SATPC0041255 Tab 04 4 SOW.pdf
PDF 665 KB Posted
- Solicitation number
- 80NSSC26933745Q
About this file
This is a Statement of Work (SOW) for procuring water fountain equipment and related materials for the White Sands Complex (WSC) Second TDRSS Ground Terminal facility in Las Cruces, New Mexico, a NASA-supporting communications infrastructure site.
The SOW requires provision of four new water fountains with integrated bottle filling stations to replace existing units. The specified equipment includes one Elkay EZH2O Retrofit Bottle Filling Station ($1.9K) for a recently replaced location that will utilize existing chiller and frame infrastructure, and three EZH2O FILTERED-ERPBGRNM8K COMBO units ($4.3K each) for new installations where retrofit compatibility is not feasible due to style and frame mismatches. Contractors must supply all materials necessary for installation as listed in an attached document, ensure material compatibility with existing building infrastructure to minimize installation labor, and include two years' worth of manufacturer-recommended replacement filters for each fountain. Installation will be conducted separately under task order SENSE TO-137 and is explicitly excluded from this SOW. The document references GSA Advantage catalog links for the specified equipment models.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SATPC0041255 Tab 10 Open Market RFQ.pdf | ||
| SATPC0041255 Tab 04 4 SOW.pdf | ||
| SATPC0041255 Tab 10 Open Market RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Background The White Sands Complex (WSC) Second TDRSS Ground Terminal (STGT) is a facility in Las Cruces, New Mexico dedicated to supporting NASA by providing essential communications infrastructure and services. This SOW involves procuring materials necessary for the replacement of four existing water fountains with modern filtered water bottle filling stations, ensuring improved access to clean drinking water for personnel and visitors. Installation of these stations will be conducted under a separate task order, with the goal of enhancing the facility’s amenities and supporting ongoing mission readiness.
Technical Task Requirements Provide four new water fountains with integrated bottle filling stations to replace the existing units at WSC STGT.
Installation is not included in this Statement of Work and will be addressed separately under
SENSE TO-137.
Basis of design:
o 1 qty.: Elkay EZH2O Retrofit Bottle Filling Station, ($1.9K per)- This retrofit will fit one location that was recently replaced, therefore it will make use of the existing chiller and frame. https://www.gsaadvantage.gov/advantage/ws/catalog/product_detai l?gsin=11000049777516 o 3 qty.: EZH2O FILTERD-ERPBGRNM8K COMBO, ($4.3K per)- This is a new install of the other 3 locations given a retrofit would not be available due to mismatch styles and frame. https://www.gsaadvantage.gov/advantage/ws/catalog/product_d etail?gsin=11000049777685
Provide materials needed for installation as provided in attached list.
Ensure material compatibility with existing building infrastructure thus minimizing labor needed for installation.
Include two years’ worth of replacement filters for each fountain, based on manufacturer’s recommended replacement intervals.