Solicitation_Questions.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Renovation of Instituto Contaricence sobre Droga Storage Warehouse located in La Uruca, Costa Rica
Solicitation number
SAQMMA16R0428
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
SF_30_(Signed).pdf PDF
Updated_Section_B-M_(A001).pdf PDF
Pre-Proposal_Conference.pptx PPTX presentation
DUNS_Number_Instructions.docx DOCX document
SAMS_Registation.docx DOCX document
J.2_and_J.3_Attachments.zip ZIP file
J.1_Adminstrative_Documents.zip ZIP file
Solicitation_SAQMMA16R0428.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Compliation

Q&A #Drawing/Spec.
ReferenceSubjectDescriptionResponses
1C 1.4Please confirm that the roof components that are going to be replaced include not only the thermal - acoustic roof deck, but also the roof beams. This because the current beams are clearly in bad shape, visibly corroded and with great spacing between each other.The required work is to perform a replacement of the existing roof with new thermal acoustic roof. Also at the last publication, we had included to perform paint maintenance of the metallic structure. But it is needed to clarify that it does not include a structural reinforcement of the structure. If this will be needed, it will be analyzed during construction process.
2C 1.4The awarded contractor will install a new roof structure over the existing metallic structure composed of steel frames. Please confirm that the contractor is required to perform a structural analysis of the existing structure, to ensure the structural integrity of the overall new structure, which may conclude that structural reinforcement is required. This in the understanding that the contractor will be responsible for the new structure. If structural reinforcement is required that may significantly increase the cost of the project (pending the analysis to estimate costing). Currently we are preparing the bid assuming no structural reinforcement would be required.The solicitation does not include a structural reinforcement of the existing building. It includes all the design and build of the new structure for the management area. During the soil survey and structural analysis of this area, we will have more information in order to define any type of reinforcement for the existing structure, therefore proposals should not include a reinforcement of the existing structure.
3C 1.7When contemplating the design and integration of the electrical system, we assume that the current electric installation of the area that isn´t going to be renovated is compliant with the current electric Costa Rican guidelines and regulations. In order integrate the new installation with the existing installation onto the new electric board, the existing installation for the area not going to be renovated has to be compliant in order to achieve an overall system compliance with the current electric Costa Rican guidelines and regulations. If the existing electrical installation of the area that isn´t going to be renovated isn´t compliant, the changes required in order to make it compliant would increase the cost of the project.We have to assume that actual installations accomplish with local electric regulations. The request is to perform a new electric system just for the area of renovation and continue providing with the electric service for the other area. If during the construction process, the local electric company requires the improvement of the existing installations of all the building, this is something that will be analyzed with the beneficiary and it is not part of the contract.
4Will all Window V01 be fixed glasses?Windows shall be according section C.3.9.2. “ The contractor shall include one sliding side for each window; other sides shall be fixed glass.”
5On page 49 of the Statement of Work, it specifies that the door ME300 is 3.00 m wide and 3.00 high, however the opening of this door as shown in the drawing A-2 is 1.50 m wide. Is this correct?The correct measure is 3.00 m according to C.3.9.4 and to drawing A-2, the blue print includes the representation of the door. You had measured the space between the wall and the door's edge which is not totally opened.
6The identification for the secondary storage areas does not match with the drawings. Please clarify.Yes there is a mistake. Section C.1.2 should state the following: In order to implement a secondary storage area, the contractor shall build a chain link mesh fence to separate areas 108, 109 and 110 according to drawing A-1. At the entrance of each area the contractor shall provide and install sliding doors, constructed with chain link mesh of the same characteristics of the fence and according to the specifications.
7The Improvement of the main access include the renovation of the façade, which includes paint to the translucent sheet located in the actual façade, is that right?No, in order to correct this, we are including the following instruction for section C.1.3 : "In addition, the existing façade has translucent panels that will be removed and replaced by waterproof gypsum panels (of 12mm in thickness and for both sides of the wall) in order to accomplish with the architectural design, for this purpose the contractor shall design and build the required supporting system with metallic sections."
8Is it included a renovation for the existing metallic structure?Please add the following paragraph to Section C.1.4: Before the new roof is installed the existing metallic structure of the building shall be painted with enamel in order to provide an appropriate maintenance of the facilities. The contractor shall cover with two layers of anti-rust paint and two layers of enamel. This paint work shall be done just for the area of renovation.
9A/E services overlap various line item costs. Please advise if A/E services can be quoted as a separate line item.No, pricing should match current CLN Structure. For example: A/E services for the nationalization of the project should be included with the preliminary work at CLN 001 according to C.1.1, and A/E services for the design of the Air conditioning should be included at CLN 008 ,according to C.1.8.
10Bonds and insurance charges overlap all line item costs. Please advise if bonds and insurance can be quoted as a separate line item.No, pricing should match current CLN Structure.
11Section C.1.6Provide location of public water serviceThe public water connection is located at the left corner of the main entrance
12Section C.1.6Alternatively advise whether bid price can be based on stubbing out the new water pipes at about 2 meters from building face.Since the contractor has to provide the designs for the water system the location of the new pipes will be according to those designs but the system shall follow the local regulations and the regulations of the American Water Works Association (AWWA), and the National Standard Plumbing Code (NSPC). Also pipes shall be hidden as possible, or located in places that do not intercept other services.
13Section C.1.6Provide location of public sewer system.The actual service is located in front of the existing building in the left corner.
14Section C.1.6Alternatively advise whether bid price can be based on stubbing out new sewer pipe at about 2 meters from building face.Since the contractor has to provide the designs for the sewage system the location of the new pipes will be according to those designs but the system shall follow the local regulations in order to obtain the respective construction authorizations.
15Section C.1.8Confirm location of intercom door station.The intercom door system shall include opening system for the new door WDE90 and for the existing door ERD1 controlled from the interior station located at the security office (114) and the exterior station shall be placed beside the existing door ERD1. The intercom system shall be new equipment from well-known brand from United States that can be easily obtained in Costa Rica for maintenance purposes. The contractor shall follow all the recommendations from the manufacturers. This intercom system shall be included at the improvement of the main access (C.1.3.) , this cost shall be included at CLN 003.
16Section C.2.3Verify applicability of following wording on page 16 “...contractor shall consider that INL will require at least 3 months in order to provide the equipment that INL is being committed to deliver....”For the IEDs warehouse at la Uruca project INL is not providing equipment, therefore this paragraph can be deleted.
17Section C.3.6Confirm that existing roof trusses and other roof members are to remain “as is” unpainted.The following paragraph had been added to C.1.4: "Before the new roof is installed the existing metallic structure of the building shall be painted with enamel in order to provide an appropriate maintenance of the facilities. The contractor shall cover with two layers of enamel. This paint work shall be done just for the area of renovation."
18Section C.3.13.2During the walk through it was indicated that the overhead lighting fixtures in the warehouse are to remain “as is” and only be reconnected to the new electrical system. Please confirm.Yes, that is right.
19Drawing A‐1Views F1‐F2 (interior views) Provide specs for metallic fascia boardMetallic boards for views F1 and F2 shall be the same boards as it is used for the main façade. This panels are aluminum
20Drawing A‐1Warehouse Frontal View (exterior) Clarify whether existing metal fascia is to remain or to be removed.Yes the existing fascia shall be removed.
21Drawing A‐1Warehouse Frontal View (exterior) Front left window is not labeled. Front right window is labeled EW1 on drawing A‐2. Verify if these front windows are to remain or be replaced with new ones.Yes, windows located in the frontal view (main access) have to be replaced with new windows.
22Drawing A‐1Warehouse Frontal View (exterior) Provide specs for new aluminum panels to be used to partially cover the existing concrete blocks.Please include the following specification: COATING FOR FACADES: In order to perform a renovation of the existing façade according to the architectural design, the contractor shall cover the walls with aluminum panels in the areas detailed in drawings. Aluminum panel shall be type “Panel de Aluminum Compuesto ACM” from “Advance” or other with similar features that can be found in Costa Rica. Panels shall have a total thickness of 4 mm, and shall be smooth. For manipulation and installation, the contractor shall follow all the recommendations from the manufacturer. The contractor shall prepare sketches for the distribution and placement of the aluminum panels with design details, types, colors, joints and structural supports for the approval of the COR.
23Drawing A‐1Area for Renovation (overall first floor plan) Verify if sliding door ME300 (space 100) is made of galvanized chain link material similar to sliding doors for spaces 109 and 110.No it is not galvanized chain link, it shall be galvanized steel sheet of 1.5mm in thickness.
24Drawing A‐1Area for Renovation (overall first floor plan) Indicate what part of the interior side of the “Frontal View” wall is to be plastered and painted.The existing walls of the frontal view that are part of the management area shall be plastered and painted. But also it is needed to clarify that the frontal view (exterior) shall be plastered and painted according to drawing A-1.
25Drawing A‐1Area for Renovation (overall first floor plan) Clarify if the “Pedestrian Area” requires any floor paint.It is not requested a floor paint in this area.
26Drawing A‐2Space 100 (main entrance) Verify status of existing entrance doors not shown on drawing.At drawing A-2, in space 100 we have included 3 doors: new door ME300, new door WDE90 and the existing door ERD1.
27Drawing A‐2Spaces 101‐105 (corridor and bathrooms) Clarify whether interior partitions are concrete block or metal framed/insulated drywall.Walls shall be constructed using concrete masonry units according to specification C.3.5
28Drawing A‐2Spaces 101‐105 (corridor and bathrooms) Confirm that ceiling is painted concrete structure.It has to be according finishing schedule detailed on drawing A-3, plastered and painted.
29Drawing A‐2Spaces 106‐107 (storage) Confirm that ceiling is painted concrete structure.It has to be according finishing schedule detailed on drawing A-3, plastered and painted.
30Drawing A‐2Spaces 111‐115 Verify if interior partitions are concrete block or metal framed/insulated drywall.Walls shall be constructed using concrete masonry units according to specification C.3.5
31Drawing A‐2Spaces 111‐115 Verify if insulation is required above suspended ceiling tiles and specify type if needed.No insulation is not required, consider that in this area we are renovating the roof with thermal-acoustic roof.
32Drawing A‐2Space 114 (security) Verify if counter is included in scope of work. In the affirmative confirm counter material.No, counter is not included
33Drawing A‐2Windows V01 Clarify whether these windows are fixed or partially sliding windows.Windows shall be according section C.3.9.2. “ The contractor shall include one sliding side for each window; other sides shall be fixed glass.”
34Drawing A‐2Stairs 116 Verify if stairs can be metal or must be concrete.All the main structure including stairs shall be concrete.
35Drawing A‐3Views F1 and F3 Consider that existing roof joists (not shown) are deeper toward the center of the roof.Remind that drawings are for a reference, the final design has to be provided by the contractor. The fascia for the management area is not located at the center of the existing structure, therefore the high is less than in the center.
36Drawing A‐3Views F1 and F3 Therefore verify if the top metallic fascia panels should stop at the bottom of the roof joists or extend along the sides of the roof joists and how high.The fascia shall stop at the new roof according to drawing A-3.
37Drawing A‐3Views F1 and F3 Provide specs for metallic fascia panels.Metallic boars for views F1 and F3 shall be the same boards as it is used for the main façade. This panels are aluminum

WWTF Pol-i-Charki Prison Questions and Answers SAQMMA-16-R-0150