This document is the Scope of Work for Project SA+97, which is the Northwest Area Water Supply (NAWS) Pipeline Condition Assessment in Ward and McLean counties, North Dakota. The project involves pressure testing and potential leak repairs for the NAWS main transmission pipeline in these two counties. The work is to be completed by the selected contractor within a 120-day period following the Notice to Proceed. The bid opening date is August 31, 2024, and the contract award is anticipated by September 30, 2024. A mandatory pre-bid meeting is scheduled for August 15, 2024, and site visits can be arranged upon request.
The contract is a fixed-price agreement, and the project is funded by the State of North Dakota. The estimated project value is between $2.5 and $3 million. There are no set-asides or incumbent contractors specified in the document. The contract term is for the duration of the 120-day project, with no renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NAWS+SA+97+Final+IFB+posted.pdf | ||
| SA+97+Addendum+1+7-29-24+Sealed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE
AUDUBON
MAU-04
MAU-01WD
FE
FE
FEFE
FE
FE
FE FE
FE
FE
FE
FE FE FE
VC
ACMUV
BHLQ
4M-6
6M-8
3M-5
5M-7
FILTERNO 4
FILTERNO 3FILTERNO 2
FILTERNO 1
FLOCCULATION
BASIN NO 2FLOCCULATIONBASIN NO 1
DAF BASINNO 2
DAF BASINNO 1
CHEMICALSTORAGE& FEEDROOM
ELECTRICALROOM
CHLORINESTORAGEROOM
INSTRUMENTSHOP &STORAGE
BLOWERROOMMECHANICALROOM
UV REACTORS
232422
G FDNPTSWYXZ
SURGE TANK
TRAIN/CONFROOM
CHLORINEFEEDROOMM
M
MMMM
MM
M
T
T
T
T
T
TT
T
T
T
T
T
T
T
ABCDEFGHJKL
131415
MNPQRSTUV
222324
WXY
Z
1H-3 2H-4
4H-6 3H-5
WD
FE
FE
FEFE
FE
FE
FE FE
FE
FE
FE FE FETectonic Copyright 2007Tectonic Copyright 2007M MMMMM
MM
M
MS-3
S-1S-2
EEW/ES-1TMV-5
EEW-1
EEW-2
F-1
GD-1WB-1
TMV-4S-4
WB-1
TMV-3
ACDEFGH
KL
J
B
MNPQRSTUV
222324
WXY
Z
2665 UP 3865 3920
10859
ELECTRICALROOM109A
CHEMICALSTORAGE& FEEDROOM105
BLOWERROOM120
PROCESSAREA 1101
LABORATORY/OPERATIONS108
CHLORINESTORAGEROOM103
JANITOR111
CHLORINEFEEDROOM102
FEMALERESTROOM115
PROCESSAREA 2116
HALLWAY104
FEMALELOCKERS114
MALELOCKERS112MALERESTROOM113 INSTRUMENTSHOP &STORAGE110
HALLWAY118
MECHANICALROOM119
MAINENTRYHALLWAY106
TRAIN/CONFROOM107
COM/ITROOM109B
KITCHEN107A
OFFICE106A
PROCESSAREA 3117
ENTRYVESTIBULE104A
LAUNDRY110A
3/4"HB-2
3FG
H E D C B A2'-0"TYP.2'-0"TYP.UH-2
UH-1UH-3
UH-4
EF-S3
BDD-S3
EF-S2BDD-S2
EF-S1CD-S1
RR-2RR-1RR-3
LV-S3
LV-S1
LV-S2
2'-0" 6'-10"
1'-2" 1'-2"
4'-3"4'-3"4'-6"4'-6"
10'-0"10'-0" 18"x18" 3'-0"
3FG
H E D C B A
10'-0"TYP.
16'-0"
IN-LINE WATERHEATER H+C
SHOPSINK 4" ACO K100 SLOPED TRENCH DRAIN (TYP.)6" OUTLET6" OUTLET
SLOTTED PLASTICGRATE TYPE 492D(TYP.)
ACO K1-621CATCH BASIN(TYP.)ACO K1-631CATCH BASIN(TYP.) STAINLESS STEELGRATES TYPE 830D ANDTRASH BUCKETS (TYP.)
29'-8"19'-4"19'-4"10'-8"17'-4"10'-8"
19'-8"19'-8"
2" W UP
W
W
W
W W
W W W W WW
W W W W
W
W
W W W W WLAKE
SAKAKAWEA
N A W S
SHEET INDEX
GENERAL:
G-1 COVER & LOCATION MAP
G-2 ABBREVIATIONS & SYMBOLS
CIVIL:
P-1 TO P-3 PIPELINE PLAN SHEETS
C-1 TO C-2 SITE DETAILS
PRS-1 PRESSURE REDUCING STATION
GC-1 TO GC-2 CIVIL DETAILS
CP-1 TO CP-3 CATHODIC PROTECTION DETAILS
LEGEND
NAWS RAW WATER PIPELINE
NAWS RAW WATER PIPELINE IN SERVICE
(NOT IN CONTRACT)
W
W
N
NORTH DAKOTA
NAWS PROJECT
TOWN OF MAX
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
PE-3837
DATE 07/17/2024
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\ G
Sh ee ts .d w g-
G- 2-
7/
/2
:1
AM
-(t pa ul
ABBREVIATIONS AND SYMBOLS
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
JAR
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
G-2
HDPE
HP
FOW
FT
FACE OF WALL
FEET PER SECOND
FEET OR FOOT
HOSE BIBBH/B
BUTTERFLY VALVE
CAPACITY
CENTER TO CENTER
CUBIC FEET PER MINUTE
CUBIC FEET PER SECOND
DOUBLE
DIRECT CURRENT
DETAIL
DIAMETER
DISCHARGE
DOWN OR DECANT
DRAWING
DUCTILE IRON
DIAGONAL
FLG
FLGD
FLR
FMH
FND
FOC
FLANGED
FLOOR
FLEXIBLE METAL HOSE
FOUNDATION
FACE OF CONCRETE
GPM
GRD
GV
GRTG
HDW HARDWARE
HORIZ HORIZONTAL
SECONDARY
SECTION
SIMILAR
S
SCD
SCFM
SEC
SECT
SHT
SIM
SL
SP
SPECS
SPECF
SQ
SS
STA
STC
STD
STL
STRUCT
SUCT
SV
SYM
SYS
STEEL
STRUCTURAL OR STRUCTURE
SUCTION
SOLENOID VALVE
SYMMETRICAL OR SYMBOL
SYSTEM
STATIC PRESSURE
SPECIFICATIONS
SPECIFIED
SQUARE
STATION
SLEEVE-TYPE COUPLING
STANDARD
SCREWED
STANDARD CUBIC FEET PER MINUTE
W W/
WC
WCO
W/O
WP
WSTP
WT
WWF
WWP
WITH
WALL CLEANOUT
WITHOUT
WATER STOP
WEIGHT
WATER WORKING PRESSURE
VACUUM, VALVE, VERTICAL, VENT, VOLT OR VOLUME
VARIES OR VARIABLE
VERTICAL
VOLUME
VENT THROUGH ROOF
V
VAR
VERT
VOL
VTR
R
RCP
RD
RED
REF
RADIUS, RISER, RETURN OR RATE OF SLOPE
REINFORCED CONCRETE PIPE
REDUCER OR REDUCING
REFERENCE OR REFER
PR
PRV
PS
PSF
PSI
PSIA
PSIG
PV
PVC
PAIR
PRESSURE REGULATING, RELIEF OR REDUCING VALVE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH GAUGE
PLUG VALVE
POLYVINYL CHLORIDE
TOP AND BOTTOM
THREAD BOTH ENDS
TEMPORARY BENCH MARK
TOP OF CURB
THICK OR THICKNESS
THREADED
T
TBE
TBM
TC
TEMP
THK
THR'D
TK
TP
TRANS
TSB
TW
TYP
TANK
TELEPHONE POLE OR TELEGRAPH POLE
TRANSITION OR TRANSMITTER
TOP SET BASE
TYPICAL
UNDER-CROSSING
UNDERGROUND CONDUIT
UNDERGROUND ELECTRIC
UNIT HEATER
UNDERWRITERS LABORATORIES
UC
UGC
UGE
UH
UL
PAVEMENT
PRESSURE GAGE
PAVMT
PG
PI
PL
PNEU
PNL
PP
PLT
PLATE, PROPERTY LINE OR PLACE
PNEUMATIC
PANEL
PLANT
INSIDE DIAMETER
INSIDE FACE
INCH
INSULATION OR INSULATED
INSTRUMENT
INTERIOR
IRON PIPE
ID
IF
IN
INSL
INSTR
INT
INV
IP
KILOVOLT
KILOWATT
KILOWATT HOUR
KV
KW
KWH
L
LB
LEV
LG
LT
LWR
POUND
LENGTH OR LONG
LEVEL
LEFT OR LIGHT
LOWER
MANUAL
MAXIMUM
MECHANICAL
MANUFACTURER
MANUFACTURED
MAN
MAX
MECH
MFR
MFR'D
MH
MIN
MISC
MK
MO
MANHOLE
MINIMUM OR MINUTE
MISCELLANEOUS
MARK
MECHANICAL-TYPE COUPLING
MOUNTED
MOUNTING
MATERIAL OR METAL
MOTOR
MTC
MTD
MTG
MTL
MTR
N
NC
NEC
NEMA
NFPA
NF
NG
NIC
NO
NPS
NPT
NS
NTS
NOMINAL PIPE SIZE (FORMERLY I.P.S.)
