Summary
This is a Small Business Opportunity (SBO) program draft document from the City of Atlanta's Office of Contract Compliance detailing requirements for the Citywide Clean and Close Services contract. The document establishes non-discrimination policies and procedures for bidders and joint venture participants responding to this procurement opportunity. The contract requires qualified contractors to provide citywide nuisance property cleanup, debris removal, securing unsafe structures, salvage reconciliation, and regulatory compliance documentation. Prospective bidders must meet a minimum of three consecutive years of recent experience performing clean and close services, provide five professional references and three years of financial statements, maintain sufficient staffing and fully owned equipment with no rentals, and comply with all applicable City of Atlanta codes and environmental regulations. The document emphasizes that a Joint Venture Agreement with at least one Small Business Enterprise (SBE) firm at the prime level is required for this eligible project valued at five million dollars or greater.
All bidders must submit completed SBO compliance documentation including a Covenant of Non-Discrimination (SBO-1), Subcontractor Contact Form (SBO-2), and Subcontractor Project Plan (SBO-3) to be considered responsive. The project establishes a 35% SBE participation goal across the dominant NAICS codes of Specialized Freight Trucking, Local (484220) and Landscaping Services (562730). The Office of Contract Compliance will review all submissions to determine compliance with non-discrimination requirements, and failure to submit complete and timely forms will result in bid rejection. Upon contract award, the successful bidder must submit monthly SBO participation reports and maintain the approved subcontractor utilization plan throughout the contract term without modification unless written approval from the OCC Director is obtained.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft_ Appendix B APD Clean and Close.doc | DOC document | |
| Draft_Exhibit F _ Task Order Clean and Close_.docx | DOCX document | |
| Draft_Scope of Services _ Citywide Clean and .docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF ATLANTA
SUITE 5100
68 MITCHELL STREET
ATLANTA, GA 30303
(404) 330-6010 Fax: (404) 658-7359
Internet Home Page: www.atlantaga.gov
Andre Dickens
Mayor
OFFICE OF CONTRACT COMPLIANCE
Rocsean Spencer Director
MEMORANDUM
TO:
Chandra Houston, Chief Procurement Officer
Department of Procurement
FROM:
Rocsean Spencer, Director
Mayor’s Office of Contract Compliance
RE:
Citywide Clean and Close Services
DATE:
March 19th, 2026
The SBO bid documents with project specific availability for Project, Citywide Clean and
Close Services enclosed.
The entire OCC package, including both the standard and project specific SBO/EEO sections must be included in the bid documents. Please note that the enclosed package is solely for this project.
If there are questions, please contact me at (404) 330-6010, or Wendy Theodore, at (404)330-
6114.
cc: File
China Williams, DOP
Rodney E. Nicol, OCC http://www.ci.atlanta.ga.us/
SUITE 5100
68 MITCHELL STREET
ATLANTA, GA 30303
(404) 330-6010 Fax: (404) 658-7359
Internet Home Page: www.atlantaga.gov
Andre Dickens
Mayor
OFFICE OF CONTRACT COMPLIANCE
Rocsean Spencer Director
March 12th, 2026
RE: Citywide Clean and Close Services
Dear Prospective City of Atlanta Bidder:
The Office of Contract Compliance (OCC) information is an integral part of every eligible City of
Atlanta bid. All Bidders are required to make efforts to ensure that businesses are not discriminated against on the basis of their race, ethnicity or gender, and to demonstrate compliance with these program requirements at or prior to the time of Bid opening, or upon request by OCC.
Bidders are required to ensure that prospective subcontractors, vendors, suppliers and other potential participants are not denied opportunities to compete for work on a City contract on the basis of their race, ethnicity, or gender, and must afford all firms, including Small Business
Enterprises (SBE) opportunities to participate in the performance of the business of the City to the extent of their availability, capacity and willingness to compete. Please read all of the information very carefully. Pay close attention to the specific goals for SBE participation for this project and the SBO program reminders listed on page 6.
