Saybrook Point Seawall Repair - Appendix C.pdf
PDF 8 MB Posted
- Attached to
- Saybrook Point Seawall Repair
- Solicitation number
- 35396
- Issued by
- Middlesex County, Connecticut
About this file
This is a technical specification and construction document for the Saybrook Point Seawall Repair project involving the Town of Old Saybrook, Connecticut, and The Point, LLC property located at 145 and Lot #42-2 College Street. The project encompasses seawall repair and reconstruction, concrete sidewalk installation, stone work restoration, rip-rap enhancement, new galvanized steel railings, and associated earthwork and demolition. The scope includes approximately 131 feet of repaired stone seawall and 175 feet of rebuilt stone seawall, with work to be phased in maximum 50-foot increments per permit requirements. The project is subject to DEEP Permit (202503154-COP) and USACOE permit (NAE-2025-01003). Construction specifications require contractors to submit concrete mix designs for engineering review prior to material placement, verify existing conditions before construction, maintain erosion and sedimentation controls throughout the project period including turbidity curtains in the water column, and comply with all federal, state, and local regulations including OSHA excavation safety requirements and wetlands protection standards.
Key technical requirements include concrete design per ACI-318 with specified strengths (3,000 psi for seawall backfill and 4,000 psi for sidewalk), Grade 60 epoxy-coated reinforcing steel with 3-inch clear cover, and new galvanized steel guardrails featuring 1.5-inch diameter Schedule 40 pipes spaced at four-foot centers. All elevations are referenced to the North American Vertical Datum of 1988 (NAVD88), with the Coastal Jurisdiction Line established at 2.9 feet. The contractor bears responsibility for locating and protecting all utilities, managing construction storage areas in coordination with the property owner, safeguarding excavations, and repairing any property damage incurred during construction. The document was issued for permit on January 30, 2026, and revised on March 5, 2026, with project drawings prepared by Coastline Consulting & Development, LLC, the licensed engineering firm for the project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONCRETE
REINFORCED CONCRETE.
1. ALL CONCRETE IS DESIGNED BY ULTIMATE STRENGTH METHOD PER
ACI-318 AND SHALL BE NORMAL WEIGHT CONCRETE AS FOLLOWS:
A. SEAWALL BACKFILL f'c= 3,000 psi B. SIDEWALK f'c= 4,000 psi
AIR-ENTRAINED 5%-6%, WATER:CEMENT RATIO 0.5.
2. CONTRACTOR TO SUBMIT CONCRETE MIX DESIGN FOR ENGINEER'S
REVIEW, PRIOR TO DELIVERY OR PLACEMENT OF CONCRETE.
3. ALL STEEL REINFORCING BARS TO BE GRADE 60 EPOXY-COATED REBAR.
4. LAP #5 BARS 2'-6" WHERE NECESSARY.
5. MINIMUM COVER ON STEEL TO BE 3" CLEAR, TYPICAL.
6. CONCRETE SHALL HAVE NO JOINTS IN A HORIZONTAL PLANE.
7. EPOXY ADHESIVE TO BE HILTI HIT OR EQUIVALENT.
BASEMAP:
IS AN ELECTRONIC COPY OF: PRELIMINARY DESIGN PLAN
BULKHEAD REPAIR & PEDESTRIAN WALKWAY PROJECT BY COASTLINE
CONSULTING & DEVELOPMENT, 57-B EAST INDUSTRIAL ROAD, BRANFORD, CT
06405
BASEMAP REFERENCES:
TOPOGRAPHIC SURVEY & HYDROGRAPHIC SURVEY, THE POINT, LLC & TOWN
OF OLD SAYBROOK, 145 & LOT #42-2 COLLEGE STREET, OLD SAYBROOK,
CONNECTICUT", DATED MAY 20, 2024, SCALE 1" = 30' AND PREPARED BY
COASTLINE CONSULTING & DEVELOPMENT, LLC (TIMOTHY MCCARTHY
CERTIFIED HYDROGRAPHER, Cert No. 296) AND CERTIFIED TO CLASS T-2
STANDARDS OF ACCURACY BY JAMES NAGLE, L.S., LIC. NO. 15195
(EXCLUSIVE OF SOUNDINGS.
"SUBDIVISION OF WINTER TRUST, KODAMA & WALTERS, COLLEGE STREET
EXT., OLD SAYBROOK, CONNECTICUT", SCALE 1" = 40', DATED OCTOBER 20,
1988, CERTIFIED TO CLASS A-2 STANDARDS OF ACCURACY AND PREPARED
BY RICHARD W. GATES, LAND SURVEYOR, CENTERBROOK, CT. SAID MAP ON
FILE IN OLD SAYBROOK TOWN CLERK'S OFFICE AS MAP No 1928.
"NFIP, FLOOD INSURANCE RATE MAP, MIDDLESEX COUNTY, CONNECTICUT",
MAP NUMBER 09007C0361J, MAP EFFECTIVE 2/6/2013, PREPARED BY THE
FEDERAL
EMERGENCY MANAGEMENT AGENCY.
VERTICAL DATUM & TIDELINES
ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL
DATUM OF 1988 (NAVD88). THE CJL (COASTAL JURISDICTION LINE)
ELEVATION OF 2.9' NAVD88
DATUM IS THE VALUE FOR OLD SAYBROOK, CT AS ESTABLISHED BY THE
CONNECTICUT DEPARTMENT OF ENERGY & ENVIRONMENTAL PROTECTION.
1.
2.
3.
4.
5.
6.
7.
1.
2.
EROSION & SEDIMENTATION CONTROLS:
LAND DISTURBANCE SHALL BE KEPT TO A MINIMUM.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THE STANDARDS AND
SPECIFICATIONS OF THE “CONNECTICUT GUIDELINES FOR SOIL
EROSION AND SEDIMENT CONTROL”, JANUARY 1985.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
MAINTAINED IN EFFECTIVE CONDITION THROUGHOUT THE
CONSTRUCTION PERIOD.
INSTALL IN WATER COLUMN A TURBIDITY CURTAIN FOR SEDIMENT
CONTROL TO CONTAIN DISTURBED FINES IN WATER. CURTAIN SHALL
ENCLOSE ANY ACTIVE WORK AREA AT LEAST 10 FEET MINIMUM OF
SEAWALL WORK AND CONFORM TO CONNECTICUT DOT STANDARDS.
CURTAIN MAY BE REMOVED AND OR REUSED AT OTHER WORK
AREAS ONCE CONSTRUCTION FINES HAVE SETTLED OUT OF THE
WATER COLUMN.
THE CONTRACTOR SHALL UTILIZE APPROVED METHODS/MATERIALS
FOR PREVENTING THE BLOWING AND MOVEMENT OF DUST FROM
EXPOSED SOIL SURFACES ONTO ADJACENT PROPERTIES AND SIRE
AREAS.
THE CONTRACTOR SHALL MAINTAIN AN ADDITIONAL SUPPLY OF
EROSION & SEDIMENTATION CONTROL ON SITE FOR EMERGENCY
PURPOSES.
THE CONTRACTOR SHALL PROVIDE A PROJECT SPECIFIC PLAN FOR
THE INSTALLATION AND MAINTENANCE OF SEDIMENTATION AND
EROSION CONTROL MEASURES FOR THE PROJECT SITE AND SHALL
BE RESPONSIBLE FOR CONSTRUCTION AND MAINTENANCE OF ALL
CONTROL MEASURES THROUGHOUT THE CONSTRUCTION PERIOD.
SELECTIVE DEMOLITION
EXCEPT FOR ITEMS THAT ARE SPECIFICALLY SCHEDULED FOR
REINSTALLATION, DEMOLISHED MATERIAL SHALL BE CONSIDERED TO
BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE
COMPLETELY REMOVED FROM THE JOB SITE AND DISPOSED OF IN A
SAFE AND LEGAL MANNER.
EXTENT OF DEMOLITION WORK IS SHOWN SCHEMATICALLY ON THE
DRAWINGS. THE CONTRACTOR SHALL VISIT THE SITE P PRIOR TO
SUBMITTING THE BID TO BECOME FAMILIAR WITH HE EXISTING SITE
CONDITIONS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
STONE WORK:
1. REPAIR / REBUILD OF STONE SEAWALL SHALL USE EXISTING STONE.
2. CLEAN STONE FOR REUSE OF ORGANIC GROWTH OR OTHER
FOREIGN MATERIALS.
3. FOR REBUILD, PLACE STONES IN SIMILAR ARRANGEMENT TO
EXISTING WALL WITH VERTICAL WATERSIDE FACE.
4. FOR WALL REPAIR AT VOIDS, REMOVE LOOSER STONES AND
REBUILD AND CHINK TO PROVIDE SOLID FACE.
5. FOR STONE EMBEDDED BEYOND EXISTING (RETURNS AT SIDES OF
WOOD DECK) PROVIDE STONE OF SIMILAR SIZE AND MATERIAL OF
EXISTING.
EARTH WORK:
USE EQUIPMENT ADEQUATE IN SIZE, CAPACITY, AND NUMBERS TO
ACCOMPLISH THE WORK OF THIS SECTION IN A SAFE AND PROPER
MANNER.
PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND
OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, WASHOUT, AND OTHER HAZARDS CREATED BY
OPERATIONS UNDER THIS SECTION .
UPLAND SOIL STOCKPILES SHALL BE CONTAINED BY HAY BALES OR
SILT FENCING TO PREVENT EROSION. MAINTAIN CONTAINMENT
MEASURES DURING THE WORK.
PERFORM EXCAVATION OF EVERY TYPE OF MATERIAL ENCOUNTERED
WITHIN THE LIMITS OF THE WORK TO THE LINES, GRADES, AND
ELEVATIONS INDICATED HEREIN.
EXCAVATE AND BACKFILL IN A MANNER AND SEQUENCE THAT WILL
PROVIDE PROPER DRAINAGE AT ALL TIMES.
SLOPE EXCAVATIONS AS NECESSARY TO MAKE SLOPES SAFE IN
ACCORDANCE WITH THE APPROPRIATE REGULATIONS. CONTRACTOR
IS RESPONSIBLE FOR COMPLIANCE WITH SAFETY LAWS AND
REGULATIONS FOR EXCAVATION.
CONTRACTOR IS RESPONSIBLE TO PROVIDING QUALIFIED PERSONNEL
TO MEET THE REQUIREMENTS OF OSHA DEFINED ‘COMPETENT
PERSON’.
SHORE AND BRACE SHALL BE PROVIDED WHERE SLOPING IS NOT
POSSIBLE BECAUSE OF SPACE RESTRICTIONS OR STABILITY OF THE
MATERIALS BEING EXCAVATED.
MAINTAIN SIZES AND SLOPES OF EXCAVATIONS IN A SAFE CONDITION
UNTIL COMPLETION OF BACKFILLING.
PERFORM ALL BACK FILLING AND COMPACTION OPERATIONS IN A
CAREFUL AND CONTROLS MANNER, AVOID DAMAGING EXISTING
STRUCTURES, PREVENT LOSS OF MATERIAL THROUGH OPENINGS IN
THE BULKHEAD AND PREVENT MATERIALS FROM ENTERING THE
WATERWAY.
DESCRIPTION OF WORK:
THE WORK COVERED UNDER THESE CONTRACT DOCUMENTS,
INCLUDING THE DRAWINGS, PROJECT NOTES, AND ALL AMENDMENTS,
CONSISTS OF PROVIDING ALL PLANT, LABOR, SUPERVISION EQUIPMENT,
APPLIANCES AND MATERIALS AND IN PERFORMING ALL OPERATIONS IN
CONNECTION WITH AT LEAST, BUT NOT NECESSARILY LIMITED TO, THE
FOLLOWING ITEMS:
TEMPORARY REMOVAL OF STRUCTURES
SELECTIVE DEMOLITION
REPAIR / REBUILD OF STONE WORK
CONCRETE BACKFILL BEHIND WALL
EXCAVATION, BACKFILLING, AND COMPACTING
THE CONTRACTOR SHALL PROVIDE ALL ITEMS AND ACCESSORIES
REQUIRED TO COMPLETE ALL ASPECTS OF THE WORK NEEDED FOR A
COMPLETE AND PROPER INSTALLATION, ALL IN STRICT ACCORDANCE
WITH THE CONTRACT DOCUMENTS.
REBUILD / ENHANCE RIP RAP
NEW SIDEWALK
NEW GALVANIZED STEEL RAILINGS
GENERAL
1. ALL ELEVATIONS REFERENCED TO NAVD88 DATUM.
2. ALL WORK TO COMPLY WITH DEEP PERMIT (202503154-COP 145
& LOT42-2 COLLEGE STREET, OLD SAYBROOK, CT AND - USACOE
NAE-2025-01003 WHERE APPLICABLE)
3. WORK SHALL COMPLY WITH FEDERAL, STATE, AND LOCAL LAWS
AND STATUES AND THE REQUIREMENTS AND CONDITIONS OF
ALL REGULATORY PERMITS ISSUED FOR THE WORK.
4. EXISTING CONDITIONS AND DIMENSIONS SHALL BE VERIFIED BY
THE CONTRACTOR PRIOR TO CONSTRUCTION AND
FABRICATION OR ORDERING OF ANY CONSTRUCTION
MATERIALS.
5. SECTIONS AND DETAILS APPLY TO SAME AND SIMILAR
CONDITIONS UNLESS SPECIFICALLY NOTED OTHERWISE
HEREIN.
6. DAMAGE TO ANY PROPERTY, PRIVATE OR OF PUBLIC TRUST,
OCCURRING DURING THE CONSTRUCTION BY THE
CONTRACTOR SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND SHALL BE REPAIRED TO SATISFACTION OF
THE OWNER AT THE EXPENSE OF THE CONTRACTOR.
7. THE CONTRACTOR SHALL SAFEGUARD AND PROTECT ALL
EXCAVATIONS.
8. THE CONTRACTOR SHALL USE ADEQUATE NUMBERS OF
SKILLED WORKMEN WHO ARE THOROUGHLY TRAINED AND
EXPERIENCE IN THE NECESSARY CRAFTS AND WHO ARE
COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS
AND METHODS NEEDED FOR PROPER PERFORMANCE OF THE
WORK.
9. THE CONTRACTOR SHALL USE EQUIPMENT ADEQUATE IN SIZE,
CAPACITY, AND NUMBERS, AND MAINTAINED TO THE
REQUIREMENTS OF ALL FEDERAL, STATE, AND LOCAL LAWS
AND REGULATIONS TO ACCOMPLISH THE WORK.
10. THE CONTRACTOR SHALL PROTECT ALL WETLANDS AND
COASTAL RESOURCES FROM INTRUSION BY TURBID WATERS,
CONSTRUCTION DEBRIS, CONSTRUCTION EQUIPMENT, OR
PERSONNEL DURING ALL WORK ACTIVITIES.
11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
LOCATE AND PROTECT FROM DAMAGE ALL UTILIZES , UTILITY
STRUCTURES, DRAINS & TANKS OR ANY UNKNOWN UTILITIES
OR STRUCTURES EXCLUDING THOSE UTILITIES SPECIFIED FOR
DEMOLITION.
12. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY
IN WRITING IF CONTRACTOR OBSERVES ANY DISCREPANCIES
OR ERRORS WHICH WOULD MATERIALLY AFFECT THE PROJECT.
13. CONSTRUCTION STORAGE AREA SHALL BE COORDINATED WITH
THE OWNER.
14. CONTRACTOR SHALL PROVIDE OWNER WITH A LIST OF
EQUIPMENT AND MATERIALS TO BE STORED IN CONSTRUCTION
STORAGE AREA.
BASEMAP: (CONTINUED)
UTILITY NOTE
ANY UNDERGROUND AND/OR UNDERWATER UTILITY, STRUCTURE, AND
FACILITY LOCATIONS DEPICTED AND/OR NOTED HEREON MAY HAVE BEEN
COMPILED, IN PART, FROM RECORD MAPPING SUPPLIED BY THE RESPECTIVE
UTILITY COMPANIES OR GOVERNMENTAL AGENCIES, FROM PAROLE
TESTIMONY AND FROM OTHER SOURCES. THESE LOCATIONS MUST BE
CONSIDERED AS APPROXIMATE IN NATURE. ADDITIONALLY, OTHER SUCH
FEATURES MAY EXIST ON THE SITE, THE LOCATIONS OF WHICH ARE
UNKNOWN TO COASTLINE CONSULTING & DEVELOPMENT, LLC. THE SIZE,
LOCATION AND EXISTENCE OF ALL SUCH FEATURES MUST BE FIELD
DETERMINED AND VERIFIED BY THE APPROPRIATE AUTHORITIES PRIOR TO
ANY CONSTRUCTION. CALL BEFORE YOU DIG: 1-800-922-4455
RAILING:
1. PROVIDE NEW GALVANIZED STEEL GUARDRAIL FOR FULL LENGTH OF
CONCRETE SIDEWALK AT OUTER EDGE.
2. GUARDRAIL TO HAVE TOP AND LOWER HORIZONTAL RAIL 1 1/2" DIA.
SCHEDULE 40 WELDED TO 1 1/2" DIA SCHEDULE 40 VERTICAL
SUPPORTS AT MAXIMUM OF 4FT ON CENTERS.
3. PROVIDE FIELD SPLICES IN HORIZONTAL PIPES AS NEEDED TO ALLOW
FOR SHIP FABRICATE AND GALVANIZED OF RAIL SECTIONS IN LONGEST
LENGTHS POSSIBLE.
4. FIELD MEASURE LOCATIONS FOR GUARDRAILS PRIOR TO SUBMITTING
SHOP DRAWING FOR REVIEW AND FABRICATION.
GENERAL STRUCTURAL NOTES
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
NOTES:
\\ProjectServer2\Public\ProjectServer\2025 Projects\25248 OS Point Seawall\CAD\1 Current\25248 OS Point Seawall.rvt
1" = 1'-0"
S1S1
25248
09/23/25
JJS
CCB
THE POINT, LLC &
TOWN OF OLD
SAYBROOK
SEAWALL REBUILD
145 & LOT #42-2 COLLEGE
STREET
OLD SAYBROOK,
CONNECTICUT
GENERAL NOTES
FOR PERMIT +
CONSTRUCTION
ISSUED DRAWINGS
No. DESCRIPTION DATE
1 ISSUED FOR PERMIT 1/30/2026
2 REVISED FOR PERMIT 3/5/2026
PROPERTY OF
TOWN OF OLD SAYBROOK
COLLEGE STREET LOT #42-2
FEMA ZONE VE EL. 15
FULL EXTENT OF MAP
BENCHMARK NGS SURVEY DISK
EL. 5.2' NAVD88
MAINTAIN OF POSSIBLE
CJL/HTL (2.9), MHW (1.3) & MLW
(-1.9) ALONG FACE OF BULKHEAD
JAMES NAGLE, L.S.
CT Lic. No. 15195
S3
S3
N/F TOWN OF OLD SAYBROOK
155 COLLEGE STREET
S3
REBUILT STONE WALL WITH
CONCRETE BACKUP
APPROXIMATE LIMIT OF
TEMPORARY EXCAVATION
CONSTRUCTION
LIMIT LINE IMPROVED
RIP-RAP
PROPERTY OF
THE POINT, LLC
145 COLLEGE STREET
LENGTH OF
REPAIRED STONE
SEAWALL ~131 FT.
LENGTH OF
REBUILT STONE
SEAWALL ~175 FT.
RETURN
STONE
SEAWALL
10'-0"
10'-0" WIDE CONCRETE SIDEWALK
PROVIDE CONTROL JOINTS IN
SIDE WALK AT 5'-0" CENTERS &
EXP JOINT EVERY 20 FT. TYP.
4' -0
GALV RAILING. SEE 1/S3
GALV RAILING. SEE 1/S3
APPROXIMATE LIMIT OF
TEMPORARY EXCAVATION
NORTH
1/16" = 1'-0"2 PROPOSED SITE PLAN
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
NOTES:
\\ProjectServer2\Public\ProjectServer\2025 Projects\25248 OS Point Seawall\CAD\1 Current\25248 OS Point Seawall.rvt
As indicated
S2S2
25248
09/23/25
JJS
CCB
THE POINT, LLC &
TOWN OF OLD
SAYBROOK
SEAWALL REBUILD
145 & LOT #42-2 COLLEGE
STREET
OLD SAYBROOK,
CONNECTICUT
EXISTING CONDTIONS
AND PROPOSED SITE
PLANS
FOR PERMIT +
CONSTRUCTION
ISSUED DRAWINGS
No. DESCRIPTION DATE
1 ISSUED FOR PERMIT 1/30/2026
1" = 30'-0"1 EXISTING CONDITIONS SITE PLAN
MUD / SAND
MLW = -1.9'
MHW = 1.3'
CJL / HTL = 2.9'
REBUILD STONE
BULKHEAD TO
TOP EL. 4.5' +/-
GRADE AND PAVE
AS NECESSARY
0'
OSHA SAFE
EXCAVATION.
APPROXIMATE LIMIT
OF TEMPORARY
EXCAVATION (TYP)
3/4" CRUSHED
STONE BACK FILL
HEAVY DUTY FILTER
FABRIC (GEOTEXTILE)
REBUILT STONE
SEAWALL
CONCRETE WALL
2'-0"
RIP RAP BEYOND
EL. -1.5 FT
2'-0" MIN.
OPTIONAL
COLD JOINTS
COMPACTED SOIL BACK FILL
OR 3/4" PROCESS RECYCLED
CONCRETE IN 8" LIFTS
FRONT STONES
MIN. 2'-0"
TURBIDITY CURTAIN
NOTE: WORK AREAS SHALL
BE PHASED TO A MAXIMUM
OF 50 FOOT LENGTH OF
WALL AT A TIME PER PERMIT.
R
EM
O
VE
E
XI
ST
IN
G A
N D
R
EB
U
IL
D
6' -8
" M
IN
IM
U
M
EL. = 5.3'
REMOVE EXISTING
CONCRETE SIDEWALK
FUTURE SLAB AND
RAILING. N.I.C.
MLW = -1.9'
MHW = 1.3'
CJL / HTL = 2.9'
UPLAND SOILS
MUD / SAND
RE ORGANIZE AND ADD RIP-RAP
TO SLOPE SHOWN. (ADDED RIP
RAP UP TO 8 CUBIC YARDS.)
TIMBER PILE (TYP)
0'
EXISTING PLATFORM CUT BACK
EXISTING CONCRETE
END WALL
EXISTING RIP-RAP
UNDER PLATFORM
TO REMAIN
EL. = 5.3'
MUD / SAND
MLW = -1.9'
MHW = 1.3'
CJL / HTL = 2.9'
0'
REMOVE EXISTING
CONCRETE WALL AND
SIDEWALK
REBUILD STONE
BULKHEAD TO TOP
EL. 4.5' +/-
GRADE AND PAVE
AS NECESSARY
OSHA SAFE
EXCAVATION.
APPROXIMATE LIMIT
OF TEMPORARY
EXCAVATION (TYP)
3/4" CRUSHED
STONE BACK FILL
HEAVY DUTY FILTER
FABRIC (GEOTEXTILE)
REBUILT STONE
SEAWALL
CONCRETE WALL
2'-0"
RIP RAP BEYOND
EL. -1.5 FT
2'-0" MIN.
OPTIONAL
COLD JOINTS
COMPACTED SOIL BACK FILL
OR 3/4" PROCESS RECYCLED
CONCRETE IN 8" LIFTS
FRONT STONES
MIN. 2'-0"
4' -6
" R
EM
O
VE
A N
D R
EB
U
IL
D
EL. = 5.3'
NOTE: WORK AREAS SHALL
BE PHASED TO A MAXIMUM
OF 50 FOOT LENGTH OF
WALL AT A TIME PER PERMIT.
FUTURE SLAB AND
RAILING. N.I.C.
3/4" = 1'-0"2 PROPOSED CONDITIONS AT PLATFORM
3/4" = 1'-0"1
PROPOSED REBUILD AT STONE
BULKHEAD
3/4" = 1'-0"3
PROPOSED CONDITIONS AT STONE
BULKHEAD
SCALE:
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
NOTES:
\\ProjectServer2\Public\ProjectServer\2025 Projects\25248 OS Point Seawall\CAD\1 Current\25248 OS Point Seawall.rvt
3/4" = 1'-0"
S3S3
25248
09/23/25
JJS
CCB
THE POINT, LLC &
TOWN OF OLD
SAYBROOK
SEAWALL REBUILD
145 & LOT #42-2 COLLEGE
STREET
OLD SAYBROOK,
CONNECTICUT
SEA WALL SECTION
VIEWS
FOR PERMIT +
CONSTRUCTION
ISSUED DRAWINGS
No. DESCRIPTION DATE
1 ISSUED FOR PERMIT 1/30/2026
| S1 - GENERAL NOTES |
| S2 - EXISTING CONDTIONS AND PROPOSED SITE PLANS |
| S3 - SEA WALL SECTION VIEWS |
File details come from the government source that posted it. Updated .