NEAR SIDE
NOT TO SCALE
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NATIONAL FIRE PROTECTION ASSOCIATION
NEAR FACE
NATURAL GRADE OR NATURAL GAS
NOT IN CONTRACT
NUMBER OR NORMALLY OPEN
OVER-CROSSING OR ON CENTER
OPERATOR OR OPERATING
OC
OD
OF
OPER
OPNG OPENING
HEATER
HAND WHEEL OPERATED
HTR
HWO
CHANGE
CAST IRON PIPE
CONSTRUCTION JOINT
CLEAR
CEMENT MORTAR LINED AND COATED
GALVANIZED
GROOVED FLANGE ADAPTER
GALVANIZED IRON
GLOBE VALVE
GALLONS PER MINUTE
GRADE OR GROUND
GRATING
GATE VALVE
FABR
FE
FABRICATION, FABRICATE OR FABRICATED
FLAT BAR, FLOOR BEAM OR FIELD BOOK
FLOOR DRAIN
FINISHED GRADE
FIRE HYDRANT
FIGURE
FINISHED
FIXTURE
FLEXIBLE
FF
FG
FH
FIG
FIN
FIX
FL
FLEX
EXHAUST
EXISTING
EXTERIOR OR EXTENSION
EXH
EXIST
EXT
EL
ELEC
ENCL
EQ
EQUIP
EW
ELEVATION
ENCLOSURE
EQUAL
EQUIPMENT
EAST
EACH
ECCENTRIC
EACH FACE OR EXHAUST FAN
EA
ECC
EF
EG
ABBREVIATION
ADJUSTABLE
ABBR
APPD
APPROX
ASME
ASTM
AWWA
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AMERICAN SOCIETY FOR TESTING AND MATERIAL
ATMOSPHERE
AIR VACUUM AND AIR RELEASE VALVE
AMERICAN WATER WORKS ASSOCIATION
AMERICAN NATIONAL STANDARDS INSTITUTE (FORMERLY A.S.A.)
APPROVED
APPROXIMATE
BLIND FLANGE
TEMPERATURE OR TEMPORARY
FT. LB FOOT-POUND
FPS
FR
FRP
FRAME
FIBERGLASS REINFORCED PLASTIC
CONC
CONN
CONST
CONT
CONTR
CORRUGATED METAL PIPE
CONCRETE OR CONCENTRIC
CONNECTION
CONSTRUCTION OR CONSTRUCT
CONTINUED OR CONTINUOUS
CONTRACTOR
COMPRESSOR OR COMPRESSION
COUPLING
COUNTERSUNK
CENTER
COMP
CPLG
GALV
GEN
GFA
GI
GLV
DISCH
DN
DWG
DIFF
BLOW-OFF ASSEMBLY
BOTTOM
BELL AND SPIGOT IPS
IRRG
IRON PIPE SIZE
IRRIGATION
CYLINDER
DIRECT CURRENT
JOINTJT
SP STATIC PRESSURE
SWGR SWITCH GEAR
UNO UNLESS NOTED OTHERWISE
FLAT FACE, FINISHED FLOOR, OR FAR FACE
INVERT
LLV LONG LEG VERTICAL
MAT MATERIAL
SCH SCHEDULE
STORM DRAIN
TOC TOP OF CONCRETE
OBJ OBJECT
TO TOP OF
ADDITIONAL
ALUMINUM
ALTERNATING
HORSEPOWER, HIGH POINT OR HIGH PRESSURE
LP LOW POINT
ALTERNATING CURRENT, ASBESTOS CEMENT
ANCHOR BOLT
ALUM
AMERICAN WELDING SOCIETY
BETWEEN CENTERS
CML&C
DIFFERENTIAL
DWLS DOWELS
EACH WAY
ELEV ELEVATION
FAHRENHEIT
FIRE EXTINGUISHER
FLOW LINE
LITER, LENGTH OR ANGLE
LCP LOCAL CONTROL PANEL
LLH LONG LEG HORIZONTAL
MOTOR OPERATED
NATIONAL PIPE THREAD
OUTSIDE DIAMETER
OUTSIDE FACE
POINT OF INTERSECTION
POWER POLE
PRESSURE SWITCH
PC
PT POINT OF TANGENCY
POINT OF CURVATURE
PRESS PRESSURE
PRC POINT OF REVERSE CURVE
QTR QUARTER
ROUND OR ROAD
SOUTH, SECOND OR SLOPE
SD
SHEET
SLOPE
STAINLESS STEEL
SOG SLAB ON GRADE
T&B
TOP OF WALL
TOP TOP OF PIPE
WATER COLUMN
WATER PROOFING OR WORK POINT
WELDED WIRE FABRIC
FOB
FOT
FLAT ON BOTTOM
FLAT ON TOP
AV/AR
BENCH MARK
CENTERLINE
CUBIC
DIRECT BURY
EXISTING GRADE
ELECTRICAL
FLANGE
GENERAL
I&0 INSIDE AND OUTSIDE
TEL TELEPHONE
FO FIBER OPTIC
NOT SURVEYED OR POTHOLED
OHE OVERHEAD ELECTRIC
WATER
UNK UNKNOWN
UG UNDERGROUND
TOP, TELEPHONE
THERMOSTAT, TREAD OF STAIR, TANGENT OR
AIR RELEASE VALVE
LF LINEAL FEET
FLOW CONTROL VALVE
AGGREGATE BASE COURSE
BOOSTER PUMP STATION
DUCTILE IRON PIPE
MECHANICAL JOINTMJ
NORTH PRAIRIE RURAL WATER DISTRICTNPRWD
DUCTILE IRON PIPE SIZE
PE POLYETHYLENE OR PLAIN END
DR DIMENSION RATIO, DRIVE
STANDARD DIMENSION RATIOSDR
WTP WATER TREATMENT PLANT
BNSF BURLINGTON NORTHERN SANTA FE
COUNTY
ELB ELBOW
HIGH DENSITY POLYETHYLENE
QTY QUANTITY
ST STREET
UNDERGROUND CRUDE OILUCO
LVC LENGTH OF VERTICAL CURVE
EVCS END VERTICAL CURVE STATION
EVCE END VERTICAL CURVE ELEVATION
BEGIN VERTICAL CURVE STATION
BVCE
BVCS
BEGIN VERTICAL CURVE ELEVATION
CUBIC YARDS
CENTERLINE
DEPARTMENT OF TRANSPORTATION DOT
SW SALT WATER DISPOSAL
UNDERGROUND TELEPHONEUGT
HDD HORIZONTAL DIRECTIONAL DRILLING
CUBIC FEET
GAGE OR GAUGE
GALLON
GA
GAL
G GAS
RCPA REINFORCED CONCRETE PIPE-ARCHED
DI
DIP
DIPS
AC
ADJ
ADD
ABC
ANSI
ALT
ATM
ARV
BC
BF
BM
AWS
CHG
CIP
CJ
CL
CLR
BO
BOT
CAP
CC
CFM
CFS
B&S
BFV
BPS
CF
CMP
CO
CSK
CTR
CU
DBL
DET
CYL
DC
DB
CY
