This document is a comprehensive Site Development Plan for the Wampee Convenience Center project in Horry County, South Carolina, prepared by Thomas & Hutton Engineering on September 7, 2023, and revised on July 9, 2025. The project involves site development across 13.4 acres, with 7.1 acres to be disturbed, and will include clearing, grading, drainage improvements, installation of water, wastewater, and stormwater systems, and road construction associated with the development. The project is located at PIN# 348-00-00-0008 and will increase the site's impervious area from 0% to 32.8%, with specific focus on improvements along U.S. Highway 90.
The project's technical specifications include detailed erosion control measures, stormwater management plans, and landscaping requirements. The site will involve tree removal (totaling 55 inches in diameter), with a fee in lieu calculation of $3,300 for replacement trees. The development will interface with local infrastructure, including drainage systems that ultimately discharge into the Waccamaw River, and will require comprehensive environmental controls throughout the construction process. The site is located in FEMA Flood Zone X and will involve multiple phases of construction, including land clearing, grading, utility installation, road construction, and final stabilization, with strict adherence to South Carolina Department of Health and Environmental Control (DHEC) regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION HISTORY
SUBMITTAL HISTORY
J-
6.
9/ 7/
W
A M
PE
E
C O
N V
EN
IE
N C
E C
EN
TE
R
Know what'sbelow.
before you dig.Call
R
SITE DEVELOPMENT PLANS
OF
WAMPEE CONVENIENCE CENTER
HORRY COUNTY, SOUTH CAROLINA
PREPARED FOR:
HORRY COUNTY
4401 PRIVETTS ROAD
CONWAY, SOUTH CAROLINA 29526
SEPTEMBER 7, 2023
REVISED: JULY 9, 2025
PIN# 348-00-00-0008
J-30986.0000
VICINITY MAP
SCALE: 1" = 2000'
PREPARED BY:
611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 p.843.839.3545 www.thomasandhutton.com
Sheet List Table
SHEET NUMBER SHEET TITLE
C0 COVER SHEET
G1.1 GENERAL NOTES AND INDEX
C1.1 SITE PLAN
CD1.1 DEMOLITION PLAN
EC0.1 EROSION CONTROL NOTES
EC0.2 EROSION CONTROL CHARTS
EC1.1 EROSION CONTROL - INITIAL LAND
DISTURBANCE
EC2.1 EROSION CONTROL - CONSTRUCTION
EC3.1 EROSION CONTROL - STABILIZATION
EC4.1 EROSION CONTROL DETAILS
EC4.2 EROSION CONTROL DETAILS
C2.1 WATER & SEWER PLAN
C2.2 WATER & SEWER PLAN
C2.3 WATER & SEWER PLAN
C2.4 FORCEMAIN PROFILES
C2.5 WATER & SEWER DETAILS
C2.6 WATER & SEWER DETAILS
C3.1 PAVING, GRADING, & DRAINAGE PLAN
C3.2 PAVING, GRADING, & DRAINAGE PLAN
C3.3 PAVING, GRADING, & DRAINAGE PLAN
C3.4 ROAD PROFILES
C3.5 DRAINAGE PROFILES
C3.6 DRAINAGE PROFILES
C3.7 U.S. HWY 90 CROSS SECTIONS
C3.8 U.S. HWY 90 CROSS SECTIONS
C3.9 U.S. HWY 90 CROSS SECTIONS
C3.10 U.S. HWY 90 CROSS SECTIONS
C3.11 U.S. HWY 90 CROSS SECTIONS
C3.12 U.S. HWY 90 CROSS SECTIONS
C3.13 U.S. HWY 90 CROSS SECTIONS
C3.14 U.S. HWY 90 CROSS SECTIONS
C3.15 U.S. HWY 90 CROSS SECTIONS
C3.16 U.S. HWY 90 CROSS SECTIONS
C3.17 U.S. HWY 90 CROSS SECTIONS
C3.18 U.S. HWY 90 CROSS SECTIONS
C3.19 U.S. HWY 90 CROSS SECTIONS
C3.20 U.S. HWY 90 CROSS SECTIONS
C3.21 U.S HWY 90 CROSS SECTIONS
C3.22 U.S HWY 90 CROSS SECTIONS
C3.23 U.S HWY 90 CROSS SECTIONS
C3.24 U.S HWY 90 CROSS SECTIONS
C3.25 PAVING, GRADING, & DRAINAGE DETAILS
C3.26 PAVING, GRADING, & DRAINAGE DETAILS
C3.27 PAVING, GRADING, & DRAINAGE DETAILS
C3.28 PAVING, GRADING, & DRAINAGE DETAILS
C3.29 SCDOT NOTES & DETAILS
C3.30 SCDOT NOTES & DETAILS
C4.1 STAKING, SIGNING, & MARKING PLAN
C4.2 STAKING, SIGNING, & MARKING PLAN
C4.3 STAKING, SIGNING, & MARKING PLAN
C4.4 TRAFFIC CONTROL PLAN
L1.1 LANDSCAPE PLAN
L2.1 GENERAL NOTES AND DETAILS
L2.2 LANDSCAPE SPECIFICATIONS
http://www.thomasandhutton.com
ONLYONLY
ONLY
611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545 www.thomasandhutton.com
611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545
TREES TO REMAIN
POINT # DESCRIPTION SPECIES DBH
7449 13" WHO WHITE OAK 13
7457 18" LAO LAUREL OAK 18
10446 18" BGUM BLACK GUM 18
TREES TO REMOVE
POINT # DESCRIPTION SPECIES DBH
10442 17" BGUM BLACK GUM 17
10448 17" BGUM BLACK GUM 17
10449 21" LAO LAUREL OAK 21
Total DBH 55
Fee in Lieu Calculation
Total DBH (in) Total
Replacement trees (RT)
Fee in Lieu
DBH/2.5=RT RT*150=F
55 22 $ 3,300.00
611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545
611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545 www.thomasandhutton.com
I. SITE DESCRIPTION
A. PROJECT DESCRIPTION
A.1. PROJECT AREA 13.4 ACRES
A.2. AREA DISTURBED 7.1 ACRES
A.3. PERCENT IMPERVIOUS AREA BEFORE CONSTRUCTION 0 %
A.4. RUNOFF COEFFICIENT BEFORE CONSTRUCTION 81 CN
A.5. PERCENT IMPERVIOUS AREA AFTER CONSTRUCTION 32.8%
A.6. RUNOFF COEFFICIENT AFTER CONSTRUCTION 86 CN
B. DESCRIPTION OF CONSTRUCTION ACTIVITY
WORK CONSISTS OF CLEARING, GRADING, DRAINAGE IMPROVEMENTS, GRASSING,
INSTALLATION OF WATER, WASTEWATER, AND STORM WATER SYSTEM, AND RODS
ASSOCIATED WITH DEVELOPMENT.
C. RUNOFF DATA
C.1. SOIL CLASSIFICATIONS: EULONIA (C/D), HOBCAW (B/D), OGEECHEE
(B/D), SUMMERTON (C), YAUHANNAH (B/D)
C.2. LAND USE(S): RESIDENTIAL
D. RECEIVING WATERS
D.1. CLOSEST RECEIVING WATERS: UNNAMED TRIBUTARY
D.2. ULTIMATE RECEIVING WATERS: WACCAMAW RIVER
E. FLOOD
E.1. FEMA FLOOD ZONE(S): X
E.2. FEMA FLOOD INSURANCE MAP(S): 45051C0605K
II. CONTROL MEASURES
1. EROSION AND SEDIMENT CONTROLS
PRIOR TO START OF CONSTRUCTION, ALL EXTERIOR SILT FENCE WILL BE INSTALLED AS
SHOWN ON THE PLANS.
1.1. CLEARING
1.1.1. AS CLEARING IS COMPLETED, ADDITIONAL SILT FENCE WILL BE INSTALLED WHERE
NECESSARY, SUCH AS POINTS WHERE FLOWS BECOME CHANNELIZED, AND OTHER
POINTS WHERE EXCESSIVE RUNOFF VELOCITIES MAY OCCUR.
1.1.2. INSTALL CONSTRUCTION ENTRANCES / EXITS BEFORE BEGINNING CLEARING
1.1.3. CONSTRUCTION DELAYS IN ANY ONE AREA GREATER THAN 14 DAYS PRIOR TO START OF
ROUGH GRADING WILL MANDATE STABILIZATION PROCEDURES. ACCEPTABLE METHODS
OF STABILIZATION INCLUDE MULCHING AND TEMPORARY SEEDING.
