SC6.21 DBB A_2026.pdf
PDF 363 KB Posted
- Solicitation number
- IFB1 OAAA 2027000023 2
- Issued by
- Arapahoe County, Colorado
About this file
This is a Design/Bid/Build (D/B/B) Agreement form (SC-6.21, Rev. 07/2026) issued by the State of Colorado Office of the State Architect State Buildings Program for the project OAAA, 3210, CRWU 26-2007, Building 960 Roof Replacement. The agreement establishes the contractual framework between the State of Colorado and a selected contractor for the complete design, bid, and construction of the roof replacement project. The contractor is required to perform all work to the highest industry standards in strict accordance with the Contract Documents and to substantially complete the project within a specified number of calendar days from the Notice to Proceed, with final completion required within an additional specified period. The agreement incorporates General Conditions (SC-6.23) and requires the contractor to submit various supporting documents including a performance bond, labor and material payment bond, insurance certificates, and prevailing wage certifications.
The contract sum is to be determined and inserted by the State, with provisions for base bid amounts and alternates as specified in the bid documents. Payment is contingent upon appropriated and available funds, with a condition precedent clause allowing discharge of obligations if additional funding is not secured by a specified date. The agreement includes optional provisions for Davis-Bacon Act applicability, state prevailing wage requirements, apprenticeship utilization certifications, Buy Clean Colorado Act compliance, and liquidated damages assessments for failure to meet completion deadlines. The project is subject to Colorado Building Code requirements and coordination procedures established by the Office of the State Architect. All notices and communications between the State and contractor must be directed to designated principal representatives, and the contract becomes effective only upon approval and signature by the State Controller or an authorized delegate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SC6.23 DBB A GC_2025.pdf | ||
| Pre-Bid Sign in Sheet.pdf | ||
| IFB1 CRWU 26-2007 B960 Roof Repair.pdf | ||
| SBP6.18 Labor Burden Calc.pdf | ||
| Addendum 1 DMVA A31 Repair Roofing B960.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SC-6.21
Rev. 07/2026
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S
DESIGN/BID/BUILD (D/B/B)
AGREEMENT
(STATE FORM SC-6.21)
State Agency Insert Department or IHE’s Full Legal Name Department I.D.
Insert Department identification Contract I.D. Number Insert CMS number or other contract number Project Number Insert OSC Project Number Project Name Insert Project as as provided by the State Controller's Office Contractor Name Insert Contractor's full Legal Name including "Inc.", "LLC" etc.
Principal Representatives For the State:
Name Department Name Address Line 1 Address Line 2 City, State ZIP Email
For Contractor:
Name Company Name Address Line 1 Address Line 2 City, State ZIP Email
ATTACHMENT 1: The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23)
Rev. 07/2026 TOC
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
TABLE OF CONTENTS… ...................................................................................................... Page Table of Contents for the entire Agreement is located in THE GENERAL CONDITIONS OF THE
CONTRACTOR’S DESIGN/BID/BUILD (D/B/B) AGREEMENT (SC-6.23)
SIGNATURE PAGE
RECITALS:
1 ARTICLE 1 PERFORMANCE OF THE WORK
2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
3 ARTICLE 3 TIME OF COMPLETION
4 ARTICLE 4 ESSENTIAL CONDITION
5 ARTICLE 5 CONTRACT SUM
5.1 CONDITION PRECEDENT
6 ARTICLE 6 CONTRACT DOCUMENTS
6.1 CAPITALIZED TERMS
7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation
7.2 MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples
7.3 MODIFICATION 1 OF ARTICLE 27: Labor and Wages
7.4 MODIFICATION 2 OF ARTICLE 27: Labor and Wages
7.5 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations
7.6 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion
7.7 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages
8 ARTICLE 8 NOTICE IDENTIFICATION
EXHIBIT A: CONTRACTORS BID ...................................................................................... A EXHIBIT B: PERFORMANCE BOND ................................................................................. B EXHIBIT C: LABOR AND MATERIAL PAYMENT BOND ...................................................... C EXHIBIT D: INSURANCE CERTIFICATE(S) ......................................................................... D EXHIBIT E: BUILDING CODE COMPLIANCE POLICY ......................................................... E EXHIBIT F: STATE SALES AND USE TAX FORM ................................................................ A
EXHIBIT G: APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP
CONTRIBUTION RATES ..................................................................................................... B
EXHIBIT H: APPRENTICESHIP UTILIZATION CERTIFICATIONS ........................................... C
SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS
Rev. 07/2026 1
SIGNATURE PAGE
THE PARTIES HERETO HAVE EXECUTED THIS AGREEMENT
Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.