DIAG
FB
FD
FCV
MJSEB MECHANICAL JOINT SMALL END BELL
REG REGULATING
REINF REINFORCE OR REINFORCED
REQD REQUIRED
RET RETURN
REV REVISION OR REVERSE
RF ROOF OR RAISED FACE
RM ROOM
RO ROUGH OPENING
RPM REVOLUTIONS PER MINUTE
RR RAILROAD
RS RISING STEM
RSC RIGID STEEL CONDUIT
RT RIGHT
ROW RIGHT OF WAY
R/W RIGHT OF WAY
RVC RADIUS OF VERTICAL CURVE
DIA Ø
SSF
CTV
X X
FO
UGT
UGE
OHP
R/W
STS
SS
W
OHP
AF AF
GAS GAS
E
F
AB
SURVEY INFORMATION
HORIZONTAL DATUM: NAD 83
VERTICAL DATUM: NAVD 88
GRID COORDINATE SYSTEM: ND STATE PLANE NORTH ZONE
UNIT OF MEASURE: US SURVEY FEET
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
W
W
W
W W
W
W W
W W W
W
W
W W W W W W W W W W W W W W W
W
STA
TE H
IG
H
W A
Y 23
205TH
A
VE SE
177TH
A
VE SE
135TH
A
VE SE
SEGMENT 1SEGMENT 2
PRS STATION, SEE
SHEETS PRS-1 & C-1.
ELEV. = 1798.2
ARV
BLOWOFF
ELEV. = 1766.86
ARV
ELEV. = 1784.1
ARVARVARVARV
ARV
ELEV. = 1934.30ARV
ARVARV
ARV
ARV
ELEV. = 2174.04ARV
ARV
ARV
ARV
ELEV. = 2214.94
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFFBLOWOFF
BLOWOFFBLOWOFF
BLOWOFF
BLOWOFF
EXISTING RAW WATER LINE
IN SERVICE (NOT IN CONTRACT)
EXISTING SUNDRE PIPELINE
(NOT IN CONTRACT)
SOUTH PRAIRIE RESERVOIR SITE
LOCATION. SEE DETAIL B/C-1
ELEV. = 2100
TRANSITION FROM 36" TO
30" DI RAW WATER PIPELINE
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\ Pl an S he et s - A lig nm en t.d w g-
P- 1-
7/
/2
:1
AM
-(t pa ul
PIPELINE PLAN
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
P-1
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES. CONTRACTOR
IS FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES
WHICH MAY RESULT FROM FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UTILITIES.
NOTE:
- WHEN WORKING WITHIN HWY ROW, CONTRACTOR SHALL NOT PARK,
STORE MATERIALS, OR DISTURB ANY PRIVATE PROPERTY OUTSIDE THE
HWY ROW LINE UNLESS OTHER EASEMENT IS SHOWN.
- CONTRACTOR SHALL NOT BE PERMITTED TO PARK, STORE MATERIALS,
OR WORK OUTSIDE OF THE 60' PERMANENT EASEMENT CENTERED ON THE
PIPELINE.
- SEE SHEET GC-1 FOR INFORMATION ON ARV AND BLOWOFF VAULTS.
- CONTRACTOR SHALL HAVE SOMEONE ON SITE AT ALL TIMES WHEN
PUMPING WATER FROM THE SUNDRE PIPELINE INTO THE PRS STATION.
- CONTRACTOR SHALL CONFIRM AIR RELEASE VALVES ARE OPERABLE
BEFORE FILLING PIPELINE SEGMENT.
FeetScale
N
SEE SHEET P-2
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
ARV
BLOWOFF
BLOWOFF W
W
W
W
WWW
W
W
WWWWW
W
W
WW
W W W W
W W
STA
TE H
IG
H
W A
Y 53
25TH
ST N
W
TOWN OF MAX
C O
U N
TY R
O
A D
24 / STA
TE H
IG
H
W A
Y 53
317TH
A
VE SE 289TH
A
VE SE
SEGMENT 2SEGMENT 3
SEGMENT 3SEGMENT 4
ARVARVARV
ARV
ARV
ARV
ARV
ELEV. = 2169.72
ARV
ARV
ARV
ARVARVARV
ELEV. = 2153.51
ARV
ARV
ARV
ARV
ARV
ARV
ELEV. = 2070.82
BLOWOFFBLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF TRANSFER
BLOWOFF
ELEV. = 2100
EXISTING 36" DI RAW
WATER PIPELINE
HYDRAULIC CONTROL STRUCTURE SITE,
SEE DETAIL A/C-2
ELEV. = 2253
BIOTA WATER TREATMENT
PLANT SITE, SEE DETAIL B/C-2
ELEV. = 2105
ARV
ELEV. = 2213.83
MAU-04
MAU-01
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\ Pl an S he et s - A lig nm en t.d w g-
P- 2-
7/
/2
:1
AM
-(t pa ul
PIPELINE PLAN
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
P-2
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
FeetScale
N
SEE SHEET P-3 SEE SHEET P-1
THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES. CONTRACTOR
IS FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES
WHICH MAY RESULT FROM FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UTILITIES.
NOTE:
- WHEN WORKING WITHIN HWY ROW, CONTRACTOR SHALL NOT PARK,
STORE MATERIALS, OR DISTURB ANY PRIVATE PROPERTY OUTSIDE THE
HWY ROW LINE UNLESS OTHER EASEMENT IS SHOWN.
- CONTRACTOR SHALL NOT BE PERMITTED TO PARK, STORE MATERIALS,
OR WORK OUTSIDE OF THE 60' PERMANENT EASEMENT CENTERED ON THE
PIPELINE.
- SEE SHEET GC-1 FOR INFORMATION ON ARV AND BLOWOFF VAULTS.
- CONTRACTOR SHALL CONFIRM AIR RELEASE VALVES ARE OPERABLE
BEFORE FILLING PIPELINE SEGMENT.
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
BLOWOFF
W
W W
W W
W W
W
W W
W W
W W
W W W
21ST ST N
W
19TH
ST N
W
STA
TE H
IG
H
W A
Y 37
LA
K
E SA
K
A K
A W
EA
LA
K
E A U
D U
B O
N
SEGMENT 4
ARV
ARV
ELEV. = 2008.63
ARV
ARV
ARVARVARV
ARV
ARV
ARV
ARVARV
ELEV. = 1966.47ARV
ARV
ARVARV
ARV
ARV
ARV
ARV
ELEV. = 1930.07
ARV
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
BLOWOFFBLOWOFFBLOWOFFBLOWOFF
BLOWOFF
BLOWOFF
BLOWOFF
ELEV. = 1855.91
EXISTING 36" DI RAW
WATER PIPELINE
TOTTEN TRAIL
CAMPGROUND
SNAKE CREEK PUMPING PLANT
FUTURE INTAKE
DISCHARGE PIPELINE.
UNDER CONSTRUCTION
ISOLATION VAULT
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\ Pl an S he et s - A lig nm en t.d w g-
P- 3-
7/
/2
:1
AM
-(t pa ul
PIPELINE PLAN
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
P-3
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
FeetScale
N
SEE SHEET P-2
THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES. CONTRACTOR
IS FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES
WHICH MAY RESULT FROM FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UTILITIES.
NOTE:
- WHEN WORKING WITHIN HWY ROW, CONTRACTOR SHALL NOT PARK,
STORE MATERIALS, OR DISTURB ANY PRIVATE PROPERTY OUTSIDE THE
HWY ROW LINE UNLESS OTHER EASEMENT IS SHOWN.
- CONTRACTOR SHALL NOT BE PERMITTED TO PARK, STORE MATERIALS,
OR WORK OUTSIDE OF THE 60' PERMANENT EASEMENT CENTERED ON THE
PIPELINE.
- SEE SHEET GC-1 FOR INFORMATION ON ARV AND BLOWOFF VAULTS.
- CONTRACTOR SHALL CONFIRM AIR RELEASE VALVES ARE OPERABLE
BEFORE FILLING PIPELINE SEGMENT.
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
U .S
H
IG
H W
A Y
205TH AVE SW
SE
G
M
EN
T
SEG
M
ENT 1
CX
C
C X C
C X C
C X C
CXC
CXC
C
XC
C X C
C X C
CXC CXC
CX
C
CX
C
CX
C
CX
C
CX
C
CX
C
CXC
CXC
CXC
CXC
CXC
W
W
W
W
W W
W W
W W
W
W
W
W
W
W
W
W
EXISTING 36" DI
RAW WATER PIPELINE
BLOWOFF VAULT
SOUTH PRAIRIE RESERVOIR
SOUTH PRAIRIE FLOW
CONTROL STRUCTURE
U .S
H
IG
H W
A Y
93RD AVE SW
SE
G
M
EN
T
W W W W W
W W
W W
W W
W
W W W W
PRS STATION
SEE SHEET PRS-1
EXISTING SUNDRE PIPELINE
(NOT IN CONTRACT)
EXISTING 30" DI
RAW WATER LINE
EXISTING BLOWOFF VAULT,
CURRENTLY IN USE SUNDRE BACK-PRESSURE
SUSTAINING VALVE VAULT
(NOT IN CONTRACT)
EXISTING NAWS RAW WATER
LINE ALREADY IN SERVICE
(NOT IN CONTRACT)
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\ C
Sh ee ts .d w g-
C- 1-
7/
/2
:1
AM
-(t pa ul
SITE DETAILS
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
C-1
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
B C-1
SOUTH PRAIRIE RESERVOIR SITE
1" = 100'
A C-1
PRESSURE REDUCING STATION (PRS) SITE
1" = 60'
N
NOTES:
- FOR FILLING SEGMENT 1, CONTRACTOR SHALL CONNECT TO EXISTING
BLOWOFF VAULT ASSEMBLY FOR SOURCE OF WATER.
- FOR CONNECTION TO SEGMENT 1, CONTRACTOR SHALL CONNECT TO
EXISTING 2" THREADED PIPE LOCATED INSIDE PRS STATION AS SHOWN ON
SHEET PRS-1.
- ESTIMATED AVAILABLE PUMP SUCTION PRESSURE FROM EXISTING
BLOWOFF VAULT IS 20 PSI.
- CONTRACTOR SHALL HAVE SOMEONE ON SITE AT ALL TIMES WHEN
PUMPING WATER FROM THE SUNDRE PIPELINE INTO THE PRS STATION.
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
STATE HIGHWAY 53
SE
G
M
EN
T
SEG
M
EN
T 4
H
IG
H W
A Y
X X X X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W
W
W
W W
W
W
W
W
W W
BLOWOFF VAULT
BLOWOFF TRANSFER VAULT
BLOWOFF VAULT
BIOTA WATER
TREATMENT PLANT
U .S
H
IG
H W
A Y
SEG
M
ENT 3
SEG
M
ENT 2
W W
W
W
W
W
W W
W W
W
W
W
MILE MARKER 180
1000' SOUTH OF APPROACH
BLOWOFF VAULT
HYDRAULIC CONTROL STRUCTURE
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\ C
Sh ee ts .d w g-
C- 2-
7/
/2
:1
AM
-(t pa ul
SITE DETAILS
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
C-2
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
B C-2
BIOTA WATER TREATMENT PLANT SITE
1" = 150'
A C-2
HYDRAULIC CONTROL STRUCTURE SITE
1" = 100'
N
NOTES:
- THERE IS A CATHODIC PROTECTION TEST STATION AT THE START OF
SEGMENT 3 THAT IS TO BE PROTECTED.
NOTES:
- THE BLOWOFF TRANSFER VAULT IS A MANHOLE WITH TWO SUMP PUMPS
THAT PUMP WATER THROUGH 2" PIPE TO THE BLOWOFF VAULT SOUTH OF
THE RAILROAD TRACKS. AS PART OF THE VAULT CONDITION
ASSESSMENT, THE CONTRACTOR SHALL TEST THE SUMP PUMPS WITH A
PORTABLE GENERATOR.
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
EXISTING 24" TEE WITH BLIND
FLANGE ON TOP AND 2" CENTER
TAP, SEE PHOTO B/PRS-1
24" BUTTERFLY VALVE
TO BE CLOSED
30" DI PIPE
24" DI PIPE
16" BUTTERFLY VALVES
(NORMALLY CLOSED)
36" DI PIPE
24" DI PIPE
16" BUTTERFLY VALVES
(NORMALLY CLOSED)
EXTERIOR DOOR
DOUBLE EXTERIOR DOOR
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\
PR
S- 1.
dw g-
PR
S-
1- 7/
/2
:1
AM
-(t pa ul
PRESSURE REDUCING STATION
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
PRS-1
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
A
PRS-1
PRESSURE REDUCING STATION
NOT TO SCALE
N
B
PRS-1
EXISTING 2" THREADED PIPE
AND BALL VALVE
NOT TO SCALE
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
6' SCH 40 PVC VENT
6' SCH 40 2-90 DEG BENDS
COMBINATION AIR VACUUM/ AIR
RELEASE VALVE WITH SPRAY
INSULATION
PLUG VALVE WITH
HANDWHEEL OPERATOR
30" - 36" DIA
DIP OR STEEL PIPE
(36" DIA. DIP SHOWN)
VA
R
IE
S
7.
6.
30" LIGHT DUTY CAST IRON
MANHOLE FRAME AND LID
AV/AR VALVE ASSEMBLY
SEE DETAIL E/GC-1
GRADED ROCK
8"X18 PERFORATED PIPE SUMP
8.
5'
M
IN
. B U
R Y
RING FLANGE W/ STAINLESS
STEEL NO.9 MESH
8'x10' PRECAST CONCRETE
VAULT, NO BOTTOM
COMBINATION AIR VACUUM/
AIR RELEASE VALVE
8'
ACCESS MANHOLE
ACCESS MANWAY
6' SCH 40 PVC VENT
10'
8"x18" PERFORATED
PIPE SUMP
6'8'
11'
9'
VA
R
IE
S
9' -3
1 2 "
1 2 "
8.
5'
M
IN
B U
R Y
24" GRADED ROCK
COWL
FLANGED AIR-VACUUM AND
AIR RELEASE VALVE
150 LB FLANGED
ECCENTRIC PLUG OR
STEEL BALL VALVE
150LB FLANGED OUTLET LINING
4" BALL VALVE
MANHOLE FRAME AND LID
8"x18" PERFORATED
PIPE SUMP TANGENTIAL OUTLET
FAR SIDE
GRADED ROCK
30" OR 36" DIP OR
STEEL PIPE (36"
DIP SHOWN)
8'x10' PRECAST
CONCRETE VAULT,
NO BOTTOM
SUMP
ACCESS MANHOLE
MANHOLE STEPS
6" BLIND FLANGE w/
1" NPT GLAV STEEL
NIPPLE
1" BALL VALVE
CURB STOP
6" ECCENTRIC PLUG
VALVE
30" OR 36" DIP OR
STEEL PIPE (36"DIP
SHOWN)
6" FLANGED TANGENTIAL
WELDED-ON OUTLET
A
B
SCH 40 PVC
SOIL PIPE 114" DIA STEEL SHAFT
EXTENSION, MACHINE
TO MATCH NUT
2" AWWA SQUARE
OPERATING NUT
BRASS FIREHOUSE COUPLING
w/ CAP AND CHAIN, 6" BELOW
COVER
6" BLIND FLANGE
w/ TAP FOR 3"
STEEL PIPE
12" GRADED
ROCK
6" SCH 40 STEEL PIPE,
EPOXY LINED OR DIP
EQUIVALENT
6" FLANGED TEE
6" SCH 40 STEEL PIPE,
FLANGE x WELDED END, EPOXY LINED OR DIP
EQUIVALENT
1" BALL VALVE CURB
STOP, TAP IN AT BOTTOM
OF BLIND FLANGE
18" CAST IRON MANHOLE
FRAME AND COVER
VALVE STEM EXTENSION
VALVE OPERATOR STEM
SEE DETAIL D/GC-1
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\
GC
S he et s.
dw g-
GC
-1
-7 /1
7/
1:
A M
-(t pa ul
CIVIL DETAILS I
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
GC-1
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
B
GC-1
AIR-VACUUM AND AIR-RELEASE VAULT
NOT TO SCALE
E
GC-1
AIR-VACUUM AND AIR-RELEASE
VALVE ASSEMBLY 4" AND LARGER
NOT TO SCALE
C
GC-1
CAST-IN PLACE VAULT
NOT TO SCALE
PLAN
SECTION
SECTION PLAN
A
GC-1
BLOWOFF ASSEMBLY IN VAULT
NOT TO SCALE
D VALVE OPERATOR STEM
NOT TO SCALE
PLAN
SECTION A
SECTION B
GC-1 NOTES:
- CAST-IN-PLACE VAULTS WERE USED AT HIGH
GROUND WATER LOCATIONS
- VAULT DESIGN FOR HIGH GROUNDWATER
CONDITIONS HAS SAME MECHANICAL LAYOUT AS
B/GC-1 EXCEPT PIPE SUPPORTS WERE REQUIRED
AND FLOOR WAS LOWERED
NOTES:
- PLUG VALVE IS MOUNTED
HORIZONTALLY, BOTTOM DRIVER
AND 2-INCH SQUARE OPERATING NUT
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\
GC
S he et s.
dw g-
GC
-2
-7 /1
7/
1:
A M
-(t pa ul
CIVIL DETAILS II
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
GC-2
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
A
GC-2
TYPICAL DIP TRENCH SECTION
NOT TO SCALE
1' MIN.
BA
C
KF
IL
L
VA
R
IE
S
6"
" F
IN
AL
OUTSIDE EDGE
OF TRENCH
PIPE INSTALLATION NOT
UNDER PAVEMENT OR
STRUCTURE
TR
EN
C H
ZO
N
E
AGGREGATE BASE
UNDER PAVEMENT
OR STRUCTURE
PIPE ZONE
PIPE INSTALLATION UNDER
PAVEMENT. DELETE ASPHALT
IF UNDER GRAVEL ROAD
24" + O.D. (MIN)
6" WIDE MARKER TAPE
LABELED "PIPELINE BURIED BELOW"
2' T
O
6" MIN
12" MIN IN ROCK AREAS
36" + O.D. (MAX)
CONTRACTOR SHALL COMPLY WITH CURRENT OSHA
REGULATIONS CONCERNING TRENCHES.
PRIOR TO INSTALLATION OF PATCH, ALL EDGES OF
EXISTING ASPHALT SHALL HAVE A TACK COAT APPLIED.
ALL SEAMS BETWEEN NEW AND EXISTING PAVEMENT
SHALL BE SEALED WITH AN ASPHALT TACK COAT AFTER
INSTALLATION OF PATCH.
ALL PAVEMENT SECTIONS, INCLUDING AGGREGATE BASE,
SHALL BE PLACED PER APPLICABLE AGENCY STANDARD.
SAW CUTS OF EXISTING PAVEMENT SHALL BE STRAIGHT,
SQUARE AND PARALLEL TO THE TRENCH.
1.
2.
3.
4.
5.
NOTES:
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
TEST STATION (TYP)
CP-901
CP-902
CP-904 CP-905
CP-907
TERMINAL BOARD
MOUNTED INSIDE
TEST STATION
C-919
CONDUIT TO
PIPE, &
REFERENCE
CELL 1 14" RSC
PIPE ZONE
MATERIAL
#4 BAR, ALL
AROUND
FINISHED GRADE
2"
6"
2" CLEARANCE (TYP)
STANDARD METER BOX & LID
OLYMPIC FOUNDARY PART NO
SM29 OR EQUAL
LOCKING BAR
CONCRETE COLLAR
FINISHED GRADE
MARKER POST
(BRADY OR
EQUAL) 18"
BURIAL (MIN)
TEST CABLES
PROVIDE 18"
OF SLACK
LEAD IN BOX
(NO OF CABLES
VARIES)
6"
5" 6"
2' -6
4' (TYP) (TYP)
(T
YP
CP-902
TEST STATION TERMINAL BOARD
IDENTIFICATION
REF
PIPE
CAS
SPAN
REFERENCE CELL
PIPE CABLES
CASING
[N, S, E, W] (DIRECTION OF SPAN CABLES
FROM TEST STATION)
PHENOLIC SHEET
ENGRAVED IDENTIFICATION
4" LETTERS (TYP)
ZINC REFERENCE
ELECTRODE
CABLE
IDENTIFICATION
TEST CABLE (TYP)
SOLDER TYPE
SPADE
CONNECTOR
BRASS BOLT
BRASS
LOCKWASHER
BRASS CUT
WASHER
BRASS NUT
NO OF TERMINALS EQUALS
NO OF TEST CABLES PLUS 1
4"
1' M
IN
1' MIN1' MIN
M
IN
CP-904
INSULATION TEST STATION CABLE INSTALLATION
AHEAD STA BACK STA
CP-911
CP-901
INSULATING
FLANGED JOINTREFERENCE CELL
PLACE AT SPRING
LINE OR BELOW,
4" ± 2" FROM PIPE
CABLE
CONNECTION (TYP)
PIPELINE
#10 XHHW (RED)
#10 XHHW (RED)
#10 XHHW (YELLOW)
#10 XHHW (BLUE)
#10 XHHW (BLUE)
CABLE TO TEST STATION
M
IN
CP-905
CP-901
2-WIRE TEST STATION CABLE INSTALLATION
REFERENCE CELL PLACE AT
SPRING LINE OR BELOW 4" ± 2"
FROM PIPE
PIPELINE
CABLE CONNECTION (TYP)
1.5' (TYP)
CABLE TO TEST STATION
#10 XHHW (BLUE)
#10 XHHW (BLUE)
#10 XHHW (YELLOW)
CP-907
CP-901
REFERENCE CELL
PLACE AT SPRING
LINE OR BELOW,
4" ± 2" FROM PIPE
PIPE
INVERT
PIPELINE
CASING
CABLE
CONNECTION (TYP)
*10 XHHW
CABLE (YELLOW)
M
IN
CABLE TO TEST STATION
2 - #10 XHHW
CABLES (WHITE)
2 - #10 XHHW
CABLES (BLUE)
CASING TEST STATION CABLE INSTALLATION
EXOTHERMIC WELD
PIPELINE TAPE
EXISTING COATING
COPPER SLEEVE
TEST CABLE
PROVIDE 2'-0" MIN
SLACK LOOP
STEEL OR DIMORTAR LINING
BUILD UP WITH SYNTHETIC ELASTOMERIC MASTIC
TO COVER ALL EXPOSED STEEL AND COPPER.
COVER WITH TAPE OVERLAPPING EXISTING
COATING 6" MIN.
CABLE TO PIPE CONNECTION STEEL PIPE
CP-909
FULL FACE INSULATING GASKET
INSULATING SLEEVE (LENGTH EQUAL
TO 116" LESS THAN INSIDE DIMENSION
OF STEEL WASHERS)
INSULATING WASHERS
STEEL WASHERS
FLANGE
NOTES:
1. PROTECTIVE COATING SYSTEM FOR DIP OR STEEP PIPE
REQUIRED.
2. ABOVE GRADE INSULATING FLANGE INSTALLATION SHOWN.
3. FOR BURIED INSULATION FLANGE INSTALLATION, DO NOT
INSTALL INSULATING WASHER ON PROTECTED SIDE OF
INSULATING FLANGE.
4. AFTER ASSEMBLING JOINT, COAT BURIED INSULATING FLANGES
WITH COLD APPLIED, COAL TAR MASTIC AND WRAP WITH A BUTYL
RUBBER ADHESIVE BACKED POLYETHYLENE TAPE.
INSULATING FLANGE JOINT
CP-911
M
IN
CP-914
CP-901
4-WIRE IR SPAN TEST STATION CABLE INSTALLATION
AHEAD STATION OR
BACK STATION AS
NOTED ON PLAN &
PROFILE DRAWINGS.
REFERENCE CELL
PLACE AT SPRING
LINE OR BLOW
4" ± 2" FROM PIPE
CABLE
CONNECTION (TYP)
PIPELINE
"#10 XHHW (YELLOW)
#10 XHHW (BLUE)
#10 XHHW (BLUE)
#10 XHHW (RED)
#10 XHHW (RED)
CONDUIT TO TEST STATION
1.5' (TYP) 1.5'200' BETWEEN LEADS
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\
GC
S he et s.
dw g-
CP
-1
-7 /1
7/
1:
A M
-(t pa ul
CATHODIC PROTECTION DETAILS
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
CP-1
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
CABLE TO PIPE
CONNECTION (TYP)
2-*10, AWG, HMWPE
CABLE. PER JOINT
2-*4, AWG, HMWPE
BONDING CABLE PER
JOINT
2-*10, AWG, HMWPE
CABLE. PER JOINT
FLEXIBLE COUPLING BONDING
EXISTING COATING
FLEXIBLE COUPLING
NOTE:
1. COATING REPAIR NOT SHOWN.
2. PLACE 2-*10 CABLES TO EACH GLAND (ONE SHOWN).
3. ALSO USE FOR REPAIR SLEEVES AND MECHANICAL JOINTS.
CP-912 CP-913
FLEXIBLE COUPLING JOINT COATING
NOTE:
BONDING CABLES REQUIRED, NOT SHOWN FOR CLARITY.
COATING
SYNTHETIC
ELASTOMERIC MASTIC
6"
HEAT-SHRINK SLEEVE1
2" MIN.
EPOXY PER TAPE COAT
SPECIFICATION (TYP)
6"
MORTAR LINING
AC
POWER
CP-920
CATHODIC PROTECTION SCHEMATIC
RECTIFIER
SERVICE SWITCH
ANODE JUNCTION PANELS
DEEP WELL
ANODE
REFERENCE CELL
PIPE
PIPE CABLES
ANODE CABLES
PIPE
REFERENCE CELL
CP-921
POLE MOUNTED RECTIFIER
CP-923
PLASTIC BUSHING
1 1
12" RSC 1-*4 NEGATIVE CABLE
2-*10 STR CABLES
1-*10 REF CELL CABLE
4" x 10'
GROUND ROD
RS TO ANODES
(+) CABLES
* 6 BARE COPPER
16" W x 14" H x 6" DEEP
ANODE JUNCTION
BOX WITH ANODE
JUNCTION
PANEL
RECTIFIER
COMBINATION METER
SOCKET SERVICE SWITCH
M
IN
PE
R
L O
C A
L C
O D
E
PER
LO
C A
L C O
D E
5' -0
M
IN
M
IN
CP-922
VENT PIPE INSTALLATION
PERFORATED PLUG
1" SCH 80 PVC PIPE VENT
SLOPE TO WELL
CP-923
STRSTR ZINC
ANODE CABLES
TO ANODE WELL
ANODE JUNCTION PANEL
CP-926
CABLE IDENTIFICATION
*10 AWG
(WHITE)
*10 AWG
(YELLOW)
.01 OHM, 8 AMP
SHUNT (TYP)
*4 CABLE TO
RECTIFIER (-)
4"x1" COPPER BUS
W/ BRASS STUDS & NUTS
*10 AWG (WHITE)
4"x13"x10" PHENOLIC
JUNCTION PANEL*6 CABLE TO
RECTIFIER (+)
TEST CABLE WITH ENGRAVED
IDENTIFICATION 14" LETTERS
CP-924
CAST IRON ANODE CABLE CONNECTION
EPOXY SEALER
STYROFOAM PLUG
HIGH DENSITY MASTIC SEALER
CABLE BRAZED TO
CONNECTOR INSTALLED
AT CENTER OF ANODE
2 PIECE LEAD STAR
CONNECTOR
HIGH DENSITY MASTIC
SEALER
EPOXY SEALER
TUBULAR ANODE W/ CENTER
CABLE CONN
STYROFOAM CABLE GUIDE
EPOXY SEALER
*8 ANODE CABLE
2" 2"
2" X"
2" 4"
1" X"
NOTES:
ALL COMPONENTS IN THE CATHODIC PROTECTION CIRCUIT
SHALL BE COPPER OR COPPER ALLOY UNLESS SPECIFIED
OTHERWISE.
ALL CABLE CONNECTIONS TO STEEL OR DUCTILE IRON STRUCTURES
SHALL BE EXOTHERMIC WELDED WITH SEPARATE WELDS AT EACH
CABLE OR WIRE CONNECTION.
1.
2.
3.
4.
JOINT BONDS SHALL BE PROVIDED AT ALL NON-WELDED PIPELINE
JOINTS OR VAULT CONTINUITY BONDS AS NECESSARY TO ENSURE
ELECTRICAL CONTINUITY EXCEPT WHERE ELECTRICAL ISOLATION IS
NECESSARY. BONDING CABLES FOR PIPE SHALL BE *4 AWG, HMWPE
CABLE, 2 PER JOINT.
BUNDLE CABLES WITH NYLON CABLE TIES. TIE THREE FOOT
ON CENTER, MINIMUM OF TWO TIES.
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\
GC
S he et s.
dw g-
CP
-2
-7 /1
7/
1:
A M
-(t pa ul
CATHODIC PROTECTION DETAILS
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
CP-2
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
ANODE CABLE
CONNECTION
CP-925
CP-924
ANODE INSTALLATION
ANODE
COKE BREEZE
STEEL CLAMP 2 PER
ANODE MIN (TYP)
1" PVC VENT PIPE
SCH 80
8" HOLES DRILL BOTH
SIDES STAGGER 90°,
1" C-C BETWEEN
BOTTOM ANODE AND 12"
ABOVE TOP ANODE
ATTACH ANODE CABLES
TO VENT PIPE WITH 10
WRAPS OF PVC TAPE
1 FT ABOVE AND AT 8 FT
INTERVALS ABOVE TOP
ANODE
ANODE CABLE
CENTERING DEVICE
FORMED FROM FLAT
STEEL (TYP)
(3 PCS 1
16"x1"x16", AT 120°, TOP AND
BOTTOM OF ANODE)
FASTEN TO CONDUIT
WITH STEEL BANDS
10"
VENT PIPE UP TO VENT
CAP INSTALLATION
(T
YP
(T
YP
CP-926
DEEP WELL ANODE INSTALLATION
CP-925
ANODE INSTALLATION
SEE
CP-922
CP-921
CENTERING DEVICE (TYP)
1" PVC VENT PIPE SCH 80
ANODE ELEMENT
NUMBER OF
ANODES = 13
CABLE WRAPPING
(TYP)
COKE BREEZE
SAND
CEMENT GROUT
ANODE CABLES
PLASTIC BUSHING
CONDUIT TO
JUNCTION BOX
ANODE NO. 1
PVC CAP
10"
0'
5' 7'
5' 5'
G R
O U
T
SE
A L
3'
0'
NOTE:
THE EXOTHERMIC WELD CAP SHALL BE A
ROYSTON HANDY CAP IP, OR APPROVED EQUAL.
CP-927
TEST CABLE OR
BOND CABLE
AS REQUIRED
EXOTHERMIC
WELDED CAP
STRUCTURE
COPPER SLEEVE
CABLE TO PIPE CONNECTION DUCTILE IRON PIPE
H:
\J
BN
\3
0\
\3
3_
N
AW
S
Ra w
W at er S
A9 7\
CA
D\
Pl an s\
GC
S he et s.
dw g-
CP
-3
-7 /1
7/
1:
A M
-(t pa ul
CATHODIC PROTECTION DETAILS
Northwest Area Water Supply PROJECT NUMBER: 3553-0097
DESIGNED
DRAWN
CHECKED
DATE
SCALE
AS SHOWN
KM
TP
KM
7/17/2024P: 701.852.7931
Minot
F: 701.858.5655
SHEET
CP-3
NAWS PIPELINE CONDITION
ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
N
R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
Project No. 237-4
NORTHWEST AREA WATER SUPPLY (NAWS)
PIPELINE PROJECT
Contract Documents for
NAWS PIPELINE CONDITION ASSESSMENT
WARD AND MCLEAN COUNTIES, ND
CONTRACT SA NO. 97
JULY 2024
Contract Documents for NAWS Pipeline Condition Assessment
Ward and McLean Counties, ND Contract SA No. 97
North Dakota State Water Commission Project No. 237-4
July 2024
GENERAL and CIVIL:
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision, and that I am a duly Registered Professional Engineer under the laws of the State of North Dakota.
This document was originally issued and sealed by Kevin E. Martin, PE, Registration Number 3837, on July 17th, 2024, and the original documents are stored at Houston Engineering, Inc., 3712 Lockport St Ste A, Bismarck, North Dakota 58503
Kevin E. Martin, PE North Dakota Registration No. 3837
Date: ______________________________
3712 Lockport Street Ste A Bismarck, ND 58503-3700 Phone: (701) 323-0200 Fax: (701) 323-0300 HEI Project No. 3553.0097
N R
O
E
R
G
T
I
H
ST
D
E
A
R
K
E
O
D
TA
PROFESSIONALENGINEER
KEVIN E.
MARTIN
TABLE OF CONTENTS
Northwest Area Water Supply (NAWS) Pipeline Project
NAWS Pipeline Condition Assessment Ward and McLean Counties, ND
Contract SA No. 97 July 2024
DOCUMENT
NO.
TITLE
NO. OF
PAGES
COLOR
BIDDING DOCUMENTS
00430 Bid Bond Form ...................................................................... 2 WHITE
CONTRACT FORMS
00510 Notice of Award ..................................................................... 1 WHITE 00520 Agreement ............................................................................. 7 WHITE 00550 Notice to Proceed .................................................................. 1 WHITE 00610 Performance Bond ................................................................ 3 WHITE 00615 Payment Bond ....................................................................... 3 WHITE
Insurance Certificate.............................................................. 2 WHITE 00620 Application for Payment ......................................................... 4 WHITE
Release of Claims Affidavit ...................................................... 1 WHITE 00625 Certificate of Substantial Completion ..................................... 1 WHITE 00940 Work Change Directive .......................................................... 1 WHITE 00941 Change Order........................................................................ 1 WHITE 00942 Field Order ............................................................................ 1 WHITE
CONDITIONS OF THE CONTRACT
00700 General Conditions ................................................................ 71 GOLDENROD 00800 Supplementary Conditions..................................................... 10 GOLDENROD
DIVISION 01 - GENERAL REQUIREMENTS
01 01 00 Coordination of Work ............................................................... 3 BLUE 01 14 10 Storage and Protection of Materials Delivered ......................... 2 BLUE 01 29 00 Measurement and Payment ..................................................... 2 BLUE 01 33 00 Contractor Submittals ............................................................... 6 BLUE 01 42 19 Reference Standards ............................................................... 2 BLUE 01 50 00 Mobilization .............................................................................. 2 BLUE 01 50 19 Temporary Environmental Controls ......................................... 3 BLUE 01 51 00 Construction Facilities and Temporary Utilities ........................ 3 BLUE 01 77 00 Project Closeout ...................................................................... . 2 BLUE
DOCUMENT
NO.
