DAILY BASIS; ESPECIALLY AFTER

HEAVY RAINFALL EVENT TO INSURE THAT ALL CONTROLS ARE MAINTAINED AND

PROPERLY FUNCTIONING. ANY DAMAGED CONTROLS SHALL BE REPAIRED PRIOR TO THE

END OF THE WORK DAY INCLUDING RE-SEEDING AND MULCHING OR RE-SODDING IF

NECESSARY.

1.2. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL

IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION

CONTROL, ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE

IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. ALL DRAINAGE SWALES,

POCKETS, DEPRESSION, LOW LINES, AND OUTLET DITCHES SHALL DRAIN EFFECTIVELY AT

ALL TIMES. SETTLEMENT OR WASHING THAT MAY OCCUR SHALL BE REPAIRED BY THE

CONTRACTOR. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN

IT REACHES 1/3 THE HEIGHT OF THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS

NECESSARY TO MAINTAIN AN EFFECTIVE BARRIER. MAINTAIN THE CONSTRUCTION EXIT IN

A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. THIS MAY

REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE. IMMEDIATELY REMOVE ALL

OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TACKED ONTO PUBLIC ROADWAYS.

RESEED AND MULCH AREA WHERE SEEDING EMERGENCE IS POOR, OR WHERE EROSION

OCCURS. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. INSPECT ALL MULCHES

PERIODICALLY, AND AFTER RAINSTORMS TO CHECK FOR EROSION, DISLOCATION OR

FAILURE. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED AND REINSTALL

MULCH. FOLLOW THE CONSTRUCTION SEQUENCE THROUGHOUT THE PROJECT

DEVELOPMENT. WHEN CHANGES IN CONSTRUCTION ACTIVITIES ARE NEEDED, AMEND THE

SEQUENCE SCHEDULE IN ADVANCE TO MAINTAIN MANAGEMENT CONTROL. IF MAJOR

CHANGES ARE NECESSARY, SEND A COPY OF THE MODIFIED SCHEDULE TO THE

ENGINEER, SEDIMENT AND EROSION CONTROL MEASURES WILL REMAIN IN PLACE AND BE

MAINTAINED UNTIL THE DISTURBED AREAS ARE STABILIZED.

2. SILT FENCE

SILT FENCES WILL BE MONITORED DURING CONSTRUCTION. ANY SILT FENCE WHICH IS NOT

FUNCTIONING PROPERLY WILL BE PROMPTLY REPAIRED. CLEAN OUT THE SILT FENCE WHEN

IT REACHES 1/3 THE HEIGHT OF THE FENCE OR REPLACE WITH FUNCTIONAL SILT FENCE

WITHIN 24 HOURS. USE OF HOSES AND WATER TO FLUSH THE SEDIMENT INTO THE STORM

INLETS IS UNACCEPTABLE.

3. SEDIMENTATION BASINS

SEDIMENTATION BASINS WHICH ARE AT 50% USED CAPACITY OR APPROACHING SUCH

CAPACITY SHALL BE RE-EXCAVATED TO ORIGINAL DIMENSIONS AND THE SILT PROPERLY

DISPOSED OF.

4. SEDIMENT LOGS/ROLLS

SEDIMENT LOGS/ROLLS OR OTHER CONTROL MEASURES WHICH BEGIN TO DISINTEGRATE

OR FUNCTION INEFFECTIVELY SHALL BE PROMPTLY REPLACED.

5. VEGETATION COVER

ANY VEGETATION COVER SERVING TO STABILIZE DISTURBED SOILS WHICH IS ITSELF

DISTURBED SHALL IMMEDIATELY BE REPLACED.

6. CONSTRUCTION ENTRANCE

MAINTAIN ROCK CONSTRUCTION ENTRANCE AND CLEAN ADJACENT ROADS OF ANY MUD

TRACKED ONTO THEM.

IV. INSPECTIONS

1. QUALIFIED PERSONNEL WILL INSPECT DISTURBED AREAS OF THE CONSTRUCTION SITE,

AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION THAT

HAVE NOT BEEN FINALLY STABILIZED, STRUCTURAL CONTROL MEASURES, AND LOCATIONS

WHERE VEHICLES ENTER OR EXIT THE SITE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.

WHERE SITES HAVE BEEN FINALLY STABILIZED SUCH INSPECTIONS SHALL BE CONDUCTED AT

LEAST ONCE EVERY MONTH DURING THE WARRANTY PERIOD.

2. DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO

PRECIPITATION SHALL BE INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR,

POLLUTANTS ENTERING THE DRAINAGE SYSTEM. EROSION AND SEDIMENT CONTROL

MEASURES IDENTIFIED IN THE PLAN SHALL BE OBSERVED TO ENSURE THAT THEY ARE

OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY

SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE

EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATERS. LOCATIONS WHERE

VEHICLES ENTER OR EXIT THE SITE SHALL BE INSPECTED FOR EVIDENCE OF OFFSITE

SEDIMENT TRACKING.

3. A WRITTEN REPORT SUMMARIZING THE SCOPE OF THE INSPECTION, NAME(S) AND

QUALIFICATIONS OF PERSONNEL MAKING THE INSPECTION, THE DATE(S) OF THE INSPECTION, WEATHER INFORMATION FOR THE PERIOD SINCE THE LAST INSPECTION (OR SINCE

COMMENCEMENT OF CONSTRUCTION ACTIVITY) INCLUDING A BEST ESTIMATE OF THE

BEGINNING OF EACH STORM EVENT, DURATION OF EACH STORM EVENT, APPROXIMATE

AMOUNT OF RAINFALL FOR EACH STORM EVENT (IN INCHES) AND WHETHER ANY DISCHARGES

OCCURRED, LOCATION(S) OF DISCHARGES OF SEDIMENT OR OTHER POLLUTANTS FROM THE

SITE, LOCATION(S) OF BMP'S THAT NEED MAINTENANCE, LOCATION(S) OF BMP'S THAT FAILED

TO OPERATE AS DESIGNED OR PROVED INADEQUATE FOR A PARTICULAR LOCATION,

LOCATION(S) WHERE ADDITIONAL BMP'S ARE NEEDED THAT DID NOT EXIST AT THE TIME OF

INSPECTION AND ANY CORRECTIVE ACTION REQUIRED INCLUDING ANY CHANGES TO SWPPP

NECESSARY AND IMPLEMENTATION DATES.

4. THE REPORT SHALL BE MAINTAINED AT LEAST THREE YEARS FROM THE DATE THE SITE IS

FINALLY STABILIZED. THE REPORT MUST BE SIGNED AND SHALL CONTAIN A CERTIFICATION

THAT THE FACILITY IS IN COMPLIANCE WITH THE STORM WATER POLLUTION PREVENTION PLAN

AND THE NPDES PERMIT REFERENCED ABOVE. THE CONTRACTOR SHALL MAINTAIN THIS

REPORT. THE REPORT SHALL BE SUBMITTED TO THE ENGINEER AND OWNER.

V. LONG TERM MAINTENANCE OF DRAINAGE AND STORM WATER

MANAGEMENT SYSTEM

THE ROADS AND DRAINAGE SYSTEM WILL BE OWNED AND MAINTAINED BY CITY OF

GEORGETOWN AFTER CONSTRUCTION IS COMPLETE.

VI. SC DHEC STANDARD NOTES

1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO GRASSING / HYDROSEEDING. IT MAY

BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION.

TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE.

2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF

THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED,

BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS

STATED BELOW:

2.1. WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN

GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS

PRACTICABLE.

2.2. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED,

AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY

STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.

3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY

CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP

HAS BEEN USED INAPPROPRIATELY, OR INCORRECTLY, THE PERMITTEE MUST ADDRESS THE

NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48

HOURS OF IDENTIFICATION.

4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL

SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED,

GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION.

FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF

WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE

ANY SEDIMENTS BEFORE BEING PUMPED INTO ANY WATERS OF THE STATE.

5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF

CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL

DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE

REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE

SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE

CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.

6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD

ONTO THE PAVED ROADWAY FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST.

THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT AS MAY BE REQUIRED.

7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE

AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL

FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN

IN ACCORDANCE WITH S.C. REG. 72-300 AND SCR100000.

8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING

CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT

SEDIMENT LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS.

9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR

OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE

INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN NOT BE MAINTAINED BETWEEN THE

DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE

LAST ROW OF SILT FENCE AND ALL WOS

10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT

POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND

CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE

PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES.

11. A COPY OF THE SWPPP, INSPECTION RECORDS AND RAINFALL DATA MUST BE RETAINED AT

THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL

BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO

THE DATE THAT FINAL STABILIZATION IS REACHED.

12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER)

WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND

WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.

13. MINIMIZE SOIL COMPACTION IN AREAS NOT UNDER PAVEMENTS AND /OR STRUCTURES AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.

14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL

WASH WATER AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT

BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUAL OR BETTER TREATMENT PRIOR TO

DISCHARGE.

15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND

EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS

(SEDIMENT BASIN, FILTER BAG, ETC.).

16. THE FOLLOWING DISCHARGES ARE PROHIBITED:

16.1. WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE

CONTROL;

16.2. WASTEWATER FROM WASHOUT AND CLEANOUT OF OF STUCCO, PAINT, FORM RELEASE

OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;

16.3. FUELS, OILS OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND

MAINTENANCE; AND

16.4. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.

17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM

OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL

STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE.

18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO

COMPLY WITH THE REQUIREMENTS OF PERMIT SCR100000 AND/OR SC'S WATER QUALITY

STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT

WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS

IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE

BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE.

19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN

APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES.

FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE, THIS CONFERENCE MUST BE

HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE.

VII. EROSION, SEDIMENTATION & POLLUTION CONTROL NOTES

1. THE IMPLEMENTATION OF THESE EROSION SEDIMENT CONTROL (ESC) PLANS AND THE

CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS

THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND

APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED.

2. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH

ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT

SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS,

OR VIOLATE APPLICABLE WATER STANDARDS.

3. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR

ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES

SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT

SEDIMENT AND SEDIMENT LADEN WATER DO NOT LEAVE THE SITE.

4. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS

NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.

5. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF

ONCE A MONTH OR WITHIN THE 24 HOURS FOLLOWING A MAJOR STORM EVENT.

6. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN

A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO

PAVING AND PRIOR TO FINAL INSPECTION. THE CLEANING OPERATION SHALL NOT FLUSH

SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM.

7. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF

CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL

MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE

DURATION OF THE PROJECT.

8. BEFORE COMMENCING ANY LAND DISTURBING ACTIVITY, THE EXISTING STORM WATER

INLET(S) THAT RECEIVING RUNOFF FROM THE PROPOSED WORK AREA SHALL BE PROTECTED.

THE TEMPORARY INLET PROTECTION MUST REMAIN IN PLACE UNTIL THE CONSTRUCTION

ACTIVITY IS COMPLETED, THE STREET HAS BEEN SWEPT AND ANY EXPOSED SOILS ARE

STABILIZED. THE CONTRACTOR IS ALSO RESPONSIBLE FOR REMOVING ANY TEMPORARY

INLET PROTECTION INSTALLED; AFTER ALL DISTURBED AREAS ARE STABILIZED. TEMPORARY

PROTECTION OF THE INLETS MAY BE ACCOMPLISHED BY ONE OR MORE OF THE FOLLOWING:

8.1. USE OF GRAVEL BAGS TO FILTER THE SEDIMENT FROM ANY RUNOFF. TO MAKE A GRAVEL

BAG, USE A BAG MADE OF GEOTEXTILE FABRIC (NOT BURLAP) AND FILL WITH EITHER 3/4

INCH ROCK OR 1/4 INCH PEA GRAVEL.

8.2. USE OF SEDIMENT LOGS TO FILTER THE SEDIMENT FROM ANY RUNOFF (AVAILABLE

THROUGH LOCAL EROSION CONTROL SUPPLIERS).

8.3. USE OF ABOVE OR UNDER-GRATE FILTER BAGS OR DEVICES TO FILTER THE SEDIMENT

FROM ANY RUNOFF (AVAILABLE THROUGH EROSION CONTROL SUPPLIERS).

9. WATER MAY NOT BE DISCHARGED IN A MANNER THAT CAUSES EROSION, SEDIMENTATION, OR

FLOODING ON THE SITE, ON DOWNSTREAM PROPERTIES, IN THE RECEIVING CHANNELS, OR IN

ANY STORM WATER INLET. WHEN SITE DEWATERING, WATER PUMPED FROM THE SITE,

INCLUDING TRENCHES, SHALL BE TREATED BY ONE OF THE FOLLOWING:

9.1. TEMPORARY SEDIMENTATION BASINS

9.2. SEDIMENT FILTERING BAGS

10. THE CONTRACTOR SHALL VERIFY THE SIZE AND LOCATION OF ALL EXISTING UTILITIES.

EXISTING UTILITIES ARE ALL UTILITIES THAT EXIST ON THE PROJECT IN AN ORIGINAL,

RELOCATED OR NEWLY INSTALLED POSITION. THE CONTRACTOR SHALL BE HELD

RESPONSIBLE FOR THE COST OF REPAIRS TO DAMAGED UNDERGROUND OR OVERHEAD

FACILITIES, EVEN IF THE UTILITY IS NOT SHOWN ON THE SITE DEVELOPMENT PLANS. THE

CONTRACTOR SHALL CONTACT THE LOCAL UTILITIES PROTECTION CENTER TO COORDINATE

THE MARKING OF EXISTING UTILITY LINES A MINIMUM OF 96 HOURS PRIOR TO

COMMENCEMENT OF ANY WORK.

11. THE CONTRACTOR SHALL FLUSH ALL INLETS AND PIPE AT THE COMPLETION OF

CONSTRUCTION TO REMOVE SILT AND DEBRIS. THE CLEANING AND FLUSHING OF INLETS AND

PIPE (EXISTING AND PROPOSED) SHALL BE CONSIDERED PART OF THE COST FOR THE

PROJECT.

12. EGRESS FROM THE SITE SHALL BE CONTROLLED SUCH THAT VEHICLES LEAVING THE SITE

MUST TRAVERSE CONSTRUCTION EXITS TO REMOVE MUD FROM TIRES.

13. SCHEDULE CONSTRUCTION ACTIVITIES TO MINIMIZE THE EXPOSED AREA AND DURATION OF

EXPOSURE. IN SCHEDULING, TAKE INTO ACCOUNT THE SEASON AND THE WEATHER

FORECAST.

14. EROSION CONTROL MEASURES ARE THE MINIMUM REQUIRED. THE CONTRACTOR SHALL

PROVIDE ADDITIONAL CONTROL MEASURES AS DICTATED BY ACTUAL FIELD CONDITIONS AT

THE TIME OF CONSTRUCTION IN ORDER TO PREVENT EROSION AND CONTROL SEDIMENT.

EROSION AND SEDIMENT CONTROL MEASURES WILL REMAIN IN PLACE AND BE MAINTAINED

UNTIL THE ENTIRE PROJECT IS TERMINATED OR SUSPENDED FOR AND INDEFINITE LENGTH OF

TIME, ALL DISTURBED AREAS SHALL BE PLANTED WITH PERMANENT VEGETATION.

15. THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS, OR IN ANY

WAY INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, IS

BASED UPON FIELD INVESTIGATIONS AND IS BELIEVED TO BE INDICATIVE OF ACTUAL

CONDITIONS. HOWEVER, THE SAME IS SHOWN AS INFORMATION ONLY, IS NOT GUARANTEED

AND DOES NOT BIND THOMAS & HUTTON, OR THE OWNER IN ANY WAY.

16. CONTRACTOR SHALL MAINTAIN SITE ON A DAILY BASIS TO PROVIDE FOR POSITIVE DRAINAGE.

CONTRACTOR, AT HIS COST, SHALL GRADE SITE AND PROVIDE NECESSARY TEMPORARY

DRAINAGE SWALES TO INSURE STORM WATER DOES NOT POND ON SITE.

17. SITE DRAINAGE SHALL BE ESTABLISHED TO PREVENT ANY PONDED WATER CONDITIONS

WITHIN THE CONSTRUCTION AREA AND TO FACILITATE STORM WATER DISCHARGE.

18. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF

EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT

WITH, LAND DISTURBING ACTIVITIES.

19. LIME RATES AND ANALYSIS:

19.1. AGRICULTURAL LIME SHALL BE APPLIED AT THE RATE SHOWN IN THE SEEDING SECTION

UNLESS SOIL TESTS INDICATE OTHERWISE. GRADED AREAS REQUIRE LIME APPLICATION.

IF LIME IS APPLIED WITHIN SIX MONTHS OF PLANTING PERMANENT PERENNIAL

VEGETATION, ADDITIONAL LIME IS NOT REQUIRED. AGRICULTURAL LIME APPLICATION

SHALL BE WITHIN THE SPECIFICATIONS OF THE SOUTH CAROLINA DEPARTMENT OF

AGRICULTURE.

20. MULCHING:

MULCHING IS REQUIRED FOR ALL PERMANENT VEGETATION APPLICATIONS. MULCH APPLIED

TO SEEDED AREAS SHALL ACHIEVE 75% SOIL COVER. SELECT THE MULCHING MATERIAL FROM

THE FOLLOWING AND APPLY AS INDICATED:

20.1. DRY STRAW OR DRY HAY OF GOOD QUALITY AND FREE OF WEED SEEDS CAN BE USED.

DRY STRAW SHALL BE APPLIED AT THE RATE OF TWO TONS PER ACRE. DRY HAY SHALL BE

APPLIED AT THE RATE OF 2 1/2 TONS PER ACRE.

20.2. WOOD CELLULOSE MULCH OR WOOD PULP FIBER SHALL BE USED WITH HYDRAULIC

SEEDING. IT SHALL BE APPLIED AT A RATE OF 500 POUNDS PER ACRE. DRY STRAW OR DRY

HAY SHALL BE APPLIED (AT THE RATE INDICATED ABOVE) AFTER HYDRAULIC SEEDING.

20.3. ONE THOUSAND POUNDS OF WOOD CELLULOSE OR WOOD PULP FIBER, WHICH INCLUDES

A TACKIFIER, SHALL BE USED WITH HYDRAULIC SEEDING ON SLOPES 3/4:1 OR STEEPER.

20.4. PINE STRAW OR PINE BARK SHALL BE APPLIED AT A THICKNESS OF 3 INCHES FOR

BEDDING PURPOSES. OTHER SUITABLE MATERIALS IN SUFFICIENT QUANTITY MAY BE USED

WHERE ORNAMENTALS OR OTHER GROUND COVERS ARE PLANTED. THIS IS NOT

APPROPRIATE FOR SEEDED AREAS.

20.5. WHEN USING TEMPORARY EROSION CONTROL BLANKETS OR BLACK SOD, MULCH IS NOT

REQUIRED.

20.6. ON SLOPES GREATER THAN 10 FEET IN LENGTH AND 4:1 OR STEEPER, USE THE

FOLLOWING EROSION CONTROL BLANKETS THAT HAVE BEEN PROPERLY ANCHORED TO

THE SLOPE ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS:

· 2:1 SLOPES OR STEEPER: - STRAW/COCONUT BLANKET OR HIGH VELOCITY WOOD

BLANKET

· 3:1 SLOPES OR STEEPER: - WOOD OR STRAW BLANKET WITH NET ON BOTH SIDES

· 4:1 SLOPES OR FLATTER: - WOOD OR STRAW MULCH BLANKET WITH NET ON ONE SIDE

VIII. HOUSEKEEPING

THESE PERFORMANCE STANDARDS APPLY TO ALL SITES.

1. PETROLEUM PRODUCTS: INCLUDING OIL, GASOLINE, LUBRICANTS AND ASPHALTIC

SUBSTANCES.

1.1. HAVE EQUIPMENT TO CONTAIN AND CLEAN UP PETROLEUM SPILLS IN FUEL STORAGE

AREAS OR ON MAINTENANCE AND FUELING VEHICLES

1.2. STORE IN COVERED AREAS PROTECTED WITH DIKES

2. SPILLS: PREVENTION AND RESPONSE.

2.1. STORE AND HANDLE MATERIALS TO PREVENT SPILLS

2.2. TIGHTLY SEALED CONTAINERS, NEAT AND SECURE STACKING, ETC.

2.3. REDUCE STORM WATER CONTACT IF SPILL OCCURS

2.3.1. CLEANUP PROCEDURES SHOULD BE CLEARLY POSTED.

2.3.2. CLEANUP MATERIALS SHOULD BE READILY AVAILABLE

2.3.3. STOP THE SOURCE

2.3.4. CONTAIN THE SPILL

3. NON-STORM WATER DISCHARGES

THE FOLLOWING NON-STORMWATER DISCHARGES MUST BE PROTECTED FROM CAUSING

POLLUTION OR EROSION:

3.1. DISCHARGES FROM FIRE-FIGHTING ACTIVITIES

3.2. FIRE HYDRANT FLUSHINGS

3.3. WATERS USED TO WASH VEHICLES WHERE DETERGENTS ARE NOT USED

3.4. WATER USED TO CONTROL DUST

3.5. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS

3.6. ROUTINE EXTERNAL BUILDING WASH DOWN THAT DOES NOT USE DETERGENTS

3.7. PAVEMENT WASH WATERS WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS

MATERIALS HAVE NOT OCCURRED (UNLESS ALL SPILLED MATERIAL HAS BEEN REMOVED)

AND WHERE DETERGENTS ARE NOT USED

3.8. UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE

3.9. UNCONTAMINATED GROUND WATER OR SPRING WATER

3.10. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH

PROCESS MATERIALS SUCH AS SOLVENTS

3.11. UNCONTAMINATED EXCAVATION DEWATERING

3.12. LANDSCAPE IRRIGATION

3.13. DECHLORINATED SWIMMING POOL DISCHARGES.

4. CONSTRUCTION WASTES: DEMOLITION RUBBLE, PACKAGING MATERIALS, SCRAP BUILDING

SUPPLIES, ETC.

4.1. SELECT A DESIGNATED WASTE COLLECTION AREA

4.2. PROVIDE LIDS FOR WASTE CONTAINERS

4.3. WHEN POSSIBLE LOCATE CONTAINERS IN COVERED AREA

4.4. MAINTAIN CONSISTENT REMOVAL SCHEDULE FOR WASTE

5. PESTICIDES: REDUCE THE AMOUNT OF PESTICIDES AVAILABLE FOR CONTACT WITH STORM

WATER.

5.1. STORE IN A DRY COVERED AREA

5.2. INSTALL CURBS OR DIKES AROUND STORAGE AREA TO PROTECT AGAINST SPILLS

5.3. STRICTLY FOLLOW RECOMMENDED APPLICATION RATES

6. FERTILIZERS AND DETERGENTS: REDUCE THE AMOUNT OF FERTILIZERS AND DETERGENTS

AVAILABLE FOR CONTACT WITH STORM WATER.

6.1. LIMIT APPLICATION OF FERTILIZERS TO THE MINIMUM NEEDED

6.2. APPLY MORE FREQUENTLY BUT AT LOWER APPLICATION RATES

6.3. LIMIT USE OF DETERGENTS ON-SITE

6.4. DO NOT DISCHARGE WASH WATER INTO STORM WATER SYSTEM

6.5. MAINTAIN STRUCTURAL AND VEGETATIVE BMP'S

6.6. APPLY ACCORDING TO SOIL TEST RECOMMENDATIONS PRIOR TO SEEDING.

IX. GRASSING NOTES

1. SOD:

ALL SOD SHALL BE NURSERY GROWN AS CLASSIFIED IN THE ASPS GSS. MACHINE CUT SOD AT

A UNIFORM THICKENS OF 3/4" WITHIN A TOLERANCE OF 1/4", EXCLUDING TOP GROWTH AND

THATCH. EACH INDIVIDUAL SOD PIECE SHALL BE STRONG ENOUGH TO SUPPORT ITS OWN

WEIGHT WHEN LIFTED BY THE ENDS. BROKEN PODS, IRREGULARLY SHAPED PIECES, AND

TORN OR UNEVEN ENDS WILL BE REJECTED. WOOD PEGS AND / OR WIRE STAPLES SHALL

REPLACE SOD WITH AN EQUAL SOD COMPOSITION AS THAT WHICH IS EXISTING. IF NO SOD

TYPE EXIST. THEN THE FOLLOWING SOD COMPOSITION SHALL BE USED.

2. SODDING SCHEDULE:

LAY SOD FROM MAY 1 TO SEPTEMBER 15 FOR SPRING PLANTING AND FROM SEPTEMBER 15 TO

NOVEMBER 1 FOR FALL PLANTING.

3. SEED:

ALL SEED SHALL CONFORM TO ALL STATE LAWS AND TO ALL REQUIREMENTS AND

REGULATIONS OF THE SOUTH CAROLINA DEPARTMENT OF AGRICULTURE. THE SEVERAL

VARIETIES OF SEED SHALL BE INDIVIDUALLY PACKAGED OR BAGGED, AND TAGGED TO SHOW

NAME OF SEED, NET WEIGHT, ORIGIN, GERMINATION, LOT NUMBER, AND OTHER INFORMATION

REQUIRED BY THE DEPARTMENT OF AGRICULTURE.

3.1. PENNISETUM GLAUCIUM (BROWNTOP MILLET): TESTING 98 PERCENT PURITY AND 85

PERCENT GERMINATION.

3.2. BERMUDA COMMON: TESTING 98 PERCENT PURITY AND 85 PERCENT GERMINATION.

3.3. DOMESTIC ITALIAN RYE: TESTING 98 PERCENT PURITY AND 90 PERCENT GERMINATION.

4. MISCELLANEOUS:

4.1. PERMANENT SEEDING SHALL COVER ALL DISTURBED AREA NOT TO BE COVERED BY

LANDSCAPE PLANTING BEDS, STRUCTURE, OR PAVEMENT.

4.2. SEED ALL DISTURBED AREAS WITHIN SEVEN DAYS OF FINAL GRADING AND TEMPORARY

SEED/MULCH ALL AREAS THAT WILL BE LEFT INACTIVE FOR MORE THAN FOURTEEN (14)

DAYS.

4.3. ALL PERMANENT GRASS PLANTINGS SHALL BE MULCHED

4.4. CENTIPEDE SOD CAN BE USED AS PERMANENT COVER ANYTIME EXCEPT JUNE THRU

OCTOBER

4.5. IF GRASSING OCCURS DURING A MONTH REQUIRING TEMPORARY COVER, THE CONTRACTOR

SHALL APPLY PERMANENT COVER (IN ADDITION TO THE TEMPORARY COVER) AT THE

APPROPRIATE TIME AT NO NO ADDITIONAL COST. THE CONTRACTOR MUST ACHIEVE A STRAND

OF PERMANENT GRASS WITH AT LEAST 95% COVER. BARE SPOTS CAN NOT BE MORE THAN 1

INCH SQUARE IN ANY 10 SF.

X. PERMANENT STABILIZATION

NEWLY SEEDED OR SODDED AREAS MUST BE PROTECTED FROM VEHICLE TRAFFIC,EXCESSIVE

PEDESTRIAN TRAFFIC, AND CONCENTRATED RUNOFF UNTIL THE VEGETATION IS WELL

ESTABLISHED. IF NECESSARY, AREAS MUST BE RE-WORKED AND RE-STABILIZED IF GERMINATION IS SPARSE, PLANT COVERAGE IS SPOTTY ,OR TOPSOIL EROSION IS EVIDENT. ONE OR MORE OF

THE FOLLOWING MAY APPLY TO THE SITE.

4.1. SEEDED AREAS

FOR SEEDED AREAS, PERMANENT STABILIZATION MEANS A 90% COVER OF THE

DISTURBED AREA WITH MATURE, HEALTHY PLANTS WITH NO EVIDENCE OF WASHING OR

RILLING OF THE TOPSOIL.

4.2. SODDED AREAS

FOR SODDED AREAS, PERMANENT STABILIZATION MEANS THE COMPLETE BINDING OF THE

SOD ROOTS INTO THE APPROVED MULCH MATERIAL.

4.3. PERMANENT MULCH

FOR MULCHED AREAS, PERMANENT MULCHING MEANS TOTAL COVERAGE OF THE

EXPOSED AREA WITH AN APPROVED MULCH MATERIAL.

4.4. RIPRAP

FOR AREAS STABILIZED WITH RIPRAP, PERMANENT STABILIZATION MEANS THAT SLOPES

STABILIZED WITH RIPRAP HAVE AN APPROPRIATE BACKING OF AN APPROVED GEOTEXTILE

TO PREVENT SOIL MOVEMENT FROM BEHIND THE RIPRAP.

4.5. DITCHES, CHANNELS, AND SWALES

FOR OPEN CHANNELS, PERMANENT STABILIZATION MEANS THE CHANNEL IS STABILIZED

WITH MATURE VEGETATION AT LEAST THREE INCHES IN HEIGHT, WITH WELL-GRADED

RIPRAP LINING, OR WITH ANOTHER NON-EROSIVE LINING CAPABLE OF WITHSTANDING THE

ANTICIPATED FLOW VELOCITIES AND FLOW DEPTHS WITHOUT RELIANCE ON CHECK DAMS

TO SLOW FLOW. THERE MUST BE NO EVIDENCE OF SLUMPING OF THE LINING,

UNDERCUTTING OF THE BANKS, OR DOWN CUTTING OF THE CHANNEL.

XI. FERTILIZER REQUIREMENTS

1. TEMPORARY SEEDING FERTILIZER

APPLY A MINIMUM OF 500 LBS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (11.5 POUNDS

PER 1000 SQUARE FEET) OR EQUIVALENT DURING TEMPORARY SEEDING OF GRASSES UNLESS

A SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF

USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE

CONDITIONS ALLOW. LIME IS NOT REQUIRED FOR TEMPORARY SEEDING UNLESS A SOIL TEST

SHOWS THAT THE SOIL PH IS BELOW 5.0. IT IS DESIRABLE TO APPLY LIME DURING THE

TEMPORARY SEEDING OPERATION TO BENEFIT THE LONG-TERM PERMANENT SEEDING. APPLY

A MINIMUM OF 1.5 TONS OF LIME / ACRE (70LBS. / 1000 SQ. FT.).

2. PERMANENT SEEDING FERTILIZER

APPLY A MINIMUM OF 1000 LBS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (23 POUNDS

PER 1000 SQUARE FEET) OR EQUIVALENT DURING PERMANENT SEEDING OF GRADES UNLESS

A SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF

USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE

CONDITIONS ALLOW. DO NOT MIX THE LIME AND THE FERTILIZER PRIOR TO THE FIELD

APPLICATION. UNLESS A SPECIFIC SOIL TEST INDICATES OTHERWISE, APPLY 1 & 1/2 TONS OF

GROUND COARSE TEXTURED AGRICULTURAL LIMESTONE PER ACRE (70 LBS. / 1000 SQ.FT.).

XII. SWPP PREPARER CERTIFICATION

I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000.

www.thomasandhutton.com

STORMWATER POLLUTION PREVENTION PLANSTORMWATER POLLUTION PREVENTION PLAN

LIST OF ACRONYMS FOR SEDIMENT AND EROSION CONTROL

AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

AMD ACRYLAMIDE POLYMER

BFM BONDED FIBER MATRIX

BMP(S) BEST MANAGEMENT PRACTICE(S)

CFS CUBIC FEET PER SECOND

CMP CORRUGATED METAL PIPE

DHEC DEPARTMENT OF HEATH AND ENVIRONMENTAL CONTROL

ECB EROSION CONTROL BLANKET

EPA UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

EPSC EROSION PREVENTION AND SEDIMENTATION CONTROL

FDA UNITED STATES FOOD AND DRUG ADMINISTRATION

FGM FLEXIBLE GROWTH MATRIX

HDPE HIGH DENSITY POLYETHYLENE

MS4 MUNICIPAL SEPARATE STORM SEWER SYSTEM

MSDS MATERIAL SAFETY DATA SHEETS

NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

PAM POLYACRYLAMIDE OR POLYMER

RCP REINFORCED CONCRETE PIPE

SCS SOIL CONSERVATION SERVICE

SWPPP STORMWATER POLLUTION PREVENTION PROGRAM

TRM TURF REINFORCEMENT MAT

VFS VEGETATED FILTER STRIP

TEMPORARY SEEDING - COASTAL

SPECIES LBS/AC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

SANDY, DROUGHTY SITES

BROWNTOP MILLET 40

RYE, GRAIN 56

WELL DRAINED, CLAYEY/LOAMEY SITES

BROWNTOP MILLET 40

JAPANESE MILLET 40

RYE, GRAIN 56

OATS 75

PERMANENT SEEDING - COASTAL

SPECIES LBS/AC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

SANDY, DROUGHTY SITES

BROWNTOP MILLET 10

BAHIAGRASS 40

BROWNTOP MILLET 10

BAHIAGRASS 30

BROWNTOP MILLET 10

ATLANTIC COASTAL 15

PANICGRASS PLS

BROWNTOP MILLET 10

SWITCHGRASS 8

(ALAMO) PLS

LITTLE BLUESTEM 4

BROWNTOP MILLET 10

WEEPING LOVEGRASS 8

WELL DRAINED, CLAYEY/LOAMEY SITES

BROWNTOP MILLET 10

BAHIAGRASS 40

RYE, GRAIN 10

BAHIAGRASS 40

CLOVER, CRIMSON (ANNUAL) 5

BROWNTOP MILLET 10

BAHIAGRASS 30

BROWNTOP MILLET 10

BERMUDA, COMMON 10

BROWNTOP MILLET 10

BERMUDA, COMMON 12

BROWNTOP MILLET 10

BAHIAGRASS 20

BERMUDA, COMMON 6

BROWNTOP MILLET 10

SWITCHGRASS 8

LITTLE BLUESTEM PLS

INDIANGRASS 3

CONSTRUCTION SEQUENCE

CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION

1 OBTAIN COPIES OF ALL PLAN APPROVALS AND

OTHER APPLICABLE PERMITS.

CONTRACTOR TO HAVE ONSITE AT ALL TIMES DURING

CONSTRUCTION.

2 FLAG THE WORK LIMITS AND BARRICADE TREES AND

MARK BUFFER AREAS FOR PROTECTION.

HAVE LOCAL REGULATORY AGENCY INSPECT TREE

BARRICADES.

3 HOLD PRE CONSTRUCTION CONFERENCE AT LEAST

ONE WEEK PRIOR TO STARTING CONSTRUCTION.

REVIEW TREE PROTECTION (BARRICADE) WITH OWNER AND

LOCAL REGULATORY AGENCY. TAKE PICTURES OF ALL

PROTECTED TREES AND LOCATIONS WHERE SITE WORK TIES

INTO EXISTING TO DOCUMENT PREDEVELOPMENT

PROCEDURES.

4 INSTALL CONSTRUCTION ACCESS AND LAY DOWN

AREAS

STABILIZE BARE AREAS IMMEDIATELY AND INSTALL

CONSTRUCTION EXITS / ENTRANCES.

5 INSTALL PERIMETER CONTROLS - SILT FENCE AND

ANY OTHER PERIMETER BMP'S

CLEARING AND GRUBBING AS NECESSARY FOR INSTALLATION

OF PERIMETER CONTROLS

611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545

CONSTRUCTION SEQUENCE

CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION

1 CONSTRUCT SEDIMENT TRAPS AND BARRIERS -

BASIN TRAPS, SEDIMENT FENCES, AND OUTLET

PROTECTION.

INSTALL PRINCIPAL BASINS AFTER CONSTRUCTION SITE IS

ACCESSED. INSTALL ADDITIONAL TRAPS AND BARRIERS AS

NEEDED DURING GRADING.

2 ESTABLISH RUNOFF CONTROL - DIVERSIONS,

PERIMETER DIKES, WATER BARS, AND OUTLET

PROTECTION.

INSTALL KEY PRACTICES AFTER PRINCIPAL SEDIMENT TRAPS

AND BEFORE LAND GRADING. INSTALL ADDITIONAL

RUNOFF-CONTROL MEASURES DURING GRADING.

3 LAND CLEARING AND GRADING-SITE PREPARATION

CUTTING, FILLING AND GRADING, SEDIMENTATION

TRAPS, BARRIERS, DIVERSIONS, DRAINS, SURFACE

ROUGHENING.

BEGIN MAJOR CLEARING AND GRADING AFTER PRINCIPAL

SEDIMENT AND KEY RUNOFF-CONTROL MEASURES ARE

INSTALLED. CLEAR BORROW AND DISPOSAL AREAS ONLY AS

NEEDED. INSTALL ADDITIONAL CONTROL MEASURES AS

GRADING PROGRESSES. MARK TREES AND BUFFER AREAS

FOR PRESERVATION.

4 RUNOFF CONVEYANCE SYSTEM- INSTALL STORM

DRAINS, STABILIZE BANKS, CHANNELS, INSTALL

INLET AND OUTLET PROTECTION, SLOPE DRAINS.

WHERE NECESSARY, STABILIZE BANKS AS EARLY AS

POSSIBLE. INSTALL PRINCIPAL RUNOFF CONVEYANCE SYSTEM

WITH RUNOFF- CONTROL MEASURES. INSTALL REMAINDER OF

SYSTEM AFTER GRADING.

5 INSTALL WASTEWATER COLLECTION, WATER

DISTRIBUTION, AND STORM DRAINAGE SYSTEMS

APPLY TEMPORARY OR PERMANENT STABILIZATION

MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE

WORK IS DELAYED OR COMPLETE.

611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545

CONSTRUCTION SEQUENCE

CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION

1 SURFACE STABILIZATION - TEMPORARY AND

PERMANENT SEEDING, MULCHING, SODDING, RIPRAP

APPLY TEMPORARY OR PERMANENT STABILIZATION

MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE

WORK IS DELAYED OR COMPLETE.

2 BUILDING CONSTRUCTION- BUILDINGS UTILITIES,

ROADS, ETC.

INSTALL NECESSARY EROSION AND SEDIMENTATION CONTROL

PRACTICES AS WORK TAKES PLACE.

3 LANDSCAPING AND FINAL STABILIZATION -

TOPSOILING, TREES AND SHRUBS, PERMANENT

SEEDING, MULCHING, SODDING, RIP RAP.

LAST CONSTRUCTION PHASE--STABILIZE ALL OPEN AREAS,

INCLUDING BORROW AND SPOIL AREAS. REMOVE AND

STABILIZE ALL TEMPORARY CONTROL MEASURES.

611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545 www.thomasandhutton.com

STORMWATER POLLUTION PREVENTION PLAN

FILTER FABRIC

BACKFILL TRENCH WITH

COMPACTED EARTH

COMPACTED

EARTH

COMPACTED

EARTH

FILTER FABRIC FILTER FABRIC

RUNOFF

RUNOFF RUNOFF

BURY FABRICUSE EITHER FLAT-BOTTOM

OR V-BOTTOM TRENCH

SHOWN BELOW

FLAT-BOTTOM TRENCH DETAIL V-SHAPED TRENCH DETAIL

SILT FENCE INSTALLATION

FILTER

FABRIC

FILTER FABRIC

1.25 LB./LINEAR FT. STEEL POSTS

HEAVY DUTY PLASTIC TIE

FOR STEEL POSTS

WHEN AND WHERE TO USE IT:

SILT FENCE IS APPLICABLE IN AREAS:

WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100-FEET.

WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:1V.

THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS.

DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP.

MATERIALS:

STEEL POSTS

USE 48-INCH LONG STEEL POSTS THAT MEET THE FOLLOWING MINIMUM PHYSICAL REQUIREMENTS:

COMPOSED OF HIGH STRENGTH STEEL WITH MINIMUM YIELD STRENGTH OF 50,000 PSI.

HAVE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND NOMINAL "T" LENGTH OF 1.48-INCHES.

WEIGH 1.25 POUNDS PER FOOT (± 8%).

HAVE A SOIL STABILIZATION PLATE WITH A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES ATTACHED TO THE STEEL POSTS.

PAINTED WITH A WATER BASED BAKED ENAMEL PAINT.

USE STEEL POSTS WITH A MINIMUM LENGTH OF 4-FEET, WEIGHING 1.25 POUNDS PER LINEAR FOOT (± 8%) WITH PROJECTIONS TO AID IN FASTENING THE FABRIC. EXCEPT WHEN HEAVY CLAY SOILS ARE PRESENT ON SITE, STEEL POSTS WILL HAVE A METAL SOIL STABILIZATION PLATE WELDED NEAR THE BOTTOM SUCH THAT WHEN THE POST IS DRIVEN TO THE PROPER DEPTH, THE PLATE WILL BE

BELOW THE GROUND LEVEL FOR ADDED STABILITY.

THE SOIL PLATES SHOULD HAVE THE FOLLOWING CHARACTERISTICS:

BE COMPOSED OF MINIMUM 15 GAUGE STEEL.

HAVE A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES.

GEOTEXTILE FILTER FABRIC:

FILTER FABRIC IS:

COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS COMPOSED OF AT LEAST 85% BY WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES.

FORMED INTO A NETWORK SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER.

FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES AFTER INSTALLATION.

FREE OF DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING PROPERTIES.

CUT TO A MINIMUM WIDTH OF 36 INCHES.

USE ONLY FABRIC APPEARING ON SCDOT APPROVAL SHEET #34 MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE

SCDOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.

INSTALLATION:

EXCAVATE A TRENCH APPROXIMATELY 6-INCHES WIDE AND 6-INCHES DEEP WHEN PLACING FABRIC BY HAND. PLACE 12-INCHES OF GEOTEXTILE FABRIC INTO THE 6-INCH DEEP TRENCH, EXTENDING THE REMAINING 6-INCHES TOWARDS THE UPSLOPE SIDE OF THE TRENCH. BACKFILL THE TRENCH WITH SOIL OR GRAVEL AND COMPACT. BURY 12-INCHES OF FABRIC INTO THE GROUND WHEN PNEUMATICALLY INSTALLING SILT FENCE WITH A SLICING METHOD. PURCHASE FABRIC IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, WRAPPED THE FABRIC TOGETHER AT A SUPPORT POST WITH BOTH ENDS FASTENED TO THE POST, WITH A 6-INCH MINIMUM OVERLAP.

INSTALL POSTS TO A MINIMUM DEPTH OF 24-INCHES. INSTALL POSTS A MINIMUM OF 1- TO 2- INCHES ABOVE THE FABRIC, WITH NO MORE THAN 3-FEET OF THE POST ABOVE THE GROUND. SPACE POSTS TO MAXIMUM 6-FEET CENTERS. ATTACH FABRIC TO WOOD POSTS USING STAPLES MADE OF HEAVY-DUTY WIRE AT LEAST 1-1/2-INCH LONG, SPACED A MAXIMUM OF 6-INCHES APART. STAPLE A 2-INCH WIDE LATHE OVER THE FILTER FABRIC TO SECURELY FASTEN IT TO THE UPSLOPE SIDE OF WOODEN POSTS. ATTACH FABRIC TO THE STEEL POSTS USING HEAVY-DUTY PLASTIC TIES THAT ARE EVENLY SPACED AND PLACED IN A MANNER TO PREVENT SAGGING OR TEARING OF THE FABRIC. IN CALL CASES, TIES SHOULD BE AFFIXED IN NO LESS THAN 4 PLACES. INSTALL THE FABRIC A MINIMUM OF 24-INCHES ABOVE THE GROUND. WHEN NECESSARY, THE HEIGHT OF THE FENCE ABOVE GROUND MAY BE GREATER THAN 24-INCHES. IN TIDAL AREAS, EXTRA SILT FENCE HEIGHT MAY BE REQUIRED. THE POST HEIGHT WILL BE TWICE THE EXPOSED POST HEIGHT. POST SPACING WILL REMAIN THE SAME AND EXTRA HEIGHT FABRIC WILL BE 4-, 5-, OR 6-FEET TALL.

LOCATE SILT FENCE CHECKS EVERY 100 FEET MAXIMUM AND AT LOW POINTS. INSTALL THE FENCE PERPENDICULAR TO THE DIRECTION OF FLOW AND PLACE THE FENCE THE PROPER DISTANCE FROM THE TOE OF STEEP SLOPES TO PROVIDE SEDIMENT STORAGE AND ACCESS FOR MAINTENANCE AND

CLEANOUT.

INSPECTION AND MAINTENANCE:

CHECK FOR SEDIMENT BUILDUP AND FENCE INTEGRITY. CHECK WHERE RUNOFF HAS ERODED A CHANNEL BENEATH THE FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED BY FENCE OVERTOPPING. IF THE FENCE FABRIC TEARS, BEGINS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE SECTION OF FENCE IMMEDIATELY. REMOVE SEDIMENT ACCUMULATED ALONG THE FENCE WHEN IT REACHES 1/3 THE HEIGHT OF THE FENCE, ESPECIALLY IF HEAVY RAINS ARE EXPECTED. REMOVE TRAPPED SEDIMENT FROM THE SITE OR STABILIZE IT ON SITE. REMOVE SILT FENCE WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED OR

AFTER TEMPORARY BEST MANAGEMENT PRACTICES (BMPS) ARE NO LONGER NEEDED. PERMANENTLY STABILIZE DISTURBED AREAS RESULTING

FROM FENCE REMOVAL.

END VIEW OF DITCH

FLOW

TOP VIEW OF DITCH

2.0'MIN.2.0' SPACING (TYPICAL)

CONTINUOUS ALONG

TUBE

48" MIN.

LENGTH

DESCRIPTION:

SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER OR HARDWOOD MULCH.

STRAW,

PINE NEEDLE AND LEAF MULCH-FILLED SEDIMENT TUBES ARE NOT PERMITTED UNDER THIS SPECIFICATION.

WHEN AND WHERE TO USE IT:

INSTALL SEDIMENT TUBES ALONG CONTOURS, IN DRAINAGE CONVEYANCE SWALES, AND AROUND INLETS TO HELP REDUCE THE EFFECTS OF SOIL EROSION BY

ENERGY DISSIPATION AND RETAIN SEDIMENT.

MATERIALS:

SEDIMENT TUBES FOR DITCH CHECKS AND TYPE A INLET STRUCTURE FILTERS EXHIBIT THE FOLLOWING PROPERTIES:

PRODUCED BY A MANUFACTURER EXPERIENCED IN SEDIMENT TUBE MANUFACTURING.

COMPOSED OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBERS, HARDWOOD MULCH OR A MIX OF THESE MATERIALS

ENCLOSED BY A FLEXIBLE NETTING MATERIAL.

STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES AND LEAF MULCH ARE NOT ALLOWED UNDER THIS SPECIFICATION.

UTILIZES OUTER NETTING THAT CONSISTS OF SEAMLESS, HIGH-DENSITY POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH-DENSITY POLYETHYLENE NON-DEGRADABLE MATERIALS. DIAMETER RANGING FROM 18-INCHES TO 24-INCHES.

CURLED EXCELSIOR WOOD, OR NATURAL COCONUT ROLLED EROSION CONTROL PRODUCTS (RECPS) THAT ARE ROLLED UP TO CREATE A SEDIMENT TUBE ARE

NOT ALLOWED UNDER THIS SPECIFICATION.

INSTALLATION:

INSTALL OVER BARE SOIL, MULCHED AREAS OR EROSION CONTROL BLANKETS.

BE COMPOSED OF GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER OR HARDWOOD MULCH ENCLOSED BY A FLEXIBLE NETTING MATERIAL.

STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES AND LEAF MULCH ARE NOT ALLOWED.

THE MINIMUM DIAMETER SHOULD BE 18 INCHES.

SEDIMENT TUBES SHOULD BE STAKED USING WOODEN STAKES (2-INCH X 2-INCH) OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) A MINIMUM OF 48-INCHES IN LENGTH PLACED ON 2-FOOT CENTERS.

STAKES SHOULD BE INTERTWINED WITH THE OUTER MESH ON THE DOWNSTREAM SIDE AND DRIVEN IN THE GROUND TO A MINIMUM DEPTH OF 1.5 FEET LEAVING LESS THAN 1 FOOT OF STAKE EXPOSED ABOVE THE SEDIMENT TUBE. ALWAYS REFER TO THE MANUFACTURER'S RECOMMENDATIONS FOR THE STAKING DETAIL, INSTALL ALL SEDIMENT TUBES INSURING THAT NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM OF THE SEDIMENT TUBE.

THE ENDS OF ADJACENT SEDIMENT TUBES SHOULD BE LAPPED 6-INCH TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT.

IN NO SITUATIONS SHOULD SEDIMENT TUBES BE STACKED ON TOP OF ONE ANOTHER.

CONSTRUCT A TRENCH THAT IS 20% OF THE TUBE DIAMETER TO INSTALL THE TUBE IN.

AVOID DAMAGE TO SEDIMENT TUBES WHILE INSTALLING THEM. IF THE SEDIMENT TUBE BECOMES DAMAGED DURING INSTALLATION, A STAKE SHOULD BE PLACED ON BOTH SIDES OF THE DAMAGED AREA TERMINATING THE TUBE SEGMENT AND A NEW TUBE SEGMENT SHOULD BE INSTALLED.

SHOULD BE INSTALLED IN SWALES OR DRAINAGE DITCHES PERPENDICULAR TO THE FLOW OF WATER. SEDIMENT TUBES SHOULD CONTINUE UP THE SIDE SLOPES A MINIMUM OF 1 FOOT ABOVE THE DESIGN FLOW DEPTH. SEDIMENT TUBES SHOULD BE SPACED ACCORDING TO THE FOLLOWING TABLE.

MAXIMUM SEDIMENT TUBE SPACINGSLOPE

4%

SEDIMENT TUBE SPACING

3% 2%

LESS THAN 2%

50-FEET

40-FEET

30-FEET

25-FEET

5% 6%

GREATER THAN 6%

150-FEET

100-FEET

75-FEET

INSPECTION AND MAINTENANCE:

LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED.

IF EROSION CAUSES THE EDGES TO FALL TO A HEIGHT EQUAL TO OR BELOW THE HEIGHT OF THE CENTER, REPAIRS SHOULD BE MADE IMMEDIATELY.

REMOVE ACCUMULATED SEDIMENT FROM THE UPSTREAM SIDE OF THE SEDIMENT TUBE WHEN THE SEDIMENT HAS REACHED A HEIGHT OF APPROXIMATELY

ONE-THIRD OF THE EXPOSED HEIGHT OF THE TUBE (MEASURED AT THE CENTER).

ACCUMULATED SEDIMENT SHOULD BE REMOVED PRIOR TO REMOVING SEDIMENT TUBES.

SEDIMENT TUBE REMOVAL SHOULD BE COMPLETED ONLY AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN COMPLETELY STABILIZED. PERMANENT VEGETATION SHOULD REPLACE AREAS FROM WHICH GRAVEL, STONE, SEDIMENT TUBES, OR OTHER MATERIALS HAVE BEEN REMOVED.

SEDIMENT TUBE LENGTH SELECTED SHOULD MINIMIZE THE NUMBER OF SEDIMENT TUBES NEEDED TO SPAN THE WIDTH OF THE DRAINAGE CONVEYANCE.

IF THE DITCH CHECK LENGTH (PERPENDICULAR TO THE WATER FLOW) IS 15 FEET, THEN ONE 15 FOOT SEDIMENT TUBE IS PREFERRED COMPARED

TO TWO…

This is the start of the file's text. The full file is on GovTribe.