In accordance with §24-30-202, C.R.S., this Contract is not valid until signed by the State Controller (or an authorized delegate) or the Title of IHE CFO per the Fiscal Rules of the individual Institution of Higher Education
Project Number/Name: Insert OSC Project Number followed by Project Name Contract ID No.: Insert CMS Number & Encumbrance Number
CONTRACTOR
INSERT: Legal Name of Contractor
By: Name & Title of Person Signing for Contractor
Date: __________________
STATE OF COLORADO
Jared S. Polis, Governor
INSERT: Name of Agency or IHE INSERT: Name & Title of Head of Agency or
IHE
By: Name & Title of Person Signing for Agency or
IHE
Date: __________________
State Buildings Program
By: Name & Title of Person Signing for State Buildings
Date: __________________
LEGAL REVIEW
Philip J. Weiser, Attorney General
By: Assistant Attorney General
Date: __________________
STATE CONTROLLER
Robert Jaros, CPA, MBA, JD
By: Name of Agency or IHE Delegate Effective Date: __________________
Rev. 07/2026 2
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD (D/B/B) AGREEMENT
(STATE FORM SC-6.21)
Department ID: Insert Dept. Code Contract ID #: Insert Contract ID Project #:Insert Project #
1. PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Insert Department's or IHE's Full Legal Name hereinafter referred to as the State or Principal Representative, and Insert Contractor's full Legal Name including "Inc.", "LLC" etc.
having its offices at Street address, City, State and Zip Code hereinafter referred to as the Contractor.
2. EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State Controller or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Contractor for any Work performed or expense incurred before the Effective Date.
RECITALS:
WHEREAS, the Principal Representative intends to engage the services of a Contractor for the Insert Project Name as provided by the State Controller's Office hereinafter called the Project;
and
WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment in Fund Number Insert Fund Number Here, Account Number Insert Account Number here; and
WHEREAS, the State has Appropriated and the Principal Representative has been authorized to expend the total sum of Insert Dollar Value in Written Words Dollars ($ ) for this project including all professional services, construction/improvements, project contingencies, furnishings, movable equipment, reimbursable expenses and miscellaneous expenses; and
(WHEREAS, funds are available for only a portion of the services defined herein, as more fully described in the funding Condition Precedent clause in Article 5.1; and)
WITNESSETH, that the State of Colorado and the Contractor agree as follows:
Rev. 07/2026 3
1 ARTICLE 1 PERFORMANCE OF THE WORK
The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents for the above referenced Project.
2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
The Contractor agrees to perform the Work to the highest industry standards and to the satisfaction of the State of Colorado and its contractor in strict accordance with the provisions of the Contract Documents.
3 ARTICLE 3 TIME OF COMPLETION
The Contractor agrees to Substantially Complete the Project within calendar days from the date of the Notice to Proceed, in addition, the Contractor agrees to finally complete the Project from Substantial Completion to Final Acceptance within calendar days for a total time of completion of the entire Project of calendar days.
The Contractor shall perform the Work with due diligence to completion.
4 ARTICLE 4 ESSENTIAL CONDITION
Timely completion of the Project is an essential condition of this Agreement. The Contractor shall be subject to any liquidated damages described in Article 7.6 for failure to satisfactorily complete the Work within the time periods in Article 3 above.
5 ARTICLE 5 CONTRACT SUM
The Contractor shall be paid for the performance of this Agreement, subject to any additions and deductions as provided for in Articles 32, 34 and 35 of The General Conditions of the Construction Contract SC-6.23, the sum of INSERT DOLLAR VALUE IN
WORDS DOLLARS AND NO/100 ($ ).
Rev. 07/2026 4
Name of Document Short Description of Work/Date Dollar Amount Base Bid Amount Base Bid Alt. # Alt. #
Total Contract Sum -$
5.1 CONDITION PRECEDENT
(At the time of the execution of this Agreement, there are sufficient funds budgeted and appropriated to compensate the Contractor only for performance of the services through and including Insert the project phases that have been fully funded Therefore, it shall be a Condition Precedent to the Contractor’s performance of the remaining services and the State's liability to pay for such performance, sufficient funding must be appropriated and made available to the Principal Representative for the Project prior to and, as a further Condition Precedent, a written Amendment is entered into in accordance with the State of Colorado Fiscal Rules, stating that additional funds are lawfully available for the project. If either Condition Precedent is not satisfied by , the Contractor’s obligation to perform services for Insert the scope pf work or phases that will be completed in the future and the State's obligation to pay for such service is discharged without liability to each other. If funding is eventually made available after , the Contractor has no right to perform services under of this Agreement and the state has no right to require the Architect/Engineer to perform the said services.)
6 ARTICLE 6 CONTRACT DOCUMENTS
The Contract Documents, as enumerated in Article 1.1 of The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.23), (the “General Conditions”).
The Contract Documents, including the General Conditions, are all essential parts of this Agreement and are fully incorporated herein.
6.1 CAPITALIZED TERMS
Capitalized terms used herein and not defined shall have the meanings ascribed to them in The General Conditions of Design/Bid/Build (D/B/B) Agreement (SC-6.23)
7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
The provisions of this Article 7 alter or enlarge upon the following Articles (the General Conditions of the Contractor’s Design/Bid/Build Agreement SC-6.23):
7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation.
If the box below is marked, certification of apprenticeship utilization is required for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical and plumbing work on the project.
☒ ______ Principal Representative initial
Rev. 07/2026 5
7.2 MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples
If the box below is marked, the Buy Clean Colorado Act, §24-92-117, C.R.S., shall be applicable to the Project. The Contractor is responsible for submitting Environmental Product Declaration (EPD) information for all eligible materials to be used on the project.
☐ ______ Principal Representative initial
7.3 MODIFICATION 1 OF ARTICLE 27: Labor and Wages
If the box below is marked, the Federal Davis-Bacon Act shall be applicable to the Project.
The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
☐ ______ Principal Representative initial
7.4 MODIFICATION 2 OF ARTICLE 27: Labor and Wages
If the box below is marked, the State prevailing wage statute shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
☐ ______ Principal Representative initial
7.5 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations
If the box below is marked, and initialed by the State as noted, the requirement to participate in facilitated negotiations shall be deleted from this Contract. Article 39, Non- Binding Dispute Resolution – Facilitated Negotiations, shall be deleted in its entirety and all references to the right to the same where ever they appear in the contract shall be similarly deleted.
The box may be marked only for projects with an estimated value of less than $500,000.
☒ ______ Principal Representative initial
7.6 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion
If the box below is marked the six month guarantee inspection is not required.
☐ ______ Principal Representative initial
7.7 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages
If an amount is indicated immediately below, liquidated damages shall be applicable to this Project as, and to, the extent shown below. Where an amount is indicated below, liquidated damages shall be assessed in accordance with and pursuant to the terms of The General Conditions of the Design/Bid/Build Agreement Article 46, Time of Completion And Liquidated Damages, in the amounts and as here indicated. The election of liquidated damages shall limit and control the parties right to damages as the State’s sole and exclusive remedy for delay.
7.7.1 Inability To Use The Project
Rev. 07/2026 6
For the inability to use the Project, for each day after the number of calendar days specified in the Contractor’s bid for the Project and the Agreement for achievement of Substantial Completion, until the day that the Project has achieved Substantial Completion and the Notice of Substantial Completion is issued, the Contractor agrees that an amount equal Insert dollar value in words Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due, but amounts remaining are insufficient to cover the entire assessment.
7.7.2 Damages Related to Extended Closeout
For damages related to or arising from additional administrative, technical, supervisory and professional expenses related to and arising from the extended closeout period, for each day in excess of the number of calendar days specified in the Contractor’s bid for the Project and the Agreement to finally complete the Project as defined by the issuance of the Notice of Final Acceptance (after the issuance of the final Notice of Substantial Completion), the Contractor agrees that an amount equal to Insert dollar value in words Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due but amounts remaining are insufficient to cover the entire assessment.
8 ARTICLE 8 NOTICE IDENTIFICATION
All Notices pertaining to this Agreement and the General Conditions (SC-5.23) or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing.
NOTICE TO PRINCIPAL REPRESENTATIVE:
Insert Name of Individual acting on the PR behalf Insert Street Address City, State Zip Code Insert email address
With copies to State Buildings Program (or Delegate) Insert Name of Individual acting on OSA/SBP behalf Insert Street Address City, State Zip Code Insert email address
Rev. 07/2026 7
NOTICE TO CONTRACTOR:
Insert Name of Individual acting on the contractor behalf Insert Street Address City, State Zip Code Insert email address
Rev. 07/2026 Ex A
STATE OF COLORADO
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT A: CONTRACTORS BID
CONTRACTOR’S BID (Form SBP-6.13) Workers’ Compensation Certification (SBP-4.1) Bid Alternates (Form SBP-6.131) Unit Pricing (Form SBP-6.133) Bid Bond (Form SBP-6.14) Labor Burden Calculation (Form SBP-6.18)
Rev. 07/2026 Ex B
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT B: PERFORMANCE BOND
PERFORMANCE BOND (Form SC-6.22)
Rev. 07/2026 Ex C
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT C: LABOR AND MATERIAL PAYMENT BOND
LABOR AND MATERIAL PAYMENT BOND (Form SC-6.221)
Rev. 07/2026 Ex D
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT D: INSURANCE CERTIFICATE(S)
INSURANCE CERTIFICATE(S) (attached)
Rev. 07/2026 Ex E
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT E: BUILDING CODE COMPLIANCE POLICY
BUILDING CODE COMPLIANCE POLICY: COORDINATION OF APPROVED BUILDING CODES, PLAN
REVIEWS, BUILDING INSPECTIONS AND STATE DEVELOPMENT REQUIREMENTS
Refer to the Office of the State Architect’s Building Codes Webpage for the Building Code Compliance Policy (Rev. July 2025)
Exhibit A: Approved Building Codes of the Code Compliance Policy dated July 2025 including the Amendments to the International Building Code and Code Compliance Plan Review Procedures (Rev. July 2025);
Exhibit B: Plan Review Procedures of the Code Compliance Policy dated July 2025
Exhibit I: State Development Requirements of the Code Compliance Policy dated July 2025
The State Buildings Program Building Codes Webpage may be found at:
https://osa.colorado.gov/state-buildings/building-codes
Rev. 07/2026 Ex A
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT F: STATE SALES AND USE TAX FORM
STATE SALES AND USE TAX FORM
Rev. 07/2026 Ex B
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
EXHIBIT G: APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP
CONTRIBUTION RATES
Applicable Prevailing Wage Determinations (Attached) Apprenticeship Contribution Rates (Attached)
Rev. 07/2026 Ex C
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT H: APPRENTICESHIP UTILIZATION CERTIFICATIONS
APPRENTICESHIP UTILIZATION CERTIFICATIONS
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS
Supplementary General Conditions Federal Provisions
SLFRF Federal Funds: Contractor Terms and Conditions Certification
SLFRF Federal Funds: Contractor Terms and Conditions
| State Agency |
| Department I.D. |
| Contract I.D. Number |
| Project Number |
| Project Name |
| Contractor Name |
| Principal Representatives |
| CONTRACTOR |
| STATE OF COLORADO |
| OFFICE OF THE STATE ARCHITECT |
| LEGAL REVIEW |
| STATE CONTROLLER |
| 1 ARTICLE 1 PERFORMANCE OF THE WORK |
| 2 ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS |
| 3 ARTICLE 3 TIME OF COMPLETION |
| 4 ARTICLE 4 ESSENTIAL CONDITION |
| 5 ARTICLE 5 CONTRACT SUM |
| 5.1 CONDITION PRECEDENT |
| 6 ARTICLE 6 CONTRACT DOCUMENTS |
| 6.1 CAPITALIZED TERMS |
| 7 ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS |
| 7.1 MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation. |
| 7.2 MODIFICATION OF ARTICLE 13: Shop Drawings, Product Data and Samples |
| 7.3 MODIFICATION 1 OF ARTICLE 27: Labor and Wages |
| 7.4 MODIFICATION 2 OF ARTICLE 27: Labor and Wages |
| 7.5 MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations |
| 7.6 MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion |
| 7.7 MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages |
| 7.7.1 Inability To Use The Project |
| 7.7.2 Damages Related to Extended Closeout |
| 8 ARTICLE 8 NOTICE IDENTIFICATION |
| Refer to the Office of the State Architect’s Building Codes Webpage for the Building Code Compliance Policy (Rev. July 2025) |
| Exhibit A: Approved Building Codes of the Code Compliance Policy dated July 2025 including the Amendments to the International Building Code and Code Compliance Plan Review Procedures (Rev. July 2025); |
| Exhibit B: Plan Review Procedures of the Code Compliance Policy dated July 2025 |
| Exhibit I: State Development Requirements of the Code Compliance Policy dated July 2025 |
File details come from the government source that posted it. Updated .