1.1.4. MAINTAIN EXISTING VEGETATION WHENEVER POSSIBLE AND MINIMIZE THE AREA OF
DISTURBANCE. RETAIN AND PROTECT TREES TO ENHANCE FUTURE LANDSCAPING
EFFORTS AND REDUCE RAINDROP IMPACT.
1.1.5. INSTALL ALL SEDIMENT CONTROL PRACTICES PRIOR TO ANY UP-SLOPE SOIL
DISTURBING ACTIVITIES.
1.1.6. PHASE CONSTRUCTION ACTIVITIES TO MINIMIZE THE AREAS DISTURBED AT ONE TIME.
THIS WILL ALSO ALLOW COMPLETED AREAS TO BE STABILIZED AND RE-VEGETATED
BEFORE DISTURBING ADJACENT SITES. THE NEED FOR TEMPORARY EROSION CONTROL
MEASURES MAY BE AVOIDED BY COMPLETING A PHASE AND INSTALLING PERMANENT
EROSION CONTROL MEASURES WHEN THE FINAL GRADE IS ATTAINED.
1.1.7. MAINTAIN AND PROTECT ALL NATURAL WATERWAYS. RETAIN AT LEAST A 35-FOOT
UNDISTURBED BUFFER OF NATURAL VEGETATION ALONG ALL WATERWAYS TO FILTER
OUT SEDIMENT AND OTHER POLLUTANTS. MAINTAIN A 45-FOOT UNDISTURBED BUFFER
AROUND SENSITIVE WATERS.
1.1.8. INSTALL SILT FENCE (OR BIO ROLLS/ROCK SOCK PRODUCTS) ON THE DOWN-SLOPE
PERIMETER OF ALL DISTURBED AREAS PRIOR TO ANY SOIL DISTURBING ACTIVITIES
(INCLUDING CLEARING AND GRUBBING). SILT FENCE CAN TREAT A MAXIMUM OF 100
SQUARE FEET PER LINEAL FOOT OF FENCE. INSTALL SILT FENCE IN SHORTER REACHES
ON THE CONTOUR WITH EACH END TURNED UP-SLOPE . SWALES AND SHORELAND
AREAS SHOULD ALSO BE PROTECTED WITH SILT FENCE, BIO ROLLS, OR ROCK SOCKS.
1.1.9. IN AREAS OF CONCENTRATED FLOW INSTALL STRAW BALE CHECKS, ROCK CHECK DAMS,
TRIANGULAR DIKES, BIO ROLL BLANKETS, OR ROCK SOCKS TO SLOW RUNOFF AND TRAP
SEDIMENT.
1.1.10. USE TEMPORARY SLOPE DRAINS OR ROCK CHUTES TO MOVE WATER DOWN STEEP
SLOPES.
1.1.11. CONSTRUCT SEDIMENT BASINS FOR DRAINAGE AREAS GREATER THAN 10 ACRES
1.2. ROUGH GRADING
1.2.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING ROUGH GRADING, DELAYS OF
GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE
STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE
MULCHING AND TEMPORARY SEEDING.
1.2.2. ALL AREAS NOT SUBJECT TO FURTHER CONSTRUCTION (DRAINAGE, SANITARY SEWER,
ROADS, WATER DISTRIBUTION SYSTEMS, OR STORM WATER FACILITIES) SHALL BE
GRASSED WITH A PERMANENT COVER.
1.2.3. COVER ANY STOCK PILED TOPSOIL WITH PLASTIC (OR OTHER IMPERVIOUS COVERING)
OR USE A TEMPORARY SEED MIX. USE STOCKPILED TOPSOIL AS EARTHEN BERMS TO
SERVE AS TEMPORARY SEDIMENT BASINS.
1.3. DRAINAGE
1.3.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING DRAINAGE INSTALLATION.
1.3.2. CONSTRUCTION DRAINAGE WILL BE ROUTED THROUGH LAKES, WHICH WILL ACT AS
SEDIMENT BASINS OR OTHER ACCEPTABLE SEDIMENT BASINS/TRAPS.
1.3.3. STORM DRAIN INLET PROTECTION AS SHOWN ON DETAIL SHEET SHALL BE INSTALLED
ON ALL CURB INLETS, STORM DRAIN MANHOLES, JUNCTION BOXES, AND GRATE INLETS.
1.3.4. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF THE NEXT CONSTRUCTION
SEQUENCE WILL MANDATE STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF
STABILIZATION INCLUDE MULCHING AND TEMPORARY SEEDING.
1.3.5. ALL STORM LINES NOT IN STREETS OR OTHER PAVED AREAS ARE TO BE MULCHED AND
SEEDED WITHIN 5 DAYS AFTER BACKFILL.
1.4. WASTE DISTRIBUTION SYSTEM INSTALLATION
1.4.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING INSTALLATION OF THE WATER
DISTRIBUTION SYSTEM.
1.4.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE
STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE
MULCHING AND TEMPORARY SEEDING.
1.5. WASTEWATER COLLECTION SYSTEM INSTALLATION
1.5.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING INSTALLATION OF THE
WASTEWATER SYSTEM.
1.5.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE
STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE
MULCHING AND TEMPORARY SEEDING.
1.6. CONSTRUCTION OF ROADS
1.6.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING ROAD CONSTRUCTION.
1.6.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE
STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE
MULCHING AND TEMPORARY SEEDING.
1.7. GRASSING
1.7.1. ALL EXISTING CONTROLS WILL BE MAINTAINED UNTIL GRASSING IS ESTABLISHED
1.7.2. ANY AREAS THAT ERODE OR WHERE GRASS DOES NOT ESTABLISH ITSELF SHALL BE
RE-GRADED AND RE-GRASSED.
2. STORM WATER MANAGEMENT
RUNOFF FROM THIS PROJECT WILL DISCHARGE INTO A STORM WATER MANAGEMENT SYSTEM.
TREATMENT WILL OCCUR IN STORM WATER DETENTION PONDS.
3. OTHER CONTROLS
3.1. WASTE DISPOSAL
3.1.1. NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL BE DISCHARGED TO ANY
RECEIVING WATERS.
3.1.2. OFFSITE VEHICLE TRACKING OF SEDIMENTS AND THE GENERATION OF DUST SHALL BE
MINIMIZED.
3.1.3. THIS PLAN SHALL COMPLY WITH STATE AND/OR LOCAL WASTE DISPOSAL, SANITARY
SEWER OR SEPTIC SYSTEM REGULATIONS.
3.1.4. DUST CONTROL ON DISTURBED AREAS - CONTROLLING SURFACE AND AIR MOVEMENT OF
DUST ON CONSTRUCTION SITE AND HAUL ROUTES. THE PURPOSE OF THE MEASURE IS
TO REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES, WHICH MAY BE HARMFUL OR
INJURIOUS TO HUMAN HEALTH, WELFARE OR SAFETY, OR TO ANIMALS OR PLANT LIFE.
III. MAINTENANCE
1. MAINTENANCE PROGRAM
1.1. THE SITE SUPERINTENDENT, OR HIS/HER REPRESENTATIVE, SHALL MAKE VISUAL
INSPECTIONS OF ALL MECHANICAL CONTROLS AND NEWLY STABILIZED AREAS (I.E.
SEEDED AND MULCHED AND/OR SODDED AREAS) ON A DAILY BASIS; ESPECIALLY AFTER
HEAVY RAINFALL EVENT TO INSURE THAT ALL CONTROLS ARE MAINTAINED AND
PROPERLY FUNCTIONING. ANY DAMAGED CONTROLS SHALL BE REPAIRED PRIOR TO THE
END OF THE WORK DAY INCLUDING RE-SEEDING AND MULCHING OR RE-SODDING IF
NECESSARY.
1.2. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION
CONTROL, ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE
IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. ALL DRAINAGE SWALES,
POCKETS, DEPRESSION, LOW LINES, AND OUTLET DITCHES SHALL DRAIN EFFECTIVELY AT
ALL TIMES. SETTLEMENT OR WASHING THAT MAY OCCUR SHALL BE REPAIRED BY THE
CONTRACTOR. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN
IT REACHES 1/3 THE HEIGHT OF THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS
NECESSARY TO MAINTAIN AN EFFECTIVE BARRIER. MAINTAIN THE CONSTRUCTION EXIT IN
A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. THIS MAY
REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TACKED ONTO PUBLIC ROADWAYS.
RESEED AND MULCH AREA WHERE SEEDING EMERGENCE IS POOR, OR WHERE EROSION
OCCURS. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. INSPECT ALL MULCHES
PERIODICALLY, AND AFTER RAINSTORMS TO CHECK FOR EROSION, DISLOCATION OR
FAILURE. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED AND REINSTALL
MULCH. FOLLOW THE CONSTRUCTION SEQUENCE THROUGHOUT THE PROJECT
DEVELOPMENT. WHEN CHANGES IN CONSTRUCTION ACTIVITIES ARE NEEDED, AMEND THE
SEQUENCE SCHEDULE IN ADVANCE TO MAINTAIN MANAGEMENT CONTROL. IF MAJOR
CHANGES ARE NECESSARY, SEND A COPY OF THE MODIFIED SCHEDULE TO THE
ENGINEER, SEDIMENT AND EROSION CONTROL MEASURES WILL REMAIN IN PLACE AND BE
MAINTAINED UNTIL THE DISTURBED AREAS ARE STABILIZED.
2. SILT FENCE
SILT FENCES WILL BE MONITORED DURING CONSTRUCTION. ANY SILT FENCE WHICH IS NOT
FUNCTIONING PROPERLY WILL BE PROMPTLY REPAIRED. CLEAN OUT THE SILT FENCE WHEN
IT REACHES 1/3 THE HEIGHT OF THE FENCE OR REPLACE WITH FUNCTIONAL SILT FENCE
WITHIN 24 HOURS. USE OF HOSES AND WATER TO FLUSH THE SEDIMENT INTO THE STORM
INLETS IS UNACCEPTABLE.
3. SEDIMENTATION BASINS
SEDIMENTATION BASINS WHICH ARE AT 50% USED CAPACITY OR APPROACHING SUCH
CAPACITY SHALL BE RE-EXCAVATED TO ORIGINAL DIMENSIONS AND THE SILT PROPERLY
DISPOSED OF.
4. SEDIMENT LOGS/ROLLS
SEDIMENT LOGS/ROLLS OR OTHER CONTROL MEASURES WHICH BEGIN TO DISINTEGRATE
OR FUNCTION INEFFECTIVELY SHALL BE PROMPTLY REPLACED.
5. VEGETATION COVER
ANY VEGETATION COVER SERVING TO STABILIZE DISTURBED SOILS WHICH IS ITSELF
DISTURBED SHALL IMMEDIATELY BE REPLACED.
6. CONSTRUCTION ENTRANCE
MAINTAIN ROCK CONSTRUCTION ENTRANCE AND CLEAN ADJACENT ROADS OF ANY MUD
TRACKED ONTO THEM.
IV. INSPECTIONS
1. QUALIFIED PERSONNEL WILL INSPECT DISTURBED AREAS OF THE CONSTRUCTION SITE,
AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION THAT
HAVE NOT BEEN FINALLY STABILIZED, STRUCTURAL CONTROL MEASURES, AND LOCATIONS
WHERE VEHICLES ENTER OR EXIT THE SITE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS.
WHERE SITES HAVE BEEN FINALLY STABILIZED SUCH INSPECTIONS SHALL BE CONDUCTED AT
LEAST ONCE EVERY MONTH DURING THE WARRANTY PERIOD.
2. DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO
PRECIPITATION SHALL BE INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR,
POLLUTANTS ENTERING THE DRAINAGE SYSTEM. EROSION AND SEDIMENT CONTROL
MEASURES IDENTIFIED IN THE PLAN SHALL BE OBSERVED TO ENSURE THAT THEY ARE
OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY
SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE
EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATERS. LOCATIONS WHERE
VEHICLES ENTER OR EXIT THE SITE SHALL BE INSPECTED FOR EVIDENCE OF OFFSITE
SEDIMENT TRACKING.
3. A WRITTEN REPORT SUMMARIZING THE SCOPE OF THE INSPECTION, NAME(S) AND
QUALIFICATIONS OF PERSONNEL MAKING THE INSPECTION, THE DATE(S) OF THE INSPECTION, WEATHER INFORMATION FOR THE PERIOD SINCE THE LAST INSPECTION (OR SINCE
COMMENCEMENT OF CONSTRUCTION ACTIVITY) INCLUDING A BEST ESTIMATE OF THE
BEGINNING OF EACH STORM EVENT, DURATION OF EACH STORM EVENT, APPROXIMATE
AMOUNT OF RAINFALL FOR EACH STORM EVENT (IN INCHES) AND WHETHER ANY DISCHARGES
OCCURRED, LOCATION(S) OF DISCHARGES OF SEDIMENT OR OTHER POLLUTANTS FROM THE
SITE, LOCATION(S) OF BMP'S THAT NEED MAINTENANCE, LOCATION(S) OF BMP'S THAT FAILED
TO OPERATE AS DESIGNED OR PROVED INADEQUATE FOR A PARTICULAR LOCATION,
LOCATION(S) WHERE ADDITIONAL BMP'S ARE NEEDED THAT DID NOT EXIST AT THE TIME OF
INSPECTION AND ANY CORRECTIVE ACTION REQUIRED INCLUDING ANY CHANGES TO SWPPP
NECESSARY AND IMPLEMENTATION DATES.
4. THE REPORT SHALL BE MAINTAINED AT LEAST THREE YEARS FROM THE DATE THE SITE IS
FINALLY STABILIZED. THE REPORT MUST BE SIGNED AND SHALL CONTAIN A CERTIFICATION
THAT THE FACILITY IS IN COMPLIANCE WITH THE STORM WATER POLLUTION PREVENTION PLAN
AND THE NPDES PERMIT REFERENCED ABOVE. THE CONTRACTOR SHALL MAINTAIN THIS
REPORT. THE REPORT SHALL BE SUBMITTED TO THE ENGINEER AND OWNER.
V. LONG TERM MAINTENANCE OF DRAINAGE AND STORM WATER
MANAGEMENT SYSTEM
THE ROADS AND DRAINAGE SYSTEM WILL BE OWNED AND MAINTAINED BY CITY OF
GEORGETOWN AFTER CONSTRUCTION IS COMPLETE.
VI. SC DHEC STANDARD NOTES
1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO GRASSING / HYDROSEEDING. IT MAY
BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION.
TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE.
2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF
THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED,
BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS
STATED BELOW:
2.1. WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN
GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS
PRACTICABLE.
2.2. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED,
AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY
STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.
3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY
CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP
HAS BEEN USED INAPPROPRIATELY, OR INCORRECTLY, THE PERMITTEE MUST ADDRESS THE
NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48
HOURS OF IDENTIFICATION.
4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL
SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED,
GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION.
FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF
WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE
ANY SEDIMENTS BEFORE BEING PUMPED INTO ANY WATERS OF THE STATE.
5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF
CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL
DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE
REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE
SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE
CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.
6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD
ONTO THE PAVED ROADWAY FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST.
THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT AS MAY BE REQUIRED.
7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE
AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL
FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN
IN ACCORDANCE WITH S.C. REG. 72-300 AND SCR100000.
8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING
CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT
SEDIMENT LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS.
9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR
OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE
INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN NOT BE MAINTAINED BETWEEN THE
DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE
LAST ROW OF SILT FENCE AND ALL WOS
10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT
POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND
CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE
PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES.
11. A COPY OF THE SWPPP, INSPECTION RECORDS AND RAINFALL DATA MUST BE RETAINED AT
THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL
BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO
THE DATE THAT FINAL STABILIZATION IS REACHED.
12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER)
WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND
WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.
13. MINIMIZE SOIL COMPACTION IN AREAS NOT UNDER PAVEMENTS AND /OR STRUCTURES AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.
14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL
WASH WATER AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT
BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUAL OR BETTER TREATMENT PRIOR TO
DISCHARGE.
15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND
EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS
(SEDIMENT BASIN, FILTER BAG, ETC.).
16. THE FOLLOWING DISCHARGES ARE PROHIBITED:
16.1. WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE
CONTROL;
16.2. WASTEWATER FROM WASHOUT AND CLEANOUT OF OF STUCCO, PAINT, FORM RELEASE
OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;
16.3. FUELS, OILS OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND
MAINTENANCE; AND
16.4. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.
17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM
OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL
STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE.
18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO
COMPLY WITH THE REQUIREMENTS OF PERMIT SCR100000 AND/OR SC'S WATER QUALITY
STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT
WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS
IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE
BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE.
19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN
APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES.
FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE, THIS CONFERENCE MUST BE
HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE.
VII. EROSION, SEDIMENTATION & POLLUTION CONTROL NOTES
1. THE IMPLEMENTATION OF THESE EROSION SEDIMENT CONTROL (ESC) PLANS AND THE
CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS
THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND
APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED.
2. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH
ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT
SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS,
OR VIOLATE APPLICABLE WATER STANDARDS.
3. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR
ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES
SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT
SEDIMENT AND SEDIMENT LADEN WATER DO NOT LEAVE THE SITE.
4. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS
NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
5. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN THE 24 HOURS FOLLOWING A MAJOR STORM EVENT.
6. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN
A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO
PAVING AND PRIOR TO FINAL INSPECTION. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM.
7. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL
MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE
DURATION OF THE PROJECT.
8. BEFORE COMMENCING ANY LAND DISTURBING ACTIVITY, THE EXISTING STORM WATER
INLET(S) THAT RECEIVING RUNOFF FROM THE PROPOSED WORK AREA SHALL BE PROTECTED.
THE TEMPORARY INLET PROTECTION MUST REMAIN IN PLACE UNTIL THE CONSTRUCTION
ACTIVITY IS COMPLETED, THE STREET HAS BEEN SWEPT AND ANY EXPOSED SOILS ARE
STABILIZED. THE CONTRACTOR IS ALSO RESPONSIBLE FOR REMOVING ANY TEMPORARY
INLET PROTECTION INSTALLED; AFTER ALL DISTURBED AREAS ARE STABILIZED. TEMPORARY
PROTECTION OF THE INLETS MAY BE ACCOMPLISHED BY ONE OR MORE OF THE FOLLOWING:
8.1. USE OF GRAVEL BAGS TO FILTER THE SEDIMENT FROM ANY RUNOFF. TO MAKE A GRAVEL
BAG, USE A BAG MADE OF GEOTEXTILE FABRIC (NOT BURLAP) AND FILL WITH EITHER 3/4
INCH ROCK OR 1/4 INCH PEA GRAVEL.
8.2. USE OF SEDIMENT LOGS TO FILTER THE SEDIMENT FROM ANY RUNOFF (AVAILABLE
THROUGH LOCAL EROSION CONTROL SUPPLIERS).
8.3. USE OF ABOVE OR UNDER-GRATE FILTER BAGS OR DEVICES TO FILTER THE SEDIMENT
FROM ANY RUNOFF (AVAILABLE THROUGH EROSION CONTROL SUPPLIERS).
9. WATER MAY NOT BE DISCHARGED IN A MANNER THAT CAUSES EROSION, SEDIMENTATION, OR
FLOODING ON THE SITE, ON DOWNSTREAM PROPERTIES, IN THE RECEIVING CHANNELS, OR IN
ANY STORM WATER INLET. WHEN SITE DEWATERING, WATER PUMPED FROM THE SITE,
INCLUDING TRENCHES, SHALL BE TREATED BY ONE OF THE FOLLOWING:
9.1. TEMPORARY SEDIMENTATION BASINS
9.2. SEDIMENT FILTERING BAGS
10. THE CONTRACTOR SHALL VERIFY THE SIZE AND LOCATION OF ALL EXISTING UTILITIES.
EXISTING UTILITIES ARE ALL UTILITIES THAT EXIST ON THE PROJECT IN AN ORIGINAL,
RELOCATED OR NEWLY INSTALLED POSITION. THE CONTRACTOR SHALL BE HELD
RESPONSIBLE FOR THE COST OF REPAIRS TO DAMAGED UNDERGROUND OR OVERHEAD
FACILITIES, EVEN IF THE UTILITY IS NOT SHOWN ON THE SITE DEVELOPMENT PLANS. THE
CONTRACTOR SHALL CONTACT THE LOCAL UTILITIES PROTECTION CENTER TO COORDINATE
THE MARKING OF EXISTING UTILITY LINES A MINIMUM OF 96 HOURS PRIOR TO
COMMENCEMENT OF ANY WORK.
11. THE CONTRACTOR SHALL FLUSH ALL INLETS AND PIPE AT THE COMPLETION OF
CONSTRUCTION TO REMOVE SILT AND DEBRIS. THE CLEANING AND FLUSHING OF INLETS AND
PIPE (EXISTING AND PROPOSED) SHALL BE CONSIDERED PART OF THE COST FOR THE
PROJECT.
12. EGRESS FROM THE SITE SHALL BE CONTROLLED SUCH THAT VEHICLES LEAVING THE SITE
MUST TRAVERSE CONSTRUCTION EXITS TO REMOVE MUD FROM TIRES.
13. SCHEDULE CONSTRUCTION ACTIVITIES TO MINIMIZE THE EXPOSED AREA AND DURATION OF
EXPOSURE. IN SCHEDULING, TAKE INTO ACCOUNT THE SEASON AND THE WEATHER
FORECAST.
14. EROSION CONTROL MEASURES ARE THE MINIMUM REQUIRED. THE CONTRACTOR SHALL
PROVIDE ADDITIONAL CONTROL MEASURES AS DICTATED BY ACTUAL FIELD CONDITIONS AT
THE TIME OF CONSTRUCTION IN ORDER TO PREVENT EROSION AND CONTROL SEDIMENT.
EROSION AND SEDIMENT CONTROL MEASURES WILL REMAIN IN PLACE AND BE MAINTAINED
UNTIL THE ENTIRE PROJECT IS TERMINATED OR SUSPENDED FOR AND INDEFINITE LENGTH OF
TIME, ALL DISTURBED AREAS SHALL BE PLANTED WITH PERMANENT VEGETATION.
15. THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS, OR IN ANY
WAY INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, IS
BASED UPON FIELD INVESTIGATIONS AND IS BELIEVED TO BE INDICATIVE OF ACTUAL
CONDITIONS. HOWEVER, THE SAME IS SHOWN AS INFORMATION ONLY, IS NOT GUARANTEED
AND DOES NOT BIND THOMAS & HUTTON, OR THE OWNER IN ANY WAY.
16. CONTRACTOR SHALL MAINTAIN SITE ON A DAILY BASIS TO PROVIDE FOR POSITIVE DRAINAGE.
CONTRACTOR, AT HIS COST, SHALL GRADE SITE AND PROVIDE NECESSARY TEMPORARY
DRAINAGE SWALES TO INSURE STORM WATER DOES NOT POND ON SITE.
17. SITE DRAINAGE SHALL BE ESTABLISHED TO PREVENT ANY PONDED WATER CONDITIONS
WITHIN THE CONSTRUCTION AREA AND TO FACILITATE STORM WATER DISCHARGE.
18. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF
EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT
WITH, LAND DISTURBING ACTIVITIES.
19. LIME RATES AND ANALYSIS:
19.1. AGRICULTURAL LIME SHALL BE APPLIED AT THE RATE SHOWN IN THE SEEDING SECTION
UNLESS SOIL TESTS INDICATE OTHERWISE. GRADED AREAS REQUIRE LIME APPLICATION.
IF LIME IS APPLIED WITHIN SIX MONTHS OF PLANTING PERMANENT PERENNIAL
VEGETATION, ADDITIONAL LIME IS NOT REQUIRED. AGRICULTURAL LIME APPLICATION
SHALL BE WITHIN THE SPECIFICATIONS OF THE SOUTH CAROLINA DEPARTMENT OF
AGRICULTURE.
20. MULCHING:
MULCHING IS REQUIRED FOR ALL PERMANENT VEGETATION APPLICATIONS. MULCH APPLIED
TO SEEDED AREAS SHALL ACHIEVE 75% SOIL COVER. SELECT THE MULCHING MATERIAL FROM
THE FOLLOWING AND APPLY AS INDICATED:
20.1. DRY STRAW OR DRY HAY OF GOOD QUALITY AND FREE OF WEED SEEDS CAN BE USED.
DRY STRAW SHALL BE APPLIED AT THE RATE OF TWO TONS PER ACRE. DRY HAY SHALL BE
APPLIED AT THE RATE OF 2 1/2 TONS PER ACRE.
20.2. WOOD CELLULOSE MULCH OR WOOD PULP FIBER SHALL BE USED WITH HYDRAULIC
SEEDING. IT SHALL BE APPLIED AT A RATE OF 500 POUNDS PER ACRE. DRY STRAW OR DRY
HAY SHALL BE APPLIED (AT THE RATE INDICATED ABOVE) AFTER HYDRAULIC SEEDING.
20.3. ONE THOUSAND POUNDS OF WOOD CELLULOSE OR WOOD PULP FIBER, WHICH INCLUDES
A TACKIFIER, SHALL BE USED WITH HYDRAULIC SEEDING ON SLOPES 3/4:1 OR STEEPER.
