SAQMMA16R0035_dated_16_Jun_2016.pdf
PDF 188 KB Posted
- Solicitation number
- SAQMMA16R0035
About this file
SAQMMA16R0035 Request For Proposal (RFP) 16 Jun 2016
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30
1. REQUISITION NUMBER
5. SOLICITATION NUMBER
SAQMMA16R0035
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 6. SOLICITATION ISSUE
DATE
06/16/2016
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
Madhu B. LeFevre
b. TELEPHONE NUMBER (No collect calls)
c. EMAIL lefevremb@state.gov
8. OFFER DUE DATE / LOCAL
TIME
07/18/2016 17:00:00
CODE LMAQM
OFFICE OF ACQUISITION MANAGEMENT (A/LM/AQM)
1038 S PATRICK DRIVE
ATTN: INL AIRWING
PATRICK AFB, FL 32925
9. ISSUED BY X UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS: 336413
SIZE STANDARD:
10. THE ACQUISITION IS
SEE
SCHEDULE
11. DELIVERY FOR FOB DESTINATION
UNLESS BLOCK IS MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS
RATED ORDER UNDER DPAS
13b. RATING A1
RFQ IFB X RFP
14. METHOD OF SOLICITATION
INLALCODE15. DELIVER TO
DEPT. OF STATE LOGISTICS/MAINTENANCE/ADMIN.
DIV (INL/A/L)
1038 S. Patrick Drive
BLDG. 985
PATRICK AFB, FL 32925
CODE LMAQM16. ADMINISTERED BY
OFFICE OF ACQUISITION MANAGEMENT (A/LM/AQM)
1038 S PATRICK DRIVE
ATTN: INL AIRWING
PATRICK AFB, FL 32925
FACILITY
CODE
CODE
Contact Duns Telephone No.
17a. CONTRACTOR/OFFEROR RMGFOCODE18a. PAYMENT WILL BE MADE BY
GLOBAL FINANCIAL SERVICES CENTER, CHARLESTON,
SOUTH CAROLINA
PO BOX 150008; Fax To: 1-866-483-3436
ATTN: OFFICE OF CLAIMS
CHARLESTON, SC 29415-5008
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER SEE ADDENDUM
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/SERVICES
(Use Reverse and/or Attach Additional Sheets as Necessary)
21. QUANTITY 22. UNIT 23. UNIT PRICE 24. AMOUNT
See Line Items Section
25. ACCOUNTING AND APPROPRIATION DATA
See Line Item Detail
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
X 27a. SOLICITATION INCORPORATES BY REFERENCES FAR 52.212-1, 52.212-4, FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA X ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE
TERMS AND CONDITIONS SPECIFIED.
29. AWARD OF CONTRACT: REF. OFFER DATED . YOUR OFFER ON
SOLICITATION (BLOCK 5) INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT)
Patrick Murphy 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 02/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
SAQMMA16R0035
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
PARTIAL FINAL
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
COMPLETE PARTIAL FINAL
36. PAYMENT 37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 02/2012) BACK
Table of Contents
Section Description Page Number
2 Contract Clauses 52.212-4 Contract Terms and Conditions--Commercial Items (May 2015) 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders--Commercial Items (June 2016) 52.216-22 Indefinite Quantity (Oct 1995) 52.217-6 Option for Increased Quantity (Mar 1989) 52.217-9 Option to Extend the Term of the Contract (Mar 2000)
652.216-70 ORDERING INDEFINITE-DELIVERY CONTRACTS (APR 2004)
652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE
UNITED STATES (JUL 1988)
652.229-71 PERSONAL PROPERTY DISPOSITION AT POSTS ABROAD (AUG 1999)
652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)
652.242-71 NOTICE OF SHIPMENTS (JUL 1988)
652.242-72 SHIPPING INSTRUCTIONS (DEC 1994)
652.243-70 NOTICES (AUG 1999)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