If you have any questions about the information included in this section of the solicitation, please contact the City of Atlanta Office of Contract Compliance at (404) 330-6010.
The City of Atlanta looks forward to the opportunity to do business with your company.
http://www.ci.atlanta.ga.us/
TABLE OF CONTENTS
Policy Statement
Implementation of SBO Policy
Determination of Non-discrimination During Bid Process
OCC Review of Bidder Submissions
Equal Business Opportunity Program Bid.RFP Submittals
Monitoring of SBO Policy
Implementation of EEO Policy
Monitoring of EEO Policy
Joint Venture Participation on City of Atlanta Projects
Joint Venture Information Pre-Award Review ...................................................................... 6-9
Small Business Opportunity SBE Goals for This Project
Small Business Opportunity Program Reminders
Covenant of Non-discrimination (SBO-1)
SBO Subcontractor Contact Form (SBO-2) ......................................................................... 13-14
SBO Subcontractor Utilization Plan (SBO-3)
Letters of Intent .....................................................................................................................16-17
Termination/Substitution Acknowledgement Form i
SMALL BUSINESS OPPORTUNITY PROGRAM
POLICY STATEMENT
It is the policy of the City of Atlanta to promote full and equal business opportunity for all persons doing business with the City. The City must ensure that firms seeking to participate in contracting and procurement activities with the City are not prevented from doing so on the basis size as it relates to revenue and number of employees. The City is committed to ensuring that it is not a passive participant in any private scheme of discrimination. To ensure that businesses are not discriminated against with regard to prime contracting, subcontracting or other partnering opportunities with the
City, the City has developed its’ various diversity inclusion programs. The purpose of the Small
Business Opportunity Program is to ensure that the City of Atlanta has a robust race-neutral approach to promoting full and equal business opportunity for all persons doing business with the City of
Atlanta, to promote commerce by assisting Small Business Enterprises (SBEs) to actively participate in the City’s procurement process, and ensure that the City of Atlanta utilizes programs that provide it with the best possible resources.
It is also the policy of the City of Atlanta to actively promote equal employment opportunities for minority and female workers and prohibit discrimination based upon race, religion, color, sex, national origin, marital status, physical handicap or sexual orientation through the City's Equal
Employment Opportunity (EEO) Program. The purpose of these program is to mitigate the present and ongoing effects of the past and present discrimination against women and minority workers so that opportunity, regardless of race or gender, will become institutionalized in the Atlanta marketplace. It is important to note that all bidders, without exception, including firms that are Small
Business Enterprises themselves must comply with the City of Atlanta's SBO and EEO Program requirements. Goals for minority and female business enterprises are set for this project on page 6.
Implementation of SBO Policy
The Office of Contract Compliance will review information submitted by Bidders pertaining to efforts to promote opportunities for small businesses to compete for business as subcontractors and/or suppliers. A
Bidder is eligible to be further considered for award of a City contract upon a finding by OCC that the Bidder has engaged in, and provided with its bid submission documentation of efforts to ensure that its process of soliciting, evaluating and awarding subcontracts, placing orders, and partnering with other companies has been non-discriminatory. To assist prime contractors in this effort, the Office of Contract Compliance has set forth in this solicitation document the SBE goals within the relevant NAICS Codes, for this Project.
For subcontracting, the Subcontractor Project Plan must include all subcontractors (both small and non-small business enterprises) to be utilized on the project, detail the services to be performed, the dollar value of the work to be performed by each subcontractor, and the City of Atlanta SBE certification number and supplier id number as applicable.
For suppliers, the Subcontractor Project Plan must include all subcontractors (both small and non-small business enterprises), the supplies to be provided, including the dollar value of the supplies being provided and the City of Atlanta SBE certification number and supplier id number as applicable.
Determination of Non-discrimination During Bid Process
No Bidder shall be awarded a contract on an Eligible Project unless the Office of Contract Compliance determines that the Bidder has satisfied the non-discrimination requirements of section 2-1372 on such
Eligible Project. Accordingly, each Bidder shall submit with each Bid the following
1. Covenant of Non Discrimination. Each Bidder shall submit with her/his Bid a Covenant of Non-
Discrimination which is set forth herein as Exhibit SBO1.
2. Outreach efforts documentation. Each bidder shall submit with her/his bid written documentation demonstrating the bidder’s outreach efforts to identify, contact, contract with, or utilize businesses, including certified SBEs as subcontractors or suppliers on the contract. This information shall be set forth on Exhibit SBO2, which is included herein.
3. Subcontractor project plan. Each bidder shall submit with her/his bid a completed and signed subcontractor project plan, in a form approved and provided by the office of contract compliance, which lists the name, address, telephone number and contact person of each subcontractor or other business to be used in the contract, the NAICS Code and the type of work or service each business will perform, the dollar value of the work and the scope of work, the ownership of each business, certification number of each business, and any other information requested by the office of contract compliance. In order for the office of contract compliance to officially consider a firm to be an SBE, the SBE firm must be certified by or have a certification application pending with the office of contract compliance prior to the bidder’s submission of the bid. The subcontractor project plan shall not be changed or altered after approval of the plan and award of the contract without the written approval of the director of the office of contract compliance. A written letter to the director of the office of contract compliance requesting approval to change the subcontractor project plan must be submitted prior to any change in the plan or termination of an SBE’s contract.
OCC Review of Bidder Submissions
The Office of Contract Compliance shall determine whether a Bidder has satisfied the non-discrimination requirements of section 2-1448 based on its review of the Covenant of Non
Discrimination, the Outreach Efforts Documentation, the Subcontractor Project Plan, and its review of other relevant facts and circumstances, including complaints received as part of the bid process.
In reviewing the documents submitted by a Bidder to determine whether the Bidder has satisfied the non-discriminatory practices requirement of this section, the Office of Contract Compliance will consider, among other things, the total project dollars subcontracted to or expended for services performed by other businesses, including certified SBEs, whether such businesses perform
Commercially Useful Functions in the work of the contract based upon standard industry trade practices, whether any amounts paid to Supplier businesses are for goods customarily and ordinarily used based upon standard industry trade practices, and the availability of certified SBEs within the relevant NAICS Codes for such Eligible Project.
(a) Receipt of Complaint of Discrimination in the Bid Process
The office of contract compliance shall accept complaints of alleged discrimination during the bid process regarding any participant in the bid process. Where the complaint of discrimination is specific to the procurement which is under consideration by the city, the office of contract compliance may investigate said complaint, determine its validity, and determine whether the actions complained of impact the bidder’s responsiveness on the specific procurement. Allegations of discrimination based on events, incidents or occurrences which are unrelated to the specific procurement will be placed in the bidder’s file maintained in the vendor relations database and handled in accordance with the procedure established in the city’s vendor relations subdivision, section 2-1465, et seq.
(b) Determination of Violation of SBO Process
Where the office of contract compliance investigates a complaint of discrimination that is related to the specific bid process, the details of that investigation, including findings, shall be recorded and maintained in the vendor relations database, pursuant to section 2-1471.
(c) Office of Contract Compliance Determination of Non-Compliance
When, based upon the totality of the circumstances, the office of contract compliance determines that a bidder fails to satisfy the requirements of section 2-1448(a) of a city bid solicitation, the director of the office of contract compliance shall present a written determination of non-compliance to the Chief Procurement Officer which states the determination and lists the reasons for the determination. A bid that does not comply with the requirements set forth in section 2-1448(a) shall be deemed non-responsive and rejected.
Small Business Opportunity Program Bid/RFP Submittals
The Office of Contract Compliance will make any determination of non-responsiveness. The covenant of non-discrimination, the outreach efforts documentation, the subcontractor project plan, and any other information required by OCC in the solicitation document pursuant to section 2-1448 must be completed in their entirety by each bidder and submitted with the other required bid documents in order for the bid to be considered as a responsive bid. Failure to timely submit these forms, fully completed, will result in the bid being considered as a non-responsive bid, and therefore, excluded from consideration.
