QUESTIONS AND ANSWERS SBAHQ-14-R-0019 as of 23 August 2014
IDIQ/General
What is the need for Labor Hour rates for proposed personnel if it is Firm Fixed Price, FFP All CLIN’s
PLEASE SEE THE DEFINITION OF AN IDIQ CONTRACT ON PAGE 10 OF THE RFP AND
CORRESPONDING FAR EXPLAINANTION. THE IDIQ BASE CONTRACT IS THE “ORDERING
DOCUMENT” THAT WILL CONTAIN THE FIRM FIXED PRICES INCORPORATED AFTER
AWARD. THE RATES IN THE BASE IDIQ ARE USED WHEN TASK ORDER REQUESTS ARE
ISSUED BY THE GOVERNMENT TO DETERMINE THE PRICING OF EACH INDIVIDUAL TASK
ORDER. THE BASE IDIQ CONTRACT ITSELF IS NOT FUNDED. ALL FUNDING IS APPLIED TO
EACH INDIVIDUAL TASK ORDER WHEN THE GOVERNMENT IDENTIFIES A BONA FIDE
NEED FOR A REQUIREMENT WITHIN SCOPE OF THE IDIQ.
As an IDIQ was it the intent to establish fair and reasonable pricing from the Labor CLIN item Quotes for evaluation purposes only? Or is it to establish a contract ceiling? Or will the Labor CLIN Quotes -001,2,3 quotes be the Firm Fixed Price for each year?
AS STATED IN SECTION L & M “IMPORTANT NOTES” AWARD FOR THE BASE WILL BE
BASED ON EVALUATION OF CONTRACTOR RESPONSE TO TASK ORDER 001. HOWEVER, IN
ADDITION TO TASK ORDER 001 RESPONSES, CONTRACTORS SHOULD PROPOSE ANY
ADDITIONAL LABOR CATEGORIES THEY DEEM NECESSARY TO FULLFIL REQUIREMENTS
OF THE ENITRE IDIQ. ADDITIONAL TASK ORDERS MAY OR MAY NOT BE ISSUED AT A
LATER DATE THAT MAY INCLUDE REQUIREMENTS DIFFERENT FROM TASK ORDER 001,
BUT STILL BE WITHIN THE SCOPE OF THE IDIQ.
Will Task Order 1 be awarded as proposed upon award?
TASK ORDER 001 WILL BE AWARD IN CONJUCTION WITH THE BASE IDIQ
Regarding Section 3, d. Annual Communications and Outreach Plan Evaluation, Implementation, and Assessment (page 16): Is this inclusive of base year (in accordance with task 3.4 of Task Order 001) as well as for option periods? Please confirm this is for Base and Option Years.
THE PLAN WILL BE DEVELOPED AS PART OF TASK ORDER 001 AND MAY NEED TO BE
CONTINUOUSLY UPDATED THROUGHOUT THE LIFE OF THE IDIQ. UPDATES TO THE PLAN
WILL BE ISSUED AT THE TASK ORDER LEVEL
Does Task Order 1 include all the work of task 1?
THE CONTRACTOR MUST MAKE THE DETERMINATION AS TO WHAT SECTIONS OF THE
PWS TASK ORDER 001 APPLIES.
In RFP CLINS ending in -001 Page 9 of 67 says that CLIN -001 includes Other Direct Expenses, yet there is a CLIN for ODE’s. How can the offeror know what ODE’s – Travel Materials, Telephone/Communications – for that case what the cost of the facility will be for the annual meeting without understanding the details (Number of Attendees, use of Audio Visual and the Facility that governs A/V and other information. Will the government consider these costs should be included under the ODE CLIN 003.
AS STATED IN CLIN 003 DEFINITION, THIS CLIN MAY, OR MAY NOT, BE USED. USE OF
THIS CLIN WILL BE MADE BY THE GOVERNMENT SHOULD THE NEED ARISE AND THE
CONTRACTOR SHALL BE NOTIFIED THAT THIS SPECIFIC CLIN IS APPLICABLE.
THE ANSWER TO THE SECOND PART OF THE QUESTION IS THE CONTRACTOR CANNOT
KNOW UNLESS THE GOVERNMENT ISSUES A TASK ORDER REQUEST/RFP FOR WORK.
TASK ORDER 001 ATTACHED TO THIS SOLICITATION IS THE ONLY GOVERNMENT
REQUESTED WORK THAT WILL BE ISSUED AGAINST THE IDIQ.