652.232-72 LIMITATION OF FUNDS (AUG 1999)
52.245-1 Government Property (Apr 2012)
652.247-70 NOTICE OF SHIPMENTS (FEB 2015)
652.247-71 SHIPPING INSTRUCTIONS (FEB 2015)
3 Solicitation Provisions 52.215-1 Alt I Instructions to Offerors - Competitive Acquisition (Jan 2004) - Alternate I (Oct 1997) 56 52.216-1 Type of Contract (Apr 1984) 52.232-38 Submission of Electronic Funds Transfer Information With Offer (Jul 2013)
652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)
L-008 STANDARD COMMERCIAL WARRANTY
52.212-1 Instructions to Offerors--Commercial Items (Oct 2015)
4 Evaluation Factors 52.217-5 Evaluation of Options (July 1990)
M-006 PROPOSAL EVALUATION
52.212-2 Evaluation - Commercial Items (Oct 2014)
5 Representations and Certifications 52.212-3 Offeror Representations and Certifications--Commercial Items (Apr 2016)
652.225-70 ARAB LEAGUE BOYCOTT OF ISRAEL (AUG 1999)
001 Overhaul Engine T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;
disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine overhaul CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AB
Over and Above Materials 1.00 EA
This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016
Line Item No. Description Quantity Unit Unit Price Total Cost
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
002 Engine Conversion T53-L-13B to T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for Engine Conversion. Unit Price shall include shipping from Melbourne, FL to Offeror's facility by authorized carrier;
receiving inspection of the T53-L-13B; evaluation;
Honeywell Engine Fabrication Instructions (EFI);
disassembly; complete Clean; all inspection tasks; all NDI requirements; total reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables; all hardware used to include lock cups and seals; common spot repairs;
common helicoil repairs and replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed Governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and Oil Sampling;
Preserve and secure in shipping container; documentation;
Commercial Warranty and, shipment from Offeror's facility to Melbourne, FL by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic T53-L-13B to T53-L-703 conversion CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AB
Over and Above Materials 1.00 EA
This is Cost Reimbursable CLIN for any additional materials required outside the basic T53-L-13B to T53-L-703 conversion CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Cost includes but is not limited to: precision machining;
brazing; welding; plasma spray; air flow and adjustment;
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
003 Shipping Container Refurbishment 1.00 EA This is a FFP CLIN for refurbishing containers used for shipment of T53 engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
004 Engine Repair and Return to Service 1.00 EA This is a FFP CLIN for the inspection and repair of T53-L-703 engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier;
receiving inspection of the T53-L-703; evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine repair CLIN to complete and make ready to issue (RFI).
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AB
Over and Above Materials 1.00 EA
This is a Cost Reimbursable CLIN for additional materials required for any additional required outside the basic repair to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 but shall not exceed 60% of OEM published catalog prices.
Delivery Date
(Start to End) Date FOB:
08/15/2016 to 08/14/2017
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Included but not limited to: precision machining; brazing;
welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
005 Engine Transport 1.00 EA This is a FFP CLIN for one way engine shipping cost, per unit, by authorized carrier, either to the Offeror facility from Melbourne Florida or to Melbourne Florida from the Offeror facility.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
006 Demilitarization and Property Disposal 1.00 EA This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
AA
Over and Above Property Disposal 1.00 EA
Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
007 Engine Performance Run 1.00 EA This is a Firm Fixed Price (FFP) CLIN to perform a T53-L-703 Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 run cleaning; all consumables; any hardware used; engine test cell run(s) and evaluation; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
008 Contractor Travel 1.00 LT This is a Not-to-Exceed Cost Reimbursable CLIN for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2017
1001 Overhaul Engine T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;
disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine overhaul CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
AB
Over and Above Materials 1.00 EA
This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
1002 Engine Conversion T53-L-13B to T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for Engine Conversion. Unit Price shall include shipping from Melbourne, FL to Offeror's facility by authorized carrier;
receiving inspection of the T53-L-13B; evaluation;
Honeywell Engine Fabrication Instructions (EFI);
disassembly; complete Clean; all inspection tasks; all NDI requirements; total reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables; all hardware used to include lock cups and seals; common spot repairs;
common helicoil repairs and replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed Governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and Oil Sampling;
Preserve and secure in shipping container; documentation;
Commercial Warranty and, shipment from Offeror's facility to Melbourne, FL by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic T53-L-13B to T53-L-703 conversion CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016
08/15/2017 to 08/14/2018
AB
Over and Above Materials 1.00 EA
This is Cost Reimbursable CLIN for any additional materials required outside the basic T53-L-13B to T53-L-703 conversion CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Cost includes but is not limited to: precision machining;
brazing; welding; plasma spray; air flow and adjustment;
accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
1003 Shipping Container Refurbishment 1.00 EA This is a FFP CLIN for refurbishing containers used for shipment of T53 engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
1004 Over and Above Repair and Rework 1.00 EA This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Included but not limited to: precision machining; brazing;
welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016
08/15/2017 to 08/14/2018
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine repair CLIN to complete and make ready to issue (RFI).
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
AB
Over and Above Materials 1.00 EA
This is a Cost Reimbursable CLIN for additional materials required for any additional required outside the basic repair to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Included but not limited to: precision machining; brazing;
welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
1005 Engine Transport 1.00 EA This is a FFP CLIN for one way engine shipping cost, per unit, by authorized carrier, either to the Offeror facility from Melbourne Florida or to Melbourne Florida from the Offeror facility.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
1006 Demilitarization and Property Disposal 1.00 EA This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 salvage, and or scrap.
Delivery Date
(Start to End) Date FOB:
08/15/2017 to 08/14/2018
AA
Over and Above Property Disposal 1.00 EA
Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
1007 Engine Performance Run 1.00 EA This is a Firm Fixed Price (FFP) CLIN to perform a T53-L-703 Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables; any hardware used; engine test cell run(s) and evaluation; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
1008 Contractor Travel 1.00 LT This is a Not-to-Exceed Cost Reimbursable CLIN for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2017 to 08/14/2018
2001 Overhaul Engine T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;
disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per manhour for any additional work required outside the basic engine overhaul.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2016 to 08/14/2019
AB
Over and Above Materials 1.00 EA
This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
2002 Engine Conversion T53-L-13B to T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for Engine Conversion. Unit Price shall include shipping from Melbourne, FL to Offeror's facility by authorized carrier;
receiving inspection of the T53-L-13B; evaluation;
Honeywell Engine Fabrication Instructions (EFI);
disassembly; complete Clean; all inspection tasks; all NDI requirements; total reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables; all hardware used to
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 include lock cups and seals; common spot repairs;
common helicoil repairs and replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed Governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and Oil Sampling;
Preserve and secure in shipping container; documentation;
Commercial Warranty and, shipment from Offeror's facility to Melbourne, FL by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic T53-L-13B to T53-L-703 conversion CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AB
Over and Above Materials 1.00 EA
This is Cost Reimbursable CLIN for any additional materials required outside the basic T53-L-13B to T53-L-703 conversion CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Cost includes but is not limited to: precision machining;
brazing; welding; plasma spray; air flow and adjustment;
accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
2003 Shipping Container Refurbishment 1.00 EA This is a FFP CLIN for refurbishing containers used for shipment of T53 engines. Unit Price shall include
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
2004 Over and Above Repair and Rework 1.00 EA This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Included but not limited to: precision machining; brazing;
welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine repair CLIN to complete and make ready to issue (RFI).
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AB
Over and Above Materials 1.00 EA
This is a Cost Reimbursable CLIN for additional materials required for any additional required outside the basic repair to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Included but not limited to: precision machining; brazing;
welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
2005 Engine Transport 1.00 EA This is a FFP CLIN for one way engine shipping cost, per unit, by authorized carrier, either to the Offeror facility from Melbourne Florida or to Melbourne Florida from the Offeror facility.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
2006 Demilitarization and Property Disposal 1.00 EA This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
AA
Over and Above Property Disposal 1.00 EA
Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
2007 Engine Performance Run 1.00 EA This is a Firm Fixed Price (FFP) CLIN to perform a T53-L-703 Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables; any hardware used; engine test cell run(s) and evaluation; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
2008 Contractor Travel 1.00 LT This is a Not-to-Exceed Cost Reimbursable CLIN for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016
Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2018 to 08/14/2019
3001 Overhaul Engine T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;
disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per manhour for any additional work required outside the basic engine overhaul.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AB
Over and Above Materials 1.00 EA
This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
This cost includes but is not limited to: precision
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016 machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
3002 Engine Conversion T53-L-13B to T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for Engine Conversion. Unit Price shall include shipping from Melbourne, FL to Offeror's facility by authorized carrier;
receiving inspection of the T53-L-13B; evaluation;
Honeywell Engine Fabrication Instructions (EFI);
disassembly; complete Clean; all inspection tasks; all NDI requirements; total reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables; all hardware used to include lock cups and seals; common spot repairs;
common helicoil repairs and replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed Governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and Oil Sampling;
Preserve and secure in shipping container; documentation;
Commercial Warranty and, shipment from Offeror's facility to Melbourne, FL by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic T53-L-13B to T53-L-703 conversion CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AB
Over and Above Materials 1.00 EA
This is Cost Reimbursable CLIN for any additional materials required outside the basic T53-L-13B to T53-L-703 conversion CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Cost includes but is not limited to: precision machining;
brazing; welding; plasma spray; air flow and adjustment;
accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
3003 Shipping Container Refurbishment 1.00 EA This is a FFP CLIN for refurbishing containers used for shipment of T53 engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
3004 Over and Above Repair and Rework 1.00 EA This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Included but not limited to: precision machining; brazing;
welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine repair CLIN to complete and make ready to issue (RFI).
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AB
Over and Above Materials 1.00 EA
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016
This is a Cost Reimbursable CLIN for additional materials required for any additional required outside the basic repair to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
Included but not limited to: precision machining; brazing;
welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
3005 Engine Transport 1.00 EA This is a FFP CLIN for one way engine shipping cost, per unit, by authorized carrier, either to the Offeror facility from Melbourne Florida or to Melbourne Florida from the Offeror facility.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
3006 Demilitarization and Property Disposal 1.00 EA This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
AA
Over and Above Property Disposal 1.00 EA
Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016
3007 Engine Performance Run 1.00 EA This is a Firm Fixed Price (FFP) CLIN to perform a T53-L-703 Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables; any hardware used; engine test cell run(s) and evaluation; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
3008 Contractor Travel 1.00 LT This is a Not-to-Exceed Cost Reimbursable CLIN for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2019 to 08/14/2020
4001 Overhaul Engine T53-L-703 5.00 EA This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;
disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2020 to 08/14/2021
AA
Over and Above Labor 1.00 EA
This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per manhour for any additional work required outside the basic engine overhaul.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
SAQMMA16R0035
Line Item Summary
Solicitation Number:
SAQMMA16R0035
Contract Number: Title: Honeywell Engine Conversion and Overhaul
Date of Solicitation:
06/16/2016
08/15/2020 to 08/14/2021
AB
Over and Above Materials 1.00 EA
This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2020 to 08/14/2021
AC
Over and Above Repair and Rework 1.00 EA
This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.
This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).
Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.
Doc Ref No:
Delivery
Date (Start to End) Date FOB:
08/15/2020 to 08/14/2021
4002 Engine Conversion T53-L-13B to T53-L-703 5.00 EA This is a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .