PROJECT: UTILITIES AND INFRASTRUCTURE FOR DIRAN FACILIITES
Place: CNP Facilities in Finca Paraguay Caucasia, Antioquia, Colombia
Date: 12/8/2016
BASE BID
ITEM DESCRIPTION
MATERIAL
UNIT
MATERIAL
QUANTITY
MATERIAL
UNIT COST
LABOR UNIT
LABOR
QUANTITY
LABOR UNIT
COST
EQUIPMENT
UNIT
EQUIPMENT
QUANTITY
EQUIPMENT
UNIT COST
TOTAL COST TOTAL COST BY CHAPTER
A. GENERAL REQUIREMENTS $ 0.00
1 GENERAL REQUIREMENTS $ 0.00
01 32 16 00 20 Construction Progress Documentation $ 0.00
$ 0.00
01 33 00 Submittal Procedures $ 0.00
$ 0.00
01 50 00 Temporary Construction Facilities and Controls $ 0.00
$ 0.00
01 78 00 Execution and Closeout Submittals $ 0.00
$ 0.00
B. WATER SUPPLY, SEWAGE, STORM DRAINAGE, AND ELECTRICAL FACILITIES $ 0.00
3 CONCRETE $ 0.00
03 20 00.00 10 Concrete Reinforcing $ 0.00
$ 0.00
03 30 00 Cast-in-Place Concrete $ 0.00
$ 0.00
5 METALS $ 0.00
05 50 13 Metal: Miscellaneous and Fabrications $ 0.00
$ 0.00
05 51 33 Metal Ladders $ 0.00
7 THERMAL AND MOISTURE PROTECTION $ 0.00
07 11 13 Bituminous Dampproofing $ 0.00
$ 0.00
22 PLUMBING $ 0.00
22 00 00 Plumbing, General Purpose $ 0.00
$ 0.00
26 Electrical $ 0.00
26 12 19.00 40 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformer $ 0.00
$ 0.00
26 23 00.00 40 Switchgear $ 0.00
$ 0.00
26 24 16.00 40 Panelboards $ 0.00
$ 0.00
26 28 21.00 40 Automatic Transfer Switches $ 0.00
$ 0.00
26 32 13.00 20 Single Operation Generator set $ 0.00
$ 0.00
C. EXTERIOR WORKS $ 0.00
31 Earthwork $ 0.00
31 00 00 Earthwork $ 0.00
$ 0.00
31 11 00 Clearing and Grubbing $ 0.00
$ 0.00
31 23 00.00 20 Excavation and Fill $ 0.00
$ 0.00
OFFICIAL BIDDING CHART
PSIB Page 1 of 2 San Jose del Guaviare
ITEM DESCRIPTION
MATERIAL
UNIT
MATERIAL
QUANTITY
MATERIAL
UNIT COST
LABOR UNIT
LABOR
QUANTITY
LABOR UNIT
COST
EQUIPMENT
UNIT
EQUIPMENT
QUANTITY
EQUIPMENT
UNIT COST
TOTAL COST TOTAL COST BY CHAPTER
32 Exterior Improvements $ 0.00
32 01 19 Field Molded Sealant for Sealing Joints in rigid Pavements $ 0.00
$ 0.00
32 11 16.16 Base Course for Rigid and Subbase Course for Pervious Paving $ 0.00
$ 0.00
32 13 13.06 Portland Cement Concrete Pavement for Roads and Site facilities $ 0.00
$ 0.00
32 16 13 Concrete Sidewalks and Curbs and Gutters $ 0.00
$ 0.00
32 17 23.00 20 Pavement Marking $ 0.00
$ 0.00
32 31 13 Chain Link Fence and Gates $ 0.00
$ 0.00
32 92 23 Sodding $ 0.00
$ 0.00
32 93 23 Exterior Plants $ 0.00
$ 0.00
33 Utilities $ 0.00
33 11 00 Water Distribution $ 0.00
$ 0.00
33 30 00 Sanitary Sewer $ 0.00
$ 0.00
33 40 00 Storm Drainage Utilities $ 0.00
$ 0.00
33 71 02 Underground Electrical and Telecomunications Distribution $ 0.00
$ 0.00
D. MARKUPS $ 0.00
D TOTAL DIRECT COST PHYSICAL ADECUATION WORKS $ 0.00
D Administration % $ 0.00 D Unforenseens % $ 0.00 D Profit % $ 0.00
T TOTAL COSTS (Base bid) $ $ 0.00