About this file

This justification document describes an urgent requirement for hydraulic flushing equipment rental from January 4th, 2022 to September 5th, 2022 to support flushing of a Virginia class submarine's ship service system. The rental must include a 60 GPM flushing rig, 550 gallon oil reservoir, circulation heater, particulate counter, and hoses. Options may also be added to the contract to account for potential delays. The justification cites an urgent need to restore system cleanliness after metal shavings contaminated the system, noting that delays in flushing could negatively impact undocking schedules and missions by a minimum of four months. Accordingly, the flushing rental equipment must arrive by January 10th, 2022 to support set-up and training.

The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command to rent oil flush rig equipment. Responses are due by December 10th, 2021 and must include specification sheets for the offered equipment and fully detailed cost sheets for all contract line items to facilitate technical and price evaluations.

View the file

Other files for this federal contract opportunity

Other files attached to Oil Flush Rig Rental, newest first.
File Type Posted
N3904022R0011 P0001.pdf PDF
Q and A N3904022R0011.pdf PDF
Wage Determination.pdf PDF
Statement of Work.pdf PDF
N3904022R0011 Released.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAP

Limited Source Justification

Rev 09/30/2020

(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)

USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION

UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:Provide a description of the item or service required, to include its intended use, the name of the required source or brand name, and the required delivery date/period of performance.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.

Procurement of hydraulic flushing equipment from approximately 1/4/22-9/5/22 to support the full Ship's Service System flush on USS Field research has shown that ( carries, and has available all applicable equipment to meet the requirements of this effort during the requested POP. This includes a 60 GPM flushing rig, 550 Gal Oil reservoir, circulation heater, particulate counter and hoses. Request Options added to contract to account for unplanned delays.

Rev 09/30/2020

(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

OR:

Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).

3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.

Rev 09/30/2020

(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)

B. ___ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer. Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.

C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.

Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified:

2. Required delivery date/period of performance:

3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.

09/01/2021

09/05/2022

SS HYD System was found to be contaminated with metal shaving due to a failure on one of the power plant pumps. Contamination was pumped throughout the SS HYD System during normal system operation.

project is is required to flush the entire SS HYD system in order to restore system cleanliness.

Restoration of the SS HYD is critical to UD00 and flushing is currently driving projecting to drive undocking negative, full impact to flushing is still being determined but is a minimum of 4 months. Current planned schedule to start flushing 3/1, which would require the flushing rental equipment to be on yard NLT 1/10 to support set-up and training of personnel for flushing. Further delays of from 1/10 arrival of equipment will affect the flushing work stream, UD42 & UD00 on a day for day basis.

03/03/202301/04/2022

Rev 09/30/2020

(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)

4. If appropriate, include any additional pertinent information:

IV. CERTIFICATIONS/APPROVALS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

B. Contracting Officer Approval:

Signature Name (Printed) / Phone # Date

12/02/2021

SYLVANUS.MI

CHAEL.TEREN

CE.

Digitally signed by

SYLVANUS.MICHAEL.T

ERENCE.

Date: 2021.12.02 09:07:32 -05'00'

Michael Sylvanus 207-451-

ST PIERRE

JR.RENE.RON

ALD.

Digitally signed by ST

PIERRE

JR.RENE.RONALD.100

Date: 2021.12.06 08:46:38 -05'00'

Rene St. Pierre 207-438- 12/06/2021