Salient Characteristics.pdf
PDF 130 KB Posted
- Attached to
- Equipment Racks -19CABS
- Solicitation number
- FA446026Q0026
About this file
This document is a Statement of Work (SOW) for the reconfiguration of an IPE Warehouse facility over a 150-day period of performance.
Phase 1 (Demolition and Relocation) requires removal of 180 linear feet of Industrial Grade Guide/Guard Rails with concrete anchors, removal of 6 bollards with concrete floor repair, disassembly of 180 linear feet of existing Pallet Racks (132 positions, 3 levels, 20 feet tall), grinding flush and sealing of old floor anchors, precise layout of the new warehouse configuration to accommodate an additional pallet rack row, and relocation and reinstallation of removed items to OSHA standards with replacement bollards.
Phase 2 (Installation) includes precise layout of the warehouse configuration for four new pallet rack rows, installation of new Pallet Racks (390 linear feet with 254 positions across 3-4 levels) to OSHA standards with required fire safety spacers, installation of 24 bollards (5.5" O.D., 42" tall, Safety Yellow with Black caps), and installation of 390 linear feet of Industrial Grade Guide/Guard Rails (4"x4"x1/2" Angle, painted Safety Yellow) with countersunk mounting holes at joints. Pallet Rack Specifications mandate Husky Brand welded racks in gray color matching existing inventory, with three height levels (22 feet, 16 feet, and 12 feet), specific stanchion quantities (25, 9, and 10 respectively), 42-inch widths, support beams rated at 9100 lbs (5.5"x108") and 6100 lbs (6.0"x168"), and galvanized wire mesh decks (2.5x4 X 6 Gauge) with 3000+ lb capacity. All steel must be US-sourced to ensure quality and safety standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor:
The entire IPE Warehouse is going to have to be reconfigured. In order to do this the following actions must happen:
Period of Performance:
Period of performance shall be 150 days from execution.
Phase 1:
1. Remove 180’ of Industrial Grade Guide/Guard Rails with extensions anchored into concrete
2. Remove 6 bollards and repair concrete floor in aisles to prevent damage to wheels of material handling equipment
3. Disassemble 180’ of Pallet Racks 180’ (2 runs of 90’, 3 levels, 48” deep and 20’ tall {132 positions})
4. Removing old floor anchors from pallet racks and 180’ of Industrial Grade Guide/Guard Rails with extensions. They should be ground flush and sealed over in aisles to prevent damage to wheels of material handling equipment.
5. Layout new warehouse configuration. This must be very precise with no room for error to accommodate the installation of another Pallet Rack row.
6. Relocate and reinstall items from item #1,2, and 3 to OSHA standards (Note Bollards will have to be replaced)
Phase 2:
1. Layout new warehouse configuration. This must be very precise with no room for error to accommodate the installation of 4 new Pallet Rack rows.
2. Install new Pallet Racks (390’ {254 pallet positions} 3 to 4 levels to OSHA standards. Note Spacers required between rows for fire safety
3. Install 24 each 5.5” O.D. Bollards (42” tall) Bollards to for all new Pallet Racks to OSHA standards. Color is Safety Yellow with Black caps
4. Install new 390’ of Industrial Grade Guide/Guard Rails (4”x4” x1/2” Angle painted safety yellow) with guard extensions where applicable to OSHA standards. Rails must have countersunk mounting holes at each joint to prevent damage to Material Handling Equipment (Warehouse Turret Trucks, Lifts, etc)
Pallet Racks:
1. Must be Husky Brand and match existing (OSHA)
2. Must be welded
3. 3 different height levels of pallet racks (22’, 16’, and 12’)
4. Stanchions required are 25 each of the 22’ / 9 each of the 16’ / 10 each of 12’
5. All racks will be 42” Wide
6. Support Beams (5.5” x 108”) Must be rated at 9100 lbs or greater
7. Support Beams (6.0” x 168”) Must be rated at 6100 lbs or greater
8. Wire Decks must be Mesh and Gauge 2.5x4 X 6 Gauge-192 Galvanized Wire and
Capacity 3000 or greater
9. Color: Gray (to match existing shelving)
10. US Steel is a must. American steel generally has lower oxidation levels and higher strength, whereas some foreign imports, particularly from China, have been associated with safety hazards like boron-induced cracking.