TITLE
NO. OF
PAGES
COLOR
DIVISION 31 – EARTHWORK
31 25 13 Erosion Control…………………………………………………… 5 WHITE 31 30 00 Excavation and Backfilling for Utilities ...................................... 11 WHITE
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 92 19 Seeding and Mulching…………………………………………… 6 WHITE
DIVISION 33 – UTILITIES
33 92 20 Ductile Iron Pipe and Fittings……………………………………. 8 WHITE 33 94 20 Water Pipeline Testing and Disinfection................................... 3 WHITE 33 98 10 Cathodic Protection Systems……………………………………. 13
APPENDIX “A” ATTACHMENTS
A.1 NDSWC/USBR Environmental Commitments and FONSI ....... YELLOW A.2 Contractor-Landowner Agreement Form .................................. YELLOW A.3 Landowner-Tenant Release Form ............................................ YELLOW A.4 Pressure Test Form .................................................................. YELLOW
BIDDING
DOCUMENTS
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address): North Dakota State Water Commission
1200 Memorial Highway Bismarck, ND 58504-5262
BID
Bid Due Date: July 30, 2024, 2:00 P.M.
Description (Project Name— Include Location): NAWS Pipeline Condition Assessment, Ward and McLean
Counties, ND
BOND
Bond Number:
Date:
Penal sum $ (Words) (Figures) Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.
Prepared by the Engineers Joint Contract Documents Committee.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length.
If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
CONTRACT
FORMS
EJCDC® C-510, Notice of Award.
Prepared and published 2013 by the Engineers Joint Contract Documents Committee.
NOTICE OF AWARD
Date of Issuance:
Owner: North Dakota State Water Commission Owner's Contract No.: 237-4
Engineer: Houston Engineering, Inc. Engineer's Project No.: HEI-3553-0097
Project: NAWS Pipeline Condition Assessment Ward and McLean Counties, ND
Contract Name: Contract SA No. 97
Bidder:
Bidder’s Address:
TO BIDDER:
You are notified that Owner has accepted your Bid dated ___ ____ for the above Contract, and that you are the Successful Bidder and are awarded a Contract for:
NAWS Pipeline Condition Assessment
The Contract Price of the awarded Contract is: $____ _____, subject to unit prices
Three unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award.
a set of the Drawings will be delivered separately from the other Contract Documents.
You must comply with the following conditions precedent within 15 10 business days of the date of receipt of this Notice of Award:
1. Deliver to Owner three counterparts of the Agreement, fully executed by Bidder.
2. Deliver with the executed Agreement(s) the Contract security [e.g., performance and payment bonds] and insurance documentation as specified in the Instructions to Bidders and General Conditions, Articles 2 and 6.
3. Other conditions precedent (if any):
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions.
Owner: North Dakota State Water Commission
Authorized Signature
By: Dr. Andrea Travnicek
Title: Secretary Copy: Engineer
EJCDC® C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 of 9
AGREEMENT
BETWEEN OWNER AND CONTRACTOR FOR
CONSTRUCTION CONTRACT (STIPULATED PRICE)
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 of 9
Copyright © 2013:
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882 www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474 www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723 www.asce.org
The copyright for this EJCDC document is owned jointly by the three sponsoring organizations listed above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC documents; please direct all inquiries regarding EJCDC copyrights to NSPE.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 of 9
AGREEMENT
BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)
THIS AGREEMENT is by and between North Dakota State Water Commission (“Owner”) and
(“Contractor”).
Owner and Contractor hereby agree as follows:
ARTICLE 1 – WORK
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:
NAWS Pipeline Condition Assessment Ward and McLean Counties, ND
ARTICLE 2 – THE PROJECT
2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows:
The Work includes, but is not limited to, pressure testing the existing ductile iron line as required by the Contract Documents to assess the condition of the existing pipeline for operation and repair of any leaks found during testing. The project is located in Ward and McLean County and begins south of Minot, ND at the existing NAWS PRS Station in the southeast corner of the intersection of US Highway 83 and County Road 16 (93rd Ave SE). The existing pipeline runs south meandering along the east side of US Highway 83 approximately 8 miles to the South Prairie Reservoir. The pipeline then continues south along US Highway 83 another 6 miles to the Hydraulic Control Structure. From there the pipe again continues south on the east side of US Highway 83 approximately 9 more miles to the Biota Water Treatment Plant. Finally, the pipe continues south along the east side of US Highway 83 for approximately 15 miles and terminates at the new isolation vault just south of Totten Trail.
Although permanent easement exists for the pipeline, Contractor shall contact and notify affected landowners prior to entering upon private property when conducting a leak investigation or repair, and coordinate with the landowner for access either using the existing right-of-way or negotiated access using the Contractor-Landowner Agreement Form included as Appendix A.2 of the project Contract Documents.
ARTICLE 3 – ENGINEER
3.01 The Project has been designed by Houston Engineering, Inc.
3.02 The Owner has retained Houston Engineering, Inc. (“Engineer”) to act as Owner’s representative, assume all duties and responsibilities, and have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4 of 9
ARTICLE 4 – CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Contract Times: Dates
A. Bidder agrees that the Work for NAWS Pipeline Condition Assessment will be substantially complete on or before November 30, 2024. All remaining Work will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before June 30, 2025.
B. Parts of the Work shall be substantially completed on or before the following Milestones:
4.03 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with the Contract. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner $500 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $1,200 for each day that expires after such time until the Work is completed and ready for final payment.
3. Liquidated damages for failing to timely attain Substantial Completion and final completion are not additive and will not be imposed concurrently.
4. If more than four (4) leaks are discovered under this contract, Contractor shall be eligible for extension of the dates in paragraph 4.02.
B. Bonus: Contractor and Owner further recognize the Owner will realize financial and other benefits if the Work is completed prior to the time specified for Substantial Completion.
Accordingly, Owner and Contractor agree that as a bonus for early completion, Owner shall pay Contractor $__________ for each day prior to the time specified in Paragraph 4.02 for Substantial Completion (as duly adjusted pursuant to the Contract) that the Work is substantially complete. The maximum value of the bonus shall be limited to $__________.
4.04 Special Damages
A. In addition to the amount provided for liquidated damages, Contractor shall reimburse Owner
(1) for any fines or penalties imposed on Owner as a direct result of the Contractor’s failure to attain Substantial Completion according to the Contract Times, and (2) for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Substantial
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5 of 9
Completion (as duly adjusted pursuant to the Contract), until the Work is substantially complete.
B. After Contractor achieves Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times, Contractor shall reimburse Owner for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Work to be completed and ready for final payment (as duly adjusted pursuant to the Contract), until the Work is completed and ready for final payment.
ARTICLE 5 – CONTRACT PRICE
5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amounts that follow, subject to adjustment under the Contract:
A. For all Work, at the prices stated in Contractor’s Bid, attached hereto as an exhibit.
ARTICLE 6 – PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions.
6.02 Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on a monthly basis or about the _____ day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract.
1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract
a. 90 percent of Work completed (with the balance being retainage). If the Work has been 50 percent completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, there will be no additional retainage; and
b. 90 percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage).
2. Pursuant to North Dakota Century Code (N.D.C.C.) § 48-01.2-13, Contractor shall subtract retainage of ten percent (10%) from all requests for payment for subcontracts until the Project is fifty percent (50%) completed with no further retainage on progress payments during the continuance of the Contract unless unsatisfactory process or performance is documented. Owner may, upon completion of ninety-five percent (95%)
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .