SATPC0041510 Tab 04 4 SOW..pdf

PDF 112 KB Posted

Attached to
CVI helium Compressor and Drive Head Rebuilds
Solicitation number
80NSSC26936408Q
Issued by

About this file

This is a Statement of Work (SOW) for the rebuild of specialized compressor and drive head equipment. The statement of work encompasses two main service categories: the rebuild of three CVI CBST 6.0 water-cooled helium compressors and one CVI CGR-511 drivehead. All work is to be performed by PHPK qualified technicians at the PHPK factory.

The compressor rebuild scope includes replacement of all major components and systems: new compressor unit, new front control panel (required for pre-2000 models), new pressure gauges, new check valve, new indicator lights, new filters/strainers, new electrical panel cooling fan, mechanical and control upgrades, new adsorber, new buffer tank bypass valve, miscellaneous tubing assemblies and fittings, connector o-ring seals, decontamination (purification), and leak testing. The scope also requires performance testing and a 12-month warranty. A note indicates that two of the three compressors were built in 1995 and may require control panel upgrades, which has been factored into the pricing. The drivehead rebuild scope includes replacement of bearings and bearing sleeves, shuttle valve set, yoke shaft, cam assembly, motor, and all seals, followed by functional testing and a 12-month warranty. Both compressor and drivehead rebuilds include performance/functional testing and warranty coverage as deliverables.

View the file

Other files

File Type Posted
SATPC0041510 Tab 07 Capability Statement.pdf PDF
SATPC0041510 Tab 06 RDSS..pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for Compressor & Drive Head Rebuilds

Compressor Rebuilds

Rebuild CVI CBST 6.0 water cooled helium compressor to include the following:

• New compressor

• New front control panel (required for pre-2000 models).

• New pressure gauges

• New check valve

• New indicator lights

• New filters/strainers

• New electrical panel cooling fan

• Mechanical and control upgrades to current design

• New adsorber

• New buffer tank bypass valve

• Required miscellaneous tubing assemblies and fittings, connector o-ring seals, decontamination (purification) and leak testing

• Performance testing and a 12-month warranty shall also be included.

• All work to be performed by PHPK qualified technicians at the PHPK factory

NOTE: Compressors built before 2000 may require a control panel upgrade. Two of the Three compressors being sent were built in 1995. This has been factored into the PR amount. PHPK will confirm the need for this upon receipt & inspection of the compressors.

Drive Head Rebuild

Rebuild CVI CGR-511 drivehead to include the following:

• Replace bearings and bearing sleeves

• Replace shuttle valve set

• Replace yoke shaft

• Replace cam assembly

• Replace motor

• Replace all seals

• Perform functional testing to confirm proper operation and 12-month warranty shall also be included.

• All work to be performed by PHPK qualified technicians at the PHPK factory

File details come from the government source that posted it. Updated .