Monitoring Of SBO Policy
Upon execution of a contract with the City of Atlanta, the successful bidder's SBE Project
Participation Plan will become a part of the contract between the bidder and the City of Atlanta.
The SBE Project Participation Plan, all executed subcontract agreements, operating agreements, other contract governing documents, along with all other pertinent records required by OCC as deemed necessary will be placed on file. Said documentation shall be in a format that is established by the Office of Contract Compliance and will be monitored by the City of Atlanta's Office of
Contract Compliance for adherence with the plan. The successful bidder will be required to provide specific SBE information on a monthly basis that demonstrates the use of subcontractors and suppliers as indicated on the Subcontractor Project Plan. The failure of the successful bidder to provide the specific SBO information by the specified date each month shall be sufficient cause for the City to withhold approval of the successful bidder’s invoices for progress payments, increase the amount of the successful bidder’s retainage, require joint check issuance, or evoke any other penalties as set forth in the City of Atlanta Code of Ordinances, Section 2-1373.
Implementation of EEO Policy
The City effectuates its EEO policy by adopting racial and gender work force availability for every contractor performing work for the City of Atlanta. These percentages are derived from the work force demographics set forth in the 2000 Census EEO file prepared by the United States Department of Commerce for the applicable labor pool normally utilized for the contract.
Monitoring of EEO Policy
Upon award of a contract with the City of Atlanta, the successful bidder must submit a Contract
Employment Report (CER), describing the racial and gender make-up of the firm's work force. If the CER indicates that the firm's demographic composition does not meet the adopted EEO goals, the firm will be required to submit an affirmative action plan setting forth the steps to be taken to reach the adopted goals. The CER and the affirmative action plan, if necessary, will become a part of the contract between the successful bidder and the City of Atlanta. Compliance with the EEO requirements will be monitored by the Office of Contract Compliance.
Joint Venture Participation on City of Atlanta Projects
The City of Atlanta encourages, where economically feasible, the establishment of joint ventures to ensure prime contracting opportunities for all businesses, including good faith outreach efforts to utilize COA certified small business enterprises (SBEs) on Eligible Projects. On projects valued at five (5) million dollars or greater, the Office of Contract Compliance shall determine on a project-by-project basis whether non-discriminatory outreach efforts to enter into a joint venture shall be required. On such Eligible Projects, joint venture member proponents must have at least one SBE firm on the JV team at the Prime level. The small business enterprise member(s) of the joint venture on projects on which a joint venture is required must be certified as such by the Office of Contract
Compliance, and the joint venture team shall include in its bid submittal the SBE certification number of each SBE joint venture member. OCC has made the determination non-discriminatory outreach efforts to enter into a joint venture are required for this solicitation.
No bid on a City contract for an Eligible Project shall be accepted from a joint venture team unless each participant independently signs and submits a Covenant of non-discrimination (SBO-1)
A joint venture may submit its agreement to the Office of Contract Compliance for a complimentary pre-approval review no later than fourteen (14) calendar days prior to the date set for receipt of bids on an Eligible Project. Otherwise, executed agreements must be submitted on or before the date set for receipt of bids on an Eligible Project.
Components of a Joint Venture Agreement
The Joint Venture agreement should include at a minimum:
• The name of the Joint Venture
• Contact information of designated primary JV contact person
• Identification of all firms participating in the JV
• The initial capital investment of each venture partner
• Terms and conditions under which future contributions may be necessary
• The proportional allocation of profits and losses to each venture partner
• Description of proportion of work controlled by and management of the joint venture team members
• The method of, and responsibility for, accounting
• Frequency of JV meetings and method for minutes taking and storage
• The methods by which disputes are resolved.
• Provide the specific citation/section of your JV that speaks to the Contract’s non-discrimination and assurance requirements
• All other pertinent factors of the joint venture.
• The Joint Venture agreement must be signed by an authorized representative of each team.
City of Atlanta Office of Contract Compliance
Joint Venture Information Pre-Award Review-SBO
Proponent Instructions: All Proponents must use their executed proposed JV agreement to complete the questions below and submit completed document with bid response package (Attach additional pages if needed):
1. Name of Joint Venture:
2. Name, address and phone number of joint venture contact person serving as managing partner:
3. Firms participating in joint venture (use additional pages if necessary):
Name of firm:
Address:
Office Phone Number:
Primary Contact name/phone number:
% ownership: ______________%
SBE: No
Yes
Date of Certification:
NAICS code(s) for which certification was granted:
Name of firm:
Address:
Office Phone Number:
Contact name/phone number:
% ownership: ______________%
SBE: No Yes
Date of Certification:
NAICS code(s) for which certification was granted:
4. Was there an SBE initial capital contribution required? Amount?__________
5. Does the JV document describe the portion of the work or elements of the business controlled by the SBE JV team member(s)? No Yes
Referenced in What Section?
6. Does the JV document describe the portion of the work or elements of the business controlled by the non-SBE JV team member(s)? No Yes
7. Does the JV document describe the SBE team member's involvement in the overall management of the joint venture. (e.g., participation on a management committee or managing board, voting rights, etc.)? No Yes Referenced in What Section?
8. Does the JV document list the SBE team member's share in the profits/risk in the joint venture: No Yes Referenced in What Section?
9. Does the JV document describe the roles and responsibilities of each joint venture participant with respect to operation of the joint venture (use additional sheets if necessary): No Yes Referenced in What Section?
a. Majority interest holder joint venture participant:
b. Minority interest holder joint venture participant(s):
10. Does the JV document detail which firm will be responsible for accounting functions relative to the joint venture's business? No Yes Referenced
11. Does the JV document explain what authority each party will have to commit or obligate the other to insurance and bonding companies, financing institutions, suppliers, subcontractors, and/or other parties? No Yes
12. Did the JV document provide the name of the person who will be responsible for hiring employees for the joint venture. No Yes Referenced in What
Section?
13. Did The JV Describe the frequency of JV meetings, method for minutes taking, and storage for audit provisions? No Yes Referenced in What
Section?
14. Are any of the proposed joint venture employees currently employees of any of the joint venture partners? No Yes If yes, list the number and positions and indicate which firm currently employs the individual(s)?
15. Did the JV Detail the methods by which disputes are resolved?
No Yes Referenced in What Section?
16. Is a copy of the proposed joint venture agreement, promissory note(s), and loan agreement(s) (if applicable), and any and all written agreements between the joint venture partners included in the proposal submission No Yes Referenced
17. Does the JV document describe all other business relationships between the joint venture participants, including other joint venture agreements in which the parties are jointly involved? No Yes Referenced in What Section?
18. Does the JV document provide a specific citation/section that speaks to the non-discrimination and assurance requirements related to this solicitation? No Yes Referenced in What Section?
Additional Comments:
Small Business Opportunity Program SBE Goals for this Project
Project No.: Citywide Clean and Close Services
Part 1: All proponents must ensure that non-discriminatory practices are utilized to enter into a Joint
Venture Agreement in accordance with the City of Atlanta’s EBO/SBO Ordinance. The Joint Venture
Agreement, at the very least, should reflect details of the member company’s/companies’ involvement in the Citywide Clean and Close Services project throughout the life of the contract. (See Page 6)
Part 2: All proponents must ensure that non-discriminatory practices are utilized during efforts to engage small business enterprise subcontractors and suppliers throughout the life of the contract. All outreach efforts must be documented and included with this bid submittal.
The dominant NAICS code and trade to be engaged for the above referenced solicitation is:
Specialized Freight Trucking, Local – 484220
Landscaping Services – 562730
The above referenced dominant NAICS code(s) was/were used for the purposes of calculating the appropriate participation goal(s). However, COA certified SBE Prime proponents responding to this solicitation may consider any COA certified SBE firm(s) that perform a commercially useful function in the execution of the project to be eligible for participation credit.
