SAQMMA16R0035_A003 _Address_Correction_L-001 _2.4.pdf

PDF 193 KB Posted

Attached to
Overhaul, Repair and Modification of T-53 Aircraft Engines
Solicitation number
SAQMMA16R0035
Issued by

About this file

SAQMMA16R0035 A003 Revised paragraph L-001 2.4

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

A1

2. AMENDMENT/MODIFICATION NO.

A003

3. EFFECTIVE DATE

08/08/2016

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT

(A/LM/AQM)

1038 S PATRICK DRIVE

ATTN: INL AIRWING

PATRICK AFB, FL 32925

Madhu B. LeFevre

NAME

TEL.

lefevremb@state.gov

EMAIL

6. ISSUED BY LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT (A/LM/AQM)

1038 S PATRICK DRIVE

ATTN: INL AIRWING

PATRICK AFB, FL 32925

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

SAQMMA16R0035

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

07/01/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.____X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to revise the address in L-001, sub-para 2.4. The RFP closing date and hour are not extended.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Patrick Murphy

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SAQMMA16R0035

Table of Contents

Section Description Page Number

2 Contract Clauses 52.212-4 Contract Terms and Conditions--Commercial Items (May 2015) 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders--Commercial Items (June 2016) 52.216-22 Indefinite Quantity (Oct 1995) 52.217-6 Option for Increased Quantity (Mar 1989) 52.217-9 Option to Extend the Term of the Contract (Mar 2000)

652.216-70 ORDERING INDEFINITE-DELIVERY CONTRACTS (APR 2004)

652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE

UNITED STATES (JUL 1988)

652.229-71 PERSONAL PROPERTY DISPOSITION AT POSTS ABROAD (AUG 1999)

652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

652.242-71 NOTICE OF SHIPMENTS (JUL 1988)

652.242-72 SHIPPING INSTRUCTIONS (DEC 1994)

652.243-70 NOTICES (AUG 1999)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)

652.232-72 LIMITATION OF FUNDS (AUG 1999)

52.245-1 Government Property (Apr 2012)

652.247-70 NOTICE OF SHIPMENTS (FEB 2015)

652.247-71 SHIPPING INSTRUCTIONS (FEB 2015)

3 Solicitation Provisions 52.215-1 Alt I Instructions to Offerors - Competitive Acquisition (Jan 2004) - Alternate I (Oct 1997) 57 52.216-1 Type of Contract (Apr 1984) 52.232-38 Submission of Electronic Funds Transfer Information With Offer (Jul 2013)

652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)

L-008 STANDARD COMMERCIAL WARRANTY

52.212-1 Instructions to Offerors--Commercial Items (Oct 2015)

4 Evaluation Factors 52.217-5 Evaluation of Options (July 1990)

M-006 PROPOSAL EVALUATION

52.212-2 Evaluation - Commercial Items (Oct 2014)

5 Representations and Certifications 52.212-3 Offeror Representations and Certifications--Commercial Items (Apr 2016)

652.225-70 ARAB LEAGUE BOYCOTT OF ISRAEL (AUG 1999)

001 Overhaul Engine T53-L-703 5.00 0.00

5.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine overhaul CLIN.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

Line Item No. Description Quantity Unit Unit Price Total Cost

Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

002 Engine Conversion T53-L-13B to T53-L-703 5.00 0.00

5.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Engine Conversion. Unit Price shall include shipping from Melbourne, FL to Offeror's facility by authorized carrier;

receiving inspection of the T53-L-13B; evaluation;

Honeywell Engine Fabrication Instructions (EFI);

disassembly; complete Clean; all inspection tasks; all NDI requirements; total reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables; all hardware used to include lock cups and seals; common spot repairs;

common helicoil repairs and replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed Governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and Oil Sampling;

Preserve and secure in shipping container; documentation;

Commercial Warranty and, shipment from Offeror's facility to Melbourne, FL by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic T53-L-13B to T53-L-703 conversion CLIN.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is Cost Reimbursable CLIN for any additional materials required outside the basic T53-L-13B to T53-L-703 conversion CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

Delivery Date

(Start to End) Date FOB:

08/15/2016 to 08/14/2017

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

Cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

003 Shipping Container Refurbishment 1.00 0.00

1.00 EA

This is a FFP CLIN for refurbishing containers used for shipment of T53 engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

004 Engine Repair and Return to Service 1.00 0.00

1.00 EA

This is a FFP CLIN for the inspection and repair of T53-L-703 engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier;

receiving inspection of the T53-L-703; evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016 basic engine repair CLIN to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for additional materials required for any additional required outside the basic repair to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

Included but not limited to: precision machining; brazing;

welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

005 Engine Transport 1.00 0.00

1.00 EA

This is a FFP CLIN for one way engine shipping cost, per unit, by authorized carrier, either to the Offeror facility from Melbourne Florida or to Melbourne Florida from the Offeror facility.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

006 Demilitarization and Property Disposal 1.00 0.00

1.00 EA

This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016 salvage, and or scrap.

Doc Ref No:

Delivery Date

(Start to End) Date FOB:

08/15/2016 to 08/14/2017

AA

Over and Above Property Disposal (TBD) 1.00 0.00

1.00 EA

Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

007 Engine Performance Run 1.00 0.00

1.00 EA

This is a Firm Fixed Price (FFP) CLIN to perform a T53-L-703 Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables; any hardware used; engine test cell run(s) and evaluation; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

008 Contractor Travel (TBD) 1.00 0.00

1.00 LT

This is a Not-to-Exceed Cost Reimbursable CLIN for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. Travel cost shall include Airfare, Per Diem and Lodging in accordance with GSA Travel Regulations. (TBD)

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2016 to 08/14/2017

1001 Overhaul Engine T53-L-703 5.00 0.00

5.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016 adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine overhaul CLIN.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

08/15/2017 to 08/14/2018

1002 Engine Conversion T53-L-13B to T53-L-703 5.00 0.00

5.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Engine Conversion. Unit Price shall include shipping from Melbourne, FL to Offeror's facility by authorized carrier;

receiving inspection of the T53-L-13B; evaluation;

Honeywell Engine Fabrication Instructions (EFI);

disassembly; complete Clean; all inspection tasks; all NDI requirements; total reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables; all hardware used to include lock cups and seals; common spot repairs;

common helicoil repairs and replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed Governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and Oil Sampling;

Preserve and secure in shipping container; documentation;

Commercial Warranty and, shipment from Offeror's facility to Melbourne, FL by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic T53-L-13B to T53-L-703 conversion CLIN.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is Cost Reimbursable CLIN for any additional materials required outside the basic T53-L-13B to T53-L-703 conversion CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

Cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

1003 Shipping Container Refurbishment 1.00 0.00

1.00 EA

This is a FFP CLIN for refurbishing containers used for shipment of T53 engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

1004 Engine Repair and Return to Service 1.00 0.00

1.00 EA

This is a FFP CLIN for the inspection and repair of T53-L-703 engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier;

receiving inspection of the T53-L-703; evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine repair CLIN to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AB

Over and Above Materials (TBD) 1.00 0.00

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

1.00 EA

This is a Cost Reimbursable CLIN for additional materials required for any additional required outside the basic repair to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

Included but not limited to: precision machining; brazing;

welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

1005 Engine Transport 1.00 0.00

1.00 EA

This is a FFP CLIN for one way engine shipping cost, per unit, by authorized carrier, either to the Offeror facility from Melbourne Florida or to Melbourne Florida from the Offeror facility.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

1006 Demilitarization and Property Disposal 1.00 0.00

1.00 EA

This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

AA

Over and Above Property Disposal (TBD) 1.00 0.00

1.00 EA

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

1007 Engine Performance Run 1.00 0.00

1.00 EA

This is a Firm Fixed Price (FFP) CLIN to perform a T53-L-703 Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables; any hardware used; engine test cell run(s) and evaluation; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

1008 Contractor Travel (TBD) 1.00 0.00

1.00 LT

This is a Not-to-Exceed Cost Reimbursable CLIN for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. Travel cost shall include Airfare, Per Diem and Lodging in accordance with GSA Travel Regulations. (TBD)

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2017 to 08/14/2018

2001 Overhaul Engine T53-L-703 5.00 0.00

5.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016 in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per manhour for any additional work required outside the basic engine overhaul.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AC

Over and Above Repair and Rework(TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

2002 Engine Conversion T53-L-13B to T53-L-703 5.00 0.00

5.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Engine Conversion. Unit Price shall include shipping from Melbourne, FL to Offeror's facility by authorized carrier;

receiving inspection of the T53-L-13B; evaluation;

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

Honeywell Engine Fabrication Instructions (EFI);

disassembly; complete Clean; all inspection tasks; all NDI requirements; total reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables; all hardware used to include lock cups and seals; common spot repairs;

common helicoil repairs and replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed Governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and Oil Sampling;

Preserve and secure in shipping container; documentation;

Commercial Warranty and, shipment from Offeror's facility to Melbourne, FL by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic T53-L-13B to T53-L-703 conversion CLIN.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AB

Over and Above Materials 1.00 0.00

1.00 EA

This is Cost Reimbursable CLIN for any additional materials required outside the basic T53-L-13B to T53-L-703 conversion CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AC

Over and Above Repair and Rework 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

Cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.

Doc Ref No:

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

(Start to End) Date FOB:

08/15/2018 to 08/14/2019

2003 Shipping Container Refurbishment 1.00 0.00

1.00 EA

This is a FFP CLIN for refurbishing containers used for shipment of T53 engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of inside and outside of the container; and reapplication of DoS markings.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

2004 Engine Repair and Return to Service 1.00 0.00

1.00 EA

This is a FFP CLIN for the inspection and repair of T53-L-703 engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier;

receiving inspection of the T53-L-703; evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine repair CLIN to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for additional materials required for any additional required outside the basic repair to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

(Start to End) Date FOB:

08/15/2018 to 08/14/2019

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

Included but not limited to: precision machining; brazing;

welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

2005 Engine Transport 1.00 0.00

1.00 EA

This is a FFP CLIN for one way engine shipping cost, per unit, by authorized carrier, either to the Offeror facility from Melbourne Florida or to Melbourne Florida from the Offeror facility.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

2006 Demilitarization and Property Disposal 1.00 0.00

1.00 EA

This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

AA

Over and Above Property Disposal (TBD) 1.00 0.00

1.00 EA

Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

2007 Engine Performance Run 1.00

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

1.00 EA

This is a Firm Fixed Price (FFP) CLIN to perform a T53-L-703 Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables; any hardware used; engine test cell run(s) and evaluation; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

2008 Contractor Travel (TBD) 1.00 0.00

1.00 LT

This is a Not-to-Exceed Cost Reimbursable CLIN for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. Travel cost shall include Airfare, Per Diem and Lodging in accordance with GSA Travel Regulations. (TBD)

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2018 to 08/14/2019

3001 Overhaul Engine T53-L-703 5.00 0.00

5.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for a Basic T53-L-703 Engine Overhaul. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation;

disassembly; complete cleaning; all inspection tasks; all NDI requirements; reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables for complete overhaul; all hardware used including lock cups and seals; common spot repairs; common helicoil repairs and or replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed governor overhaul; fuel nozzle replacement or overhaul and testing; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AA

Over and Above Labor 1.00 0.00

1.00 EA

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per manhour for any additional work required outside the basic engine overhaul.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for additional materials required outside the basic overhaul CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog price. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

This cost includes but is not limited to: precision machining; brazing; welding; plasma spray; air flow and adjustment; accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in-house and not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

3002 Engine Conversion T53-L-13B to T53-L-703 5.00 0.00

5.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Engine Conversion. Unit Price shall include shipping from Melbourne, FL to Offeror's facility by authorized carrier;

receiving inspection of the T53-L-13B; evaluation;

Honeywell Engine Fabrication Instructions (EFI);

disassembly; complete Clean; all inspection tasks; all NDI requirements; total reassembly; all testing and adjustments; all functional testing of installed accessories and assemblies; all consumables; all hardware used to include lock cups and seals; common spot repairs;

common helicoil repairs and replacement if required; strip, inspection, repairing, blending, treating, painting of all magnesium parts, housings; complete fuel control and overspeed Governor overhaul; fuel nozzle overhaul and testing; engine test cell run(s) and adjustments; post test

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016 run FOD check, filter replacement, and Oil Sampling;

Preserve and secure in shipping container; documentation;

Commercial Warranty and, shipment from Offeror's facility to Melbourne, FL by authorized carrier.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic T53-L-13B to T53-L-703 conversion CLIN.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AB

Over and Above Materials 1.00 0.00

1.00 EA

This is Cost Reimbursable CLIN for any additional materials required outside the basic T53-L-13B to T53-L-703 conversion CLIN. The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AC

Over and Above Repair and Rework 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

Cost includes but is not limited to: precision machining;

brazing; welding; plasma spray; air flow and adjustment;

accessary overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

3003 Shipping Container Refurbishment 1.00 0.00

1.00 EA

This is a FFP CLIN for refurbishing containers used for shipment of T53 engines. Unit Price shall include inspection; evaluation; complete cleaning; all inspections tasks; rust removal; repair; complete strip and paint of

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016 inside and outside of the container; and reapplication of DoS markings.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

3004 Engine Repair and Return to Service 1.00 0.00

1.00 EA

This is a FFP CLIN for the inspection and repair of T53-L-703 engines. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier;

receiving inspection of the T53-L-703; evaluation; complete cleaning; all functional testing of installed accessories and assemblies; all consumables; all hardware used including lock cups and seals; engine test cell run(s) and adjustments; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized carrier

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AA

Over and Above Labor 1.00 0.00

1.00 EA

This is a Firm-Fixed Priced (FFP) CLIN for Unit Labor Cost per man-hour for any additional work required outside the basic engine repair CLIN to complete and make ready to issue (RFI).

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AB

Over and Above Materials (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for additional materials required for any additional required outside the basic repair to complete and make ready to issue (RFI). The proposed unit cost for new materials shall include OEM costs and any related material handling costs but shall not exceed OEM published catalog prices. The cost for used approved, overhauled materials shall be cost plus fixed fee but shall not exceed 60% of OEM published catalog prices.

The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AC

Over and Above Repair and Rework (TBD) 1.00 0.00

1.00 EA

This is a Cost Reimbursable CLIN for all outside vendor repairs and rework not included in the fixed price CLIN.

Included but not limited to: precision machining; brazing;

welding; plasma spray; air flow and adjustment; accessary

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016 overhaul; proprietary specialty coatings; electron beam (EB) welding; Electrical Discharge Machining (EDMs).

Repairs and reworks performed in house not included in the fixed price CLIN will be reimbursed at the over and above labor rate and material will be provided under the Over and Above Materials CLIN. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

3005 Engine Transport 1.00 0.00

1.00 EA

This is a FFP CLIN for one way engine shipping cost, per unit, by authorized carrier, either to the Offeror facility from Melbourne Florida or to Melbourne Florida from the Offeror facility.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

3006 Demilitarization and Property Disposal 1.00 0.00

1.00 EA

This is a Firm Fixed Price (FFP) CLIN for Unit Labor Cost per man-hour for demilitarization and disposal of government provided materials that are deemed Beyond Economical to Repair (BER), at or near life limit, excess, salvage, and or scrap.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

AA

Over and Above Property Disposal (TBD) 1.00 0.00

1.00 EA

Cost reimbursable CLIN for outside vendor disposal of those government materials deemed extremely hazardous and beyond the capability of the Offeror's facility to dispose properly. The cost for this SubClin is to be determined (TBD) later.

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

3007 Engine Performance Run 1.00 0.00

1.00 EA

This is a Firm Fixed Price (FFP) CLIN to perform a T53-L-703 Engine test cell run evaluation. Unit Price shall include shipping from Melbourne Florida to Offeror's facility by authorized carrier; receiving inspection; evaluation; pre run cleaning; all consumables; any hardware used; engine test cell run(s) and evaluation; post test run FOD check, filter replacement, and oil sampling; preserve and secure engine in shipping container; documentation; and shipment from Offeror's facility to Melbourne Florida by authorized

SAQMMA16R0035

Line Item Summary

Solicitation Number:

SAQMMA16R0035

Contract Number: Title: Honeywell Engine Conversion and Overhaul

Date of Solicitation:

08/08/2016 carrier.

Doc Ref No:

Delivery Date

(Start to End) Date FOB:

08/15/2019 to 08/14/2020

3008 Contractor Travel (TBD) 1.00 0.00

1.00 LT

This is a Not-to-Exceed Cost Reimbursable CLIN for approved Offeror travel to perform engine evaluations and repairs at locations other than Offeror's facility. Contractor shall submit a proposal for each travel request to the Contracting Officer or the Contracting Officer's Representative (COR) for approval in advance. Travel cost shall include Airfare, Per Diem and Lodging in accordance with GSA Travel Regulations. (TBD)

Doc Ref No:

Delivery

Date (Start to End) Date FOB:

08/15/2019 to 08/14/2020

4001 Overhaul Engine T53-L-703 5.00 0.00

5…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .