Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 30 PAGES

LODGING FOR CEFOP CAUCASIA

01 11 00 SD-01 Preconstruction Submittals Submittal Register Performance Policy (Poliza de Cumplimiento):

Payment Policy (Poliza de Pagos de Salarios y Prestaciones Sociales:

Liability Policy (Poliza de Responsabilidad Civil Contractual)

Stability Policy (Poliza de Estabilidad)

Elements Quality Policy (Poliza de Calidad de Elementos)

Correct Equipment Functioning Policy (Poliza de Correcto funcionamiento de los Equipos)

Project Schedule Temporary Facilities Personnel List Field Personnel Qualifications Health and Safety Plan Quality Control (QC) Plan List of Proposed Subcontractors List of Proposed Products

01 32 16.00 20 SD-01 Preconstruction Submittals 1.3Construction schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 30 PAGES

01 32 16.00 20 Submittal Register 01 33 00 SD-01 Preconstruction Submittals

1.7Submittal Register 01 50 00 SD-01 Preconstruction Submittals

1.3Construction site plan 01 78 00 SD-03 Product Data

As-Built Record of Equipment and Materials

1.6.1Warranty Management Plan 1.6.4Warranty Tags

Spare Parts Data SD-08 Manufacturer’s Instructions

1.5Preventative Maintenance 1.5Condition Monitoring (Predictive

Testing) 1.5Inspection 1.6.1Instructions

SD-10 Operation and Maintenance Data

1.7Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.4.1Record Drawings

03 11 13.00 10 SD-02 Shop Drawings

3.1.1 GFormwork

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 30 PAGES

03 11 13.00 10 1.2Design 2.1Form Materials 2.1.6Form Releasing Agents

SD-04 Samples

1.4 GSample Panels

SD-06 Test Reports 3.5Inspection

3.4.1 GFormwork Not Supporting Weight

of Concrete SD-07 Certificates Fiber Voids

03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement

SD-03 Product Data 1.3.1Welding

Material SD-04 Samples Reinforcement Bars

SD-06 Test Reports Material Tests, Inspections, and Verifications

SD-07 Certificates 2.3Reinforcing Steel

03 30 00 SD-02 Shop Drawings 1.6.2.1Fabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 30 PAGES

03 30 00 1.6.2.2Formwork 1.6.2.2Formwork 1.6.2.1Special Construction 1.6.2.3Reinforcing steel

SD-03 Product Data 2.4.7Materials for curing concrete 2.4.9Joint sealants 2.4.8Joint filler 2.4.1Cement 2.4.1.1Portland Cement 2.3.2Ready-Mix Concrete 2.4.6Vapor barrier 2.6Bonding Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 1.6.2.1Reinforcement Materials 2.4.10Epoxy bonding compound 2.4.9.3Waterstops 3.13.2Waterstops 2.1.1Wood Forms 2.4.11Biodegradable Form Release

Agent SD-04 Samples

1.6.5.1Slab finish sample 2.4.9.3Dumbbell Type 2.4.9.3Rubber

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 30 PAGES

03 30 00 2.4.9.3Polyvinylchloride (PVC) SD-05 Design Data

2.3.1mix design 1.6.1.1Calculations

SD-06 Test Reports 1.6.4.1Concrete mix design 1.6.4.2Aggregates

Tolerance report 3.11.2.3Compressive strength tests 2.7.4Slump 2.7.1Air Entrainment

SD-07 Certificates 1.6.3.1Curing concrete elements 1.6.3.3Finishing plan 1.6.3.6Material Safety Data Sheets 2.5.5Steel Bar

04 20 00 SD-02 Shop Drawings 1.4.4Detail Drawings

SD-03 Product Data 2.4.2Cement 2.5Water-Repellant Admixture

SD-04 Samples 2.2Concrete Masonry Units (CMU) 2.7Anchors, Ties, and Bar

Positioners 2.10Expansion-Joint Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 30 PAGES

04 20 00 2.8Joint Reinforcement 1.4.2Portable Panel

SD-05 Design Data 2.4.3Pre-mixed Mortar 1.2.1.1Unit Strength Method

SD-06 Test Reports 3.15.1Field Testing of Mortar 3.15.2Field Testing of Grout 3.15.3Prism tests 1.4.3Masonry Inspector Qualifications 3.15.4Single-Wythe Masonry Wall