20.4. PINE STRAW OR PINE BARK SHALL BE APPLIED AT A THICKNESS OF 3 INCHES FOR
BEDDING PURPOSES. OTHER SUITABLE MATERIALS IN SUFFICIENT QUANTITY MAY BE USED
WHERE ORNAMENTALS OR OTHER GROUND COVERS ARE PLANTED. THIS IS NOT
APPROPRIATE FOR SEEDED AREAS.
20.5. WHEN USING TEMPORARY EROSION CONTROL BLANKETS OR BLACK SOD, MULCH IS NOT
REQUIRED.
20.6. ON SLOPES GREATER THAN 10 FEET IN LENGTH AND 4:1 OR STEEPER, USE THE
FOLLOWING EROSION CONTROL BLANKETS THAT HAVE BEEN PROPERLY ANCHORED TO
THE SLOPE ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS:
· 2:1 SLOPES OR STEEPER: - STRAW/COCONUT BLANKET OR HIGH VELOCITY WOOD
BLANKET
· 3:1 SLOPES OR STEEPER: - WOOD OR STRAW BLANKET WITH NET ON BOTH SIDES
· 4:1 SLOPES OR FLATTER: - WOOD OR STRAW MULCH BLANKET WITH NET ON ONE SIDE
VIII. HOUSEKEEPING
THESE PERFORMANCE STANDARDS APPLY TO ALL SITES.
1. PETROLEUM PRODUCTS: INCLUDING OIL, GASOLINE, LUBRICANTS AND ASPHALTIC
SUBSTANCES.
1.1. HAVE EQUIPMENT TO CONTAIN AND CLEAN UP PETROLEUM SPILLS IN FUEL STORAGE
AREAS OR ON MAINTENANCE AND FUELING VEHICLES
1.2. STORE IN COVERED AREAS PROTECTED WITH DIKES
2. SPILLS: PREVENTION AND RESPONSE.
2.1. STORE AND HANDLE MATERIALS TO PREVENT SPILLS
2.2. TIGHTLY SEALED CONTAINERS, NEAT AND SECURE STACKING, ETC.
2.3. REDUCE STORM WATER CONTACT IF SPILL OCCURS
2.3.1. CLEANUP PROCEDURES SHOULD BE CLEARLY POSTED.
2.3.2. CLEANUP MATERIALS SHOULD BE READILY AVAILABLE
2.3.3. STOP THE SOURCE
2.3.4. CONTAIN THE SPILL
3. NON-STORM WATER DISCHARGES
THE FOLLOWING NON-STORMWATER DISCHARGES MUST BE PROTECTED FROM CAUSING
POLLUTION OR EROSION:
3.1. DISCHARGES FROM FIRE-FIGHTING ACTIVITIES
3.2. FIRE HYDRANT FLUSHINGS
3.3. WATERS USED TO WASH VEHICLES WHERE DETERGENTS ARE NOT USED
3.4. WATER USED TO CONTROL DUST
3.5. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS
3.6. ROUTINE EXTERNAL BUILDING WASH DOWN THAT DOES NOT USE DETERGENTS
3.7. PAVEMENT WASH WATERS WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS
MATERIALS HAVE NOT OCCURRED (UNLESS ALL SPILLED MATERIAL HAS BEEN REMOVED)
AND WHERE DETERGENTS ARE NOT USED
3.8. UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE
3.9. UNCONTAMINATED GROUND WATER OR SPRING WATER
3.10. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH
PROCESS MATERIALS SUCH AS SOLVENTS
3.11. UNCONTAMINATED EXCAVATION DEWATERING
3.12. LANDSCAPE IRRIGATION
3.13. DECHLORINATED SWIMMING POOL DISCHARGES.
4. CONSTRUCTION WASTES: DEMOLITION RUBBLE, PACKAGING MATERIALS, SCRAP BUILDING
SUPPLIES, ETC.
4.1. SELECT A DESIGNATED WASTE COLLECTION AREA
4.2. PROVIDE LIDS FOR WASTE CONTAINERS
4.3. WHEN POSSIBLE LOCATE CONTAINERS IN COVERED AREA
4.4. MAINTAIN CONSISTENT REMOVAL SCHEDULE FOR WASTE
5. PESTICIDES: REDUCE THE AMOUNT OF PESTICIDES AVAILABLE FOR CONTACT WITH STORM
WATER.
5.1. STORE IN A DRY COVERED AREA
5.2. INSTALL CURBS OR DIKES AROUND STORAGE AREA TO PROTECT AGAINST SPILLS
5.3. STRICTLY FOLLOW RECOMMENDED APPLICATION RATES
6. FERTILIZERS AND DETERGENTS: REDUCE THE AMOUNT OF FERTILIZERS AND DETERGENTS
AVAILABLE FOR CONTACT WITH STORM WATER.
6.1. LIMIT APPLICATION OF FERTILIZERS TO THE MINIMUM NEEDED
6.2. APPLY MORE FREQUENTLY BUT AT LOWER APPLICATION RATES
6.3. LIMIT USE OF DETERGENTS ON-SITE
6.4. DO NOT DISCHARGE WASH WATER INTO STORM WATER SYSTEM
6.5. MAINTAIN STRUCTURAL AND VEGETATIVE BMP'S
6.6. APPLY ACCORDING TO SOIL TEST RECOMMENDATIONS PRIOR TO SEEDING.
IX. GRASSING NOTES
1. SOD:
ALL SOD SHALL BE NURSERY GROWN AS CLASSIFIED IN THE ASPS GSS. MACHINE CUT SOD AT
A UNIFORM THICKENS OF 3/4" WITHIN A TOLERANCE OF 1/4", EXCLUDING TOP GROWTH AND
THATCH. EACH INDIVIDUAL SOD PIECE SHALL BE STRONG ENOUGH TO SUPPORT ITS OWN
WEIGHT WHEN LIFTED BY THE ENDS. BROKEN PODS, IRREGULARLY SHAPED PIECES, AND
TORN OR UNEVEN ENDS WILL BE REJECTED. WOOD PEGS AND / OR WIRE STAPLES SHALL
REPLACE SOD WITH AN EQUAL SOD COMPOSITION AS THAT WHICH IS EXISTING. IF NO SOD
TYPE EXIST. THEN THE FOLLOWING SOD COMPOSITION SHALL BE USED.
2. SODDING SCHEDULE:
LAY SOD FROM MAY 1 TO SEPTEMBER 15 FOR SPRING PLANTING AND FROM SEPTEMBER 15 TO
NOVEMBER 1 FOR FALL PLANTING.
3. SEED:
ALL SEED SHALL CONFORM TO ALL STATE LAWS AND TO ALL REQUIREMENTS AND
REGULATIONS OF THE SOUTH CAROLINA DEPARTMENT OF AGRICULTURE. THE SEVERAL
VARIETIES OF SEED SHALL BE INDIVIDUALLY PACKAGED OR BAGGED, AND TAGGED TO SHOW
NAME OF SEED, NET WEIGHT, ORIGIN, GERMINATION, LOT NUMBER, AND OTHER INFORMATION
REQUIRED BY THE DEPARTMENT OF AGRICULTURE.
3.1. PENNISETUM GLAUCIUM (BROWNTOP MILLET): TESTING 98 PERCENT PURITY AND 85
PERCENT GERMINATION.
3.2. BERMUDA COMMON: TESTING 98 PERCENT PURITY AND 85 PERCENT GERMINATION.
3.3. DOMESTIC ITALIAN RYE: TESTING 98 PERCENT PURITY AND 90 PERCENT GERMINATION.
4. MISCELLANEOUS:
4.1. PERMANENT SEEDING SHALL COVER ALL DISTURBED AREA NOT TO BE COVERED BY
LANDSCAPE PLANTING BEDS, STRUCTURE, OR PAVEMENT.
4.2. SEED ALL DISTURBED AREAS WITHIN SEVEN DAYS OF FINAL GRADING AND TEMPORARY
SEED/MULCH ALL AREAS THAT WILL BE LEFT INACTIVE FOR MORE THAN FOURTEEN (14)
DAYS.
4.3. ALL PERMANENT GRASS PLANTINGS SHALL BE MULCHED
4.4. CENTIPEDE SOD CAN BE USED AS PERMANENT COVER ANYTIME EXCEPT JUNE THRU
OCTOBER
4.5. IF GRASSING OCCURS DURING A MONTH REQUIRING TEMPORARY COVER, THE CONTRACTOR
SHALL APPLY PERMANENT COVER (IN ADDITION TO THE TEMPORARY COVER) AT THE
APPROPRIATE TIME AT NO NO ADDITIONAL COST. THE CONTRACTOR MUST ACHIEVE A STRAND
OF PERMANENT GRASS WITH AT LEAST 95% COVER. BARE SPOTS CAN NOT BE MORE THAN 1
INCH SQUARE IN ANY 10 SF.
