Fabrication of Liquid Hydrogen Vacuum Jacketed Supply Section for Cell 7
Solicitation number
80NSSC26936913Q
Issued by

About this file

This is a Statement of Work (SOW) for the design, fabrication, testing, delivery, and commissioning of a vacuum-jacketed liquid hydrogen (LH2) supply system for CCL-7 at NASA Glenn Research Center. The vendor must design vacuum-jacketed piping and components to ASME B31.12 standards using LH2-compatible materials, procure all required components including vacuum-jacketed piping, cryogenic globe valves, actuators, and instrumentation fittings, and fabricate piping assemblies with inner and outer jackets. The system design pressure is 275 psig, and the two required globe valves must be rated for -423°F with a minimum flow coefficient of Cv=8.3, include positioner transmitters with 4-20mA signals, and meet NEC Class I, Division 2, Group B specifications. All components must be cleaned for oxygen/cryogenic service.

Testing and quality assurance requirements include hydrostatic testing at 1.5x design pressure (or pneumatic testing at 1.1x design pressure for minimum 10 minutes), vacuum retention testing for at least 7 days, leak testing at 1x10^(-8) CC/s, material certifications, cold shock testing using liquid nitrogen, and radiography of 10% of total welds on fluid process piping prior to vacuum jacket installation. Deliverables include certificates of conformance, approved drawings, inspection reports, material certifications, comprehensive testing reports, and the completed vacuum-jacketed piping system. The vendor must provide evidence of successfully completing similar projects and receive approval from NASA facility engineers before work begins. System components must be packaged and transported to NASA Glenn Research Center in Cleveland, Ohio, with installation guidelines provided for NASA technicians. Government acceptance is contingent upon receipt of satisfactory deliverables.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: THE LAST PAGE IS A CHANGE REQUEST FORM FOR FUTURE REVISIONS

Template Rev. Date: 1/23/2023

STATEMENT OF WORK

FOR

Vacuum Jacketed LH2 Supply System for CCL-7 , Version 1.0

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

GLENN RESEARCH CENTER

LEWIS FIELD NEIL A. ARMSTRONG TEST FACILITY

21000 BROOKPARK ROAD 3597 SCHEID ROAD

CLEVELAND, OHIO 44135 SANDUSKY, OHIO 44870

Vacuum Jacketed LH2 Supply System for CCL7, Version 1.0

Background This statement defines the scope, deliverables, and responsibilities for the design, fabrication, testing, delivery, and commissioning of a vacuum-jacketed liquid hydrogen (LH2) supply system. The system will safely transfer LH2 from the source (e.g., tanker or storage vessel) to designated end-use equipment while maintaining cryogenic temperatures and minimizing boil-off losses. The vendor will also provide (2) liquid hydrogen compatible globe valves with actuator and position transmitters to be able to isolate supply and transfer operations within the supply system. Additional ports and fittings have been called out in the drawing to implement instrumentation into the system.

Environmental Impacts

☐Universal waste, recycling ☐Hazardous waste (see Appendix B for details)

☐Air ☐Storm Water ☐Wastewater ☐Species Management ☐Soil ☐Underground/Aboveground Storage tanks ☐Chemical Management ☐Other

No environmental impacts.

Pressure Vessels and Systems Does this work include pressure vessels and systems? Yes.

Scope of Work Description Engineering and Design:

• Drawings to be provided and reviewed with NASA personnel to approve before work can begin.

• Design vacuum-jacketed piping and components to ASME B31.12

• Materials should be compatible with LH2

Procurement and Fabrication:

• Procure all required materials and components, including” o Vacuum-jacketed piping and transfer lines o Cryogenic globe valves, actuators and fittings o Specified fittings/ports to implement instrumentation

• System design pressure is 275psig

• (2) Globe Valves:

o Materials rated for -423°F o Flow coefficient of at least Cv=8.3 o Come with positioner transmitter

4-20mA setpoint and feedback signal NEC Class I, Div 2, Group B

• Fabricate piping assemblies with inner and outer jackets

• Perform vacuum insulation and sealing

• Clean all components for oxygen/cryogenic service Testing & Quality Assurance

• All testing should comply with ASME B31.12 Hydrogen Service: Inspection, Examination and Testing o Hydrostatic testing at 1.5x design pressure, or Pneumatic testing at 1.1x design pressure for a minimum of 10 minutes.

o Vacuum Retention test of at least 7-days o Leak Testing of 1x10^(-8) CC/s o Material certifications o Cold shock testing using LN2 to check for leaks/cracks o Radiography of 10% of total welds on fluid process piping, prior to VJ install

Delivery & Installation

• Package and transport system components to NASA Glenn Research Center o 21000 Brookpark Road, Cleveland OH 44135

• Provide installation guidelines for NASA technicians to install hardware

Requirements for Vendor The Vendor shall provide evidence of successfully completing projects of similar scope, size, complexity, and technical requirements. Such evidence shall include project descriptions, client references, dates of performance, contract values (if permissible), and the Vendor's role in each project. Vendor will need to be approved by NASA facility engineers before work can begin.

Inspections

• Drawing review with NASA personnel

• Visual Examination of the build per ASME B31.12 Normal Fluid Service

• Radiography of 10% of total welds on fluid process piping, prior to VJ install

Deliverables

• Certificates of Conformance

• Drawings (which are approved before manufacturing)

• Inspection Reports

• Material Certifications of piping system

• Testing Reports including:

o Hydrostatic (150% MAWP) or Pneumatic (110% MAWP) Test o Vacuum Retention report o Leak Check report o Cold shock testing report o Radiography of 10% total welds report

• Vacuum Jacketed Piping System

Government Acceptance POC will accept pending receipt of satisfactory deliverables.

VERSION HISTORY

Version

Purpose

(Original or CR #)

1.0 Original

APPENDIX A: GROUND-BASED PRESSURE VESSEL AND SYSTEMS PURCHASES

NASA policy requires that the Pressure Systems Manager (PSM) review ground-based pressure vessel and systems (PVS) design and procurement specifications for compliance with NPD 8710.5 and NASA Standard 8719.17, which require that all new PVS be designed, acquired, fabricated, inspected, tested, installed, repaired, altered, operated, and maintained in accordance with the applicable codes, standards, guides, and regulations. Further, all flexible hose purchases shall conform to Glenn Safety Manual Chapter 7, paragraph 6.3.

The GRC PSM grants technical review authority to the PVS owner’s organization. However, to avoid potential cost and schedule delays resulting from PVS that are not compliant with NPD 8710.5 and NASA Standard 8719.17, PVS requesters are strongly encouraged to involve the Pressure Systems Office (PSO) as early in the project effort as possible (e.g. – invite the PSO to participate in all reviews, seek the feedback of the PSO on specifications prior to the purchase of significant PVS), instead of waiting to obtain PSO concurrence during the safety permitting and recertification process.

If a PVS requester is unsure regarding the PVS’s code compliance, and/or proper application of the PVS in an existing or new system (i.e. design pressure/ Maximum Allowable Working Pressure (MAWP), minimum design metal temperature, maximum design temperature, commodity compatibility, etc.) it is best to request a PSO review prior to initiating a procurement activity.

A PSO review may be requested by calling the Contact the PSO Help Line at (216) 433-2973 or by e-mail at grc-pso@mail.nasa.gov. All requests should include the following pertinent information:

http://pso.grc.nasa.gov/DocumentFiles/PSODocs/7330/New Construction Documentation Checklist 6- 1-2010.pdf. Electronic files can be transmitted via e-mail and hardcopies can be sent to the PSO at MS 6-8. Where the review request involves the replacement of existing recertified PVS, please provide the recertification tag numbers of the PVS being replaced.

mailto:grc-pso@mail.nasa.gov http://pso.grc.nasa.gov/DocumentFiles/PSODocs/7330/New

APPENDIX B: Common Waste Collected Via the GRC260A Waste Disposal Request

1. The following are examples of waste not suitable for trash dumpsters that must be disposed of via the C260a Waste Disposal Request.

https://shedapps.grc.nasa.gov/cms/DisposalRequests/WasteC260DataEntry.cfm

• Liquids—any material that is a liquid or releases a free liquid

• Corrosives (e.g. nitric acid, hydrochloric acid, sulfuric acid, sodium hydroxide, potassium hydroxide, zinc chloride, aluminum chloride, etc.)

• Batteries

• Chemicals (Note: If it has a barcode or needs reviewed for approval prior to purchase it needs to be disposed of via the GRC260A Waste Disposal Request).

• Combustible or ignitable materials (e.g. fuel oil, paint, kerosene etc.)

• Compressed gas cylinders

• Compressors

• Fuels

• Lighting bulbs—including, but not limited to, fluorescent, LED, metal halide, mercury, vapor, or sodium vapor

• Lighting ballasts

• Lumber or wood—other than tiny incidental pieces included in floor sweepings, etc.

• Metal that can be recycled

• Combustible or pyrophoric metals (e.g. alkyl metals [t-butyllithium, trimethylaluminum], alkyl metal halides [diethylaluminum bromide], organometallics [organolithium], white phosphorous, super fine metal powders [iron, lead, nickel, aluminum], silanes)

• Oil

• Oil-soaked rags that have free liquid, including solvents or fuels

• Painted or treated wood pallets (untreated/unpainted wood pallets can be recycled in the LTID wood dumpster)

• Paint cans—if they are not empty and if they contain liquid paint of any type or solid

(dried-out) oil-based paint

• Powdered metals (e.g. iron, aluminum, cobalt, any metal in powder form)

• Solvents (e.g. ethanol, isopropanol, acetone, MEK, acetonitrile, etc.)

• Empty aerosol cans (there should be a stand-alone collection container for these, if not contact Code FE)

If you are not certain if the waste is suitable for trash dumpsters contact Code FE, Lisa Ramsey.

https://shedapps.grc.nasa.gov/cms/DisposalRequests/WasteC260DataEntry.cfm