Water Penetration Test SD-07 Certificates

2.2Concrete Masonry Units (CMU) 2.4.1Admixtures for Masonry Mortar

05 05 23 SD-03 Product Data 1.5Welding Procedure Qualifications 1.5.5Welder, Welding Operator, and

Tacker Qualification 1.5.6Inspector Qualification 1.5.2Previous Qualifications 1.5.3Pre-qualified Procedures

SD-06 Test Reports 3.2Quality Control 3.3.1Nondestructive Examination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 30 PAGES

05 05 23 1.5.1Certified Welding Procedure Specifications (WPS)

1.5.1Certified Procedure Qualification Records (PQR)

1.5.1Certified Welder Performance Qualifications (WPQ)

05 12 00 SD-02 Shop Drawings 1.5.2.1Erection Plan 1.5.1Fabrication drawings

SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.2.5Load indicator washers

SD-06 Test Reports 2.4Class B coating 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 1.5.2.2Welding procedures and qualifications 05 50 13 SD-02 Shop Drawings

2.7structural steel door frames 2.3Access doors and panels 2.4Cover plates and frames

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 30 PAGES

05 50 13 2.3Access doors and panels 2.4Cover plates and frames

Control-joint covers 2.7Structural steel door frames

05 50 14 SD-02 Shop Drawings 1.3.2Detail Drawings

SD-03 Product Data 2.2.2.1Welding of Structural Steel 2.3.4Structural Steel Welding Repairs

Materials Orders 2.1.1Materials List

Shipping Bill SD-06 Test Reports

2.3Tests, Inspections, and Verifications

SD-07 Certificates 1.3.1Qualification of Welders and

Welding Operators 07 41 63 SD-01 Preconstruction Submittals

1.5.1Qualification of Manufacturer 1.5.3Qualification of Manufacturer 1.5.1Qualification of Installer

SD-02 Shop Drawings 1.5.1Roofing Panels 1.5.1Flashing and Accessories 1.5.1Gutter/Downspout Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 30 PAGES

07 41 63 SD-03 Product Data 1.5.1Factory Color Finish 1.5.1Sub-girts and Formed Shapes 1.5.1Closure Materials 1.5.1Insulation 1.5.1Pressure Sensitive Tape 1.5.1Sealants and Caulking 1.5.1Galvanizing Repair Paint 1.5.1Aluminized Steel Repair Paint 1.5.1Accessories

SD-04 Samples 1.5.1Roofing Panels 2.2.2Fasteners 2.4.1Metal Closure Strips 1.5.1Insulation 1.5.1Manufacturer s color charts and chips SD-05 Design Data

1.5.1Wind design analysis SD-07 Certificates

2.2.2Fasteners 1.5.1Enamel Repair Paint

SD-08 Manufacturer’s Instructions 1.5.1Installation of Roof panel assemblies SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 30 PAGES

07 41 63 1.8Warranty 1.5.1Instructions 1.5.1Material Safety Data Sheets

07 60 00 SD-02 Shop Drawings 3.1.7Gutters 3.1.8Downspouts 3.1.11Flashing at roof penetrations 3.1.9Eave flashing

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings 2.1Doors 2.1Doors 2.4Frames 2.4Frames 2.3Accessories 2.5Weatherstripping

SD-03 Product Data 2.1Doors 2.4Frames 2.3Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 30 PAGES

08 11 16 SD-04 Samples 1.5.1.1Finish sample

SD-08 Manufacturer’s Instructions 2.1Doors and frames

08 51 13 SD-03 Product Data 2.2Windows 2.3.8.1Hardware 2.3.3Fasteners 1.9Window Performance 2.5Mullions 2.3.10Screens 2.3.2Weatherstripping 2.3.8Accessories 2.3.4Adhesives

