SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 30 PAGES
LODGING FOR CEFOP CAUCASIA
01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance Policy (Poliza de Cumplimiento):
Payment Policy (Poliza de Pagos de Salarios y Prestaciones Sociales:
Liability Policy (Poliza de Responsabilidad Civil Contractual)
Stability Policy (Poliza de Estabilidad)
Elements Quality Policy (Poliza de Calidad de Elementos)
Correct Equipment Functioning Policy (Poliza de Correcto funcionamiento de los Equipos)
Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors List of Proposed Products
01 32 16.00 20 SD-01 Preconstruction Submittals 1.3Construction schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 30 PAGES
01 32 16.00 20 Submittal Register 01 33 00 SD-01 Preconstruction Submittals
1.7Submittal Register 01 50 00 SD-01 Preconstruction Submittals
1.3Construction site plan 01 78 00 SD-03 Product Data
As-Built Record of Equipment and Materials
1.6.1Warranty Management Plan 1.6.4Warranty Tags
Spare Parts Data SD-08 Manufacturer’s Instructions
1.5Preventative Maintenance 1.5Condition Monitoring (Predictive
Testing) 1.5Inspection 1.6.1Instructions
SD-10 Operation and Maintenance Data
1.7Operation and Maintenance Manuals
SD-11 Closeout Submittals 1.4.1Record Drawings
03 11 13.00 10 SD-02 Shop Drawings
3.1.1 GFormwork
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 30 PAGES
03 11 13.00 10 1.2Design 2.1Form Materials 2.1.6Form Releasing Agents
SD-04 Samples
1.4 GSample Panels
SD-06 Test Reports 3.5Inspection
3.4.1 GFormwork Not Supporting Weight
of Concrete SD-07 Certificates Fiber Voids
03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement
SD-03 Product Data 1.3.1Welding
Material SD-04 Samples Reinforcement Bars
SD-06 Test Reports Material Tests, Inspections, and Verifications
SD-07 Certificates 2.3Reinforcing Steel
03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 30 PAGES
03 30 00 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Special Construction 1.6.2.3Reinforcing steel
SD-03 Product Data 2.4.7Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.4.1Cement 2.4.1.1Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor barrier 2.6Bonding Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 1.6.2.1Reinforcement Materials 2.4.10Epoxy bonding compound 2.4.9.3Waterstops 3.13.2Waterstops 2.1.1Wood Forms 2.4.11Biodegradable Form Release
Agent SD-04 Samples
1.6.5.1Slab finish sample 2.4.9.3Dumbbell Type 2.4.9.3Rubber
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 30 PAGES
03 30 00 2.4.9.3Polyvinylchloride (PVC) SD-05 Design Data
2.3.1mix design 1.6.1.1Calculations
SD-06 Test Reports 1.6.4.1Concrete mix design 1.6.4.2Aggregates
Tolerance report 3.11.2.3Compressive strength tests 2.7.4Slump 2.7.1Air Entrainment
SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.3Finishing plan 1.6.3.6Material Safety Data Sheets 2.5.5Steel Bar
04 20 00 SD-02 Shop Drawings 1.4.4Detail Drawings
SD-03 Product Data 2.4.2Cement 2.5Water-Repellant Admixture
SD-04 Samples 2.2Concrete Masonry Units (CMU) 2.7Anchors, Ties, and Bar
Positioners 2.10Expansion-Joint Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 30 PAGES
04 20 00 2.8Joint Reinforcement 1.4.2Portable Panel
SD-05 Design Data 2.4.3Pre-mixed Mortar 1.2.1.1Unit Strength Method
SD-06 Test Reports 3.15.1Field Testing of Mortar 3.15.2Field Testing of Grout 3.15.3Prism tests 1.4.3Masonry Inspector Qualifications 3.15.4Single-Wythe Masonry Wall
Water Penetration Test SD-07 Certificates
2.2Concrete Masonry Units (CMU) 2.4.1Admixtures for Masonry Mortar
05 05 23 SD-03 Product Data 1.5Welding Procedure Qualifications 1.5.5Welder, Welding Operator, and
Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures
SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 30 PAGES
05 05 23 1.5.1Certified Welding Procedure Specifications (WPS)
1.5.1Certified Procedure Qualification Records (PQR)
1.5.1Certified Welder Performance Qualifications (WPQ)
05 12 00 SD-02 Shop Drawings 1.5.2.1Erection Plan 1.5.1Fabrication drawings
SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.5Load indicator washers
SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers
SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 1.5.2.2Welding procedures and qualifications 05 50 13 SD-02 Shop Drawings
2.7structural steel door frames 2.3Access doors and panels 2.4Cover plates and frames
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 30 PAGES
05 50 13 2.3Access doors and panels 2.4Cover plates and frames
Control-joint covers 2.7Structural steel door frames
05 50 14 SD-02 Shop Drawings 1.3.2Detail Drawings
SD-03 Product Data 2.2.2.1Welding of Structural Steel 2.3.4Structural Steel Welding Repairs
Materials Orders 2.1.1Materials List
Shipping Bill SD-06 Test Reports
2.3Tests, Inspections, and Verifications
SD-07 Certificates 1.3.1Qualification of Welders and
Welding Operators 07 41 63 SD-01 Preconstruction Submittals
1.5.1Qualification of Manufacturer 1.5.3Qualification of Manufacturer 1.5.1Qualification of Installer
SD-02 Shop Drawings 1.5.1Roofing Panels 1.5.1Flashing and Accessories 1.5.1Gutter/Downspout Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 30 PAGES
07 41 63 SD-03 Product Data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation 1.5.1Pressure Sensitive Tape 1.5.1Sealants and Caulking 1.5.1Galvanizing Repair Paint 1.5.1Aluminized Steel Repair Paint 1.5.1Accessories
SD-04 Samples 1.5.1Roofing Panels 2.2.2Fasteners 2.4.1Metal Closure Strips 1.5.1Insulation 1.5.1Manufacturer s color charts and chips SD-05 Design Data
1.5.1Wind design analysis SD-07 Certificates
2.2.2Fasteners 1.5.1Enamel Repair Paint
SD-08 Manufacturer’s Instructions 1.5.1Installation of Roof panel assemblies SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 30 PAGES
07 41 63 1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets
07 60 00 SD-02 Shop Drawings 3.1.7Gutters 3.1.8Downspouts 3.1.11Flashing at roof penetrations 3.1.9Eave flashing
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings 2.1Doors 2.1Doors 2.4Frames 2.4Frames 2.3Accessories 2.5Weatherstripping
SD-03 Product Data 2.1Doors 2.4Frames 2.3Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 30 PAGES
08 11 16 SD-04 Samples 1.5.1.1Finish sample
SD-08 Manufacturer’s Instructions 2.1Doors and frames
08 51 13 SD-03 Product Data 2.2Windows 2.3.8.1Hardware 2.3.3Fasteners 1.9Window Performance 2.5Mullions 2.3.10Screens 2.3.2Weatherstripping 2.3.8Accessories 2.3.4Adhesives
SD-04 Samples 1.3.1.1Finish Sample 1.3.1.2Window Sample
SD-10 Operation and Maintenance Data
2.2Windows 08 71 00 SD-03 Product Data
2.1Hardware Items SD-08 Manufacturer’s Instructions
3.1Installation SD-11 Closeout Submittals
1.3.1Key Bitting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 30 PAGES
08 81 00 SD-01 Preconstruction Submittals Installation
SD-02 Shop Drawings Glass
1.3Glazing Accessories SD-03 Product Data
2.3.2Glazing Compound 2.3.4Tape 2.3.3.1Sealant
SD-05 Design Data 2.3Setting and Sealing Materials 3.2Glass Setting
08 87 23.13 SD-03 Product Data 2.2Fragment Retention Film 3.3Cleaning
09 06 90 SD-04 Samples 2.2Color Schedule
09 24 23 SD-02 Shop Drawings 3.2Lath
SD-03 Product Data 3.4Proportions and Mixing
SD-04 Samples 2.2Colored Stucco Finish Coat 1.3Sample Panel
09 26 00 SD-03 Product Data 2.1.4Gypsum base
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 30 PAGES
09 26 00 2.1.5Gypsum veneer plaster 09 30 10 SD-02 Shop Drawings
3.2Detail Drawings SD-03 Product Data Local/Regional Materials
2.1Tile 2.1Tile 2.2Setting-Bed 2.4Mortar, Grout, and Adhesive 2.2.6Reinforcing Wire Fabric
SD-04 Samples 2.1Tile 2.1Accessories 2.1.2Accessories 2.1Transition Strips 2.5Transition Strips 2.4Grout
SD-07 Certificates 2.1Tile 2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SD-10 Operation and Maintenance Data
3.2Installation SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 30 PAGES
09 30 10 Local/Regional Materials LEED Documentation
2.1Tile 2.4Adhesives
09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings
SD-03 Product Data Acoustical Ceiling Systems Certification
SD-04 Samples Ceiling Tiles
09 90 00 SD-02 Shop Drawings 3.11Piping identification 3.11stencil
SD-03 Product Data Certification
2.1Coating 2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.9Color 1.4.2Textured Wall Coating System 1.4.3Sample Textured Wall Coating
System Mock-Up SD-07 Certificates Applicator's qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 30 PAGES
09 90 00 Qualification Testing SD-08 Manufacturer’s Instructions Application instructions
3.7.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1Coatings:
09 96 00 SD-01 Preconstruction Submittals
1.3Material, Equipment and Fixture List
SD-03 Product Data Heat-Resistant Coatings
2.1Epoxy Coatings 2.2Polyurethane Coatings
Chlorinated-Rubber Coatings SD-04 Samples
1.3Color Chips SD-07 Certificates
2.1Epoxy Coatings 2.2Polyurethane Coatings
10 14 00.20 SD-02 Shop Drawings Detail Drawings
SD-03 Product Data 3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 30 PAGES
10 14 00.20 SD-04 Samples Interior Signage
SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.2Protection and Cleaning 10 21 13 SD-03 Product Data
2.1Cleaning and Maintenance Instructions
2.8Colors And Finishes 2.2.2Anchoring Devices and
Fasteners 2.2.4Hardware and Fittings 2.2.3Brackets 2.2.5Door Hardware 2.3.1Toilet Enclosures 2.3.2Urinal Screens 2.6Pilaster Shoes
SD-04 Samples 2.8Colors and Finishes 2.2.4Hardware and Fittings 2.2.2Anchoring Devices and
Fasteners SD-07 Certificates
1.5Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 30 PAGES
10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items
SD-04 Samples 2.1.2Finishes 2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
10 44 16 SD-02 Shop Drawings 2.1Fire Extinguishers
Accessories 2.4Cabinets 2.5Wall Brackets
SD-03 Product Data 2.1Fire Extinguishers
Accessories 2.5Wall Brackets
SD-04 Samples 2.1Fire Extinguisher 2.5Wall Brackets
Accessories SD-07 Certificates
2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag 12 21 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 30 PAGES
12 21 00 3.3Installation SD-03 Product Data
2.1Window Blinds 3.3Installation
Certification SD-04 Samples
2.1Window Blinds SD-06 Test Reports
2.1Window Blinds SD-08 Manufacturer’s Instructions
2.1Window Blinds SD-10 Operation and Maintenance Data
2.1Window Blinds 12 36 00 SD-02 Shop Drawings
2.3Fabrication 3.1Installation Drawings
SD-03 Product Data In situ polishedGranite material components
Tile SD-04 Samples
2.3Countertop 2.3Backsplash, Bronce Counter top joints
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 30 PAGES
12 36 00 Manufacturer's Standard Color Charts
2.2Filler Material SD-08 Manufacturer’s Instructions Manufacturer's Instructions
13 48 00 SD-03 Product Data 3.1Bracing 1.3Equipment Requirements
22 00 00 SD-02 Shop Drawings 3.6.1Plumbing System
SD-03 Product Data 2.4Fixtures 2.4.2Flush valve urinals 2.4.3Flush tank water closets
Wall hung lavatories 2.4.4Countertop lavatories
Kitchen sinks Service sinks Water heaters Shower Faucets
3.6.1Plumbing System SD-06 Test Reports
3.6Tests, Flushing and Disinfection SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 30 PAGES
22 00 00 SD-10 Operation and Maintenance Data
3.6.1Plumbing System 23 00 00 SD-02 Shop Drawings
1.4.5Detail Drawings SD-03 Product Data Air Vents, Penthouses, and Goosenecks
Ceiling Exhaust Fans Air Handling Units
2.10.1Room Fan-Coil Units Test Procedures Diagrams
SD-06 Test Reports 3.8Performance Tests
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions 3.9.2Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.9.1Operation and Maintenance Manuals
23 07 00 SD-03 Product Data Pipe Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 30 PAGES
23 07 00 SD-08 Manufacturer’s Instructions Pipe Insulation Systems
23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System
SD-03 Product Data 2.3Refrigerant Piping System 3.5Refrigerant Piping Tests 3.4Demonstrations 3.1Verification of Dimensions
SD-06 Test Reports 3.5Refrigerant Piping Tests
SD-10 Operation and Maintenance Data
1.5Maintenance 3.4Operation and Maintenance
Manuals 23 81 00.00 20 SD-02 Shop Drawings
2.5.2Field-assembled refrigerant piping
1.4.2Control system wiring diagrams SD-03 Product Data
2.2Air conditioners 2.5Refrigerant piping and accessories 2.3Coatings for finned tube coils
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 30 PAGES
23 81 00.00 20 3.8.3Start-up and initial operational tests
SD-08 Manufacturer’s Instructions 2.1Room air conditioners 2.2Air conditioners 2.5Refrigerant piping and accessories SD-10 Operation and Maintenance Data
2.1Room air conditioners 2.2Air conditioners
SD-11 Closeout Submittals 1.4.4Posted operating instructions
26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture
Lists SD-03 Product Data
2.1.1Conduits and Raceways 2.1.3Wire and Cable 3.2.1.9Splices and Connectors 2.1.4Switches 2.1.5Receptacles 2.1.6Outlets, Outlet Boxes, and Pull
Boxes 2.1.8Circuit Breakers 2.1.7Panelboards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 30 PAGES
26 05 00.00 40 2.1.9Lamps and Lighting Fixtures 2.1.12Dry-Type Distribution
Transformers SD-06 Test Reports
3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test
SD-07 Certificates 1.4Certification
SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions
26 05 19.00 10 SD-03 Product Data 3.1Installation Instructions
SD-06 Test Reports 3.2Tests, Inspections, and
Verifications 26 05 71.00 40 SD-02 Shop Drawings
3.1Protective Devices SD-03 Product Data
2.2Enclosures 2.3Circuit Breakers 3.1Control Devices 2.7Indicating Instruments
SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 30 PAGES
26 05 71.00 40 SD-08 Manufacturer’s Instructions 3.1Protective Devices
SD-10 Operation and Maintenance Data
2.3Circuit Breakers 26 08 00 SD-06 Test Reports
3.1Acceptance tests and inspections 1.4.3Acceptance test and inspections procedure 26 09 23.00 40 SD-03 Product Data
2.1.1Photoconductive Control Devices 3.1Installation Drawings 2.1.1Light-Sensitive Control Devices
Lighting Contactor 2.2.2Photocell Switch 2.2.3Occupancy Sensors 1.3Motion Sensors
SD-06 Test Reports 3.2System Operation Tests
26 20 00 SD-02 Shop Drawings 2.14Panelboards 2.17Transformers 2.4Busway 2.5Cable trays 2.24Wireways 3.1.10.1Marking strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 30 PAGES
26 20 00 SD-03 Product Data 2.13Receptacles 2.14.3Circuit breakers 2.11Switches 2.17Transformers 2.15Enclosed circuit breakers
CATV outlets 2.20.3Grounding Busbar 2.25Surge protective devices
SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test
SD-09 Manufacturer’s Field Reports
2.27.1Transformer factory tests 26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings 2.1.1Outline Drawings
SD-03 Product Data 1.3Panelboards 2.1.1Panelboards
SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 30 PAGES
26 24 16.00 40 SD-07 Certificates 1.4Statements
SD-08 Manufacturer’s Instructions 1.3Panelboards 2.1.1Panelboards
26 28 01.00 10 SD-03 Product Data 2.10Fault Current Analysis 2.10Protective Device Coordination
Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation
SD-06 Test Reports 3.3Field Testing
SD-07 Certificates 1.6Devices and Equipment
26 41 00.00 40 SD-02 Shop Drawings 1.4.1Overall lightning protection system 1.4.1Each major component
SD-03 Product Data 2.2.1Air Terminals 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 30 PAGES
26 41 00.00 40 2.5Lightning Protection Components 2.1Hardware 2.1Accessories
SD-06 Test Reports 3.6.1Grounding system test 3.6.2Lightning protection system inspection SD-07 Certificates UL listing or label or Equivalent
3.6.3Certificates 26 51 00 SD-03 Product Data
LED lighting fixtures LED lamps
2.7Lighting contactor 2.8Photocell switch 2.10LED Exit signs
LED Emergency lighting equipment
2.12Occupancy sensors SD-06 Test Reports
3.2Operating test 31 00 00 SD-01 Preconstruction Submittals
3.5 GShoring
SD-03 Product Data
3.9Utilization of Excavated Materials SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 30 PAGES
31 00 00 3.17Testing 2.1Borrow Site Testing
SD-07 Certificates 3.17Testing
31 11 00 SD-03 Product Data 3.6.1Nonsaleable Materials
31 23 00.00 20 SD-06 Test Reports 1.6Borrow Site Testing 3.11.2.1Fill and backfill 3.11.2.2Select material 3.11.2.3Porous fill 3.11.2.4Density tests 3.11.2.5Moisture Content Tests
31 60 00 SD-03 Product Data 3.2.1.1Tools
32 16 13 SD-03 Product Data 2.1Concrete
SD-06 Test Reports 3.8Field Quality Control
32 92 23 SD-03 Product Data 2.3Fertilizer
SD-06 Test Reports Topsoil composition tests
SD-07 Certificates 2.1sods
33 11 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 30 PAGES
33 11 00 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line
Corporation stops 2.1.2.2Valve boxes 2.2.2.2Valve boxes
SD-06 Test Reports 2.2.2.4Disinfection
SD-07 Certificates 2.1Water distribution main 2.2Water service line
Displacement Type Meters Compound Type Meters
SD-08 Manufacturer’s Instructions 1.3Delivery, storage, and handling
Installation 33 30 00 SD-01 Preconstruction Submittals
Existing Conditions SD-02 Shop Drawings
1.4.1Drawings 2.3.1Precast concrete manhole 2.3.3.1Frames, covers, and gratings
SD-03 Product Data 2.1Pipeline materials
SD-06 Test Reports 2.4Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 30 PAGES
33 30 00 SD-07 Certificates Gaskets
33 40 00 SD-03 Product Data 3.3Placing Pipe
SD-04 Samples 2.1Pipe for Culverts and Storm
Drains SD-07 Certificates
2.1.1Resin Certification 3.7Pipeline Testing 3.6.5Determination of Density 2.3.5Frame and Cover for Gratings
33 71 02 SD-03 Product Data Low voltage cable Low voltage cable terminations Sealing Material
2.11.2Manhole frames and covers 2.11.3Handhole frames and covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR