SampleTaskOrder2-Multiple Days.pdf
PDF 384 KB Posted
- Solicitation number
- 36C26122Q0247
About this file
This document outlines a multi-day task order for furniture, fixtures and equipment support services at the Veterans Affairs Palo Alto Medical Center. The task order spans from December 17th through 23rd and requires a crew of seven or more personnel per day. Services include patching walls, replacing carpet tiles, prepping for painting, removing excess items and signage, installing furniture and accessories, and overlapping work in several rooms and buildings. A second federal contract opportunity notice involves a one-year agreement for on-going FF&E support services including installations, moves, repairs, inventory management, electrical and IT support, carpentry, plumbing, painting, flooring installation, and warehousing at the VA Palo Alto facility starting on or near March 15th, 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Question-36C26122Q0247.docx | DOCX document | |
| SampleTaskOrder1 - Multiple Days.pdf | ||
| Sources Sought.docx | DOCX document | |
| Short Term Bridge Palo Alto FFE PWS.docx | DOCX document | |
| Evaluation Criteria - Draft.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Multiple IDs on Task Order Specialty Equipment Items for Open Stock
No Lift Gate Required Specialty Crew Items to Excess
Multi-Day TO
*Task Order # Start Date
*Start Interior Designer End Date
Start Time *Start Location
End Time *Crew Size
1 Interior Design Staff/POC: Start 8:00 End Select From Dropdown List
Break Select From Dropdown List- Select From Dropdown List
Line PO # QTY WASP Item # Finish Location Bldg/RM
1 PAD
Bldg
6/205-
2 PAD
Bldg
6/2nd flr wet labs
3 Edamame MPD Dumpster
4 PAD
Bldg
6/2nd flr corridor
PAD
Bldg
101/A3-
6 TC4836-5 PAD
Bldg
101/A3-
7 1 BFR36 Maple PAD
Bldg
101/A3-
12/21-12/23 Crew Size: 7+ (as many as possible)
W e d n e s d a y
T h u r s d a y
Bring supplies to sand. Bring 2-gallons of dover white, and 2 -gallons of 9029 Cool
Avocado
3x4 Whiteboard
Tues A3-219: KD existing (wall mount overheads, desk, (4) vertical files, (2) tall bookcases).
36" Round Table Tues A3-219: Patch holes and start taping for paint
8:00
BPA2021121440787
PAD
Task DescriptionDescription
WASP Pick List and Specific Task Description
Friday 12/17: Bring stuff to patch
Tuesday 12/21: Bring supplies to patch, and to sand.
Bring 5-gallons of Dover White paint
Bring (30) carpet tiles, and corresponding adhesive and supplies
Bring 5-gallons of Macademia paint, and corresponding supplies patch walls. Replace carpet tiles. Prep for painting.
Pull items for excess
Excess items.
Remove overhead signage in corridor
"Fiscal". Patch holes
Tues-Thurs B6-205,206, 207: Ongoing carpet and paint
12/23/202112 / 17 / 2021
Insert New Line
8 2 490412GC
Green &
Arctic
PAD
Bldg
101/A3-
640-
A19025 1 Maple
10 1
X8BCMSETBE
TB
silver/whit e
11 1 NTSGG Gray/gray
12 1 RCC18304AF Milk
13 1Q0612 RPM2427AFS Milk PAD
B6/2nd
Flr Wet
Labs
14 PAD
B4/RM B-
129B
15 2 RLF18364F Milk
1 Interior Design Staff/POC: Start Select From Dropdown ListEnd Select From Dropdown List
Break Select From Dropdown List- Select From Dropdown List
Line PO # QTY Item # Finish Location Bldg/RM
W e d n e s d a y
T h u r s d a y
Thurs A3-219: Install furniturePAD
Bldg
101/A3-
Humanscale dual monitor arm
Humanscale small Neat Tech
Move chairs, vinyl, casters, arms Wed A3-219: Paint walls
Amendments
18x30x52 Combo Cabinet
29x58 Ology Desk store KD'd items - will excess another week.
bring 2x4 just in case Thurs B-129B: Remove: (5) chairs and table.
4H, 18x36 Lateral file Thurs B-129B: install lateral files
Task Description
Mobile BBF Ped 24"D - reserved for
Select From Dropdown List
Description
ANES 3
A3-219
GSF:154
NSF:143
TH
IN
K
C O
M
BO
C
AB
IN
ET
3H x 4W
W H
ITEBO
AR
D
36" TABLE
AutoCAD SHX Text
29/58/UP
AutoCAD SHX Text
MOVE
AutoCAD SHX Text
MOVE
AutoCAD SHX Text
BBF2
VHAPALLindaS Text Box 12/21-12/23: Knockdown removal of all furniture, approx. (8) carpet tiles replaced, patching of all holes, painting (3) of the walls, and installing new furniture per the above plan.
Overlapping with Rooms 205-207 and 229.
STO
OFFICE
B229MECH
B226STOR
B218
OLL
FFICE
5 JANITOR
B217
PRIVATE
OFFICE
B207
PRIVATE
OFFICE
B206
OFFICE
B205
WOMEN'S
TOILET
A204
GSF:16
GSF:303
GSF:489
GSF:227
GSF:195
GSF:41
GSF:56
GSF:114
GSF:82
GSF:147
G
NSF:5
NSF:276
NSF:471
NSF:220
NSF:176
NSF:36
NSF:42
NSF:98
NSF:59
NSF:135
N
Friday 12/17-12/22:
Knockdown removal of all furniture, patch all holes, replace approx. (20) carpet tiles, paint all (3) rooms (two coats).
Overlapping with Room A3-219
Friday 12/23: knockdown removal of furniture, and patching all holes.
Overlapping with Room A3-219
| BPA2021121440787_B6 205-207 |
| F2109-5160_OFFICE A3-219_Revised |
| Sheets and Views |
| Model |
PAD-B6-FL2
File details come from the government source that posted it. Updated .