Non-Competitive_Oversight_Committee_Justification_Form.docx

DOCX document 22 KB Posted

Attached to
Reconstruct Airport Perimeter Fence Phase 2-PIE
Solicitation number
26-0618-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is a Non-Competitive Oversight Committee Justification Form for the St. Pete-Clearwater International Airport's Reconstruct Airport Perimeter Fence Phase 2 project in Florida. The project involves enhancing safety and security of the Air Operations Area by replacing vulnerable portions of existing fencing and gates with 8-foot tall prefabricated, non-scalable fencing topped with razor wire and wildlife deterrent skirt at the base. The new fencing will match the existing fencing installed during the Phase 1 project completed in 2025. The work includes removing and replacing existing fencing and gates at various locations throughout the airport perimeter to prevent unauthorized access by people and wildlife.

The form justifies the use of non-competitive procurement methods for this project. This procurement approach indicates that the airport has determined there are specific circumstances warranting direct award or limited competition rather than open competitive bidding. The justification likely relates to the need for consistency with Phase 1 materials and specifications, continuity of contractor expertise, or other operational factors specific to airport security infrastructure requirements.

View the file

Other files

File Type Posted
Reconstruct_Airport_Perimeter_Fence_Phase_2-PIE_(Addendum_#1_Revision).pdf PDF
Reconstruct_Airport_Perimeter_Fence_Phase_2-PIE_(Addendum_#1_Revision).pdf PDF
FENCING_SITE_ACCESS.pdf PDF
PIE_AOA_Fence_Replacement_Pre-Bid_Conference_20260723.pptx PPTX presentation
Site_visit_sign-in_26-0618.pdf PDF
PIE_AOA_Fence_Replacement_Pre-Bid_Conference_20260723.pptx PPTX presentation
Reconstruct_Airport_Perimeter_Fence_Phase_2-_Pre_Bid_Agenda_20260723.pdf PDF
Reconstruct_Airport_Perimeter_Fence_Phase_2-_Pre_Bid_Agenda_20260723.pdf PDF
Site_visit_sign-in_26-0618.pdf PDF
FENCING_SITE_ACCESS.pdf PDF
Reconstruct_Airport_Perimeter_Fence_Phase_2-PIE.pdf PDF
#006158A_PIE_AOA_Fence_Replacement_P2_Bid_Specs.pdf PDF
Sample_Application_for_Payment.pdf PDF
Sample_Change_Order.pdf PDF
Tierra_Report_PIE_AOA_Fence_Replacement_Phase_II.pdf PDF
#006158A_PIE_AOA_Fence_Replacement_P2_Bid_Plans.pdf PDF
Title_VI.pdf PDF
4.26.Performance_and_Payment_Bonds.pdf PDF
Agreement-26-0618.pdf PDF
Common_Carrier_Attestation_02.05.2025.pdf PDF
Florida_Trench_Safety_Form.pdf PDF
Human_Trafficking_Affidavit_02.05.2025_(3).pdf PDF
Foreign_Countries_of_Concern_Affidavit_02.05.2025_(1).pdf PDF
Pricing_Proposal_26-0618(reference_only).pdf PDF
SBE_Compliance_Form.pdf PDF
Affdavit_of_Release_and_Guarantee.pdf PDF
E-Verify_Affidavit.pdf PDF
Airport_Security_Program.pdf PDF
BID_TAB_-_PRICING_TABLE_(FOR_REFERENCE_ONLY).pdf PDF
Bid_Submittal_Form-JOC.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NON-COMPETITIVE OVERSIGHT COMMITTEE JUSTIFICATION FORM

Project/Purchase Name:

Total Budget Estimate:

Duration of engagement:

Project Manager:

Requisitioning Department:

Justification for non-compete purchase:

Was this vendor utilized on prior contracts? Please explain background:

Non-Competitive Oversight Committee
Approved at meeting
1) Merry Celeste
Yes: No:
2) Don Crowell
Yes: No:
3) Chris Rose
Yes: No:
4) Department ACA
Yes: No:

Rev. 05/05/2023

File details come from the government source that posted it. Updated .