Questions and Answers for SAQMMA16R0309
1. Is this a follow-on requirement? If so, could you please provide the incumbent contract number for this opportunity? If not, is this a new requirement?
A: No, this is a new requirement.
2. Please provide a site plan that identifies the location of the existing barriers, the guard booths which will house the slave controls, and the guard booth that will house the master controls.
A: See attachment
3. Please identify the size (width) of each barrier.
A: Two (2) 10’ at the main gate and one (1) 12’at VIP gate.
4. Please provide the approximate distance between each barrier and the associated hydraulic pumping units.
A: see attachment
5. Please provide the approximate distance between each barrier and the associated master and slave control panels.
A: see attachment.
6. Please confirm if the existing conduit infrastructure is to be reused for electrical, control, and hydraulic lines.
A: Yes, but to be verified during the site visit.
7. Please confirm if the new hydraulic pumping units will be located in the same location as the existing hydraulic pumping units.
A: Yes, in the general area.
8. Please confirm if the new hydraulic pumping units will be located inside of an existing building/structure.
A: HPU to be housed inside an approved steel box and located near the barrier.
9. Please confirm the power source (voltage, phase, and circuit amperage) for the existing hydraulic pumping units.
A: 220V, 50H 3 phase.