The IDIQ states that "all printing of materials will be ordered through mandated sources such as the Government printing Office (GPO)," and that "the contractor shall create digitized print-ready files in accordance with OVBD detailed specifications for submission to mandated printing sources such as the Government Printing Office (GPO)." Should we factor printing costs into our proposal, or will SBA be covering print costs through its relationship with GPO?
PRINTING WILL BE CHARGEABLE UNDER CLIN002 AND WILL BE SUBJECT TO THE NOT-
TO-EXCEED PRICE LISTED.
Page 1 of the solicitation indicates that the size standard is $14M. However, page 52, paragraph 52.212-1 indicates that the size standard is 500 employees. Please clarify the size standard.
THE “500 EMPLOYEES” LISTED 52.212-1 REFERENCES THE SBA NON-MANUFACTURER
RULE. AS STATED IN THIS PROVISION, THE CORRECT SIZE STANDARD IS LISTED IN
BLOCK 10 OF THE SF1449. IT IS IMPORTANT TO NOTE HOWEVER IT IS THE
RESPONSIBILITY OF EACH INDIVDUAL CONTRACTOR FOR ENSURING THEY MEET THE
SIZE STANDARDS FOR THE APPLICABLE NAICS CODE AS INSTRUCTED IN PROVISION
52.212-3.
Are the estimated CLIN values for 0002-0004 in the SF1449 for the Base Year IDIQ, Total 5-year IDIQ, or specific to Task Order 0001? Is there an estimate for CLIN 0001?
Please clarify the price proposal submission. Should attachment 3 be submitted in Excel format? And then a separate worksheet with Task order pricing?
THE NOT-TO-EXCEED VALUES ARE FOR THE BASE IDIQ AND WILL APPLY WHEN TASK
ORDERS ARE ISSUED. CLIN001 SHALL CONTAIN LABOR CATEGORIES/RATES AS
PROPOSED BY THE CONTRACTOR AND ESTIMATES DO NOT APPLY IN THIS CASE. EXCEL
FORMAT IS PREFERRED FOR PRICINGAND THERE SHOULD BE SEPARATE SUBMISSIONS
FOR BASE IDIQ AND TASK ORDER 001. AS STATED IN SECTIONS L&M, AWARD WILL BE
MADE BASED ON TASK ORDER 001 EVALUATIONS.
Page 31 states that the contractor shall designate a management official responsible for fulfilling the responsibilities of a system security officer who is knowledgeable in automated data process technology and computer security methodology. Please clarify this requirement.
THE CONTRACTOR WILL BE NOTIFIED AFTER AWARD IF THIS ADDITIONAL DUTY IS
REQUIRED. THIS IS NOT A SEPARATE POSITION IN AND OF IT SELF, BUT THE ADDITIONAL
DUTY OF CONTRACTOR EMPLOYEES REQUIRING ACCESS TO SBA IT SYSTEMS. HISTORY
HAS SHOWN THE COMPANY FSO WOULD NORMALLY PERFORM SUCH DUTIES.
Is the Project Manager the only required Key Personnel?
WE ARE REQUESTING AN ALTERNATE BE ASSIGNED IN ADDITION TO A PROJECT
MANAGER. THE CONTRACTOR IS FREE TO PROPOSE ADDITIONAL KEY PERSONNEL IF
NECESSARY.
Can you confirm that VA CVE verification is required for all SDVOSB offerors?
VA CVE IS A VA SPECIFIC REQUIREMENT AND DOES NOT APPLY TO THE REST OF THE
FEDERAL GOVERNMENT. PLEASE SEE FAR SUBPART 19.14 FOR SDVOSB PROGRAM
What travel should be included in the completed Travel Worksheet or is this an example of what will be required per TO?
THE TRAVEL WORKSHEET IS TO ASSIST THE CONTRACTOR IN SUBMITTING ALLOWABLE
REIMBURSEMENT OF TRAVEL COSTS. IT IS NOT A REQUIREMENT TO USE BUT WILL
FACILITATE APPROVAL OF INVOICE PAYMENT SHOULD ANY QUESTIONS ARISE
CONCERNING TRAVEL COSTS.
For field events, is it anticipated that audio visual services be needed?
THIS DETERMINATION WILL BE MADE WHEN TASK ORDER REQUESTS ARE ISSUED.
COSTS FOR SUCH SERVICES WILL BE CHARGEABLE TO CLIN002 TAKING THE LISTED NTE
AMOUNT INTO CONSIDERATION.
Can you tell me if there will be an Interested Vendors page for your SBA Boots to Business solicitation, SBAHQ-14-R-0019?
NO, CONTRACTORS SHALL FOLLOW INSTRUCTIONS IN SECTION L OF THE RFP.
Page 10. Section B.4.3 – The maximum quantity for this order is listed as $5M. Does that ceiling include the not to exceed amounts for CLINS ending in 002, 003, 004?
YES
TASK ORDER 001
Can the government please confirm that their intended LOE for that task order is one FTE?
THE GOVERNMENT IS REQUESTING AT LEAST ONE FTE, IT IS UP TO EACH CONTRACTOR
TO DETERMINE IF ADDITIONAL LABOR IS NECESSARY TO PERFORM WORK REQUIRED IN
TASK ORDER 001.
No section: Who is currently performing this work?
THERE IS NO INCUMBENT
What is the expected Period of Performance for Task Order 001?
12 MONTHS FROM DATE OF AWARD
What is the expected Level of Effort for Task Order 001?
THIS IS A FIRM FIXED PRICE, PERFORMANCED BASED CONTRACT AND LEVEL OF EFFORT
DOES APPLY. CONTRACTORS ARE EXPECTED TO MEET PERFORMANCE
REQUIREMENTS/DELIVERABLES OUTLINED IN EACH TASK ORDER AND ATTACHMENT D
OF THE IDIQ
Under Section 3.4.3 Roll Out Strategy, it states that the marketing plan "will include the review and possible redesign of current OVBD marketing materials and website." Is the current website hosted and managed within SBA? In the event that we recommend a website redesign, would we be working with SBA's web development team to implement changes, or could we handle that externally? Can you tell us what platform the website currently uses? Is it hard coded as HTML, or does it use a content management system?
THE CONTRACTOR WILL NOT BE REQUIRED TO MAINTAIN THE ACTUAL B2B WEBSITE;
THIS WILL BE DONE BY THE SBA OFFICE OF COMMUNICATIONS AND PUBLIC LIAISON.
THE CONTRACTOR WILL ONLY BE REQUIRED TO SUBMIT PROPOSED DESIGN
CHANGES/UPGRADES TO THE SITE WHEN REQUESTED WHICH WILL BE IMPLEMENTED
BY SBA’S WEBMASTER.
Is the contractor expected to host the B2B website upon contract award?
NO, ADMINISTRATIVE OVERSIGHT AND SHOULD HAVE BEEN REMOVED
Task 3.1 indicates that 1 FTE “onsite” is required. Does SBA believe that this is the only personnel required for TO 001?
PLEASE SEE #27
Are there existing agreements with stakeholder groups or marketing/outreach contracts (e.g., ad placements) that will transfer to the contractor upon award?
THERE IS NO INCUMBENT OR ANY BINDING AGREEMENTS APPLICABLE TO THIS EFFORT
Please provide a list of any media buys, and other contractual commitments that may continue under the new contract.
THERE ARE NO APPLICABLE CONTRACTS OR AGREEMENTS FOR THIS EFFORT. ANY
WORK REQUIRED WILL BE ISSUED AT THE TASK ORDER LEVEL
Does CLIN 002 have to cover the cost of any supplies or media placement that will continue into the new contract? If so, what is the approximate cost of those supplies?
THIS CLIN CONTAINS A NOT-TO-EXCEED AMOUNT AND PRICES FOR ANY SUPPLIES
APPLICABLE WILL NEGOTIATED AT THE TASK ORDER LEVEL. THE CONTRACTOR IS NOT
REQUIRED TO PROPOSE PRICES FOR CLINS CONTAINING AN NTE.
Once the communication strategy is accepted by SBA, will additional task orders be issued to fund the other direct costs and field marketing costs included as part of the marketing strategy? If not, is the contractor expected to include these costs as part of the Task Order 001 proposal?
THE CONTRACTOR SHALL SUBMIT OFFERS THEY DEEM SUFFICIENT TO COMPLETE
WORK REQUIRED IN TASK ORDER 001. PRICES SUBMITTED TO COMPLETE TASK ORDER
SHALL BE INCORPORATED INTO THE BASE IDIQ FOR FUTURE TASK ORDERS.
CONTRACTORS SHALL ALSO PROPOSE ANY ADDITIONAL LABOR CATEGORIES/RATES
FOR WORK WITHIN SCOPE OF THE BASE IDIQ THEY DEEM APPLICABLE. TASK ORDER 001
DOES NOT INCLUDE ALL WORK WITHIN SCOPE OF THE BASE IDIQ. FUTURE TASK
ORDERS FOR ADDITIONAL SERVICES MAY DIFFER FROM TASK ORDER 001 BUT FALL
WITHIN SCOPE OF THE IDIQ AND THE GOVERNMENT WILL NEED RATES IN ORDER TO
DETERMINE ESTIMATES FOR FUTURE WORK.
Do you have a separate budget to buy media and if so can you give us a NTE amount, so we can realistically plan the outreach effort?
CLIN002 IS APPLICABLE AND CONTAINS NTE AMOUNT
We are a GSA contract holder and plan to submit our labor categories and the approved hourly rate, do you want us to tell you the labor categories we expect to use or do you already have an idea of the labor hours and categories for this project?
PLEASE SUBMIT YOUR LABOR CATEGORIES TOGETHER WITH RATES
Regarding this solicitation, it is marked as follows: Set Aside: Service-Disabled Veteran-Owned Small Business. Does this mean only Service-Disabled Veteran-Owned Small Business may apply for this opportunity? Or can they be sub-contractors? Please advise.
THE PRIME CONTRACTOR MUST BE A SDVOSB AND MUST BE THE ENTITY SUBMITTING
THE OFFER.
Please confirm the number of CDs that should be submitted in response. Is it 1 or 4?
ONE CD, WE ARE REQUESTING THE OFFER BE SEPARATED INTO 4 VOLUMES.
Can you clarify what is meant by the clause related to the package being “physically in control of an SBA acquisition employee?” Can offerors assume, for example, that a signed FedEx delivery is sufficient to meet this requirement?
A FEDEX PACKAGE MUST BE SIGNED FOR AND IN POSSESSION BY AN SBA PRIOR TO THE
CLOSING DATE. FOR EXAMPLE, IF THE PACKAGE IS POST MARKED, BUT NOT SIGNED
FOR AND RECEIVED AFTER THE CLOSING DATE, IT IS LATE.
Will Task Order 1 be awarded FF Price as bid in this proposal, or will task 1 be used to establish price realism only?
TASK ORDER 001 WILL BE FIRM FIXED PRICE
Does the price proposal for the TO require level of effort information or just the completed Table? (pg. 1 of Attachment A)
THIS FIRM FIXED PRICE, PERFORMANCE BASED AND LEVEL OF EFFORT DOES NOT
APPLY, THE CONTRACTOR IS NOT REQUIRED TO USE THE TABLE ON PAGE 1
For budgeting purposes, how many interviews will be conducted?
THE GOVERNMENT HAS PROVIDED A NTE AMOUNT; IT IS UP TO THE CONTRACTOR TO
DETERMINE PRICING.
For budgeting purposes, what paid media budget should be allocated?
THE GOVERNMENT HAS PROVIDED A NTE AMOUNT FOR THE APPLICABLE CLIN
(CLIN002), THE CONTRACTOR IS NOT REQUIRED TO PRPOSE AN AMOUNT FOR THIS
REQUIREMENT.
Please confirm key personnel should fall within the response portion dedicated to Task Order 001
THE GOVERNMENT DOES NOT DICTATE TO THE CONTRACTOR HOW TO MANAGE THE
WORK, BUT KEY PEROSNNEL APPLIES TO BOTH THE BASE IDIQ AND INDIVIDUAL TASK
ORDERS AS ASSIGNED. INDIVIDUALS APPOINTED COULD BE ONE IN THE SAME, BUT IT IS
THE CONTRACTOR’S DISCRETION.
Please verify one Management Work Plan is required in the response, which should be focused on the management of Task Order 001.
ONE PMP IS REQUIRED
CLIN 0002 – please confirm the NTE amount of $300,000 must cover any paid media (traditional or online) for the base year only. Please confirm this amount must also cover any other fees associated with outreach.
THE NTE AMOUNTS ARE MORE FOR GOVERNMENT ESTIMATING PURPOSES WHEN
DEVELOPING THE STATEMENT OF WORK FOR PROPOSED TASK ORDERS. THE NTE
AMOUNTS ARE GOVERNMENT BUDGETED CEILING ESTIMATES FOR MATERIALS
IDENTIFIED IN THE CLIN DEFINITIONS. FINALS COSTS WILL BE NEOGITATED BETWEEN
THE GOVERNMENT AND CONTRACT AWARDEE AT THE TASK ORDER LEVEL. THE CLINS
CONTAINING THE NTE AMOUNTS WILL NOT BE USED FOR EVALUATION PURPOSES.
In regards to labor associated with Field Events Marketing Services, is Contractor required to staff events? For example, is Contractor required to provide staff to answer questions at a job fair booth? If so, what is the estimated level of effort, in terms of hours, SBA is expecting of Contractor regarding staffing labor for such events?
THE CONTRACTOR WILL NOT BE REQUIRED TO STAFF FIELD MARKETING EVENTS, ONLY
ODE’S NECESSARY TO CONDUCT SUCH EVENTS. PLEASE SEE CLIN004 DEFINITION.
SHOULD A TASK ORDER BE ISSUED FOR SUCH EVENTS, THE GOVERNMENT AND
CONTRACTOR SHALL NEGOTIATE APPLICABLE COSTS.
In regards to “e-mail initiatives” and the labor related thereto as mentioned on page 9 under the description of CLINs ending in -0002, please provide an estimated level of effort, in terms of hours or email projects, expected of Contractor for labor and design services related to e-mail initiatives, if any?
CONTRACTOR WILL NOT BE TASKED WITH CONDUCTING ANY EMAIL RELATED
MARKETING. THIS WAS AN ADMINISTRATIVE OVERSIGHT AND SHOULD HAVE BEEN
REMOVED.
What is the meaning of “private individuals” and “usual discounts” as used in this sentence, “1.1. Rates. Advertisements may be paid for at rates not over the commercial rates charged private individuals, with the usual discounts.”
PRIVATE INDIVIDUALS ARE THOSE NOT ASSOCIATED WITH THE PUBLIC SECTOR.
THE DEFINITION WAS PULLED STRAIGHT FROM THE FAR, BUT ADVERTISING
PROFESSIONALS TASKED WITH OBTAINING THESE TYPES OF SERVICES SHOULD
UNDERSTAND THE TERMS.
SECTION L
Regarding pricing, should the contractor provide two separate pricing sheets: one that shows Labor Categories and Hourly Rates for the IDIQ, and one that demonstrates labor categories, rate, and total price to complete all tasks associated with Task Order 001?
PLEASE PROVIDE 2 SEPARATE PRICE SHEETS. ALTHOUGH THE IDIQ & TAKS ORDER 001
WILL BE AWARDED BASED ON TASK ORDER EVALUATION, RATES PROPOSED AND
ACEPTED BY THE GOVERNMENT WILL BE INCOPROATED INTO THE BASE IDIQ FOR
FUTURE TASK ORDERS.
Can any attachments e.g. example report templates, media flight plans, media analysis etc. be included as attachments and not be included in the page count?
YES
The RFP mentions sending in examples of work performed before submittal of the proposal, for this proposal would SBA like to see work examples and in what form.
NOT SURE WHICH PORTION OF THE RFP TO WHICH YOU ARE REFERRING, BUT PLEASE
INCLUDE THIS INFORMATION WITH YOUR PAST PERFORMANCE SUBMITALS.
Do Resumes add page count?
NO
Is SBA planning to offer an extension on the submission deadline?
PLEASE SEE #21
Is this RFP for a Fixed Price contract, or is it Fixed Price Labor Hour IDIQ.
AS STATED IN SECTION L, 52.216-1, THIS IS A FIRM FIXED PRICED EFFORT AND TASK
ORDERS WILL BE ISSUED AS SUCH
Page 53. Section L.1 – In order to allow time for the thorough answering of these questions and the contractor’s incorporation of those into our proposal, would the government consider extending the due date until 5 September?
NO, THIS IS DUE TO END OF YEAR TIME CONSTRAINTS AND THE EFFORT INVLOVED TO
MAKE AWARD DETERMINATION AFTER THE SOLICITATION CLOSES.
Page 57. Section L.1 - The past performance section states that only a single set of up to 5 PP references shall be submitted. If a Prime is using a subcontractor, does the subcontractor past performance get included in that single set as part of the up to 5 past performances or is the subcontractor set of past performances separate and not included in those 5?
YES, DUE TO THE PAPERWORK REDUCTION ACT, THE GOVERNMENT IS ONLY
AUTHORIZED TO REQUEST SO MANY SUBMITTALS FROM THE PUBLIC. HOWEVER, IN
ADDITION TO THE PPQ’S THE GOVERNMENT HAS ALTERNATIVE METHODS FOR FINDING
PAST PERFORMANCE INFORMATION.
Page 57. Section L.1. When are the past performance questionnaires due?
SAME AS THE PROPOSAL
Page 58. Section L.L.6. Are all labor categories under this contract expected to be Service Contract Act?
Or may the contractor determine which labor categories we propose are professional (non-SCA) versus non-professional (SCA) and annotate that in our proposal?
DEPARTMENT OF LABOR WAGE DETERMANTIONS AND ARE THE RESPONSIBILITY OF
EACH INDIVIDUAL EMPLOYER. PLEASE SEE FAR SUBPART 22.10 FOR ADDITIONAL
INFORMATION AS THE STATUTE FOR LABOR STANDARDS HAS RECENTLY CHANGED.
Who should submit the completed PPQ – the offeror or the person who completed it?
Can you clarify if the government requires up to 5 PPQ citations from the subcontractor AND 5 PPQ citations from the prime (Total up to 10) (assuming that the sub will perform more than 30% of the work)? Or does the government require 5 total PPQ citations from the team?
WE WILL ACCEPT A PPQ FROM EITHER THE CONTRACTOR OR THE PERSON WHO
COMPLETED IT. WE ARE REQUESTING A NOT-TO-EXCEED MAXIMUM OF UP TO 5 PPQ’S
PER PROPOSAL.
Section L, Volume II, page 56, the solicitation states the contractor should “…describe its approach to operate and maintain exiting SBA OVBD B2B Advertising Marketing IT environments, systems websites, and appellations alone with identifying emerging digital and rich media technologies…” The IDIQ Tasks do not discuss updating websites, working within SBA’s IT environment, or updating applications. Can the government please clarify what is meant by this sentence? Is the contractor to update SBA websites and work directly within SBA IT environments? If so, can you please provide information on the types and numbers of websites, the requirements for working with the IT environment, and provide more information on what applications require updating?
CONTRACTORS WILL NOT BE UPDATING WEBSITES. CONTRACTORS MAY BE REQUIRED
TO PROVIDED GRAPHIC/MEDIA UPDATES AS PART OF A TASK ORDER, BUT THE
ACTUALLY UPDATING OF THE WEBSITE WILL BE DONE BY SBA PERSONNEL.
Will the government accept a previously completed CPARS by a client in place of a PPQ?
IF A CONTRACTOR IS UNABLE TO PROVIDE COMPLETED PPQ’S WITH THEIR OFFER, THEY
MUST PROVIDE ENOUGH INFORMATION FOR THE GOVERNMENT TO COMPLETE AN
APPROPRIATE EVALUATION. THE GOVERNMENT WILL ACCEPT CPARS IN PLACE OF
PPQ’S OR AS SUPPORTING DOCUMENTATION
Does the Base IDIQ contract constitute all of the PWS tasks?
THE PWS IN THE BASE IDIQ CONTAINS THE REQUIREMENTS THE CONTRACTOR SHALL
BE READY TO PERFORM THORUGH ITS LIFE SHOULD THE NEED ARISE ALONG WITH THE
SUBSEQUENT ISSUE OF A TASK ORDER.
On page 57, under the past performance (Factor 3), the solicitation states, “the offeror submits a separate chart and narrative described in this section above for the proposed subcontractor(s).” What chart does the statement refer to?
THE CHART REFERS TO A SEPARATE PPQ. THIS WAS AN ADMINISTRATIVE OVERSIGHT
AND SHOULD HAVE BEEN UPDATED TO REFLECT PPQ.
SECTION M
Page 63. Section M. Can the government confirm that evaluations will be made based on the technical and price proposals submitted for task Order 001 and not the overall IDIQ?
AS STATED, AWARD WILL BE MADE BASED ON TASK ORDER 001 EVALUATIONS
No Section: Can the government confirm that only one award will be made for this IDIQ?
A SINGLE AWARD WILL BE MADE FOR THIS EFFORT