X. PERMANENT STABILIZATION
NEWLY SEEDED OR SODDED AREAS MUST BE PROTECTED FROM VEHICLE TRAFFIC,EXCESSIVE
PEDESTRIAN TRAFFIC, AND CONCENTRATED RUNOFF UNTIL THE VEGETATION IS WELL
ESTABLISHED. IF NECESSARY, AREAS MUST BE RE-WORKED AND RE-STABILIZED IF GERMINATION IS SPARSE, PLANT COVERAGE IS SPOTTY ,OR TOPSOIL EROSION IS EVIDENT. ONE OR MORE OF
THE FOLLOWING MAY APPLY TO THE SITE.
4.1. SEEDED AREAS
FOR SEEDED AREAS, PERMANENT STABILIZATION MEANS A 90% COVER OF THE
DISTURBED AREA WITH MATURE, HEALTHY PLANTS WITH NO EVIDENCE OF WASHING OR
RILLING OF THE TOPSOIL.
4.2. SODDED AREAS
FOR SODDED AREAS, PERMANENT STABILIZATION MEANS THE COMPLETE BINDING OF THE
SOD ROOTS INTO THE APPROVED MULCH MATERIAL.
4.3. PERMANENT MULCH
FOR MULCHED AREAS, PERMANENT MULCHING MEANS TOTAL COVERAGE OF THE
EXPOSED AREA WITH AN APPROVED MULCH MATERIAL.
4.4. RIPRAP
FOR AREAS STABILIZED WITH RIPRAP, PERMANENT STABILIZATION MEANS THAT SLOPES
STABILIZED WITH RIPRAP HAVE AN APPROPRIATE BACKING OF AN APPROVED GEOTEXTILE
TO PREVENT SOIL MOVEMENT FROM BEHIND THE RIPRAP.
4.5. DITCHES, CHANNELS, AND SWALES
FOR OPEN CHANNELS, PERMANENT STABILIZATION MEANS THE CHANNEL IS STABILIZED
WITH MATURE VEGETATION AT LEAST THREE INCHES IN HEIGHT, WITH WELL-GRADED
RIPRAP LINING, OR WITH ANOTHER NON-EROSIVE LINING CAPABLE OF WITHSTANDING THE
ANTICIPATED FLOW VELOCITIES AND FLOW DEPTHS WITHOUT RELIANCE ON CHECK DAMS
TO SLOW FLOW. THERE MUST BE NO EVIDENCE OF SLUMPING OF THE LINING,
UNDERCUTTING OF THE BANKS, OR DOWN CUTTING OF THE CHANNEL.
XI. FERTILIZER REQUIREMENTS
1. TEMPORARY SEEDING FERTILIZER
APPLY A MINIMUM OF 500 LBS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (11.5 POUNDS
PER 1000 SQUARE FEET) OR EQUIVALENT DURING TEMPORARY SEEDING OF GRASSES UNLESS
A SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF
USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE
CONDITIONS ALLOW. LIME IS NOT REQUIRED FOR TEMPORARY SEEDING UNLESS A SOIL TEST
SHOWS THAT THE SOIL PH IS BELOW 5.0. IT IS DESIRABLE TO APPLY LIME DURING THE
TEMPORARY SEEDING OPERATION TO BENEFIT THE LONG-TERM PERMANENT SEEDING. APPLY
A MINIMUM OF 1.5 TONS OF LIME / ACRE (70LBS. / 1000 SQ. FT.).
2. PERMANENT SEEDING FERTILIZER
APPLY A MINIMUM OF 1000 LBS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (23 POUNDS
PER 1000 SQUARE FEET) OR EQUIVALENT DURING PERMANENT SEEDING OF GRADES UNLESS
A SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF
USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE
CONDITIONS ALLOW. DO NOT MIX THE LIME AND THE FERTILIZER PRIOR TO THE FIELD
APPLICATION. UNLESS A SPECIFIC SOIL TEST INDICATES OTHERWISE, APPLY 1 & 1/2 TONS OF
GROUND COARSE TEXTURED AGRICULTURAL LIMESTONE PER ACRE (70 LBS. / 1000 SQ.FT.).
XII. SWPP PREPARER CERTIFICATION
I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000.
www.thomasandhutton.com
STORMWATER POLLUTION PREVENTION PLANSTORMWATER POLLUTION PREVENTION PLAN
LIST OF ACRONYMS FOR SEDIMENT AND EROSION CONTROL
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
AMD ACRYLAMIDE POLYMER
BFM BONDED FIBER MATRIX
BMP(S) BEST MANAGEMENT PRACTICE(S)
CFS CUBIC FEET PER SECOND
CMP CORRUGATED METAL PIPE
DHEC DEPARTMENT OF HEATH AND ENVIRONMENTAL CONTROL
ECB EROSION CONTROL BLANKET
EPA UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
EPSC EROSION PREVENTION AND SEDIMENTATION CONTROL
FDA UNITED STATES FOOD AND DRUG ADMINISTRATION
FGM FLEXIBLE GROWTH MATRIX
HDPE HIGH DENSITY POLYETHYLENE
MS4 MUNICIPAL SEPARATE STORM SEWER SYSTEM
MSDS MATERIAL SAFETY DATA SHEETS
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
PAM POLYACRYLAMIDE OR POLYMER
RCP REINFORCED CONCRETE PIPE
SCS SOIL CONSERVATION SERVICE
SWPPP STORMWATER POLLUTION PREVENTION PROGRAM
TRM TURF REINFORCEMENT MAT
VFS VEGETATED FILTER STRIP
TEMPORARY SEEDING - COASTAL
SPECIES LBS/AC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
SANDY, DROUGHTY SITES
BROWNTOP MILLET 40
RYE, GRAIN 56
WELL DRAINED, CLAYEY/LOAMEY SITES
BROWNTOP MILLET 40
JAPANESE MILLET 40
RYE, GRAIN 56
OATS 75
PERMANENT SEEDING - COASTAL
SPECIES LBS/AC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
SANDY, DROUGHTY SITES
BROWNTOP MILLET 10
BAHIAGRASS 40
BROWNTOP MILLET 10
BAHIAGRASS 30
BROWNTOP MILLET 10
ATLANTIC COASTAL 15
PANICGRASS PLS
BROWNTOP MILLET 10
SWITCHGRASS 8
(ALAMO) PLS
LITTLE BLUESTEM 4
BROWNTOP MILLET 10
WEEPING LOVEGRASS 8
WELL DRAINED, CLAYEY/LOAMEY SITES
BROWNTOP MILLET 10
BAHIAGRASS 40
RYE, GRAIN 10
BAHIAGRASS 40
CLOVER, CRIMSON (ANNUAL) 5
BROWNTOP MILLET 10
BAHIAGRASS 30
BROWNTOP MILLET 10
BERMUDA, COMMON 10
BROWNTOP MILLET 10
BERMUDA, COMMON 12
BROWNTOP MILLET 10
BAHIAGRASS 20
BERMUDA, COMMON 6
BROWNTOP MILLET 10
SWITCHGRASS 8
LITTLE BLUESTEM PLS
INDIANGRASS 3
CONSTRUCTION SEQUENCE
CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION
1 OBTAIN COPIES OF ALL PLAN APPROVALS AND
OTHER APPLICABLE PERMITS.
CONTRACTOR TO HAVE ONSITE AT ALL TIMES DURING
CONSTRUCTION.
2 FLAG THE WORK LIMITS AND BARRICADE TREES AND
MARK BUFFER AREAS FOR PROTECTION.
HAVE LOCAL REGULATORY AGENCY INSPECT TREE
BARRICADES.
3 HOLD PRE CONSTRUCTION CONFERENCE AT LEAST
ONE WEEK PRIOR TO STARTING CONSTRUCTION.
REVIEW TREE PROTECTION (BARRICADE) WITH OWNER AND
LOCAL REGULATORY AGENCY. TAKE PICTURES OF ALL
PROTECTED TREES AND LOCATIONS WHERE SITE WORK TIES
INTO EXISTING TO DOCUMENT PREDEVELOPMENT
PROCEDURES.
4 INSTALL CONSTRUCTION ACCESS AND LAY DOWN
AREAS
STABILIZE BARE AREAS IMMEDIATELY AND INSTALL
CONSTRUCTION EXITS / ENTRANCES.
5 INSTALL PERIMETER CONTROLS - SILT FENCE AND
ANY OTHER PERIMETER BMP'S
CLEARING AND GRUBBING AS NECESSARY FOR INSTALLATION
OF PERIMETER CONTROLS
611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545
CONSTRUCTION SEQUENCE
CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION
1 CONSTRUCT SEDIMENT TRAPS AND BARRIERS -
BASIN TRAPS, SEDIMENT FENCES, AND OUTLET
PROTECTION.
INSTALL PRINCIPAL BASINS AFTER CONSTRUCTION SITE IS
ACCESSED. INSTALL ADDITIONAL TRAPS AND BARRIERS AS
NEEDED DURING GRADING.
2 ESTABLISH RUNOFF CONTROL - DIVERSIONS,
PERIMETER DIKES, WATER BARS, AND OUTLET
PROTECTION.
INSTALL KEY PRACTICES AFTER PRINCIPAL SEDIMENT TRAPS
AND BEFORE LAND GRADING. INSTALL ADDITIONAL
RUNOFF-CONTROL MEASURES DURING GRADING.
3 LAND CLEARING AND GRADING-SITE PREPARATION
CUTTING, FILLING AND GRADING, SEDIMENTATION
TRAPS, BARRIERS, DIVERSIONS, DRAINS, SURFACE
ROUGHENING.
BEGIN MAJOR CLEARING AND GRADING AFTER PRINCIPAL
SEDIMENT AND KEY RUNOFF-CONTROL MEASURES ARE
INSTALLED. CLEAR BORROW AND DISPOSAL AREAS ONLY AS
NEEDED. INSTALL ADDITIONAL CONTROL MEASURES AS
GRADING PROGRESSES. MARK TREES AND BUFFER AREAS
FOR PRESERVATION.
4 RUNOFF CONVEYANCE SYSTEM- INSTALL STORM
DRAINS, STABILIZE BANKS, CHANNELS, INSTALL
INLET AND OUTLET PROTECTION, SLOPE DRAINS.
WHERE NECESSARY, STABILIZE BANKS AS EARLY AS
POSSIBLE. INSTALL PRINCIPAL RUNOFF CONVEYANCE SYSTEM
WITH RUNOFF- CONTROL MEASURES. INSTALL REMAINDER OF
SYSTEM AFTER GRADING.
5 INSTALL WASTEWATER COLLECTION, WATER
DISTRIBUTION, AND STORM DRAINAGE SYSTEMS
APPLY TEMPORARY OR PERMANENT STABILIZATION
MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE
WORK IS DELAYED OR COMPLETE.
611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545
CONSTRUCTION SEQUENCE
CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION
1 SURFACE STABILIZATION - TEMPORARY AND
PERMANENT SEEDING, MULCHING, SODDING, RIPRAP
APPLY TEMPORARY OR PERMANENT STABILIZATION
MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE
WORK IS DELAYED OR COMPLETE.
2 BUILDING CONSTRUCTION- BUILDINGS UTILITIES,
ROADS, ETC.
INSTALL NECESSARY EROSION AND SEDIMENTATION CONTROL
PRACTICES AS WORK TAKES PLACE.
3 LANDSCAPING AND FINAL STABILIZATION -
TOPSOILING, TREES AND SHRUBS, PERMANENT
SEEDING, MULCHING, SODDING, RIP RAP.
LAST CONSTRUCTION PHASE--STABILIZE ALL OPEN AREAS,
INCLUDING BORROW AND SPOIL AREAS. REMOVE AND
STABILIZE ALL TEMPORARY CONTROL MEASURES.
611 Burroughs & Chapin Blvd. • Suite 202 Myrtle Beach, SC 29577 • 843.839.3545 www.thomasandhutton.com
STORMWATER POLLUTION PREVENTION PLAN
FILTER FABRIC
BACKFILL TRENCH WITH
COMPACTED EARTH
COMPACTED
EARTH
COMPACTED
EARTH
FILTER FABRIC FILTER FABRIC
RUNOFF
RUNOFF RUNOFF
BURY FABRICUSE EITHER FLAT-BOTTOM
OR V-BOTTOM TRENCH
SHOWN BELOW
FLAT-BOTTOM TRENCH DETAIL V-SHAPED TRENCH DETAIL
SILT FENCE INSTALLATION
FILTER
FABRIC
FILTER FABRIC
1.25 LB./LINEAR FT. STEEL POSTS
HEAVY DUTY PLASTIC TIE
FOR STEEL POSTS
WHEN AND WHERE TO USE IT:
SILT FENCE IS APPLICABLE IN AREAS:
WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100-FEET.
WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:1V.
THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS.
DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP.
MATERIALS:
STEEL POSTS
USE 48-INCH LONG STEEL POSTS THAT MEET THE FOLLOWING MINIMUM PHYSICAL REQUIREMENTS:
COMPOSED OF HIGH STRENGTH STEEL WITH MINIMUM YIELD STRENGTH OF 50,000 PSI.
HAVE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND NOMINAL "T" LENGTH OF 1.48-INCHES.
WEIGH 1.25 POUNDS PER FOOT (± 8%).
HAVE A SOIL STABILIZATION PLATE WITH A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES ATTACHED TO THE STEEL POSTS.
PAINTED WITH A WATER BASED BAKED ENAMEL PAINT.
USE STEEL POSTS WITH A MINIMUM LENGTH OF 4-FEET, WEIGHING 1.25 POUNDS PER LINEAR FOOT (± 8%) WITH PROJECTIONS TO AID IN FASTENING THE FABRIC. EXCEPT WHEN HEAVY CLAY SOILS ARE PRESENT ON SITE, STEEL POSTS WILL HAVE A METAL SOIL STABILIZATION PLATE WELDED NEAR THE BOTTOM SUCH THAT WHEN THE POST IS DRIVEN TO THE PROPER DEPTH, THE PLATE WILL BE
BELOW THE GROUND LEVEL FOR ADDED STABILITY.
THE SOIL PLATES SHOULD HAVE THE FOLLOWING CHARACTERISTICS:
BE COMPOSED OF MINIMUM 15 GAUGE STEEL.
HAVE A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES.
GEOTEXTILE FILTER FABRIC:
FILTER FABRIC IS:
COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS COMPOSED OF AT LEAST 85% BY WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES.
FORMED INTO A NETWORK SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER.
FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES AFTER INSTALLATION.
FREE OF DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING PROPERTIES.
CUT TO A MINIMUM WIDTH OF 36 INCHES.
USE ONLY FABRIC APPEARING ON SCDOT APPROVAL SHEET #34 MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE
SCDOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.
INSTALLATION:
EXCAVATE A TRENCH APPROXIMATELY 6-INCHES WIDE AND 6-INCHES DEEP WHEN PLACING FABRIC BY HAND. PLACE 12-INCHES OF GEOTEXTILE FABRIC INTO THE 6-INCH DEEP TRENCH, EXTENDING THE REMAINING 6-INCHES TOWARDS THE UPSLOPE SIDE OF THE TRENCH. BACKFILL THE TRENCH WITH SOIL OR GRAVEL AND COMPACT. BURY 12-INCHES OF FABRIC INTO THE GROUND WHEN PNEUMATICALLY INSTALLING SILT FENCE WITH A SLICING METHOD. PURCHASE FABRIC IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, WRAPPED THE FABRIC TOGETHER AT A SUPPORT POST WITH BOTH ENDS FASTENED TO THE POST, WITH A 6-INCH MINIMUM OVERLAP.
INSTALL POSTS TO A MINIMUM DEPTH OF 24-INCHES. INSTALL POSTS A MINIMUM OF 1- TO 2- INCHES ABOVE THE FABRIC, WITH NO MORE THAN 3-FEET OF THE POST ABOVE THE GROUND. SPACE POSTS TO MAXIMUM 6-FEET CENTERS. ATTACH FABRIC TO WOOD POSTS USING STAPLES MADE OF HEAVY-DUTY WIRE AT LEAST 1-1/2-INCH LONG, SPACED A MAXIMUM OF 6-INCHES APART. STAPLE A 2-INCH WIDE LATHE OVER THE FILTER FABRIC TO SECURELY FASTEN IT TO THE UPSLOPE SIDE OF WOODEN POSTS. ATTACH FABRIC TO THE STEEL POSTS USING HEAVY-DUTY PLASTIC TIES THAT ARE EVENLY SPACED AND PLACED IN A MANNER TO PREVENT SAGGING OR TEARING OF THE FABRIC. IN CALL CASES, TIES SHOULD BE AFFIXED IN NO LESS THAN 4 PLACES. INSTALL THE FABRIC A MINIMUM OF 24-INCHES ABOVE THE GROUND. WHEN NECESSARY, THE HEIGHT OF THE FENCE ABOVE GROUND MAY BE GREATER THAN 24-INCHES. IN TIDAL AREAS, EXTRA SILT FENCE HEIGHT MAY BE REQUIRED. THE POST HEIGHT WILL BE TWICE THE EXPOSED POST HEIGHT. POST SPACING WILL REMAIN THE SAME AND EXTRA HEIGHT FABRIC WILL BE 4-, 5-, OR 6-FEET TALL.
