Engineering Design Services for Well 22 Rehabilitation
Solicitation number
25-058-RFP
Issued by
Yolo County, California

About this file

Exhibit 10-H is a California Department of Transportation (Caltrans) document containing three sample cost proposal templates for consultants bidding on state and local government contracts. The templates cover three primary contract pricing models: Cost-Plus-Fixed Fee or Lump Sum or Firm Fixed Price Contracts (Sample Cost Proposal 1), Specific Rate of Compensation for On-Call or As-Needed Contracts (Sample Cost Proposal 2), and Cost Per Unit of Work Contracts (Sample Cost Proposal 3). These templates are designed for design, engineering, environmental studies, construction engineering, inspection, and geotechnical and material testing services, providing standardized frameworks for consultants to develop cost proposals that comply with federal and state regulatory requirements.

The templates require detailed documentation of direct labor costs, including employee classifications, hourly rates, and anticipated salary increases, as well as comprehensive accounting of indirect costs such as fringe benefits, overhead, and general administrative expenses. Consultants must provide a fixed fee calculation and itemize other direct costs, including subconsultant expenses, equipment, mileage, and supplies. Each template includes a certification section where an executive-level financial officer must verify that all proposed costs are actual, reasonable, allowable, and allocable to the contract, in compliance with Generally Accepted Accounting Principles (GAAP), federal cost principles, and specific federal and state regulations. The templates explicitly prohibit mark-ups and require consistent cost application across all contracts.

View the file

Other files

File Type Posted
Engineering_Design_Services_for_Well_22_Rehabilitation_(Addendum_#3_Revision).pdf PDF
Well_22_Publishing_Reciept.pdf PDF
Well_22_Publishing_Reciept.pdf PDF
Engineering_Design_Services_for_Well_22_Rehabilitation.pdf PDF
Contract_for_Services_(West_Sacramento)_-_Federal_Boilerplate_04.16.25.docx DOCX document
Contract_for_Services_(West_Sacramento)_-_Federal_Boilerplate_04.16.25.docx DOCX document
Federal_Award_Requirements_Appendix_II_to_Part_200_Contract_Provision_Language.docx DOCX document
Federal_Award_Requirements_Appendix_II_to_Part_200_Contract_Provision_Language.docx DOCX document
Insurance_Checklist_2023.pdf PDF
Insurance_Checklist_2023.pdf PDF
Sample_Exhibit_10-H_(Sample-Cost-Proposal-1_thru_3).pdf PDF
Davis_Bacon_Wage_Rates_6.13.2025.txt TXT text file
Davis_Bacon_Wage_Rates_6.13.2025.txt TXT text file
Well_22_Condition_Assessment_(6.10.25).docx DOCX document
Well_22_Condition_Assessment_(6.10.25).docx DOCX document
Appendix_A_22102_West_Sacramento_Drought_Relief_Well_Assessment_Final_TM_20220513.pdf PDF
Appendix_A_22102_West_Sacramento_Drought_Relief_Well_Assessment_Final_TM_20220513.pdf PDF
R25AP00237-00_Executed.pdf PDF
R25AP00237-00_Executed.pdf PDF
Revised_Budget_(11.8.24).xlsx XLSX spreadsheet
Revised_SOW_(11.8.24).docx DOCX document
Revised_Budget_(11.8.24).xlsx XLSX spreadsheet
Revised_SOW_(11.8.24).docx DOCX document
doi-general-award-terms-and-conditions-version-4-october-1-2024.pdf PDF
doi-general-award-terms-and-conditions-version-4-october-1-2024.pdf PDF
R25AP00237_NEPA_Request_Form_(2.11.25).docx DOCX document
R25AP00237_NEPA_Request_Form_(2.11.25).docx DOCX document
Contract_for_Services_(West_Sacramento)_-_Federal_LAPM_Boilerplate_03.06.24.docx DOCX document
Contract_for_Services_(West_Sacramento)_-_Federal_LAPM_Boilerplate_03.06.24.docx DOCX document
Contract_for_Services_(West_Sacramento)_-_Boilerplate_for_RFP_11.4.24.docx DOCX document
Contract_for_Services_(West_Sacramento)_-_Boilerplate_for_RFP_11.4.24.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 10-H

Sample Cost Proposal Templates

Sample Cost Proposal 1: Cost-Plus-Fixed Fee or Lump Sum or Firm Fixed Price Contracts Sample Cost Proposal 2: Specific Rate of Compensation (Use for On-Call or As-Needed Contracts)

Sample Cost Proposal 3 : Cost Per Unit of Work Contracts

I

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 1

COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS

(DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES)

Note: Mark-ups are Not Allowed ☐ Prime Consultant ☐ Subconsultant ☐ 2nd Tier Subconsultant

Consultant __________________________________________________________

Project No. _______________________ Contract No. ____________________ Date ____________________

DIRECT LABOR

Classification/Title Name Hours Actual Hourly Rate Total

LABOR COSTS

a) Subtotal Direct Labor Costs _______________

b) Anticipated Salary Increases (see page 2 for calculation) _______________

c) TOTAL DIRECT LABOR COSTS [(a) + (b)] _______________

INDIRECT COSTS

d) Fringe Benefits (Rate: _____ ) e) Total Fringe Benefits [(c) x (d)] _______________

f) Overhead (Rate: _____ ) g) Overhead [(c) x (f)] _______________

h) General and Administrative (Rate: ___ __ ) i) Gen & Admin [(c) x (h)] _______________

j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] _______________

FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee ______ ] ______________

Description of Item Quantity Unit Unit Cost Total

l) TOTAL OTHER DIRECT COSTS

m) SUBCONSULTANTS’ COSTS (Add additi

l) CONSULTANT’S OTHER DIRECT COSTS (ODC) – ITEMIZE (Add additional pages if necessary) onal pages if necessary) Subconsultant 1:

Subconsultant 2:

Subconsultant 3:

Subconsultant 4:

m) TOTAL SUBCONSULTANTS’ COSTS

n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(l)+(m)] ___________________

TOTAL COST [(c) + (j) + (k) + (n)] _____________________

NOTES:

1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.

2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans.

3. Anticipated salary increases calculation (page 2) must accompany.

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 1

COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS

(CALCULATIONS FOR ANTICIPATED SALARY INCREASES)

1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours)

Direct Labor Total Hours per Avg 5Year Subtotal per Cost Cost Proposal Hourly Contract

Proposal Rate Duration

=$250,000.00 500 $50.00 Year 1 Avg Hourly Rate

2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation%)

Avg Hourly Rate Proposed Escalation

Year 1 $50.00 + 2% = $51.00 Year 2 Avg Hourly Rate Year 2 $51.00 + 2% = $52.02 Year 3 Avg Hourly Rate Year 3 $52.02 + 2% = $53.06 Year 4 Avg Hourly Rate Year 4 $53.06 + 2% = $54.12 Year 5 Avg Hourly Rate

3. Calculate estimated hours per year (Multiply estimate% each year by total hours)

Estimated % Completed Total Hours per Cost Total Hours per Each Year Proposal Year

Year 1 20.0% 5000 = 1000 Estimated Hours Year 1 Year 2 400% 5000 = 2000 Estimated Hours Year 2 Year 3 15.0% 5000 = 750 Estimated Hours Year 3 Year 4 15.0% 5000 = 750 Estimated Hours Year 4 Years 100% 5000 = 500 Estimated Hours Year 5

Total 100% Total = 5000

4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours)

Avg Hourly Rate Estimated hours Cost per (calculated above) (calculated above) Year

Year 1 $50.00 1000 $50,000.00 Estimated Hours Year 1 = Year 2 $51.00 2000 $102,000.00 Estimated Hours Year 2 = Year 3 $52.02 750 $39,015.00 Estimated Hours Year 3 = Year 4 $53.06 750 $39,795.30 Estimated Hours Year 4 = Years $54.12 500 = $27,060.80 Estimated Hours Year 5

Total Direct Labor Cost with Escalation $257,871.10= Direct Labor Subtotal before Escalation = $250,000.00

Estimated total of Direct Labor Salary Transfer to Page 1 = Increase $7,871.10

NOTES:

1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the# of years of the contract, and a breakdown of the labor to be performed each year.

2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the# of years is not acceptable.

(i e. $250,000 x 2% x 5 yrs= $25,000 is not an acceptable methodology)

3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted.

4. Calculations for anticipated salary escalation must be provided.

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 1

Certification of Direct Costs:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal{s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:

1. Generally Accepted Accounting Principles {GAAP)

2. Terms and conditions of the contract

3. Title 23 United States Code Section 112 - Letting of Contracts

4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures

5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and

Administration of Engineering and Design Related Service

6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board {when applicable)

All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.

Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate{s).

Prime Consultant or Subconsultant Certifying:

Name:_______________ Title*:

Signature:_ _ _ _ __ _ __ __ Date of Certification {mm/dd/yyyy): _____

_______ Phone Number:Email: ______ _ _

Address:_________________________________

*An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

List services the consultant is providinq under the proposed contract:

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 2

SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS)

(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)

Note: Mark-ups are Not Allowed

Consultant __________________ D Prime Consultant D Subconsultant D 2nd Tier Subconsultant

Project No. _________ _ Contract No.

Contract Amount $ - --- Date

For Combined Rate Fringe Benefit% + General &Administrative% = Combined ICR%

OR

For Home Office Rate

Fringe Benefit% + General &Administrative% = Home Office ICR%

For Field Office Rate Frinqe Benefit% + General &Administrative% = Field Office ICR%

= Fee %

BILLING INFORMATION CALCULATION INFORMATION

Name/Job Title/Classification1 Hourly Billing Rates2

Straight3 OT(1.5x) OT(2x) Effective Date of Hourly Rate

From To Actual or Avg.

Hourly Rate4

% or$ Increase

Hourly Range-for Classifications Only

John Doe- Project Manager* Civil Engineer II

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

Not Applicable

Sue Jones- Construction Engineeri1nspector Engineer I

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

Not Applicable

Buddy Black - Claims Engineer Engineer Ill

Land Surveyor **

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

0.0% 0.0%

0.0% 0.0%

Not Applicable

$00-$00 $00-$00 $00-$00

Technician $0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

$00-$00 $00-$00 $00-$00

(Add pages as necessary)

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

NOTES:

1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.

2. The cost proposal format shall not be amended.

3. Billing rate= actual hourly rate * (1+ ICR) * (1+ Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultants annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.

4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.

SAMPLE COST PROPOSAL 2

SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS)

(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)

Consultant ___________________ □ Prime Consultant □ Subconsultant

Project No. __________ _ Contract No.

Date _________

SCHEDULE OF OTHER DIRECT COST ITEMS (Add additional pages as necessary) Description of Item Quantity Unit Unit Cost Total

Subconsultant 1:

Subconsultant 2:

Subconsultant 3:

Subconsultant 4:

Subconsultant 5:

Note: Add additional pages if necessary.

NOTES:

1. List other direct cost items with estimated costs. These costs should be competitive in their respective industries and supported with appropriate documentation.

2. Proposed ODC items should be consistently billed regardless of client and contract type.

3. Items when incurred for the same purpose, in like circumstance, should not be included in any indirect cost pool or in the overhead rate.

4. Items such as special tooling, will be reimbursed at actual cost with supporting documentation (invoice).

5. Items listed above that would be considered "tools of the trade" are not reimbursable as other direct cost

6. Travel related costs should be pre-approved by the contracting agency and shall not exceed current State Department of Personnel Administration rules.

7. If mileage is claimed, the rate should be properly supported by the consultant's calculation of their actual costs for company vehicles. In addition, the miles claimed should be supported by mileage logs.

8. If a consultant proposes rental costs for a vehicle, the company must demonstrate that this is its standard procedure for all of their contracts and that they do not own any vehicles that could be used for the same purpose.

9. The cost proposal format shall not be amended. All costs must comply with the Federal cost principles.

10. Add additional pages if necessary.

11. Subconsultants must provide their own cost proposals.

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 2

Certification of Direct Costs:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:

7. Generally Accepted Accounting Principles (GAAP)

8. Terms and conditions of the contract

9. Title 23 United States Code Section 112 - Letting of Contracts

10. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures

11. 23 Code of Federal Regulations Part 172 - Procurement, Management, and

Administration of Engineering and Design Related Service

12. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)

All costs must be applied consistently and fair1y to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.

Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Prime Consultant or Subconsultant Certifying:

Name: ______________ _ Title*:

Signature: _ Date of Certification (mm/dd/yyyy):

Email: Phone Number: __________ __

Address:

* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

List services the consultant is providing under the proposed contract:

https://www.gpo.gov/fdsys/pkg/USCODE-2011-title23/pdf/USCODE-2011-title23-chap1-sec112.pdf http://www.ecfr.gov/cgi-bin/text-idx?SID=7d7984e723af183358e1cb797a78877f&mc=true&node=sp48.1.31.31_12&rgn=div6 http://www.ecfr.gov/cgi-bin/text-idx?rgn=div5&node=23:1.0.1.2.3 https://www.gpo.gov/fdsys/pkg/CFR-2010-title48-vol7/xml/CFR-2010-title48-vol7-part9904.xml

SAMPLE COST PROPOSAL 3

COST PER UNIT OF WORK CONTRACTS

(GEOTECHNICAL AND MATERIAL TESTING)

Note: Mark-ups are Not Allowed □ Prime Consultant □ Subconsultant □ 2nd Tier Subconsultant

Consultant __________________ _

Project No. _________ _ Contract No.

Date

Unit/Item of Work:

(Example: Log of Test Boring for Soils Report, or ADL Testing for Hazardous Waste Material Study} Include as many Items as necessary.

DIRECT LABOR Hours Billing Hourly Rate {$) Total{$)

Professional {Classification)*

Sub-professional/Technical**

EQUIPMENT 1 {with Operator)

EQUIPMENT 2 {with Operator)

Consultant's Other Direct Costs (ODC)- Itemize:

Description of Item Quantity Unit Unit Cost Total

Subconsultant 1:

Subconsultant 2:

Subconsultant 3:

Subconsultant 4:

Subconsultant 5:

Nole: Attach addtllonal pages if necessary.

TOTAL COST PER UNIT OF WORK

NOTES:

1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**) . All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. The cost proposal format shall not be amended.

2. Hourly billing rates should include prevailing wage rates and be consistent with publicly advertised rates charged to all clients (Commercial, Private or Public).

3. Mobilization/De-mobilization is based on site location and number and frequency of tests/items.

4. ODC items shall be based on actual costs and supported by historical data and other documentation.

5. ODC items that would be considered "tools of the trade' are not reimbursable.

6. Billing Hourly Rates must be actual, allowable, and reasonable.

SAMPLE COST PROPOSAL

Sample Only - Required Cost Proposal Template To Be Determined By Agency

SAMPLE COST PROPOSAL 3

Certification of Direct Costs:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal{s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:

13. Generally Accepted Accounting Principles {GAAP)

14. Terms and conditions of the contract

15. Title 23 United States Code Section 112 - Letting of Contracts

16. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures

17. 23 Code of Federal Regulations Part 172 - Procurement, Management, and

Administration of Engineering and Design Related Service

18. 48 Code of Federal Regulation Part 9904 - Cost Accounting Standards Board {when applicable)

All costs must be applied consistently and fair1y to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.

Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Prime Consultant or Subconsultant Certifying:

Name:_______________ Title*: _______________

Signature: _____________ _ Date of Certification {mm/dd/yyyy...._ : __

Email: _______________ Phone Number,_,_: _ _ _ _ _ _ _ _ _ _

Address:

* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

List services the consultant is providinq under the proposed contract:

https://www.gpo.gov/fdsys/pkg/USCODE-2011-title23/pdf/USCODE-2011-title23-chap1-sec112.pdf http://www.ecfr.gov/cgi-bin/text-idx?SID=7d7984e723af183358e1cb797a78877f&mc=true&node=sp48.1.31.31_12&rgn=div6 http://www.ecfr.gov/cgi-bin/text-idx?rgn=div5&node=23:1.0.1.2.3 https://www.gpo.gov/fdsys/pkg/CFR-2010-title48-vol7/xml/CFR-2010-title48-vol7-part9904.xml

Blank Page

RF:
C1:
D1:
DLN3:
DLN4:
DLH4:
DLAHR4:
DLT4: 0
a: 0
b:
c: 0
h:
i: 0
k: 0
U2:
Q4:
U4:
SC33:
SC44:
m: 0
n: 0
TC: 0
PC: Off
Sc: Off
2TS: Off
CN:
H1PN:
DLCT1:
DLCT2:
DLCT3:
DLCT4:
DLN1:
DLN2:
DLH1:
DLH2:
DLH3:
DLAHR1:
DLAHR2:
DLAHR3:
DLT1: 0
DLT2: 0
DLT3: 0
e: 0
l: 0
SC11:
SC1:
SC22:
SC2:
d:
f:
g: 0
j: 0
FFR:
I1: Mileage Costs
Q1:
U1:
UC1:
H1T1: 0
I2: Equipment Rental and Supplies
Q2:
UC2:
H1T2: 0
I3: Permit Fees
Q3:
U3:
UC3:
H1T3: 0
I4: Plan Sheets
UC4:
H1T4: 0
I5: Test
Q5:
U5:
UC5:
H1T5: 0
SC3:
SC4:
N1:
T1: 0
DOC:
Email:
PN:
Addr:
LS:
C2:
PC2: Off
Sc2: Off
2TS2: Off
H2PN2:
CN2:
PA2:
D2:
C3:
PC3: Off
Sc3: Off
H2PN3:
D3:
CN3:
H2I1: Mileage Costs
H2Q1:
H2U1:
H2UC1:
H2T1: 0
H2I2: Equipment Rental and Supplies
H2Q2:
H2U2:
H2UC2:
H2T2: 0
H2I3: Permit Fees
H2Q3:
H2U3:
H2UC3:
H2T3: 0
H2I4: Plan Sheets
H2Q4:
H2U4:
H2UC4:
H2T4: 0
H2I5: Test
H2Q5:
H2U5:
H2UC5:
H2T5: 0
H2I6: Vehicle
H2Q6:
H2U6:
H2UC6:
H2T6: 0
H2S1:
H2SC1:
H2S2:
H2SC2:
H2S3:
H2SC3:
H2S4:
H2SC4:
H2S5:
H2SC5:
N2:
T2: 0
DOC2:
Email2:
PN2:
Addr2:
LS2:
H3C3:
H3PC3: Off
H3Sc3: Off
2TS3: Off
H3D3:
H3CN3:
H3PN3:
DL3:
DL2:
DL1:
DL6:
DL5:
DL4:
DL9:
DL8:
DL7:
DL12:
DL11:
DL10:
H3I1: Mileage Costs
H3Q1:
H3U1:
H3UC1:
H3T1: 0
H3I2: Equipment Rental and Supplies
H3Q2:
H3U2:
H3UC2:
H3T2: 0
H3I3: Permit Fees
H3Q3:
H3U3:
H3UC3:
H3T3: 0
H3I4: Plan Sheets
H3Q4:
H3U4:
H3UC4:
H3T4: 0
H3I5: Test
H3Q5:
H3U5:
H3UC5:
H3T5: 0
H3S1:
H3SC1:
H3S2:
H3SC2:
H3S3:
H3SC3:
H3S4:
H3SC4:
H3S5:
H3SC5:
TCPUOW:
N3:
T3: 0
DOC3:
Email3:
PN3:
Addr3:
LS3:

File details come from the government source that posted it. Updated .