Salient Characteristics.doc

DOC document 77 KB Posted

Attached to
Synopsis for fabrication of quantity 100 aluminum 120-millimeter (mm) sabots
Solicitation number
W911QX-24-Q-0301
Issued by

About this file

This document is a Salient Characteristics specification for the fabrication of 100 aluminum 120-millimeter sabots. The key details are:

The Government requires the fabrication of 100 aluminum 120-millimeter sabots per the specifications provided in the attached drawings. The contractor shall use 7075-T6 aluminum in either a 3-petal or 4-petal configuration, and assemble the sabots around the penetrator per the provided drawings. The first lot of 20 sabots shall be delivered within 60 days of contract award, with the remaining 80 delivered within 120 days. The Government will inspect the first lot at the contractor's facility to ensure proper fit with the penetrator. Shipping and handling to Aberdeen Proving Ground, MD is required.

View the file

Other files

File Type Posted
Attachment 2 - ARL TF 20240801.pdf PDF
Drawing - 28084184_a.pdf PDF
Synopsis (Competitive).docx DOCX document
Attachment 1 - ARL TF 20240701.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Salient Characteristics for Non-Commercial Supply Signature (typed name):

Brett Sorensen Technical Point of Contact (TPOC)

The Government requires the fabrication of aluminum sabots, in accordance with the below minimum specifications:

1. The Contractor shall fabricate quantity (qty) 100 aluminum 120-milimeter (mm) sabots per the specifications provided by the Government in drawing #28084184.

· The Contractor shall use 7075-T6 aluminum in either a three (3)-petal or four (4)-petal configuration.

· Each sabot set shall assemble around the penetrator in accordance with (IAW) drawing Attachment 1 - #ARL‑TF‑20240701 as detailed in drawing Attachment – 2 - #ARL‑TF‑20240801 provided by the Government.

2. The Contractor shall deliver the first lot of qty 20 no later than 60 days after contract award.

· The Government will perform an inspection at Contractors facility to determine proper fit with the penetrator IAW drawing Attachement 1 - #ARL‑TF‑20240701 as detailed in drawing Attachment 2 - #ARL‑TF‑20240801 prior to delivery.

· The Government will furnish solid models to the Contractor, via solidworks files or a neutral format file, in addition to penetrators for inspection.

3. The remaining qty of 80 shall be delivered no later than 120 after contract award. Multiple lot delivery is acceptable.

4. An inspection report shall be included with each delivery.

5. Shipping and handling to Aberdeen Proving Ground (APG), MD 21005 shall be included.

Contracting Officer:

Template last updated 07/28/2016

File details come from the government source that posted it. Updated .