LOCATE SILT FENCE CHECKS EVERY 100 FEET MAXIMUM AND AT LOW POINTS. INSTALL THE FENCE PERPENDICULAR TO THE DIRECTION OF FLOW AND PLACE THE FENCE THE PROPER DISTANCE FROM THE TOE OF STEEP SLOPES TO PROVIDE SEDIMENT STORAGE AND ACCESS FOR MAINTENANCE AND
CLEANOUT.
INSPECTION AND MAINTENANCE:
CHECK FOR SEDIMENT BUILDUP AND FENCE INTEGRITY. CHECK WHERE RUNOFF HAS ERODED A CHANNEL BENEATH THE FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED BY FENCE OVERTOPPING. IF THE FENCE FABRIC TEARS, BEGINS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE SECTION OF FENCE IMMEDIATELY. REMOVE SEDIMENT ACCUMULATED ALONG THE FENCE WHEN IT REACHES 1/3 THE HEIGHT OF THE FENCE, ESPECIALLY IF HEAVY RAINS ARE EXPECTED. REMOVE TRAPPED SEDIMENT FROM THE SITE OR STABILIZE IT ON SITE. REMOVE SILT FENCE WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED OR
AFTER TEMPORARY BEST MANAGEMENT PRACTICES (BMPS) ARE NO LONGER NEEDED. PERMANENTLY STABILIZE DISTURBED AREAS RESULTING
FROM FENCE REMOVAL.
END VIEW OF DITCH
FLOW
TOP VIEW OF DITCH
2.0'MIN.2.0' SPACING (TYPICAL)
CONTINUOUS ALONG
TUBE
48" MIN.
LENGTH
DESCRIPTION:
SEDIMENT TUBES ARE ELONGATED TUBES OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER OR HARDWOOD MULCH.
STRAW,
PINE NEEDLE AND LEAF MULCH-FILLED SEDIMENT TUBES ARE NOT PERMITTED UNDER THIS SPECIFICATION.
WHEN AND WHERE TO USE IT:
INSTALL SEDIMENT TUBES ALONG CONTOURS, IN DRAINAGE CONVEYANCE SWALES, AND AROUND INLETS TO HELP REDUCE THE EFFECTS OF SOIL EROSION BY
ENERGY DISSIPATION AND RETAIN SEDIMENT.
MATERIALS:
SEDIMENT TUBES FOR DITCH CHECKS AND TYPE A INLET STRUCTURE FILTERS EXHIBIT THE FOLLOWING PROPERTIES:
PRODUCED BY A MANUFACTURER EXPERIENCED IN SEDIMENT TUBE MANUFACTURING.
COMPOSED OF COMPACTED GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBERS, HARDWOOD MULCH OR A MIX OF THESE MATERIALS
ENCLOSED BY A FLEXIBLE NETTING MATERIAL.
STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES AND LEAF MULCH ARE NOT ALLOWED UNDER THIS SPECIFICATION.
UTILIZES OUTER NETTING THAT CONSISTS OF SEAMLESS, HIGH-DENSITY POLYETHYLENE PHOTODEGRADABLE MATERIALS TREATED WITH ULTRAVIOLET STABILIZERS OR A SEAMLESS, HIGH-DENSITY POLYETHYLENE NON-DEGRADABLE MATERIALS. DIAMETER RANGING FROM 18-INCHES TO 24-INCHES.
CURLED EXCELSIOR WOOD, OR NATURAL COCONUT ROLLED EROSION CONTROL PRODUCTS (RECPS) THAT ARE ROLLED UP TO CREATE A SEDIMENT TUBE ARE
NOT ALLOWED UNDER THIS SPECIFICATION.
INSTALLATION:
INSTALL OVER BARE SOIL, MULCHED AREAS OR EROSION CONTROL BLANKETS.
BE COMPOSED OF GEOTEXTILES, CURLED EXCELSIOR WOOD, NATURAL COCONUT FIBER OR HARDWOOD MULCH ENCLOSED BY A FLEXIBLE NETTING MATERIAL.
STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES AND LEAF MULCH ARE NOT ALLOWED.
THE MINIMUM DIAMETER SHOULD BE 18 INCHES.
SEDIMENT TUBES SHOULD BE STAKED USING WOODEN STAKES (2-INCH X 2-INCH) OR STEEL POSTS (STANDARD "U" OR "T" SECTIONS WITH A MINIMUM WEIGHT OF 1.25 POUNDS PER FOOT) A MINIMUM OF 48-INCHES IN LENGTH PLACED ON 2-FOOT CENTERS.
STAKES SHOULD BE INTERTWINED WITH THE OUTER MESH ON THE DOWNSTREAM SIDE AND DRIVEN IN THE GROUND TO A MINIMUM DEPTH OF 1.5 FEET LEAVING LESS THAN 1 FOOT OF STAKE EXPOSED ABOVE THE SEDIMENT TUBE. ALWAYS REFER TO THE MANUFACTURER'S RECOMMENDATIONS FOR THE STAKING DETAIL, INSTALL ALL SEDIMENT TUBES INSURING THAT NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM OF THE SEDIMENT TUBE.
THE ENDS OF ADJACENT SEDIMENT TUBES SHOULD BE LAPPED 6-INCH TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT.
IN NO SITUATIONS SHOULD SEDIMENT TUBES BE STACKED ON TOP OF ONE ANOTHER.
CONSTRUCT A TRENCH THAT IS 20% OF THE TUBE DIAMETER TO INSTALL THE TUBE IN.
AVOID DAMAGE TO SEDIMENT TUBES WHILE INSTALLING THEM. IF THE SEDIMENT TUBE BECOMES DAMAGED DURING INSTALLATION, A STAKE SHOULD BE PLACED ON BOTH SIDES OF THE DAMAGED AREA TERMINATING THE TUBE SEGMENT AND A NEW TUBE SEGMENT SHOULD BE INSTALLED.
SHOULD BE INSTALLED IN SWALES OR DRAINAGE DITCHES PERPENDICULAR TO THE FLOW OF WATER. SEDIMENT TUBES SHOULD CONTINUE UP THE SIDE SLOPES A MINIMUM OF 1 FOOT ABOVE THE DESIGN FLOW DEPTH. SEDIMENT TUBES SHOULD BE SPACED ACCORDING TO THE FOLLOWING TABLE.
MAXIMUM SEDIMENT TUBE SPACINGSLOPE
4%
SEDIMENT TUBE SPACING
3% 2%
LESS THAN 2%
50-FEET
40-FEET
30-FEET
25-FEET
5% 6%
GREATER THAN 6%
150-FEET
100-FEET
75-FEET
INSPECTION AND MAINTENANCE:
LARGE DEBRIS, TRASH, AND LEAVES SHOULD BE REMOVED.
IF EROSION CAUSES THE EDGES TO FALL TO A HEIGHT EQUAL TO OR BELOW THE HEIGHT OF THE CENTER, REPAIRS SHOULD BE MADE IMMEDIATELY.
REMOVE ACCUMULATED SEDIMENT FROM THE UPSTREAM SIDE OF THE SEDIMENT TUBE WHEN THE SEDIMENT HAS REACHED A HEIGHT OF APPROXIMATELY
ONE-THIRD OF THE EXPOSED HEIGHT OF THE TUBE (MEASURED AT THE CENTER).
ACCUMULATED SEDIMENT SHOULD BE REMOVED PRIOR TO REMOVING SEDIMENT TUBES.
SEDIMENT TUBE REMOVAL SHOULD BE COMPLETED ONLY AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN COMPLETELY STABILIZED. PERMANENT VEGETATION SHOULD REPLACE AREAS FROM WHICH GRAVEL, STONE, SEDIMENT TUBES, OR OTHER MATERIALS HAVE BEEN REMOVED.
SEDIMENT TUBE LENGTH SELECTED SHOULD MINIMIZE THE NUMBER OF SEDIMENT TUBES NEEDED TO SPAN THE WIDTH OF THE DRAINAGE CONVEYANCE.
IF THE DITCH CHECK LENGTH (PERPENDICULAR TO THE WATER FLOW) IS 15 FEET, THEN ONE 15 FOOT SEDIMENT TUBE IS PREFERRED COMPARED
TO TWO…