The SBE goals for the trade categories listed in this project are:
35% SBE
Note: The Joint Venture agreement must be signed by an authorized representative of each team
Please be reminded that no Bidder shall be awarded a contract on an Eligible Project unless the
Office of Contract Compliance determines that the Bidder has satisfied the non-discrimination requirements of section 2-1448 on such Eligible Project. Details of the O.C.C. review process for determination of non-discrimination are detailed on page 2 of this document.
Small Business Opportunity Program Reminders
1. Certification. It is the prime contractor's responsibility to verify that all SBEs included on the
Subcontractor Project Plan are certified by the City of Atlanta’s Office of Contract Compliance, or have a certification application pending with the City of Atlanta’s Office of Contract
Compliance.
2. Joint Venture Agreements. The Joint Venture member proponents must have at least one SBE firm on the JV team at the Prime level. SBE members of the Joint Venture must be certified as such by the Office of Contract Compliance. The Joint Venture team shall include in its submittal the SBE certification number of each SBE Joint Venture member. The Joint Venture agreement must be signed by an authorized representative of each team and notarized.
3. Reporting. The successful bidder must submit monthly SBO program participation reports to the Office of Contract Compliance.
4. Subcontractor Contact Form. It is required that bidders list and submit information on all subcontractors they solicit for quotes, all subcontractors who contact them with regard to the project, and all subcontractors they have discussions with regarding the project. Failure to provide complete information on this form will result in your bid being declared non-responsive.
For you convenience, fillable versions of the Appendix A documents are available on the OCC webpage should you require additional pages.
5. SBO/EBO Ordinance. The SBO Program is governed by the provisions of the SBO/EBO
Ordinance set forth in the City of Atlanta Code Division 12, section 2 - 1356 through 2 -1480.
The ordinance can be obtained from the City of Atlanta Clerk's Office at (404) 330-6032.
6. Supplier Participation. In order to receive full SBE credit, suppliers must manufacture or warehouse the materials, supplies, or equipment being supplied for use on the Eligible Project.
7. OCC Registry of Certified Firms. To access OCC's vendors please log on to our website www.atlantaga.gob2g.com for information on all certified companies.
8. Contract Assurance. The Contractor shall not discriminate on the basis of race, color, national origin, sex, religion, or sexual orientation in the performance of this contract. The contractor shall carry out applicable requirements of City ordinance 2-1448 a (2) in the award and administration of any eligible City contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the City of Atlanta deems appropriate. Anti-discrimination provisions based upon religion and sexual orientation are enforceable through the City of
Atlanta regulations.
http://www.atlantaga.gob2g.com/
COVENANT OF NON-DISCRIMINATION
The undersigned understands that it is the policy of the City of Atlanta to promote full and equal business opportunity for all persons doing business with the City of Atlanta. The undersigned covenants that we have not discriminated, on the basis of race, gender or ethnicity, with regard to prime contracting, subcontracting or partnering opportunities. The undersigned further covenants that we have completed truthfully and fully the required forms SBO-2 and SBO-3. Set forth below is the signature of an officer of the bidding entity with the authority to bind the entity.
Signature of Attesting Party
Title of Attesting Party
On this _____ day of ________________, 20___, before me appeared ______________, the person who signed the above covenant in my presence.
Notary Public
Seal
FORM SBO-1
FORM SBO-2 (Page 1 of 2)
SUBCONTRACTOR CONTACT FORM
List all subcontractors or suppliers (SBE and Non-SBE Certified) that were contacted regarding this project.
Name of Sub-contractor/
Supplier
Contact Name, Address and Phone
Number
City Of
Atlanta
Business
License?
(Yes or No)
Type of
Work
Solicited for
SBE
Business
Ownership
(see code below)
SBE
Certification
No. and
Expiration Date
Results of Contact
Business Ownership Code: AABE - African American Business Enterprise, HABE – Hispanic Business Enterprise, FBE – Female Business Enterprise, APABE – Asian (Pacific
Islander) American Business Enterprise (M/FBE and DBE Certifications will NOT Suffice for this Procurement)
Company Name: _____________________________________ Project Name: ______________________________ FC#: _________
Contact Name (Print): ___________________________________ Date: _____________________________
Form SBO-2 (Page 2 of 2) contractor/
Supplier
Contact Name, Address and Phone
Number
City Of
Atlanta
Business
License?
(Yes or No)
Type of
Work
Solicited for
SBE
Business
Ownership
(see code below)
SBE
Certification
No. and
Expiration Date
Results of Contact
Value of Prime Proponent Self-performance: $_________________________ Total SBE%_______
Code: AABE - African American Business Enterprise, HABE – Hispanic American Business Enterprise, FBE – Female Business Enterprise, APABE – Asian (Pacific Islander) American Business Enterprise (M/FBE and DBE Certifications will NOT suffice for this Procurement)
Proponent’s Company Name: ___________________________ Project Name: ___________________________ FC#: __________
Proponent’s Contact Number: ___________________________ Contact Name (Print):_______________________ Date:____________
SBO#3
SMALL BUSINESS OPPORTUNITY SUBCONTRACTOR PROJECT PLAN
SUBCONTRACTOR/SUPPLIER UTILIZATION
List all Majority, SBE Certified, and Non-SBE Certified subcontractors/suppliers, including lower tiers, to be used on this project.
contractor/
Supplier
Contact Name, Address and
Phone Number
City of
Atlanta
Business
License?
(yes or no)
NAICS
Code Type of
Work to be
Performed
Ethnicity of
SBE
Ownership (see code below)
SBE
Certification
No. and
Expiration
Date
Dollar ($)
Value of
Work and
Scope of
Work
Percentage
(%) of Total
Bid Amount
(THIS PAGE SHALL BE SUBMITTED FOR EACH SUB FIRM)
LETTER OF INTENT
FC#________________________
Proponent Name:
Address:
City: State: Zip:
Subcontracting Firm: Firm Name:
Address:
City: State: Zip:
Sub firm Contact Person: Name: Phone: ( )
Firm is performing as: Non-certified Sub Certified Sub Joint Venture Team Member
If Certified, Certification # and Expiration Date:
Work item(s) to be performed by
Sub Description of Work Item Dollar(s) Value of Work and
Scope of Work
Percentage (%) of
Total Bid Amount
TOTAL Diversity% Credit Claimed for this Contractor
The bidder/offeror is committed to utilizing the above-named Subcontractor firm for the work described above. The estimated participation is as follows:
Sub contract amount: $ Percent of total contract: %
AFFIRMATION:
The above-named Subcontractor firm affirms that it will perform the portion of the contract for the estimated dollar value as stated above.
By: _______________________________________________________________________ (Print name) (Title)
(signature) (date)
* In the event the bidder/offeror does not receive award of the prime contract, any and all representations in this
Letter of Intent and Affirmation shall be null and void
(THIS PAGE SHALL BE SUBMITTED FOR EACH SUB FIRM)
LETTER OF INTENT
FC#________________________
Proponent Name:
Address:
City: State: Zip:
Subcontracting Firm: Firm Name:
Address:
City: State: Zip:
Sub firm Contact Person: Name: Phone: ( )
Firm is performing as: Non-certified Sub Certified Sub Joint Venture Team Member
If Certified, Certification # and Expiration Date:
Work item(s) to be performed by
Sub Description of Work Item Dollar(s) Value of Work and
Scope of Work
Percentage (%) of
Total Bid Amount
TOTAL Diversity% Credit Claimed for this Contractor
The bidder/offeror is committed to utilizing the above-named Subcontractor firm for the work described above. The estimated participation is as follows:
Sub contract amount: $ Percent of total contract: %
AFFIRMATION:
The above-named Subcontractor firm affirms that it will perform the portion of the contract for the estimated dollar value as stated above.
By: _______________________________________________________________________ (Print name) (Title)
(signature) (date)
* In the event the bidder/offeror does not receive award of the prime contract, any and all representations in this
Letter of Intent and Affirmation shall be null and void