SD-04 Samples 1.3.1.1Finish Sample 1.3.1.2Window Sample

SD-10 Operation and Maintenance Data

2.2Windows 08 71 00 SD-03 Product Data

2.1Hardware Items SD-08 Manufacturer’s Instructions

3.1Installation SD-11 Closeout Submittals

1.3.1Key Bitting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 30 PAGES

08 81 00 SD-01 Preconstruction Submittals Installation

SD-02 Shop Drawings Glass

1.3Glazing Accessories SD-03 Product Data

2.3.2Glazing Compound 2.3.4Tape 2.3.3.1Sealant

SD-05 Design Data 2.3Setting and Sealing Materials 3.2Glass Setting

08 87 23.13 SD-03 Product Data 2.2Fragment Retention Film 3.3Cleaning

09 06 90 SD-04 Samples 2.2Color Schedule

09 24 23 SD-02 Shop Drawings 3.2Lath

SD-03 Product Data 3.4Proportions and Mixing

SD-04 Samples 2.2Colored Stucco Finish Coat 1.3Sample Panel

09 26 00 SD-03 Product Data 2.1.4Gypsum base

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 30 PAGES

09 26 00 2.1.5Gypsum veneer plaster 09 30 10 SD-02 Shop Drawings

3.2Detail Drawings SD-03 Product Data Local/Regional Materials

2.1Tile 2.1Tile 2.2Setting-Bed 2.4Mortar, Grout, and Adhesive 2.2.6Reinforcing Wire Fabric

SD-04 Samples 2.1Tile 2.1Accessories 2.1.2Accessories 2.1Transition Strips 2.5Transition Strips 2.4Grout

SD-07 Certificates 2.1Tile 2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions

SD-10 Operation and Maintenance Data

3.2Installation SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 30 PAGES

09 30 10 Local/Regional Materials LEED Documentation

2.1Tile 2.4Adhesives

09 51 00 SD-02 Shop Drawings 1.2Approved Detail Drawings

SD-03 Product Data Acoustical Ceiling Systems Certification

SD-04 Samples Ceiling Tiles

09 90 00 SD-02 Shop Drawings 3.11Piping identification 3.11stencil

SD-03 Product Data Certification

2.1Coating 2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9Color 1.4.2Textured Wall Coating System 1.4.3Sample Textured Wall Coating

System Mock-Up SD-07 Certificates Applicator's qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 30 PAGES

09 90 00 Qualification Testing SD-08 Manufacturer’s Instructions Application instructions

3.7.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1Coatings:

09 96 00 SD-01 Preconstruction Submittals

1.3Material, Equipment and Fixture List

SD-03 Product Data Heat-Resistant Coatings

2.1Epoxy Coatings 2.2Polyurethane Coatings

Chlorinated-Rubber Coatings SD-04 Samples

1.3Color Chips SD-07 Certificates

2.1Epoxy Coatings 2.2Polyurethane Coatings

10 14 00.20 SD-02 Shop Drawings Detail Drawings

SD-03 Product Data 3.1Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 30 PAGES

10 14 00.20 SD-04 Samples Interior Signage

SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 21 13 SD-03 Product Data

2.1Cleaning and Maintenance Instructions

2.8Colors And Finishes 2.2.2Anchoring Devices and

Fasteners 2.2.4Hardware and Fittings 2.2.3Brackets 2.2.5Door Hardware 2.3.1Toilet Enclosures 2.3.2Urinal Screens 2.6Pilaster Shoes

SD-04 Samples 2.8Colors and Finishes 2.2.4Hardware and Fittings 2.2.2Anchoring Devices and

Fasteners SD-07 Certificates

1.5Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 30 PAGES

10 28 13 SD-03 Product Data 2.1.2Finishes 2.2Accessory Items

SD-04 Samples 2.1.2Finishes 2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

10 44 16 SD-02 Shop Drawings 2.1Fire Extinguishers

Accessories 2.4Cabinets 2.5Wall Brackets

SD-03 Product Data 2.1Fire Extinguishers

Accessories 2.5Wall Brackets

SD-04 Samples 2.1Fire Extinguisher 2.5Wall Brackets

Accessories SD-07 Certificates

2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 12 21 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 30 PAGES

