Sample_Change_Order.pdf

PDF 73 KB Posted

Attached to
Reconstruct Airport Perimeter Fence Phase 2-PIE
Solicitation number
26-0618-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is a Change Order document related to the Reconstruct Airport Perimeter Fence Phase 2-PIE project at St. Pete-Clearwater International Airport in Florida. The change order modifies the original contract terms for the replacement of vulnerable portions of existing fencing and gates with 8-foot tall prefabricated, non-scalable fencing topped with razor wire and wildlife deterrent skirts at the base. The document outlines modifications to the scope of work, scheduling, or other contract elements from the original agreement, establishing revised project specifications and requirements for the fence replacement work designed to enhance safety and security of the Air Operations Area.

The change order establishes revised terms and conditions for the fencing project, including any modifications to pricing, timeline adjustments, scope clarifications, or additional work requirements. This document serves as a binding amendment to the original contract between St. Pete-Clearwater International Airport and the contractor, ensuring all parties understand the updated project parameters and associated costs or schedule changes necessitated by conditions encountered during the Phase 2 fence reconstruction work.

View the file

Other files

File Type Posted
Reconstruct_Airport_Perimeter_Fence_Phase_2-PIE_(Addendum_#1_Revision).pdf PDF
Reconstruct_Airport_Perimeter_Fence_Phase_2-PIE_(Addendum_#1_Revision).pdf PDF
FENCING_SITE_ACCESS.pdf PDF
Reconstruct_Airport_Perimeter_Fence_Phase_2-_Pre_Bid_Agenda_20260723.pdf PDF
FENCING_SITE_ACCESS.pdf PDF
PIE_AOA_Fence_Replacement_Pre-Bid_Conference_20260723.pptx PPTX presentation
Site_visit_sign-in_26-0618.pdf PDF
PIE_AOA_Fence_Replacement_Pre-Bid_Conference_20260723.pptx PPTX presentation
Reconstruct_Airport_Perimeter_Fence_Phase_2-_Pre_Bid_Agenda_20260723.pdf PDF
Site_visit_sign-in_26-0618.pdf PDF
Reconstruct_Airport_Perimeter_Fence_Phase_2-PIE.pdf PDF
#006158A_PIE_AOA_Fence_Replacement_P2_Bid_Specs.pdf PDF
Sample_Application_for_Payment.pdf PDF
Tierra_Report_PIE_AOA_Fence_Replacement_Phase_II.pdf PDF
#006158A_PIE_AOA_Fence_Replacement_P2_Bid_Plans.pdf PDF
Title_VI.pdf PDF
4.26.Performance_and_Payment_Bonds.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
Foreign_Countries_of_Concern_Affidavit_02.05.2025_(1).pdf PDF
Pricing_Proposal_26-0618(reference_only).pdf PDF
SBE_Compliance_Form.pdf PDF
Agreement-26-0618.pdf PDF
Common_Carrier_Attestation_02.05.2025.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
Human_Trafficking_Affidavit_02.05.2025_(3).pdf PDF
E-Verify_Affidavit.pdf PDF
BID_TAB_-_PRICING_TABLE_(FOR_REFERENCE_ONLY).pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Airport_Security_Program.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX 2 – SAMPLE CHANGE ORDER

APPENDIX 2 – SAMPLE CHANGE ORDER

SAMPLE CHANGE ORDER

PINELLAS COUNTY PURCHASING DEPARTMENT

CLEARWATER, FLORIDA

FISCAL NO. CHANGE ORDER NO.

ACCOUNT NO.

TO Total Agreement $

FOR Addition $

IN CONNECTION WITH New Total $

Deletion $

New Total Agreement $

Execution by the contractor of this Change Order shall be considered a waiver of all claims or request for additional time or compensation for any activities prior to time of execution related to items included in the Change Order. The contractor also acknowledges that payment authorized by this Change Order represents full and complete compensation for labor, materials, incidental expenses, overhead profit, impact cost, and time associated with this Work. Claim procedures are outlined in the Contract documents.

Investigator

Director of Purchasing APPROVED AS TO FORM: Accepted this day of

OFFICE OF COUNTY ATTORNEY 20

By PINELLAS COUNTY Attorney BOARD OF COUNTY COMMISSIONERS

By Chairman

Attest: KEN BURKE, CLERK By

Deputy Clerk

Use Authorized Signatures Only Company

By Title

Witness

File details come from the government source that posted it. Updated .