San_Lorenzo_River_Channel_Improvement_Project_-_As-Built_Plans.pdf

PDF 38 MB Posted

Attached to
Pump Station 1 and Soquel Pump Station Design
Solicitation number
RFP No. PW-0268
Issued by
Santa Cruz County, San Francisco City, California

About this file

This document is a set of as-built plans for the San Lorenzo River Channel Improvement Project prepared for the City of Santa Cruz Department of Public Works. The plans comprise 83 sheets detailing the completed construction and design specifications for the project, including critical infrastructure components such as pipe diameter specifications and pump station details. The as-built documentation serves as the technical foundation and reference baseline for related future improvements, specifically the rehabilitation of Pump Station No. 1 and construction of the new Soquel Pump Station that are the subject of the current design services procurement. These plans establish the existing conditions and completed work against which subsequent design phases and construction activities will be coordinated and integrated. The document includes comprehensive sheet-by-sheet details spanning hydraulic systems, structural components, and site-specific configurations necessary for understanding the channel improvement work that has been executed to date.

The as-built plans function as a critical deliverable and reference document for the City's stormwater management infrastructure improvement initiatives. These technical drawings and specifications are maintained by the City of Santa Cruz and are incorporated by reference into the current design procurement to ensure that consulting teams responding to the Pump Station 1 and Soquel Pump Station design solicitation have access to accurate existing conditions documentation. The plans were developed as part of the broader San Lorenzo River Channel Improvement Project and establish the engineering baseline upon which the $1.8 million design services contract for pump station improvements will build. Firms selected for the design services contract must review and integrate these as-built plans into their hydraulic modeling, basis of design development, and 50%, 90%, and 100% design phase deliverables to ensure consistency and compatibility with completed infrastructure improvements and compliance with project objectives for flood protection during 5-year and 25-year storm events.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

kshurtleff Sticky Note Pipe Diameter kshurtleff

Pipe Diameter kshurtleff

Pump Details

002-SHEET 2
003-SHEET 3
004-SHEET 4
005-SHEET 5
006-SHEET 6
007-SHEET 7
008-SHEET 7
009-SHEET 8
010-SHEET 9
011-SHEET 9
012-SHEET 10
013-SHEET 11
014-SHEET 12
015-SHEET 13
016-SHEET 14
017-SHEET 15
018-SHEET 16
019-SHEET 17
020-SHEET 18
021-SHEET 19
022-SHEET 20
023-SHEET 21
024-SHEET 22
025-SHEET 23
026-SHEET 24
027-SHEET 25
028-SHEET 26
029-SHEET 29
030-SHEET 31
031-SHEET 32
032-SHEET 34
033-SHEET 35
034-SHEET 36
035-SHEET 37
036-SHEET 38
037-SHEET 39
038-SHEET 40
039-SHEET 41
040-SHEET 42
041-SHEET 43
042-SHEET 44
043-SHEET 45
044-SHEET 46
045-SHEET 47
046-SHEET 48
047-SHEET 49
048-SHEET 50
049-SHEET 51
050-SHEET 52
051-SHEET 53
052-SHEET 54
053-SHEET 55
054-SHEET 56
055-SHEET 57
056-SHEET 58
057-SHEET 58
058-SHEET 59
059-SHEET 60
060-SHEET 61
061-SHEET 62
062-SHEET 63
063-SHEET 63
064-SHEET 64
065-SHEET 65
066-SHEET 66
067-SHEET 67
068-SHEET 68
069-SHEET 69
070-SHEET 70
071-SHEET 71
072-SHEET 72
073-SHEET 73
074-SHEET 74
075-SHEET 75
076-SHEET 76
077-SHEET 77
078-SHEET 78
079-SHEET 79
080-SHEET 80
081-SHEET 81
082-SHEET 82
083-SHEET 83

File details come from the government source that posted it. Updated .