12 21 00 3.3Installation SD-03 Product Data

2.1Window Blinds 3.3Installation

Certification SD-04 Samples

2.1Window Blinds SD-06 Test Reports

2.1Window Blinds SD-08 Manufacturer’s Instructions

2.1Window Blinds SD-10 Operation and Maintenance Data

2.1Window Blinds 12 36 00 SD-02 Shop Drawings

2.3Fabrication 3.1Installation Drawings

SD-03 Product Data In situ polishedGranite material components

Tile SD-04 Samples

2.3Countertop 2.3Backsplash, Bronce Counter top joints

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 30 PAGES

12 36 00 Manufacturer's Standard Color Charts

2.2Filler Material SD-08 Manufacturer’s Instructions Manufacturer's Instructions

13 48 00 SD-03 Product Data 3.1Bracing 1.3Equipment Requirements

22 00 00 SD-02 Shop Drawings 3.6.1Plumbing System

SD-03 Product Data 2.4Fixtures 2.4.2Flush valve urinals 2.4.3Flush tank water closets

Wall hung lavatories 2.4.4Countertop lavatories

Kitchen sinks Service sinks Water heaters Shower Faucets

3.6.1Plumbing System SD-06 Test Reports

3.6Tests, Flushing and Disinfection SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 30 PAGES

22 00 00 SD-10 Operation and Maintenance Data

3.6.1Plumbing System 23 00 00 SD-02 Shop Drawings

1.4.5Detail Drawings SD-03 Product Data Air Vents, Penthouses, and Goosenecks

Ceiling Exhaust Fans Air Handling Units

2.10.1Room Fan-Coil Units Test Procedures Diagrams

SD-06 Test Reports 3.8Performance Tests

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.9.2Operation and Maintenance

Training SD-10 Operation and Maintenance Data

3.9.1Operation and Maintenance Manuals

23 07 00 SD-03 Product Data Pipe Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 30 PAGES

23 07 00 SD-08 Manufacturer’s Instructions Pipe Insulation Systems

23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System

SD-03 Product Data 2.3Refrigerant Piping System 3.5Refrigerant Piping Tests 3.4Demonstrations 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-10 Operation and Maintenance Data

1.5Maintenance 3.4Operation and Maintenance

Manuals 23 81 00.00 20 SD-02 Shop Drawings

2.5.2Field-assembled refrigerant piping

1.4.2Control system wiring diagrams SD-03 Product Data

2.2Air conditioners 2.5Refrigerant piping and accessories 2.3Coatings for finned tube coils

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 30 PAGES

23 81 00.00 20 3.8.3Start-up and initial operational tests

SD-08 Manufacturer’s Instructions 2.1Room air conditioners 2.2Air conditioners 2.5Refrigerant piping and accessories SD-10 Operation and Maintenance Data

2.1Room air conditioners 2.2Air conditioners

SD-11 Closeout Submittals 1.4.4Posted operating instructions

26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture

Lists SD-03 Product Data

2.1.1Conduits and Raceways 2.1.3Wire and Cable 3.2.1.9Splices and Connectors 2.1.4Switches 2.1.5Receptacles 2.1.6Outlets, Outlet Boxes, and Pull

Boxes 2.1.8Circuit Breakers 2.1.7Panelboards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 30 PAGES

26 05 00.00 40 2.1.9Lamps and Lighting Fixtures 2.1.12Dry-Type Distribution

Transformers SD-06 Test Reports

3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test

SD-07 Certificates 1.4Certification

SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions

26 05 19.00 10 SD-03 Product Data 3.1Installation Instructions

SD-06 Test Reports 3.2Tests, Inspections, and

Verifications 26 05 71.00 40 SD-02 Shop Drawings

3.1Protective Devices SD-03 Product Data

2.2Enclosures 2.3Circuit Breakers 3.1Control Devices 2.7Indicating Instruments

SD-06 Test Reports 3.2Dielectric Tests 3.2Final Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 30 PAGES

26 05 71.00 40 SD-08 Manufacturer’s Instructions 3.1Protective Devices

SD-10 Operation and Maintenance Data

2.3Circuit Breakers 26 08 00 SD-06 Test Reports

3.1Acceptance tests and inspections 1.4.3Acceptance test and inspections procedure 26 09 23.00 40 SD-03 Product Data

2.1.1Photoconductive Control Devices 3.1Installation Drawings 2.1.1Light-Sensitive Control Devices

Lighting Contactor 2.2.2Photocell Switch 2.2.3Occupancy Sensors 1.3Motion Sensors

SD-06 Test Reports 3.2System Operation Tests

26 20 00 SD-02 Shop Drawings 2.14Panelboards 2.17Transformers 2.4Busway 2.5Cable trays 2.24Wireways 3.1.10.1Marking strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 30 PAGES

26 20 00 SD-03 Product Data 2.13Receptacles 2.14.3Circuit breakers 2.11Switches 2.17Transformers 2.15Enclosed circuit breakers

CATV outlets 2.20.3Grounding Busbar 2.25Surge protective devices

SD-06 Test Reports 3.5.2600-volt wiring test 3.5.5Grounding system test 3.5.3Transformer tests 3.5.4Ground-fault receptacle test

SD-09 Manufacturer’s Field Reports

2.27.1Transformer factory tests 26 24 16.00 40 SD-02 Shop Drawings

2.1.1Detail Drawings 2.1.1Outline Drawings

SD-03 Product Data 1.3Panelboards 2.1.1Panelboards

SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 30 PAGES

26 24 16.00 40 SD-07 Certificates 1.4Statements

SD-08 Manufacturer’s Instructions 1.3Panelboards 2.1.1Panelboards

26 28 01.00 10 SD-03 Product Data 2.10Fault Current Analysis 2.10Protective Device Coordination

Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation

SD-06 Test Reports 3.3Field Testing

SD-07 Certificates 1.6Devices and Equipment

26 41 00.00 40 SD-02 Shop Drawings 1.4.1Overall lightning protection system 1.4.1Each major component

SD-03 Product Data 2.2.1Air Terminals 2.3Main and Secondary Conductors 2.2.2Ground Rods 2.4Clamp-Type Connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 30 PAGES

26 41 00.00 40 2.5Lightning Protection Components 2.1Hardware 2.1Accessories

SD-06 Test Reports 3.6.1Grounding system test 3.6.2Lightning protection system inspection SD-07 Certificates UL listing or label or Equivalent

3.6.3Certificates 26 51 00 SD-03 Product Data

LED lighting fixtures LED lamps

2.7Lighting contactor 2.8Photocell switch 2.10LED Exit signs

LED Emergency lighting equipment

2.12Occupancy sensors SD-06 Test Reports

3.2Operating test 31 00 00 SD-01 Preconstruction Submittals

3.5 GShoring

SD-03 Product Data

3.9Utilization of Excavated Materials SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 30 PAGES

31 00 00 3.17Testing 2.1Borrow Site Testing

SD-07 Certificates 3.17Testing

31 11 00 SD-03 Product Data 3.6.1Nonsaleable Materials

31 23 00.00 20 SD-06 Test Reports 1.6Borrow Site Testing 3.11.2.1Fill and backfill 3.11.2.2Select material 3.11.2.3Porous fill 3.11.2.4Density tests 3.11.2.5Moisture Content Tests

31 60 00 SD-03 Product Data 3.2.1.1Tools

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports 3.8Field Quality Control

32 92 23 SD-03 Product Data 2.3Fertilizer

SD-06 Test Reports Topsoil composition tests

SD-07 Certificates 2.1sods

33 11 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 30 PAGES

33 11 00 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line

Corporation stops 2.1.2.2Valve boxes 2.2.2.2Valve boxes

SD-06 Test Reports 2.2.2.4Disinfection

SD-07 Certificates 2.1Water distribution main 2.2Water service line

Displacement Type Meters Compound Type Meters

SD-08 Manufacturer’s Instructions 1.3Delivery, storage, and handling

Installation 33 30 00 SD-01 Preconstruction Submittals

Existing Conditions SD-02 Shop Drawings

1.4.1Drawings 2.3.1Precast concrete manhole 2.3.3.1Frames, covers, and gratings

SD-03 Product Data 2.1Pipeline materials

SD-06 Test Reports 2.4Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 30 PAGES

33 30 00 SD-07 Certificates Gaskets

33 40 00 SD-03 Product Data 3.3Placing Pipe

SD-04 Samples 2.1Pipe for Culverts and Storm

Drains SD-07 Certificates

2.1.1Resin Certification 3.7Pipeline Testing 3.6.5Determination of Density 2.3.5Frame and Cover for Gratings

33 71 02 SD-03 Product Data Low voltage cable Low voltage cable terminations Sealing Material

2.11.2Manhole frames and covers 2.11.3Handhole frames and covers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR