This is a Statement of Work (SOW) for NASA Langley Research Center detailing the complete teardown, inspection, and rebuild of two Philadelphia Gear Model 3418CT industrial cooling tower gearboxes used in Cooling Tower Cells 1 & 2. The contractor must perform comprehensive disassembly and cleaning of all internal components and the gear casing, followed by visual and dimensional inspection. All reusable torque-transmitting components require Magnetic Particle Inspection (MPI) to identify any operational distress indications. The contractor shall provide and install 100% new bearings, gearing, shafting, and seals manufactured to exact OEM specifications and tolerances, while evaluating the housing, hardware, and auxiliary lubrication components for integrity and reliability.
The contractor must conduct rigorous pre-shipment validation including a minimum 90-minute no-load, full-speed mechanical spin test to record operational temperature, sound, and vibration levels. Additional requirements include coating the gearbox exteriors with high-quality slate blue epoxy coating, applying internal rust preventative providing minimum six-month protection, and packaging/bolting the units to heavy-duty shipping skids for safe return transit. The contractor shall provide a three-year warranty covering the overhauled drives and OEM parts. All work shall be performed at the contractor's facility with complete overhaul and equipment return required within approximately 24 weeks after receipt of order and equipment. The Government will ship the gearboxes dry and drained to the contractor's location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0043027 Tab 07 Capability Statement.pdf | ||
| SATPC0043027 Tab 06 RDSS..pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements NASA Langley Research Center has an immediate requirement to perform a complete teardown, inspection, and rebuild of two (2) industrial cooling tower gearboxes for Cooling Tower Cells 1 & 2 to restore critical facility cooling infrastructure.
2. Characteristics, Scope, and Specs The contractor shall perform the following duties for two (2) Philadelphia Gear Model 3418CT Gearboxes:
• Receive the gearboxes (shipped dry/drained by the Government).
• Perform complete disassembly, cleaning, and visual/dimensional inspection of all internal components and the gear casing.
• Perform Magnetic Particle Inspection (MPI) on all reusable torque-transmitting components to ensure no indications of operational distress.
• Provide and install 100% new bearings, gearing, shafting, and seals manufactured to exact OEM specifications and tolerances.
• Evaluate housing, hardware, and auxiliary lubrication components to ensure integrity and reliability.
• Conduct a rigorous pre-shipment validation, including a minimum 90-minute no-load, full-speed mechanical spin test to record operational temperature, sound, and vibration levels.
• Coat the exterior of the gearboxes with high-quality slate blue epoxy coating.
• Apply internal rust preventative (providing minimum 6 months protection) and package/bolt the units to heavy-duty shipping skids to protect from damage during return transit.
• Provide a 3-year warranty on the overhauled drives and OEM parts.
3. Place of Performance Teardown and rebuild services shall be performed at the contractor's facility:
4. Period of Performance The complete overhaul and return of the equipment shall be completed within approximately 24 Weeks After Receipt of Order/Equipment.
File details come from the government source that posted it. Updated .