This is a draft Statement of Work for preventative maintenance and emergency services on STEREOTACTIC SYSTEMS: OTORHINOLARYNGOLOGY (Steris equipment) located at the Department of Veterans Affairs Northern California Health Care System.
The contractor must provide comprehensive maintenance services including preventive maintenance with all required parts, labor, and travel at no additional cost to the government; unscheduled service and maintenance at no additional or discounted cost; modifications for safety or reliability at no additional or discounted cost; and equipment verification services. Preventive maintenance shall be performed per manufacturer recommendations and OEM technical specifications, with all measurement and calibration data provided to certify system performance. Emergency maintenance response must occur within 24 hours with a 95% uptime guarantee, covering phone, remote, and on-site support during normal hours (Monday-Friday, 8:00 a.m. to 6:00 p.m., excluding federal holidays). All parts supplied must be OEM parts (new or rebuilt), excluding consumable items requiring replacement more frequently than monthly and parts damaged by acts of God, abuse, misuse, or neglect. The contractor must provide OEM-trained Field Service Engineers with minimum two years of experience and documented formal training certifications; the government reserves the right to reject any contractor personnel. All work must comply with NFPA-99, The Joint Commission, NEC, OSHA, HIPAA, and federal/VA security specifications. Detailed Engineering Service Reports documenting all work, parts replaced, costs, and downtime must be submitted for acceptance and authorization signatures. The contractor accepts equipment in "as-is" condition and must notify the government within 24 hours of discovering defects outside contract scope.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126Q1023.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT SCOPE OF WORK
SUPPLIES OR SERVICES
The following Steris equipment located at NCHCS.
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1. SERVICES: The C&A requirements do not apply, and that a Security Accreditation Package is not required.
Contractor shall furnish the following:
· Preventative Maintenance including PM required parts, system verification, alignment, and adjustments are provided by the Contractor at no additional customer cost
· Parts, Labor, and Travel necessary for PM are provided by the Contractor at no additional customer cost or at discounted cost.
· Unscheduled Service and maintenance parts, labor, and travel are provided at no additional or at discounted cost
· Modifications for Safety or Reliability modifications including equipment, parts, hardware, and safety is provided by the Contractor at no additional customer cost or at discounted cost
· Equipment Verification will be provided by the Contractor at no additional customer cost.
2. DEFINITIONS/ACRONYMS:
A. Biomedical Engineering - Supervisor or COR designee
B. CO - Contracting Officer.
C. COR - Contracting Officer's Technical Representative.
D. PM - Preventive Maintenance Inspection. Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or operative conditions. Service shall consist of calibration and testing in accordance with the manufacturer’s latest established service procedures to ensure operation of equipment within manufacturer’s or VA’s performance specifications, whichever is the most rigorous. PM includes cleaning, inspecting lubricating and testing all equipment. All equipment shall be operated at least one complete operating cycle at the end of each PM.
E. FSE - Field Service Engineer. A person who is authorized by the contractor to perform maintenance (corrective and/or preventive) services on the VA Outpatient Clinic premises.
F. ESR - Vendor Engineering Service Report. A documentation of the services rendered for each incidence of work performance under the terms and conditions of the contract.
G. Acceptance Signature - VAOPC employee who indicates FSE demonstrated service conclusion/status and user has accepted work as complete/pending as stated in ESR.
H. Authorization Signature - COR's signature; indicates COR accepts work status as stated in ESR.
I. NFPA - National Fire Protection Association.
J. CDRH - Center for Devices and Radiological Health.
K. VAOPC - Department of Veterans Affairs Outpatient Clinic.
L. OEM - Original Equipment Manufacturer
M. TJC – The Joint Commission
3. CONFORMANCE STANDARDS:
Contractor shall provide services and material to ensure that the equipment functions in conformance with the latest requirements of NFPA-99, TJC, NEC, OSHA, HIPAA, Federal and VA security specifications and requirements as applicable. The equipment shall be maintained such that it meets or exceeds the performance specifications as established in the OEM’s technical specifications. Additional performance specifications that exceed the OEM specifications shall be specified in writing by the VA.
4. PREVENTIVE MAINTENANCE (PM):
A. Contractor shall perform Preventive Maintenance inspections on the one STEREOTACTIC SYSTEMS: OTORHINOLARYNGOLOGY device as per contract and manufacturer recommendations.
B. The contractor shall furnish documentation, including all measurement and calibration data to certify that the system is performing in accordance with the performance specifications.
C. All required parts shall be furnished, with the exception of expendable, consumable parts. Consumable and expendable parts are defined as items that require replacement on a greater than one-month frequency. Any exceptions shall be noted by the contractor in writing prior to the initiation of the contract. Please see Section 7, PARTS for more information about parts.
D. Contractor shall be OEM trained and provide proof of OEM training upon award.
5. EMERGENCY MAINTENANCE:
A. All required parts shall be furnished, with the exception of expendable, consumable parts. Consumable and expendable parts are defined as items that require replacement on a greater than one-month frequency. Any exceptions shall be noted by the contractor in writing prior to the initiation of the contract. Please see Section 7, PARTS for more information about parts.
B. All subsequent decisions on classification of parts are at the discretion of the Biomedical Engineer. The CO, COR or designated alternate has the authority to approve/request a service call from the contractor.
C. On-site or remote response within 24 hours.
D. Labor and travel are covered.
E. Uptime guarantee is 95%.
F. Phone, remote, and on-site support are covered.
G. Updates that increase safety, performance level, or reliability are included. Does not include enhancements to the operating systems or additional functionality.
H. Contractor shall be OEM trained and provide proof of OEM training upon award.
6. HOURS OF COVERAGE:
Normal hours of coverage for the STEREOTACTIC SYSTEMS: OTORHINOLARYNGOLOGY are (Monday through Friday) from 8:00am to 6:00pm, excluding federal holidays. Work performed outside the normal hours of coverage at the request of COR will be billed at the government rate. A separate purchase order will be issued to cover the cost(s) associated with any call back service as described herein.
7. PARTS:
· The contractor shall furnish and replace all parts except exclusions identified at the end of this section at no cost or at discounted cost.
· general spare parts are covered.
· The contractor will deliver parts for the STEREOTACTIC SYSTEMS: OTORHINOLARYNGOLOGY located at the VA Sacramento Mather Campus
· The contractor shall have ready access to unique and/or high mortality replacement parts.
· All parts supplied shall be OEM parts.
· The contractor shall use new or rebuilt parts. Used parts, those removed from another system, shall not be installed without approval by the COR. The contractor is required to install VA supplied parts when said parts are determined to be fully compatible. The determination of compatibility is at the discretion of the COR.
· Parts replacement excludes: Parts defective due to "acts of God", abuse, misuse, neglect, thermal and shock.
8. SERVICE MANUALS:
The VAOPC shall not provide service manuals or service diagnostic software to the contractor for use in providing services under this contract. The contractor shall obtain, have on file, and make available to its FSE's all operational and technical documentation, (such as: operational and service manuals, schematics, and parts list), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request.
9. DOCUMENTATION/REPORTS:
The documentation will include equipment down time and detailed descriptions of the scheduled and unscheduled maintenance procedures performed, including replaced parts and prices (for outside normal working hour services) required to maintain the equipment in accordance with conformance standards. Such documentation shall meet the guidelines as set forth in the Conformance Standards. In addition, each ESR must at a minimum document the following data legibly and in complete detail:
A. Name of Contractor B. Name of FSE who performed services.
C. Contractor Service ESR Number/Log Number.
D. Date, Time (starting and ending), Hours-On-Site for service call.
E. VA Purchase Order Number(s) (if any) covering the call, if outside normal working hours.
F. Description of Problem Reported by COR/User.
G. Identification of Equipment to be serviced to include the following: Equipment ID # or MX/EE# from the bar-code, Manufacturer's Name, Device Name, Model#, Serial #, and any other Manufacturer's identification numbers.
H. Itemized Description of Service(s) Performed (including Costs associated with after normal working hour services), including: Labor and Travel, Parts (with part numbers) and Materials and Circuit Location of problem/corrective action.
I. Total Cost to be billed.
J. Signatures from the following:
1. FSE performing services described.
2. VA Employee who witnessed service described.
K. Equipment downtime calculated in accordance with Conformance Standards.
NOTE: ANY ADDITIONAL CHARGES CLAIMED MUST BE APPROVED BY THE COR BEFORE SERVICE IS COMPLETED!
10. REPORTING REQUIREMENTS:
The contractor shall report to Biomedical Engineering to "check-in" upon arrival and prior to performance of work under this contract. This check-in is mandatory and can be accomplished in person or by phone contact. When the service(s) is/are completed, the FSE shall document the services rendered on a legible ESR(s). The FSE shall be required to check out with the Biomedical Engineering Department (location to be specified at time of contract award) and submit the ESR(s) to the COR. All ESRs shall be submitted to the equipment user for an "acceptance signature" and to the COR for an "authorization signature." If the COR is unavailable, a signed accepted copy of the ESR will be sent to the COR within 5 business days of work completion.
FAILURE TO COMPLY, EITHER IN WHOLE OR IN PART, WITH EITHER THE NOTIFICATION OR ESR REQUIREMENTS WILL BE DEEMED SIGNIFICANT NON-COMPLIANCE WITH THE CONTRACT AND MAY BE JUSTIFICATION FOR TERMINATION OF THE CONTRACT.
11. ADDITIONAL CHARGES:
There will be no additional charge for time spent at the site during, or after the normal hours of coverage awaiting the arrival of additional FSE and/or delivery of parts.
12. REPORTING REQUIRED SERVICES BEYOND THE CONTRACT SCOPE:
The Contractor shall immediately, but no later than 24 consecutive hours after discovery, notify the CO and COR, (in writing), of the existence or the development of any defects in, or repairs required to the scheduled equipment which the Contractor considers he/she is not responsible for under the terms of the contract. The contractor shall furnish the CO and COR with a written estimate of the cost to make necessary repairs.
13. CONDITION OF EQUIPMENT:
The contractor accepts responsibility for the equipment described in Section B, in "as is" condition. Failure to inspect the equipment prior to contract award will not relieve the contractor from performance of the requirements of this contract.
14. COMPETENCY OF PERSONNEL SERVICING EQUIPMENT:
A. Each respondent must have an established business, with an office and full-time staff. The staff includes a "fully qualified," OEM-trained FSE and a "fully qualified," OEM-trained FSE who will serve as the backup.
B. "Fully Qualified" is based upon training and on experience in the field. For training, the FSE(s) shall have successfully completed a formalized training program, for the equipment identified in Section B. For field experience, the FSE(s) shall have a minimum of two years of experience, with respect to scheduled and unscheduled preventive and remedial maintenance on equipment identified in Section B.
C. The FSE(s) shall be authorized by the contractor to perform the maintenance services as required. All work shall be performed by "Fully Qualified" competent FSEs. The contractor shall provide written assurance of the competency of their personnel and a list of credentials of approved FSEs for each make and model the contractor services at the VAOPC. The CO may authenticate the training requirements, request copies of training certificates or credentials from the contractor at any time for any personnel who are servicing or installing any VAOPC equipment. The CO and/or the COR specifically reserve the right to reject any of the contractor's personnel and refuse them permission to work on the VAOPC equipment.
15. TEST EQUIPMENT:
Prior to commencement of work on this contract, the contractor shall make available if requested a copy of the current calibration certification of all test equipment that is to be used by the contractor in performing work under the contract. This certification shall also be provided on a periodic basis when requested by the VAOPC. Test equipment calibration shall be traceable to a national standard.