J-1-2_Mat_Prod_Substitution_Form.doc
DOC document 24 KB Posted
- Attached to
- Pier in Candelilla de la Mar, Colombia
- Solicitation number
- SAQMMA17R0029
About this file
Attachment J-1-2
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL/PRODUCT SUBSTITUTION REQUEST
Date: __________________________
Project:_____________________________________________________________________________________
D/B –A/E ___________________________________________________________________________________
Contractor: __________________________________________________________________________________
After the construction NTP, this form shall be used to request consideration of materials for substitution of products specified as a minimum standard.
Specified Material/Product___________________________________________________________________________
Specification Division – Section________________________________________________________________
Specified Manufacturer/Origin ________________________________________________________________
Proposed Substitution ________________________________________________________________________
Proposed Manufacturer/Origin _________________________________________________________________
Proposed Supplier/Source_____________________________________________________________________
Attached hereto are the specification, data, performance documents and standard laboratory test results supporting the product substitution
The following criteria has been taken into consideration
The use of this material/product is applicable to this product in the prescribed location and will be warranted in the same manner as the specified product for a period of ___ years, when applied and used as per the manufacturers’ guidelines.
The substitution of this product will not affect the dimensions shown on the drawing in any way.
This product substitution will not affect the work of other trades working on this product
The advantages of incorporating the proposed substitution into this Project are as follows:_____________
Submitted By: ________________________________________of_______________________________________
This completed form is to be sent to INL COR with the required submittal.
See contract Section/Paragraph H.44.1.6 Substitutions.
File details come from the government source that posted it. Updated .